1 CIVIL WORKS
Sl.
No
Structure
i
ii
iii
Soil Investigation Bore holes
Test pile casting & testing
RCC PILES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
iv
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
Unit - I
ESP
Mill Foundation
FD Fan
Aux.Boiler
Aux.Boiler chimney
Boiler
ID Fan
PA Fan
Stator unloading foundation
ESP Control Room
TG Raft
Power House main column& Aux. column(AB
CW Pit
MPH- Aux. found(BC Bay)
Aux.boiler FD Fan A
Aux.boiler FD Fan B
ID Duct (Near chimeny)
Trans. Yard
ID Duct (62nos hold)
Total
Unit - II
ESP
ID Fan
FD Fan
Mill Foundation
PA Fan
Power House
CW Pit
TG Raft
Service Building
Stator unloading foundation
MPH- Aux. found(AB Bay)
ID Duct (Near chimeny)
MPH- Aux. found(BC Bay)
Trans. Yard
DG Building
Boiler
ID Duct (62nos hold)
ESP Control Room
Total
Grand Total
Pile Load Test
Unit - I Vertical Load test
ESP
Boiler Area
Mill found.
FD fan
ID Duct
Aux. Boiler
TG
PA Fan
CW Pit
ESP Control Room
Power House
Chimney Fdn. In Aux.Boiler Area
ID Duct Fdn. B/W ESP & Chimney
ID fan
Total
Unit - I Lateral Load test
ESP
Boiler Area
Mill found.
FD fan
ID Duct
Aux. Boiler
TG
PA Fan
CW Pit
ESP Control Room
Power House
Chimney Fdn. In Aux.Boiler Area
ID Duct Fdn. B/W ESP & Chimney
ID fan
Total
Unit - II Vertical Load Test
ESP
Boiler
Mill found.
Power House
ID fan
ID Duct
FD fan
Nos
Nos
51
27
up to
previous
day
51
27
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
665
63
28
69
26
778
54
22
16
97
148
574
77
31
6
6
27
54
382
3123
665
63
28
69
26
778
54
22
16
97
148
574
77
31
6
6
27
54
325
3066
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
665
54
28
63
22
338
77
148
186
16
140
27
31
72
56
778
382
97
3180
6303
665
54
28
63
22
338
77
148
186
16
140
27
31
72
56
778
320
96
3117
6183
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
10
12
1
1
6
1
2
1
1
1
8
1
1
1
47
10
11
1
1
6
1
0
1
0
1
8
0
1
1
42
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
10
12
1
1
6
1
2
1
1
1
8
1
1
1
47
10
12
1
0
3
0
1
1
0
1
4
0
1
1
33
Nos
Nos
Nos
Nos
Nos
Nos
Nos
10
12
1
8
1
6
1
10
10
1
4
1
6
1
UNIT
Scope
(nos)
THIS MONTH
Cumulative
(May-2020)
Today
Balance
Remarks
51
27
0
0
Completed
Completed
665
63
28
69
26
778
54
22
16
97
148
574
77
31
6
6
27
54
325
3066
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
57
57
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
Completed
Completed
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
665
54
28
63
22
338
77
148
186
16
140
27
31
72
56
778
320
96
3117
6183
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
62
1
63
120
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
62 nos hold
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10
11
1
1
6
1
0
1
0
1
8
0
1
1
42
0
1
0
0
0
0
2
0
1
0
0
1
0
0
5
completed
0
0
0
0
0
1
0
0
0
0
0
2
0
0
0
3
10
12
1
0
3
0
1
1
0
1
4
0
1
1
33
0
0
0
1
3
1
1
0
1
0
4
1
0
0
12
completed
completed
completed
0
0
1
0
0
0
0
0
0
0
1
0
0
0
0
1
0
0
0
0
0
0
0
10
10
1
4
1
6
1
0
2
0
4
0
0
0
completed
0
Only Hold pile balance
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
BHARAT HEAVY ELECTRICALS LTD.
BTG - DPR 26-06-2020
Reporting Date: 27-06-2020
1 CIVIL WORKS
Sl.
No
v
Structure
8
9
10
11
12
TG
PA Fan
ESP Control Room
Service Building
CW-pit
1
2
3
4
5
6
7
8
9
10
11
12
Unit - II Laterl Load test
ESP
Boiler Area
Mill found.
