INSPECTION AND TEST PLAN - Structural Steel Scope of Work: Structural Steel Customer: TDE Midwest Structural ITP no.: 01-2203 Project: Customer Reference no.: 103743 IBC Tank Bases (Provide individual pack for each tank SOW) Midwest Structural Ltd Description ITP Approval Req. Document Control Initial HP Yashaswi Vishukumar Shop drawings approval HP Initial Gurbarn Singh Date Digitally signed by Gurbarn Singh Reason: I am approving this document Contact Info: 5873575860 Date: 2023.12.19 10:36:53-07'00' Req. HP V V Welding Procedures: W47.1-2019/W59-2018/W48-14 HP H V V Welders Certification: CSA W47.1 CWB Log Binder HP V V Fit Up CAN/CSA S16 QA/QC manual Form D HP V V Bolt Up CAN/CSA S16 ASTM A325 QA/QC manual Form D HP V V Welding Report form D HP V V HP V V NDE: CSA W59 5% MPI on random welds and 100% UT on CJP Welds HP V V Final Inspection and Load Release HP H V V As Built Drawings HP V V Final Documentation sent to Customer HP HP HP Welding : 100% Visual Examin. CSA W59 NDE Operators Certification Abbreviation: HP: Hold Point, V: Verify, W/V: Witness or Verify ITP Approval by: (Please stamp and sign) CAN CGSB489712/2006 CSA W178.2 Approved by: Date: Inspector Approved by: Date: Inspector: Initial Date HP V CSA G40.20/G40.21 HP Digitally signed by Yashaswi Vishukumar Date: 2023.12.18 12:56:51-07'00' Req. Scovan HP Material Control Document Control Receiving and Inspection Report Date TDE Approved by: Date: Inspector: Date: December 18, 2023 Revision: 0