BHARAT HEAVY ELECTRICALS LTD. BTG - DPR 26-06-2020 Reporting Date: 27-06-2020 1 CIVIL WORKS Sl. No Structure i ii iii Soil Investigation Bore holes Test pile casting & testing RCC PILES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 iv 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 Unit - I ESP Mill Foundation FD Fan Aux.Boiler Aux.Boiler chimney Boiler ID Fan PA Fan Stator unloading foundation ESP Control Room TG Raft Power House main column& Aux. column(AB CW Pit MPH- Aux. found(BC Bay) Aux.boiler FD Fan A Aux.boiler FD Fan B ID Duct (Near chimeny) Trans. Yard ID Duct (62nos hold) Total Unit - II ESP ID Fan FD Fan Mill Foundation PA Fan Power House CW Pit TG Raft Service Building Stator unloading foundation MPH- Aux. found(AB Bay) ID Duct (Near chimeny) MPH- Aux. found(BC Bay) Trans. Yard DG Building Boiler ID Duct (62nos hold) ESP Control Room Total Grand Total Pile Load Test Unit - I Vertical Load test ESP Boiler Area Mill found. FD fan ID Duct Aux. Boiler TG PA Fan CW Pit ESP Control Room Power House Chimney Fdn. In Aux.Boiler Area ID Duct Fdn. B/W ESP & Chimney ID fan Total Unit - I Lateral Load test ESP Boiler Area Mill found. FD fan ID Duct Aux. Boiler TG PA Fan CW Pit ESP Control Room Power House Chimney Fdn. In Aux.Boiler Area ID Duct Fdn. B/W ESP & Chimney ID fan Total Unit - II Vertical Load Test ESP Boiler Mill found. Power House ID fan ID Duct FD fan Nos Nos 51 27 up to previous day 51 27 Nos Nos Nos Nos Nos Nos Nos Nos nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 665 63 28 69 26 778 54 22 16 97 148 574 77 31 6 6 27 54 382 3123 665 63 28 69 26 778 54 22 16 97 148 574 77 31 6 6 27 54 325 3066 Nos Nos Nos Nos Nos Nos Nos Nos Nos nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 665 54 28 63 22 338 77 148 186 16 140 27 31 72 56 778 382 97 3180 6303 665 54 28 63 22 338 77 148 186 16 140 27 31 72 56 778 320 96 3117 6183 Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 10 12 1 1 6 1 2 1 1 1 8 1 1 1 47 10 11 1 1 6 1 0 1 0 1 8 0 1 1 42 Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 10 12 1 1 6 1 2 1 1 1 8 1 1 1 47 10 12 1 0 3 0 1 1 0 1 4 0 1 1 33 Nos Nos Nos Nos Nos Nos Nos 10 12 1 8 1 6 1 10 10 1 4 1 6 1 UNIT Scope (nos) THIS MONTH Cumulative (May-2020) Today Balance Remarks 51 27 0 0 Completed Completed 665 63 28 69 26 778 54 22 16 97 148 574 77 31 6 6 27 54 325 3066 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed Completed Completed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 665 54 28 63 22 338 77 148 186 16 140 27 31 72 56 778 320 96 3117 6183 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 1 63 120 completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed 62 nos hold 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 11 1 1 6 1 0 1 0 1 8 0 1 1 42 0 1 0 0 0 0 2 0 1 0 