MATERIAIS DE FABRICAÇÃO N POS DESCRIÇÃO 625 5 4" 3 6"x4" 2 12"x6" F7 J9 PF11 1 2 3 1 EL.26318 4 CONTINUA 3418.03/P-C10-602 IS-3418.03-6511-200-TGP-003 5 PI 3418.03610 6 7 255 EL.27279 37 5 81 6 8 17 TUBO PC SC SCH 40, AC API 5L GR B PSL1, CONF ASME B36.10 REDUCAO CONC ESP 0.375" X SCH 40 PC AC ASTM A234 WPB CONF ASME B16.9 REDUCAO CONC SCH 40 PC AC ASTM A234 WPB CONF ASME B16.9 MEIA LUVA 6000# ES AFO ASTM A105 CONF ASME B16.11 CURVA 90 GRAUS RL SCH 40 PC AC ASTM A234 WPB CONF ASME B16.9 LUVA A105, ASME B16.11, 6000#, ESxRO A105 FLANGE PE 300# SCH 40 FR AFO ASTM A105 CONF ASME B16.5 FLANGE PE 300# SCH 40 FR AFO ASTM A105 CONF ASME B16.5 DIAM CODIGO QTDE PESO(Kg) 4 10000014 5.5M 87.05 12 x 6 10553438 1 13.90 6x4 10003588 1 3.70 4 x 3/4 10003518 1 0.31 4 10001852 4 15.60 3/4 12 10891815 10002012 1 1 0.16 63.50 4 10002245 2 22.60 PESO TOTAL FABRICAÇÃO 206.82 MATERIAIS DE MONTAGEM EL.27024 POS DESCRIÇÃO 4 4"x3/4" DIAM CODIGO QTDE PESO(Kg) 12 10515237 1 0.00 4 10182924 4 0.00 1.1/8 10007444 16 0.00 3/4 10007421 8 0.00 3/4 10007421 16 0.00 4 - 1 36.30 4 - 1 9.00 4 - 1 80.00 3/4 - 1 2.00 J10 PF12 9 10 37 5 15 5 16 11 F8 J10 PF13 F8 J10 PF13 14 8 23 12 356 73 J10 13 304 14 15 16 17 JUNTA ESPIR 300# FR ESP 4.4 MM AISI 304 C/ ENCHIM GRAFITE FLEX E ANEIS EXT EM AC E INT EM AISI 304 CONF ASME B16.20 JUNTA ESPIR 300# FR ESP 4.4 MM AISI 304 C/ ENCHIMENTO GRAFITE FLEX E ANEL EXTERNO EM AC CONF ASME B16.20 7 " COMP. PARAFUSO ESTOJO 300# AL ASTM A193 B7 PORCAS EM ASTM A194 2H HEX SERIE PESADA CONF ASME B16.5 7.11/16 " COMP. PARAFUSO ESTOJO 300# AL ASTM A193 B7 PORCAS EM ASTM A194 2H HEX SERIE PESADA CONF ASME B16.5 4.1/2 " COMP. PARAFUSO ESTOJO 300# AL ASTM A193 B7 PORCAS EM ASTM A194 2H HEX SERIE PESADA CONF ASME B16.5 V ESFERA 300# FLG FR AFU ASTM A216 WCB OBTUR AISI 410 SEDE PTFE OPERADA POR ALAVANCA ISO 14313/API6D VAL RETENCAO, WAFER, DUPLA PORTINHOLA, 300#, FR, AC ASTM A216 GR WCB, SEDE VITON TBR-S, API 594 V GLOBO 300# FLG FR AFU ASTM A216 WCB OBTUR E SEDE AISI 410 HARE CA BS 1873 V ESFERA ISO 17292, ES, NIPLE SCH 160, 800#, AC ASTM A105, SEDE PEEK, OBTUR AISI 410, ALAVANCA 90° PESO TOTAL MONTAGEM 127.30 5 PESO TOTAL 334.12 26 99 1 1 61 25 CONTINUA 3418.03/SFW-A4-005 IS-3418.03-5420-200-LAQ-011 405 1 4" 5 EL.26943 ABREVIATURAS NOTAS GERAIS CONDIÇÕES TEMP.ºC PRESSÃO(Kgf/cm2) PROJETO 60degC 51kgf/cm2 2- SUPORTES DE TUBULAÇÃO PELO CAMPO. OPERAÇÃO 30degC 10kgf/cm2 3- LINHA PROVISÓRIA P/ LIMPEZA DO DUTO PUB-3/AIG TESTE 1- DIMENSÕES EM MM. SALVO INDICAÇÃO CONTRÁRIA. UO-RNCE CLIENTE: 76kgf/cm2 UO-RNCE ISOLANTE TÉRMICO TRATAMENTO TÉRMICO PROGRAMA: AQUECIMENTO A VAPOR AMPLIAÇÃO INJEÇÃO ÁGUA UBARANA AQUECIMENTO ELÉTRICO ÁREA: CAIMENTO PLATAFORMA DE UBARANA 3 CONDIÇÃO DE PINTURA CLASSE DE INSPEÇÃO 3 PASSAGEM DE PISO 29 29 SOLDA DE OFICINA Nº DO ITEM 4 ST-XXX-XXX SOLDA DE CAMPO DESENHOS DE REFERÊNCIA DE-3418.03.-1223-200-PAR-006 N/A TRECHO LINHA NOVA POS. SUPORTE TRECHO LINHA EXISTENTE ISOLAMENTO TRECHO LINHA A REMOVER LINHA PADRONIZAÇÃO DE MATERIAL TÍTULO: DR-ENGP-M-I-1.1_R8 Nº DAS PEÇAS P/ PRÉ-FRABICAÇÃO 0 EMISSAO ORIGINAL. LIB. P/ CONSTRUÇÃO 17/09/19 REV DESCRIÇÃO DATA HUGO EXEC. HUGO ISOMÉTRICO DE TUBULAÇÃO WALMY VERIF. APROV. 4"-P-C10-610 AS INFORMAÇÕES DESTE DOCUMENTO SAO PROPRIEDADE DA PETROBRAS, SENDO PROJ PROIBIDA A UTILIZAÇÃO FORA DA SUA FINALIDADE. EXEC PAR RAZAO SOCIAL PROJETISTA CONTRATADA: Nº DO CONTRATO NOME DO RESPONSÁVEL TÉCNICO: N° ASP ESCALA ASPNº CREA DO RESPONSÁVEL TÉCNICO Nível de Proteção 1 (NP-1) DATA NOME DO ARQUIVO IS-3418.03-1223-200-PAR-002.pdf COD. PROJETO ISOMÉTRICO CLASSIFICAÇÃO 17/09/19 APROV HUGO DOC TIPO S/ ESCALA 3418.03/P-C10-610 VERIF HUGO ORGÃO GESTOR WALMY FOLHA RC-519 1 de PROJ/EPAD NÚMERO IS-3418.03-1223-200-PAR-002 1