R 20 00 0 RIGGING PLAN LIFTING FOR POWER CONTROL CENTERS CRANE LAY OUT MOVING OBJECT FROM A TO B A B RIGGING DEPARTMENT ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK START No 05. RIGGING TOOLS No Equipment 01 Sling dia. 1.5" x 13 M 02 Chain Block 03 Shackle SWL 04 Manila Rope 7/8"x10M Qty 4 pcs 2 pcs 10 pcs 2 pcs Capacities 17 ton 10 ton 10 ton 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone Qty 77 mtr 7 pcs 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity Qty 22.00 T 1.33 T 0.15 T 0.60 T 0.15 T 24.23 T 26.62 T 48 80 ton Remark New New New ME TER Capacities 150 ton TAILING DESIGN MONO CRANE Risk Qty 1 unit 1 unit 1 unit OM Yes 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 48 meter 03 Trailer BO REFERENCE 1. RIGGING BOOK 2. EQUIPMENT MANUAL 3. ASME B30.5-2004 Mobil & Locomotive cranes 4. ASME B30.6-2003 Derrick 5. ASME B30.10-1999 Hook 6. ASME B30.21-2005 manually lever operated hoist ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling 8. ASME B30.26-2004 Rigging Hardware 9. BS EN 5973 Scaffolding 10. Australian Standard, AS 3569--1989, Wire ropes 11. Australian Standard, AS 2759--1985, Wire ropes NEED DUO CRANE 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Power Control Centers. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE DATA MATERIAL 1. DIMENSION 2. WEIGHT 7. 01. OBJECTIVE Rigging Study of Lifting Power Control Centers. JOB SAFETY ANALISYS RIGGING PLAN 3 METER SLING 1 Safe ACTION 08 1.1 26.62 SF = 24.23 = 1.1 CONTROL Final Inspection by HaGun Engineering Safety Factor No Steel plates 1.5m x 6m x 20 mm thk for track Yes Prepare Final Report for ApprovaL Handover FINISH 20000 LIFTING STUDY OBJECT 40 TON BY CRAWLER CRANE 150TON OVER ELEVATION 32 METER 01. OBJECTIVE Rigging Study of Lifting Gasifier. 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Gasifier. 05. RIGGING TOOLS No Equipment 01 Sling dia. 1.5" x 8 M 02 Chain Block 03 Shackle SWL 04 Manila Rope 7/8"x100M Qty 4 pcs 2 pcs 8 pcs 2 pcs Capacities 17 ton 10 ton 10 ton 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone Qty 77 mtr 7 pcs 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity Qty 40.00 T 1.33 T 0.15 T 0.60 T 0.15 T 42.23 T 49.50 T Remark New New FL+32000 TER Capacities 150 ton 57 ME Qty 1 unit 1 unit BOOM 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 57 meter SLING 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE FL+29400 FL+26400 FL+23700 FL+16000 08 Safety Factor SF = 49.50 42.23 1.17 = 1.17 Steel plates 1.5m x 6m x 20 mm thk for track RIGGING DEPARTMENT ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK R max 14000 mm START DATA MATERIAL 1. DIMENSION 2. WEIGHT REFERENCE 1. RIGGING BOOK 2. EQUIPMENT MANUAL ASME B30.5-2004 Mobil & Locomotive cranes 4. ASME B30.6-2003 Derrick 5. ASME B30.10-1999 Hook 6. ASME B30.21-2005 manually lever operated hoist ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling 8. ASME B30.26-2004 Rigging Hardware 9. BS EN 5973 Scaffolding 10. Australian Standard, AS 3569--1989, Wire ropes 11. Australian Standard, AS 2759--1985, Wire ropes 12. AWS Dl4.1/D14.1M:2005 Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment 3. NEED DUO CRANE No CRANE LAY OUT Yes TAILING DESIGN MONO CRANE JOB SAFETY ANALISYS Safe RIGGING PLAN ACTION CONTROL Yes Prepare Final Report for ApprovaL Handover FINISH No 00 Final Inspection by HaGun Engineering 40 Risk R1 7. Main Crane: Crawler Crane Terex Demag CC8800-1 Capacities 1600 ton Length of boom is 108 m. Counter weight is 640 t. Radius operational 30 m with capacity 613 t. Equipment to be lifted is 582 T. From analyze we find safety factor is 1,05. 00 00 Tailing Crane: Crawler Crane Terex Demag cc2400-1 Capacities 440 ton Length of boom is 118.1 ft. Counter weight is 352.7klb + 88.2 klb ZB. Radius operational 23.0 ft with capacity 679.0. Equipment to be lifted is (582/2 = 291 ton) T. From analyze we find safety factor is 1,05. 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Vessel 590 ton. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 108 meter Qty 1 unit 1 unit Capacities 1600 ton 05. RIGGING TOOLS No Equipment 01 Sling 02 Shackle SWL 04 Manila Rope 7/8"x100M Qty 4 pcs 8 pcs 2 pcs Capacities 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone Qty 77 mtr 7 pcs 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity Qty 590.00 T 2.6 T 0.4 T 0.7 T 0.4 T 594.1 T 613.0 T 08 Safety Factor SF = 613.0 594.1 Lifting study Object 590ton by CC 1600ton Tailing Design R3 01. OBJECTIVE Rigging Study of Lifting Gasifier. 1.03 = 1.03 Steel plates 1.5m x 6m x 20 mm thk for track Remark New New LIFTING STUDY OBJECT 7.5 TON BY MOBILE CRANE 160TON ON OPERATING RADIUS 14 METER Body of Silo L = 5.165 mtr 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Shackle 05 Spreader Beam 05 Total Weight 06 Crane Capacity 07 Safety Factor 21.4 SF = 9.425 = 2.21 Top of Elevation 35867mm Qty 7.5 T 1.7 T 0.2 T 0.1 T 0.2 9.7 T 21.4T in Operating Radius 14 meter Boom 50 meter 2.21 Maximum Allowable Wind Speed is Steel plates 1.5m x 6m x 20 mm thickness for out rigger LIFTING STUDY OBJECT 75 TON BY CRAWLER CRANE 550TON ON OPERATING RADIUS 24 METER R24000 01. OBJECTIVE Rigging Study of Lifting Gasifier. 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Vessel 75 ton. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 42 meter Qty 1 unit 1 unit Capacities 550 ton 05. RIGGING TOOLS No Equipment 01 Sling dia. 2.5" x 8 M 02 Shackle SWL 04 Manila Rope 7/8"x100M Qty 4 pcs 8 pcs 2 pcs Capacities 22 ton 20 ton 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone Qty 77 mtr 7 pcs 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity Qty 75.00 T 1.8 T 0.3 T 0.6 T 0.4 T 78.1 T 86.4 T 08 Safety Factor SF = 86.4 78.1 1.11 = 1.11 Steel plates 1.5m x 6m x 20 mm thk for track Remark New New