Equipment Inspection Checklist Page 1 of 1 (Water Tanker) Department. Project/Facility Name: Finance Code: Made: Equipment Name: Company ☐ Document Ref. No. Issue Date Checklist No. Project Code: Water Tanker Contractor ☐ Sub-Contractor Equipment No. Others: ☐ Note: Write Yes, No or N/A in the given box and if some comments, mention in the remark’s column. Ref: Description Remarks No N/A ☐ ☐ 1. The physical condition of vehicles is good and free from leakage. Yes ☐ 2. No damage to the tire (Bolts, crack, cuts & air pressure, etc.). ☐ ☐ ☐ 3. The side mirror should be a good condition. ☐ ☐ ☐ 4. Head & tail light and indicators are in working condition. ☐ ☐ ☐ 5. The wiper should be in running condition. ☐ ☐ ☐ 6. Windshield/glass should be in proper condition. ☐ ☐ ☐ 7. A seatbelt should be available. ☐ ☐ ☐ 8. Red triangle/Reflective tape should be used in front of the vehicle. ☐ ☐ ☐ 9. Registrat on number should be written. ☐ ☐ ☐ 10. Front & reverse horn. ☐ ☐ ☐ 11. Fire extinguisher in operator cabin. ☐ ☐ ☐ 12. Operators have a valid and suitable license. ☐ ☐ ☐ 13. The first aid kit should be available. ☐ ☐ ☐ 14. Normal break & emergency (hand) brake should be in functional & operational condition. ☐ ☐ ☐ FIT Partially Fit ☐ Inspected by: Name: Signatures: HSE Documents-Equipment Inspection Checklist- Water Tanker ☐ Unfit Reviewed by: Remarks