Power House
ID fan
ID duct
FD fan
TG
PA Fan
ESP Control Room
Service Building
CW-pit
Pile Cap & Pedestal
Unit - I ESP
Pile Cap
Pedestal (First Lift)
Pedestal (Final Lift)
RCC Qty. as on DPR date
BOILER UNIT-1(D to k)
Pile Cap
Pedestal with bolt lift
RCC Qty. as on DPR date
MILL FOUNDATION
Pile Cap
Pedestal First Lift
Pedestal Final Lift
RCC Qty. as on DPR date
ID Duct
Pile Cap
Pedestal 1st Lift
RCC Qty. as on DPR date
POWER HOUSE
Pile Cap
Pedestal (Final Lift)
RCC Qty. as on DPR date
CEP Pit
Raft
Silos
Top raft
RCC Qty. as on DPR date
CW Pit
Pile cap
Retaining wall
RCC Qty. as on DPR date
FD FAN
Pile Cap
Pedestal 1st Lift
Pile cap ( supporting column)
RCC Qty. as on DPR date
PA FAN
Pile Cap
Pedestal 1st Lift
Pile cap ( supporting column)
RCC Qty. as on DPR date
ID FAN
Pile Cap
Pedestal 1st Lift
Pile cap ( supporting column)
RCC Qty. as on DPR date
TG Pile cap
Pile Cap
Condenser Pedestal
RCC Qty. as on DPR date
ESP Control Room
Pile Cap
Column Upto PB
RCC Qty. as on DPR date
Aux Boiler
Pile Cap
Pedestal
FD Fan
Chimney
RCC Qty. as on DPR date
Trans. Yard
Pile Cap & Pedestal
RCC Qty. as on DPR date
Stator Lifting Fdn.
UNIT
Scope
(nos)
up to
previous
day
THIS MONTH
Cumulative
(May-2020)
Today
Total
Nos
Nos
Nos
Nos
Nos
Nos
2
1
3
3
1
49
Total
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
10
12
1
8
1
6
1
2
1
2
3
1
48
10
11
0
2
1
1
0
2
1
0
1
0
29
Nos
Nos
Nos
cum
125
180
180
3100
Nos
Nos
cum
Balance
Remarks
2
1
2
2
0
40
0
0
1
1
1
8
completed
completed
0
0
0
0
0
0
0
10
11
0
2
1
1
0
2
1
0
1
0
29
0
1
1
6
0
5
1
0
0
2
2
1
19
completed
0
0
0
0
0
0
0
0
0
0
0
0
0
0
125
180
133
2979
125
180
133
2979
0
0
47
121
Completed
Completed
0
0.00
0
0
4
12
53
83
8320
35
43
5541
0
0
0.00
1
2
473
35
43
5541
18
40
2779
Nos
Nos
Nos
cum
9
18
18
730
7
10
0
305
0
0.00
1
0
0
40
7
10
0
305
2
8
18
425
Nos
Nos
cum
92
92
1350
16
1
125
0.00
1
0
6.5
16
1
125
76
91
1225
Nos
Nos
cum
89
106
3500
19
14
960.5
0
0
0.00
6
3
234.5
19
14
960.5
70
92
2539.5
Nos
Nos
Nos
cum
1
3
1
150
0
0
0
0
0.00
0
0
0
0
0
0
0
0
1
3
1
150
Nos
Nos
cum
2
2
1200
0
0
0
0.00
0
0
0
0
0
0
2
2
1200
Nos
Nos
Nos
cum
2
4
6
235
1
0
0
47
0.00
0
0
0
0
1
0
0
47
1
4
6
188
Nos
Nos
Nos
cum
2
4
6
240
2
0
0
80
0.00
1
0
0
40
2
0
0
80
0
4
6
160
Nos
Nos
Nos
cum
2
4
6
450
2
4
1
289
0.00
0
4
0
79
2
4
1
289
0
0
5
161
Nos
Nos
cum
1
4
2400
0
0
0
0.00
0
0
0
0
0
0
1
4
2400
Nos
Nos
cum
22
30
400
0
0
0
0.00
0
0
0
0
0
0
22
30
400
Nos
Nos
Nos
Nos
cum
15
28
2
1
750
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
15
28
2
1
750
Nos
cum
3
800
0
0
0.00
0
0
0
0
3
800
2
1
2
2
0
40
completed
completed
completed
Completed
BHARAT HEAVY ELECTRICALS LTD.