0 1 0 0 5 completed 0 0 0 0 0 1 0 0 0 0 0 2 0 0 0 3 10 12 1 0 3 0 1 1 0 1 4 0 1 1 33 0 0 0 1 3 1 1 0 1 0 4 1 0 0 12 completed completed completed 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 10 10 1 4 1 6 1 0 2 0 4 0 0 0 completed 0 Only Hold pile balance completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed BHARAT HEAVY ELECTRICALS LTD. BTG - DPR 26-06-2020 Reporting Date: 27-06-2020 1 CIVIL WORKS Sl. No v Structure 8 9 10 11 12 TG PA Fan ESP Control Room Service Building CW-pit 1 2 3 4 5 6 7 8 9 10 11 12 Unit - II Laterl Load test ESP Boiler Area Mill found. Power House ID fan ID duct FD fan TG PA Fan ESP Control Room Service Building CW-pit Pile Cap & Pedestal Unit - I ESP Pile Cap Pedestal (First Lift) Pedestal (Final Lift) RCC Qty. as on DPR date BOILER UNIT-1(D to k) Pile Cap Pedestal with bolt lift RCC Qty. as on DPR date MILL FOUNDATION Pile Cap Pedestal First Lift Pedestal Final Lift RCC Qty. as on DPR date ID Duct Pile Cap Pedestal 1st Lift RCC Qty. as on DPR date POWER HOUSE Pile Cap Pedestal (Final Lift) RCC Qty. as on DPR date CEP Pit Raft Silos Top raft RCC Qty. as on DPR date CW Pit Pile cap Retaining wall RCC Qty. as on DPR date FD FAN Pile Cap Pedestal 1st Lift Pile cap ( supporting column) RCC Qty. as on DPR date PA FAN Pile Cap Pedestal 1st Lift Pile cap ( supporting column) RCC Qty. as on DPR date ID FAN Pile Cap Pedestal 1st Lift Pile cap ( supporting column) RCC Qty. as on DPR date TG Pile cap Pile Cap Condenser Pedestal RCC Qty. as on DPR date ESP Control Room Pile Cap Column Upto PB RCC Qty. as on DPR date Aux Boiler Pile Cap Pedestal FD Fan Chimney RCC Qty. as on DPR date Trans. Yard Pile Cap & Pedestal RCC Qty. as on DPR date Stator Lifting Fdn. UNIT Scope (nos) up to previous day THIS MONTH Cumulative (May-2020) Today Total Nos Nos Nos Nos Nos Nos 2 1 3 3 1 49 Total Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 10 12 1 8 1 6 1 2 1 2 3 1 48 10 11 0 2 1 1 0 2 1 0 1 0 29 Nos Nos Nos cum 125 180 180 3100 Nos Nos cum Balance Remarks 2 1 2 2 0 40 0 0 1 1 1 8 completed completed 0 0 0 0 0 0 0 10 11 0 2 1 1 0 2 1 0 1 0 29 0 1 1 6 0 5 1 0 0 2 2 1 19 completed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 125 180 133 2979 125 180 133 2979 0 0 47 121 Completed Completed 0 0.00 0 0 4 12 53 83 8320 35 43 5541 0 0 0.00 1 2 473 35 43 5541 18 40 2779 Nos Nos Nos cum 9 18 18 730 7 10 0 305 0 0.00 1 0 0 40 7 10 0 305 2 8 18 425 Nos Nos cum 92 92 1350 16 1 125 0.00 1 0 6.5 16 1 125 76 91 1225 Nos Nos cum 89 106 3500 19 14 960.5 0 0 0.00 6 3 234.5 19 14 960.5 70 92 2539.5 Nos Nos Nos cum 1 3 1 150 0 0 0 0 0.00 0 0 0 0 0 0 0 0 1 3 1 150 Nos Nos cum 2 2 1200 0 0 0 0.00 0 0 0 0 0 0 2 2 1200 Nos Nos Nos cum 2 4 6 235 1 0 0 47 0.00 0 0 0 0 1 0 0 47 1 4 6 188 Nos Nos Nos cum 2 4 6 240 2 0 0 80 0.00 1 0 0 40 2 0 0 80 