SRU OPERATION CONDITIONS MFG - DHDS SRU BLOCK FLOW DIAGRAM ACIDGAS MP STEAM REACTION FURNACE AIR FUEL GAS ACID GAS LP STEAM FUEL GAS AIR WASTE HEAT BOILER BFW SULPHUR CONDENSOR I LINE BURNER CLAUS CONVERTOR BFW SULPHUR REHEATER LP STEAM CONDENSOR II MCRC I MCRC II BFW MCRC III LP STEAM CONDENSOR III CONDENSOR IV CONDENSOR V AIR BFW SULPHUR INCINERATOR FUEL GAS Case 1 - 72 TPD capacity (Each Train) Case 2 - Turn down capacity (30% of design) Case 3 - 120 TPD capacity (both Trains) Case 4 - Below turndown capacity (0.5 TPH AG) Case 5 – VGO mode operation,with NH3 gas in main burner Case 6 – VGO mode operation,with NH3 gas in incinerator Case 7 – Diesel mode operation,with NH3 gas in incinerator DESIGN FLOW RATES Flow Kg/hr case case case case case case case 1 2 3 4 5 6 7 AG to MB 3357 1000 2797 475 2930 2930 1671 SG to MB 110 100 100 100 312 312 91 NH3 gas 86* 75* 75* 75* 258 516* 150* Air to MB 6524 2068 5446 1081 6951 5519 2902 Steam MB 150 AG to LB 158 50 132 25 106 106 61 Air to LB 377 119 314 60 266 266 151 Mass Velocity Calculations Mass velocity Kg/m2 sec Case case2 case case4 case5 case6 case 1 3 7 WHB o/l 20.11 6.38 16.79 3.63 21.04 17.63 9.39 Cond I o/l 19.89 6.31 16.61 3.59 20.59 16.34 8.75 Reheater o/l 15.71 4.98 13.16 2.84 16.00 12.83 6.89 Cond II o/l 22.19 7.03 18.52 4.01 23.32 18.49 9.93 Cond III o/l 23.89 7.57 19.94 4.32 24.32 19.19 10.32 Cond IV o/l 23.18 7.34 19.35 4.19 23.78 18.74 10.08 Cond V o/l 22.54 7.14 18.82 4.07 23.64 18.62 10.02 SRU CAPACITY CALCULATION DESIGN CONDITIONS SRU capacity (72 TPD) 3000 Recovery 99% Actual Sulphur in the feed 3030.30 H2S Equivalent of AG 3219.70 Average Mole wt of AG(design basis) 33.80 Acid Gas Equivalent(AG+SG) 3622.76 Acid Gas Flow 3512.76 Kg/hr Kg/hr Kg/hr Kg/hr Kg/hr AG Composition(89.4% H2S,4.9%H2O,5.5%CO2,0.1%H2,0.1%HC) Design conditions of Burners Flow Rate - Kg/hr Acid gas (max) Sour gas(max) Air (max) Tail gas (max) Sweep gas (max) NH3 rich gas(max) Fuel Gas (max) Turn down ratio * for fuel gas operation MB LB 3357 110 6524 IB 158 377 10500 15062 700 86 300* 19.2* 405 10% of Design 25% of Design 10% of Tail gas TURNDOWN On feed flow - On H2S content - 30 % of capacity of each train(3.6TPH) 1.08 MT/Hr AG feed 50 Mole % of H2S in feed Lower Turndown Requirement • The unit is required to be operated from 0.35 to 0.5 TPH, when DHDS unit is shut down and crude units are running on low sulphur crude, ARU is running for existing refinery. • Test run with 0.5 TPH was carried out on 17/10/2001,1635 hrs to 21/10/2001,1730 hrs • Test run with 0.35 TPH was carried out on 27/10/2001,2040hrs to 29/10/2001,2240hrs COMPARISON OF LOW TURN DOWN OPERATIONS Normal T/D Claus T/D Claus T/D Claus + + + 1MCRC 2 MCRC 1MCRC Feed 3.5 0.5 0.5 0.35 MB temp 1200-1250 1035-1060 1035-1060 950-960 LB temp 270-280 270-280 270-280 279-290 Claus 280-340 280-340 280-340 290-335 MCRC i/l 280 265-277 265-277 260-265 MCRC reg 270-285 230-255 240-270 220-240 MCRC SD1 135-170 MCRC SD2 135-141 % recovery 99 95 98.5 95 SO2 emmission 1200 4300 1300 3500 Flame stability yes less less less Flow variation no yes yes Yes 130-152 Limitations at Lower turndown conditions •Sulphur fog formation in reactor/condenser •Unstable flame in burners •Lower reaction furnace temperature •Fluctuation of acid gas flow at lower flow rate •Problems with flame scanner •Maintaining of temperature profile in reactor system Modifications for turndown operation •A trim bypass control valve for ARU pressure control