BTG - DPR 26-06-2020
Reporting Date: 27-06-2020
1 CIVIL WORKS
Sl.
No
Structure
Pile Cap
Pedestal
RCC Qty. as on DPR date
Unit - II
ESP
Pile Cap
Pedestal (First Lift)
Pedestal (Final Lift)
RCC Qty. as on DPR date
BOILER UNIT-2(D to k)
Pile Cap
Pedestal with bolt lift
RCC Qty. as on DPR date
MILL FOUNDATION
Pile Cap
Pedestal First Lift
Pedestal Final Lift
RCC Qty. as on DPR date
ID Duct
Pile Cap
Pedestal 1st Lift
RCC Qty. as on DPR date
POWER HOUSE
Pile Cap
Pedestal with bolt lift
RCC Qty. as on DPR date
CEP Pit
Raft
Silos
Top raft
RCC Qty. as on DPR date
CW Pit
Pile cap
Retaining wall
RCC Qty. as on DPR date
FD FAN
Pile Cap
Pedestal 1st Lift
Pedestal
RCC Qty. as on DPR date
PA FAN
Pile Cap
Pedestal 1st Lift
Pedestal
RCC Qty. as on DPR date
ID FAN
Pile Cap
Pedestal 1st Lift
RCC Qty. as on DPR date
TG Pile cap
Pile Cap
Condenser Pedestal
RCC Qty. as on DPR date
ESP Control room
Pile Cap
Column Upto PB
RCC Qty. as on DPR date
Stator Lifting Fdn.
Pile Cap
Pedestal
RCC Qty. as on DPR date
DG Building
Pile Cap
Column Upto PB
RCC Qty. as on DPR date
Trans. Yard
Pile Cap & Pedestal
RCC Qty. as on DPR date
Service Building
Pile Cap
RCC Qty. as on DPR date
UNIT
Scope
(nos)
up to
previous
day
THIS MONTH
Cumulative
(May-2020)
Today
0.0
0.00
1
2
75
13373.5
0.00
0
0
0
0
125
180
178
3092.90
0
0
2
7.1
0.00
0
0
0
34
46
6392
19
37
1928
0.00
0
0
0
0
6
12
0
326
3
6
18
404
0.00
2
1
7.5
56
5
511.9
36
87
838.1
0.00
4
0
157
34
13
1592.5
41
78
1907.5
0.00
0
0
0
0
0
0
0
0
1
3
1
150
0.00
0
0
0
0
0
0
2
2
1200
0.00
0
0
0
0
1
1
2
73.5
1
3
4
161.5
0.00
0
1
0
13
2
3
3
125
0
1
3
115
0.00
0
0
0
2
4
272
0
0
178
0.00
0
0
0
0
0
0
1
4
2400
0.00
0
0
0
14
0
133
8
30
267
0.00
0
0
0
0
0
0
1
2
75
95
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
95
Nos
cum
4
1000
0
0
0.00
0
0
0
0
4
1000
Total Unit -2
Grand Total
Nos
cum
cum
cum
56
600
23845
47545
12
100.3
12474.6
21965.1
0
0.00
0.00
0.00
0
0
177.5
1062.5
12
100.3
12619.1
21965.10
44
499.7
11225.9
24599.4
Total
cum
cum
cum
125000
125000
250000
70627
69635
140262
0
0
0
0
0
0
70627
69635
140262
54373
55365
109738
Total
cum
cum
cum
38000
38000
76000
18680
15634
28203
85
0
85
7900
2330
3144
18765
15634
28288
19235
22366
41601
MT
MT
MT
12125
12125
12125
6612.11
5481.2
2715.95
0.00
0.00
0.00
0.00
0.00
0.00
6612.11
5481.20
2715.95
5512.89
6643.8
9409.05
Backfilling
ESP Unit-1
ESP Unit-2
Nos
Nos
Nos
cum
125
180
180
3100
125
180
178
3092.9
Nos
Nos
cum
53
83
8320
34
46
6392
Nos
Nos
Nos
cum
9
18
18
730
6
12
0
326
Nos
Nos
cum
92
92
1350
56
5
511.9
Nos
Nos
cum
75
91
3500
34
13
1592.5
Nos
Nos
Nos
cum
1
3
1
150
0
0
0
0
Nos
Nos
cum
2
2
1200
0
0
0
Nos
Nos
Nos
cum
2
4
6
235
1
1
2
73.5
Nos
Nos
Nos
cum
2
4
6
240
2
3
3
125
Nos
Nos
cum
2
4
450
2
4
272
Nos
Nos
cum
1
4
2400
0
0
0
Nos
Nos
cum
22
30
400
14
0
133
Nos
Nos
cum
1
2
75
0
0
0
Nos
Nos
cum
Remarks
0
0
0
10326.5
Earth Disposal
Unit - I
Unit - II
1
2
75
23700
Balance
0
0
0
885
Total -Unit#1
Nos
Nos
cum
cum
0
0
0
9490.5
2 Superstructure Unit - 1
i
ii
iii
Structural fabrication(Fit Up)
Structural fabrication(Welding)
Painting
Completed
Completed
Completed
Completed
BHARAT HEAVY ELECTRICALS LTD.
