REPORT For MRM YOURPARTNER FORA GREENERWORL D Proposal Issues & Mitigation 6TH FLOOR, EMAAR MGF - THE PALM SQUARE, SECTOR-66, GOLF COURSE EXTENSION ROAD, GURGAON – 122102, GROUND FLOOR, FERNBANK, #3, REST HOUSE ROAD, BENGALURU - 560001 12-DEC-2023 02 1 - Floating Issues : • Dependency on vendor(s) for capacity estimation, proposed layout, and floating structure costing. • Lengthy timeline and complexity of the estimation process (for vendor dependent inputs). Mitigation : • Develop in-house capability for capacity estimation and layout preparation • Develop in-house capability to estimate tentative cost (final costing shall be vendor dependent only). • Develop cost matrix on the basis of reservoir type, average water level, reservoir depth, and proposed capacity. 2 - Pre-Fabricated Building (PFB) Issues : • Significant Cost, Manpower and Construction time required to construct RCC MCR building. • End to end timeline for RCC building construction may go up to 90 days (without design timeline). Mitigation : • Pre-fabricated building (PFB) for MCR/ICR. • Costs less than 50% as compared to RCC building. • End to end timeline for PFB construction shall be less than 60 days (without design timeline) 03 3 - Transmission Issues Line : • Complete Transmission Line work done by the EPC vendors. • Design and Material Solution are vendor dependent. • They do not offer custom solution for short transmission lines. • High timeline in streamlining all the vendor activities. Mitigation : • Initially, develop vendor base such that they offer customized solution for our requirement. • Develop in-house capability in the long run. • Develop vendors who have offerings for our proposed in-house solutions. 4 - Long Lead Items RFQ. Issues : • The complete delivery timeline of long lead items to site is critical activity considering short commissioning period of SPV plants. • Usual bottleneck for every project. Mitigation : • Tentative RFQs shall be released at the initiation. • We are planning to release before LOI/PPA confirmation with available inputs, provided we get a nod from BD (2 week advance) Central Inverter Transformer HT Panel 03 THANKYOU CONTACT DETAILS GURGAON, INDIA • BENGALURU, INDIA • KUALA LUMPUR, MALAYSIA • DUBAI, UAE 6th Floor, Emaar MGF-The Palm Square, Sector 66, Golf Course Extension Road, Gurgaon-122 102, Haryana,India. Ph: 1800-3070-8080 contact@amplussolar.com Ground Floor, Fernbank, Rest House Rd, Shanthala Nagar, AshokNagar, Bengaluru-560 001, Karnataka, India. Ph: 1800-3070-8080 | www.amplussolar.com | Jafza View 18 & 19, 1st Floor, JebelAli Free Zone, PO Box 262746, Dubai, UAE. Ph: +91 9711829002 www.facebook.com/amplusenergy | www.twitter.com/amplussolar