Area of Cuboid = 10.5 cm * 23 cm = 241.5cm2 h = 20cm Q = Discharge (cm3/s) Area of Gate , