Uploaded by Mahmoud Ali

Extracted pages from 86-ZG20-R-051 A

advertisement
Page 41 of 78
KINGDOM OF SAUDI ARABIA
WATER TRANSMISSION AND TECHNOLOGIES COMPANY
SHOAIBA QUAIZA B WATER TRANSMISSION SYSTEM
RS-JE, INLET AND OUTLET ISOLATION VALVES SHAFT 1STRUCTURAL DESIGN REPORT
Revision
Index
Subject:
First
Issue
Rev.
A
Date
18/01/2024
Document Number
86-ZG20-R-051
(WALL-2)Ultimate bending moment Mxd [kNm/m] of the wall due to Load combination 3.
(WALL-2)Ultimate bending moment Myd [kNm/m] of the wall due to Load combination 3.
Final Engineering
Contractor
ASCC
ALISHAR Contracting Company
Subcontractor
Page 54 of 78
KINGDOM OF SAUDI ARABIA
WATER TRANSMISSION AND TECHNOLOGIES COMPANY
SHOAIBA QUAIZA B WATER TRANSMISSION SYSTEM
RS-JE, INLET AND OUTLET ISOLATION VALVES SHAFT 1STRUCTURAL DESIGN REPORT
Revision
Index
Subject:
First
Issue
Rev.
A
Date
18/01/2024
Document Number
86-ZG20-R-051
Ultimate bending moment [kNm/m] of the beam due to Load combination 2.
Service bending moment [kNm/m] of the beam due to Load combination 16.
Final Engineering
Contractor
ASCC
ALISHAR Contracting Company
Subcontractor
Download