Summary data Layout change and set up new machine at NAVA2 6-8,11-14 December2023

advertisement
Data summary trial workpiece
At NAVA2
Title : Layout change,Rack850,Rack320
Date
: 6-8,11-14 December 2023
Worker : Mr.Phadoemphong sooksa-ard (Max)
Position : Engineer
LAYOUT CHANGE
Old Layout
New Layout
LAYOUT CHANGE
New Layout
-Adjust level balance of machine
-Check robot position
-Auto Run
RACK850
-Set up new machine
-Test machine and N-mashi
-Test tool life
RACK850 SUMMARY
Used tool
New tool
Result
Total workpiece for test : 30 Pcs.
Point ok = 30 pcs.(100%)
Point NG = 0 (0%)
Tool life = 300 Pcs./tool
Cycle time = 70 sec.
Total hour = 51 pcs./hr.
RACK320
-Set up new machine
-Test machine and N-mashi
-Test tool life
RACK320 SUMMARY
Used tool
New tool
Result
Total workpiece for test : 30 Pcs.
Point ok = 30 pcs.(100%)
Point NG = 0 (0%)
Tool life = 400 Pcs./tool
Cycle time = 69 sec.
Total hour = 52 pcs./hr.