0 4 6 160 Nos Nos Nos cum 2 4 6 450 2 4 1 289 0.00 0 4 0 79 2 4 1 289 0 0 5 161 Nos Nos cum 1 4 2400 0 0 0 0.00 0 0 0 0 0 0 1 4 2400 Nos Nos cum 22 30 400 0 0 0 0.00 0 0 0 0 0 0 22 30 400 Nos Nos Nos Nos cum 15 28 2 1 750 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 15 28 2 1 750 Nos cum 3 800 0 0 0.00 0 0 0 0 3 800 2 1 2 2 0 40 completed completed completed Completed BHARAT HEAVY ELECTRICALS LTD. BTG - DPR 26-06-2020 Reporting Date: 27-06-2020 1 CIVIL WORKS Sl. No Structure Pile Cap Pedestal RCC Qty. as on DPR date Unit - II ESP Pile Cap Pedestal (First Lift) Pedestal (Final Lift) RCC Qty. as on DPR date BOILER UNIT-2(D to k) Pile Cap Pedestal with bolt lift RCC Qty. as on DPR date MILL FOUNDATION Pile Cap Pedestal First Lift Pedestal Final Lift RCC Qty. as on DPR date ID Duct Pile Cap Pedestal 1st Lift RCC Qty. as on DPR date POWER HOUSE Pile Cap Pedestal with bolt lift RCC Qty. as on DPR date CEP Pit Raft Silos Top raft RCC Qty. as on DPR date CW Pit Pile cap Retaining wall RCC Qty. as on DPR date FD FAN Pile Cap Pedestal 1st Lift Pedestal RCC Qty. as on DPR date PA FAN Pile Cap Pedestal 1st Lift Pedestal RCC Qty. as on DPR date ID FAN Pile Cap Pedestal 1st Lift RCC Qty. as on DPR date TG Pile cap Pile Cap Condenser Pedestal RCC Qty. as on DPR date ESP Control room Pile Cap Column Upto PB RCC Qty. as on DPR date Stator Lifting Fdn. Pile Cap Pedestal RCC Qty. as on DPR date DG Building Pile Cap Column Upto PB RCC Qty. as on DPR date Trans. Yard Pile Cap & Pedestal RCC Qty. as on DPR date Service Building Pile Cap RCC Qty. as on DPR date UNIT Scope (nos) up to previous day THIS MONTH Cumulative (May-2020) Today 0.0 0.00 1 2 75 13373.5 0.00 0 0 0 0 125 180 178 3092.90 0 0 2 7.1 0.00 0 0 0 34 46 6392 19 37 1928 0.00 0 0 0 0 6 12 0 326 3 6 18 404 0.00 2 1 7.5 56 5 511.9 36 87 838.1 0.00 4 0 157 34 13 1592.5 41 78 1907.5 0.00 0 0 0 0 0 0 0 0 1 3 1 150 0.00 0 0 0 0 0 0 2 2 1200 0.00 0 0 0 0 1 1 2 73.5 1 3 4 161.5 0.00 0 1 0 13 2 3 3 125 0 1 3 115 0.00 0 0 0 2 4 272 0 0 178 0.00 0 0 0 0 0 0 1 4 2400 0.00 0 0 0 14 0 133 8 30 267 0.00 0 0 0 0 0 0 1 2 75 95 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 95 Nos cum 4 1000 0 0 0.00 0 0 0 0 4 1000 Total Unit -2 Grand Total Nos cum cum cum 56 600 23845 47545 12 100.3 12474.6 21965.1 0 0.00 0.00 0.00 0 0 177.5 1062.5 12 100.3 12619.1 21965.10 44 499.7 11225.9 24599.4 Total cum cum cum 125000 125000 250000 70627 69635 140262 0 0 0 0 0 0 70627 69635 140262 54373 55365 109738 Total cum cum cum 38000 38000 76000 18680 15634 28203 85 0 85 7900 2330 3144 18765 15634 28288 19235 22366 41601 MT MT MT 12125 12125 12125 6612.11 5481.2 2715.95 0.00 0.00 0.00 0.00 0.00 0.00 6612.11 5481.20 2715.95 5512.89 6643.8 9409.05 Backfilling ESP Unit-1 ESP Unit-2 Nos Nos Nos cum 125 180 180 3100 125 180 178 3092.9 Nos