IN-PLACE PROTECTION (IPP) FOR THE WORKPLACE Official Open Scope ▪ ▪ ▪ ▪ What is In-Place Protection (IPP) Importance of IPP Possible Scenarios Developing an IPP Plan for workplace Official Open What is In-Place Protection • Similar concept in keeping out dust and noise ⚫ Involves seeking shelter in an interior room with minimal openings. Shutting all windows and doors Minimise infiltration of exterior air Official Open ▪ In-place protection (IPP) includes additional precautions e.g. switching off ventilation system Official Open e.g. sealing louvre windows or openings of similar design What is In-Place Protection ▪ Concept rolled out to the public in Sep 2003 ▪ Targeted at residential premises Official Open Case Study ▪ IPP implemented in past incidents…. • Lake Charles, Louisiana, Aug 27, 2020 Incident - Chlorine release due to fire at a chemical plant. Lessons - Residents within the affected area were instructed to stay indoors. No fatalities or injuries due to the chemical fire were reported. Official Open Case Study ▪ IPP implemented in past incidents…. • Atchison, Kansas on Oct 21, 2016 Incident – Mixing of incompatible chemicals resulting in the release of chlorine cloud. Lessons - Thousands of community members ordered to shelter-in-place. Some who were outdoors and exposed to the chemical sought medical attention due to headache and sore throat. Therefore, it was safer to stay indoors. Official Open Types of Protective Action Public Protective Action IPP Evacuation • Executed through Fire Emergency Plan (FEP) • Executed through InPlace Protection Plan (IPP Plan) Official Open IPP vs Evacuation The decision to implement IPP rather than evacuation during a chemical emergency will be driven by the following considerations: 1)Potential for exposure to people being evacuated 2)Instantaneous, short plume duration 3)Vulnerable populations that cannot be evacuated readily (eg. Hospitals and nursing homes) 4)Affected area with high population density (in the region of thousands) Note: Mass evacuation is a complex procedure requiring substantial hours to complete, massive resources to move people, perfect cooperation and understanding from the people Official Open When to Implement IPP Notification to Conduct IPP In the event of a chemical incident, you will be notified by the authority to adopt in-place protection through Public Warning System (PWS) Free-to-air Mediacorp TV channels and radio stations SMS-based SGSecure Public Alert System mobile app Door-to-door notification Official Open Workplace vs Residential Aspects Workplace Residential Occupancy Transient Population Building Structure Mechanical Ventilation Systems Announcement Voluminous Present Small numbers Absent Complex Complex Simple Natural ventilation/ air-condition System to notify all occupants Need to establish Shout across the room Intuitive Need to conduct drills Simple Accountability System Drills Official Open Guidelines ▪ Step 1 : Know your building/work premises ▪ Step 2 : Develop IPP plan ▪ Step 3 : Conduct IPP drills Official Open Guidelines ▪ Step 1 : Know your building/work premises (1) Ventilation System What is the type of ventilation system? Is the building connected to other buildings, passageways, and tunnels? Determine if there are smoke purge fans (2) Switches that control air-handling units Building Automation System (BAS)Commercial Premises Fire Command Centre (3) Location of ‘Safe Haven’ (Industrial Premises) Official Open Guidelines Building Information Building Name No. of Storeys Owner’s Name Telephone No. FSM’s Name Telephone No. Building Address Occupant Load Correspondence Address (If different from above) Gross Floor Area Office Block Car Park Main Plant Room AHU Controls Switches of air-con plants Fresh air intake Official Open Guidelines ▪ Step 2 : Develop IPP plan ✓ Format modeled after Fire Emergency Plan ✓ Contents include : (1) (2) (3) (4) Objective IPP Committee Signal for Initiation of IPP IPP Procedures (5) Actions to be taken (6) Duties and Responsibilities (7) IPP Drills Official Open Develop IPP Plan Objective • Safeguard human lives in the event of hazardous release • Establish duties and responsibilities to ensure systematic and orderly implementation Official Open Develop IPP Plan IPP Committee a. Co-ordinator/Asst. Co-ordinator b. Receptionist/Information counter staff c. Mechanical Ventilation Operator d. IPP Warden/Asst. IPP Warden (the Fire Warden can be assigned as the IPP Warden) e. Chief Security Officer Official Open IPP Procedures The basic steps are: • Shut all windows, doors, blinds/curtains and openings • Turn off machinery and lights to minimise heat generation • Turn off all air handling equipment (e.g. air conditioning) to avoid drawing in air from outside • Grab some cloths/big towels and tapes • Choose a room (or rooms) with minimal windows/exterior openings • Use cloths/towels to seal off gaps between the door and floor • Close all windows in the room. If there are louvre windows (or openings of similar design), seal the gaps with commonly found items such as cloths/towels or tapes • Tune in to the free-to-air MediaCorp TV and radio stations or SCDF’s social media platforms for updates on the latest situation and/or instructions from the authorities • Leave the room only when instructed by the authorities Official Open Develop IPP Plan Actions To Be Taken Action By Co-ordinator Announcer Mechanical Ventilation Operator IPP Warden Chief Security Officer All Staff Actions to be taken Initiate activation of IPP Make announcement through Public Address Sys Shut down all air handling units Direct Staff to IPP rooms and conduct roll call Close all entrances and place signage Shut down machinery and proceed to IPP rooms Official Open Guidelines Signal / Announcements to Commence IPP • Use of Public Address System • Useful statements to include in the announcements: An In-Place Protection advisory has been issued DO NOT leave the building. The air outside is not safe. The ventilation and air-conditioning systems will be shutdown to minimise infiltration of air from outside. Close windows and doors and turn off unnecessary machinery and lights to minimise heat generation. Official Open Develop IPP Plan ▪ Mechanical Ventilation & AHUs To include Step-by-step instructions to deactivate systems (intake and exhaust) May need to modify procedures to ensure quick deactivation (eg central controls for MVs and AHUs, co-locate controls in one location) Official Open Develop IPP Plan ▪ Mechanical Ventilation & AHUs ✓ Stop operation of Lifts - piston effect ✓ To bypass activation of pressurised systems from auto alarm Official Open Develop IPP Plan ▪ Step 3 - Conduct IPP Drills Important to familiarise occupants with IPP procedures Official Open Guidelines ▪ Termination of IPP ✓ Occupants may leave the building ✓ Use of purging system to dilute and purge the building of any hazardous vapous which may have infiltrated Official Open Conclusion IPP will offer immediate protection to occupants when evacuation is not advisable during an emergency Guidelines for IPP at Workplace available on SCDF’s Website https://www.scdf.gov.sg/home/fire-safety/downloads/actscodes-regulations/in-place-protection-(ipp)-for-nonresidential-buildings Official Open THANK YOU Official Open