BTG - DPR 26-06-2020
Reporting Date: 27-06-2020
1 CIVIL WORKS
Sl.
No
Structure
UNIT
Scope
(nos)
Superstructure Unit - 2
i
ii
iii
iv
Balance
8650
8650
8650
3008
2638
736
0.00
0.00
0.00
0.00
0.00
0.00
3008.00
2638.00
736.00
5642
6012
7914.00
cum
cum
cum
1658
20.54
152
1575
16.5
46.34
0
0
0
0
0
0
0
1575
16.5
46.34
0
83
4.04
105.66
cum
sqm
cum
5977.5
19925
9962.5
707
8378
0
0
0
0
0
0
0
707
8378
0
5270.5
11547
9962.5
cum
cum
cum
cum
sqm
29302
203.13
560.46
114.31
3256
30179.9
11576.4
45.3335
197.5
30.159
921.2
11849.393
0
0
0
0
0
0.00
0
0
0
0
0
0
11576.4
45.3335
197.5
30.159
921.2
11849.39
17725.6
157.7965
362.96
84.151
2334.8
18330.5075
Superstructure (Civil)
Road Works
Excavation
Preparation of Sub Grade
Sub Grade
Boundary Wall
Excavation
Concrete grade M7.5
Concrete grade M30 below FFL
Concrete grade M30 above FFL
Application of 2 Coats of Bitumen Paint
THIS MONTH
Cumulative
(May-2020)
Today
MT
MT
MT
Structural fabrication(Fit Up)
Structural fabrication(Welding)
Painting
Field Maintenance Building
Excavation
PCC
RCC
up to
previous
day
3 Others
Construction of TANGEDCO site office Building
A
i) False ceiling work, partition work, plumbing work, floor tiles, plastering works, fixing of AC completed.
4
UNIT 1 & 2
S.NO
TOOLS AND PLANTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Concrete Batching Plant - 30Cum / Hr
Hydraulic Rotary rig
Transit Mixres
Cranes
JCB
Poclain
Hydra
Dewatering pump
Bentonite pump
Bentonite tank
DG 200KV
DG 62KV
DG 5KV
Welding Machine
Barbending machine
Bar cutting machine
Trailer
MIG Welding machine
75 T crane
40 T crane
DG 250KV
Gantry Crane
Compresser
Plate bending machine
MAN POWER
B&R
Vijay Gowtham
Power Mech Santhos
1
1
4
5
2
4
1
7
5
3
2
2
0
6
2
3
1
1
4
3
1
2
1
6
4
3
1
2
3
6
3
2
TOTAL MANPOWER (Nos)
Notes:
1
1
1
6
3
17
2
11
3
1
10
1
1
1
27-06-2020
27
2
2
6
2
3
27
2
2
4
3
2
3
20
2
1
3
1
Skilled Unskilled
M/s B&R
M/s VIJAY GOWTHAM
M/s POWER MECH
M/s Santhosh Infra
ENABLING WORKS
ELECTRICAL WORKS
1
Other
12
2
9
7
0
0
1
Total
working at
site
66
6
13
17
5
5
112
TOTAL
3
2
9
8
4
7
11
16
9
6
3
4
3
49
5
5
3
21
4
1
3
1
4
1
REMARKS