Nos cum 53 83 8320 34 46 6392 Nos Nos Nos cum 9 18 18 730 6 12 0 326 Nos Nos cum 92 92 1350 56 5 511.9 Nos Nos cum 75 91 3500 34 13 1592.5 Nos Nos Nos cum 1 3 1 150 0 0 0 0 Nos Nos cum 2 2 1200 0 0 0 Nos Nos Nos cum 2 4 6 235 1 1 2 73.5 Nos Nos Nos cum 2 4 6 240 2 3 3 125 Nos Nos cum 2 4 450 2 4 272 Nos Nos cum 1 4 2400 0 0 0 Nos Nos cum 22 30 400 14 0 133 Nos Nos cum 1 2 75 0 0 0 Nos Nos cum Remarks 0 0 0 10326.5 Earth Disposal Unit - I Unit - II 1 2 75 23700 Balance 0 0 0 885 Total -Unit#1 Nos Nos cum cum 0 0 0 9490.5 2 Superstructure Unit - 1 i ii iii Structural fabrication(Fit Up) Structural fabrication(Welding) Painting Completed Completed Completed Completed BHARAT HEAVY ELECTRICALS LTD. BTG - DPR 26-06-2020 Reporting Date: 27-06-2020 1 CIVIL WORKS Sl. No Structure UNIT Scope (nos) Superstructure Unit - 2 i ii iii iv Balance 8650 8650 8650 3008 2638 736 0.00 0.00 0.00 0.00 0.00 0.00 3008.00 2638.00 736.00 5642 6012 7914.00 cum cum cum 1658 20.54 152 1575 16.5 46.34 0 0 0 0 0 0 0 1575 16.5 46.34 0 83 4.04 105.66 cum sqm cum 5977.5 19925 9962.5 707 8378 0 0 0 0 0 0 0 707 8378 0 5270.5 11547 9962.5 cum cum cum cum sqm 29302 203.13 560.46 114.31 3256 30179.9 11576.4 45.3335 197.5 30.159 921.2 11849.393 0 0 0 0 0 0.00 0 0 0 0 0 0 11576.4 45.3335 197.5 30.159 921.2 11849.39 17725.6 157.7965 362.96 84.151 2334.8 18330.5075 Superstructure (Civil) Road Works Excavation Preparation of Sub Grade Sub Grade Boundary Wall Excavation Concrete grade M7.5 Concrete grade M30 below FFL Concrete grade M30 above FFL Application of 2 Coats of Bitumen Paint THIS MONTH Cumulative (May-2020) Today MT MT MT Structural fabrication(Fit Up) Structural fabrication(Welding) Painting Field Maintenance Building Excavation PCC RCC up to previous day 3 Others Construction of TANGEDCO site office Building A i) False ceiling work, partition work, plumbing work, floor tiles, plastering works, fixing of AC completed. 4 UNIT 1 & 2 S.NO TOOLS AND PLANTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Concrete Batching Plant - 30Cum / Hr Hydraulic Rotary rig Transit Mixres Cranes JCB Poclain Hydra Dewatering pump Bentonite pump Bentonite tank DG 200KV DG 62KV DG 5KV Welding Machine Barbending machine Bar cutting machine Trailer MIG Welding machine 75 T crane 40 T crane DG 250KV Gantry Crane Compresser Plate bending machine MAN POWER B&R Vijay Gowtham Power Mech Santhos 1 1 4 5 2 4 1 7 5 3 2 2 0 6 2 3 1 1 4 3 1 2 1 6 4 3 1 2 3 6 3 2 TOTAL MANPOWER (Nos) Notes: 1 1 1 6 3 17 2 11 3 1 10 1 1 1 27-06-2020 27 2 2 6 2 3 27 2 2 4 3 2 3 20 2 1 3 1 Skilled Unskilled M/s B&R M/s VIJAY GOWTHAM M/s POWER MECH M/s Santhosh Infra ENABLING WORKS ELECTRICAL WORKS 1 Other 12 2 9 7 0 0 1 Total working at site 66 6 13 17 5 5 112 TOTAL 3 2 9 8 4 7 11 16 9 6 3 4 3 49 5 5 3 21 4 1 3 1 4 1 REMARKS Remarks