valve •A trim bypass butterfly valve and lower range venturi meter for SRU feed control valve •Superheated LP steam to SRU main burner •HC2 gas to SRU burners •Air line modifications with lower range venturi meters and new trim air control valves Major Modifications for Lower Turn Down Operations Flow rate, Kg/hr Area ARU- Acid Gas SRU- Feed line New facility PV 2901 C FE 1201A / FE 5201A FV 1201A / FV 5201 A Air line FE 1301A / FE 5301A FV 1302 / FV 5302 Steam to MB PV 3312 PSV 3305 FE 3304 HC2 gas to burners PV 2802 A Inter connecting line from LPG kod o/l to FG line near MB RO PSV 2801 A/B size 3" 4*6 3" 8" 8" 2" 7 kg/cm2g 2" 2" 3" 3" 5.5 kg/cm2g min 200 200 200 300 300 100 50 normal max 500 1000 500 1000 500 1000 500 1000 500 1000 150 150 185 300 Trim bypass control valve for ARU pressure control valve PV2901C PV2901A To SRU PV2901 B From V-31 DD V 32 To Flare Trim bypass valve for SRU feed control valves FE 1201A/5201A FE 1202/5202 FE 5201 FV 1202/5202 To CC To LB FV1201/5201 To MB FV1201A/5201A New trim air control valve and Venturi meter FE 1302/5302 Ff FV1302/5302 FE 1301/5301 FV 1301/5301 Air to MB FE 1301 A/5301A Air to LB From Blower Discharge Superheated LP steam to SRU main burners LP Steam from Header SDV 1502 To MB Tr A LP Steam from Header SDV5502 To MB Tr B FE 3304 FV 3304 PSV 3305 PV 3312 MP steam from DHDS b/l (2") MP steam from SRU (12") HC2 gas to SRU burners To Flare HC2 gas PSV 2801 A/B LPG/FG FG to LB Tr A FG to LB Tr B PC2802 RO FG to MB Tr A PC2802A DS V 6 FG to MB Tr B Modifications during CEMP phase1 •New Reduction furnace for NH3 reductionassociated facilities such as new blowers. •New sulphur yard with capacity 9*10*1.5 m3. •New NH3 analyser at exit of WHB in each Train. •New O2 analyser at exit of WHB in each Train. •New NOx analyser for flue gas on stack. •Vap LPG/ Constant composition fuel gas to MB for start up / sweeping / hot stand by conditions Modifications during CEMP phase1 •DS V002 i/l and o/l feed nozzle and line size modifications to 6” from 2”. •DS V003 i/l and o/l feed nozzle and line size modifications to 6” from 2”. •Inert gas purging to AG bypass line to CC – SDV 1503/5503 and FG1513/5513 & RO 1503/5503. •New flow transmitters 1203,1204, 1301/5301, 1601/5601,1602/5602,1701/5701,1702/5702,2601, 2603 Modifications during CEMP phase1 •New control valves FV-1203/5203,FV1204/5204, FV-1601/5601,TV-2601,PV-2803,TV-2901 •New PV 2603 and d/s line 4*6 to reduction furnace. •New safety valves for WHB (19.7) and nozzle modified. Flow (new) DP new Flow (Old) DP old Min Nor Max Max Min Nor Max Max FV1203 76 312 345 0.4 10 49 99 0.75 FV1204 65 258 284 0.4 8.6 43 86 0.75 FV1301 1738 6951 7646 0.4 1631 5436 6524 0.84 FV1601 2310 7700 8470 1.1 2220 5680 7430 1.1 LV1701 304 1013 1114 14.9 300 840 1000 14.9 PV1701 295 983 1034 1.4 280 772 927 1.4 TV2601 50 478 500 0.9 40 322 405 1.2 PV2603 52 516 568 0.45 86 0.5 FV2601 1162 11627 12600 0.17 PV2803 60 600 600 0.4 TV2901 135 903 993 1.5 1000 7688 10467 105 654 700 1.5 Flow Transmitter Flow Rate, Kg/hr Min Nor Max (NEW) Flow Rate, Kg/hr Min Nor Max (OLD) FT 1203 624 624 686 29.7 99.0 99.0 FT 1204 516 516 568 25.8 86 86 FT 1301 1631 7217 7936 1631 5436 6524 FT 1601 2310 7700 8470 2116 5397 7056 FT 1602 2240 7469 8216 2055 5241 6850 FT 1701 295 983 1081 278 772 927 FT 1702 304 1013 1114 315 885 1050 FT 2601 1163 11627 12600 1000 7688 10467 FT 2603 47.8 478 525 Sl no problem reason solution modification implement ation status THANK YOU