INSPECTION AND TEST PLAN - Structural Steel
Scope of Work:
Structural Steel
Customer: TDE
Midwest Structural ITP no.:
01-2203
Project:
Customer Reference no.:
103743
IBC Tank Bases (Provide individual pack for each tank SOW)
Midwest Structural Ltd
Description
ITP Approval
Req.
Document Control
Initial
HP
Yashaswi Vishukumar
Shop drawings approval
HP
Initial
Gurbarn Singh
Date
Digitally signed by Gurbarn Singh
Reason: I am approving this document
Contact Info: 5873575860
Date: 2023.12.19 10:36:53-07'00'
Req.
HP
V
V
Welding Procedures: W47.1-2019/W59-2018/W48-14
HP
H V
V
Welders Certification: CSA W47.1
CWB Log Binder
HP
V
V
Fit Up
CAN/CSA S16
QA/QC manual Form D
HP
V
V
Bolt Up
CAN/CSA S16 ASTM A325
QA/QC manual Form D
HP
V
V
Welding Report form D
HP
V
V
HP
V
V
NDE: CSA W59 5% MPI on random welds and 100% UT on CJP Welds
HP
V
V
Final Inspection and Load Release
HP
H V
V
As Built Drawings
HP
V
V
Final Documentation sent to Customer
HP
HP
HP
Welding : 100% Visual Examin. CSA W59
NDE Operators Certification
Abbreviation:
HP: Hold Point, V: Verify,
W/V: Witness or Verify
ITP Approval by:
(Please stamp and sign)
CAN CGSB489712/2006 CSA
W178.2
Approved by:
Date:
Inspector
Approved by:
Date:
Inspector:
Initial
Date
HP
V
CSA G40.20/G40.21
HP
Digitally signed by
Yashaswi Vishukumar
Date: 2023.12.18
12:56:51-07'00'
Req.
Scovan
HP
Material Control
Document Control
Receiving and Inspection
Report
Date
TDE
Approved by:
Date:
Inspector:
Date: December 18, 2023