Data summary trial workpiece At NAVA2 Title : Layout change,Rack850,Rack320 Date : 6-8,11-14 December 2023 Worker : Mr.Phadoemphong sooksa-ard (Max) Position : Engineer LAYOUT CHANGE Old Layout New Layout LAYOUT CHANGE New Layout -Adjust level balance of machine -Check robot position -Auto Run RACK850 -Set up new machine -Test machine and N-mashi -Test tool life RACK850 SUMMARY Used tool New tool Result Total workpiece for test : 30 Pcs. Point ok = 30 pcs.(100%) Point NG = 0 (0%) Tool life = 300 Pcs./tool Cycle time = 70 sec. Total hour = 51 pcs./hr. RACK320 -Set up new machine -Test machine and N-mashi -Test tool life RACK320 SUMMARY Used tool New tool Result Total workpiece for test : 30 Pcs. Point ok = 30 pcs.(100%) Point NG = 0 (0%) Tool life = 400 Pcs./tool Cycle time = 69 sec. Total hour = 52 pcs./hr.