1 SCALE: NTS TITLE: REVISION DATE RIG 1 REPAIR OF COOLING TOWER ISOMETRIC VIEW REV. NO. OWNER: ALL DIMENSIONS ARE IN MILLIMETER: PLATINUM ST. CABILANGBAYBAY, CARMONA CAVITE DATE: DECEMBER 21, 2023 UNITS: MM SCALE: EDC DRAWN BY: CHECKED BY: JF RUBIA DWG NO. APPROVED BY: JM TESTIMIO TES-OR-2023-059 SHEET TM MAGPANTAY 1 OF 6 REV. 0 Modification, Derusting & Repainting of 2''x2'' 4mm thk. Square tube (railings) Derusting & Repainting of Cooling tower fan shroud Replacment of Toe Board Derusting & Repainting monkey ladder Derusting & Repainting of 10mm thk. Cooling Tower wall (inner & outer) Derusting & Repainting of 6'' x 6'' x 6mm thk. Square Tube (Cooling Tower framing) Replacement of Monkey Ladder Derusting & Repainting of 10'' x 2.6'' C Channel (Skid) Derusting & Repainting of 5'' dia. pipe riser Repair of 4''x 4'' x 6mm tk Flat bar (Louvers) Derusting & Repainting of 4'' x 4'' x 10mm thk. angle bar (Cooling Tower framing) Fabricate new Cooling tower pump base see pump base details Fabricate new Cooling tower pump base see pump base details 1 SCALE: Replacement of End Cap 2 NTS SCALE: TITLE: REVISION DATE NTS RIG 1 REPAIR OF COOLING TOWER LEFT & RIGHT SIDE VIEW REV. NO. OWNER: ALL DIMENSIONS ARE IN MILLIMETER: PLATINUM ST. CABILANGBAYBAY, CARMONA CAVITE DATE: DECEMBER 21, 2023 UNITS: MM SCALE: EDC DRAWN BY: CHECKED BY: JF RUBIA DWG NO. APPROVED BY: JM TESTIMIO TES-OR-2023-059 SHEET TM MAGPANTAY 2 OF 6 REV. 0 Modification, Derusting & Repainting of 2''x2'' 4mm thk. Square tube (railings) Derusting & Repainting of Cooling tower fan shroud Replacment of 1'' x 4mm thk Toe Board Modification, Derusting & Repainting monkey ladder Derusting & Repainting of 10mm thk. Cooling Tower wall (inner & outer) Derusting & Repainting of 6'' x 6'' x 6mm thk. Square Tube (Cooling Tower framing) Derusting & Repainting of 5'' dia. riser pipe Replacement of Monkey Ladder Derusting & Repainting of 10''x 2.6'' C Channel (Skid) 10'' Pipe Sch. 40 Derusting & Repainting of 4'' x 4'' x 10mm thk. angle bar (Cooling Tower framing) Fabricate new Cooling tower pump base see pump base details Fabricate new Cooling tower pump base see pump base details 1 SCALE: 2 NTS SCALE: TITLE: REVISION DATE NTS RIG 1 REPAIR OF COOLING TOWER FRONT & REAR VIEW REV. NO. OWNER: ALL DIMENSIONS ARE IN MILLIMETER: PLATINUM ST. CABILANGBAYBAY, CARMONA CAVITE DATE: DECEMBER 21, 2023 UNITS: MM SCALE: EDC DRAWN BY: CHECKED BY: JF RUBIA DWG NO. APPROVED BY: JM TESTIMIO TES-OR-2023-059 SHEET TM MAGPANTAY 3 OF 6 REV. 0 1 SCALE: NTS TITLE: REVISION DATE RIG 1 REPAIR OF COOLING TOWER PUMP BASE DETAILS REV. NO. OWNER: ALL DIMENSIONS ARE IN MILLIMETER: PLATINUM ST. CABILANGBAYBAY, CARMONA CAVITE DATE: DECEMBER 21, 2023 UNITS: MM SCALE: EDC DRAWN BY: CHECKED BY: JF RUBIA DWG NO. APPROVED BY: JM TESTIMIO TES-OR-2023-059 SHEET TM MAGPANTAY 4 OF 6 REV. 0 1 SCALE: NTS TITLE: REVISION DATE RIG 1 REPAIR OF COOLING TOWER PUMP BASE DETAILS REV. NO. OWNER: ALL DIMENSIONS ARE IN MILLIMETER: PLATINUM ST. CABILANGBAYBAY, CARMONA CAVITE DATE: DECEMBER 21, 2023 UNITS: MM SCALE: EDC DRAWN BY: CHECKED BY: JF RUBIA DWG NO. APPROVED BY: JM TESTIMIO TES-OR-2023-059 SHEET TM MAGPANTAY 5 OF 6 REV. 0 1 SCALE: NTS TITLE: REVISION DATE RIG 1 REPAIR OF COOLING TOWER PUMP BASE DETAILS REV. NO. OWNER: ALL DIMENSIONS ARE IN MILLIMETER: PLATINUM ST. CABILANGBAYBAY, CARMONA CAVITE DATE: DECEMBER 21, 2023 UNITS: MM SCALE: EDC DRAWN BY: CHECKED BY: JF RUBIA DWG NO. APPROVED BY: JM TESTIMIO TES-OR-2023-059 SHEET TM MAGPANTAY 6 OF 6 REV. 0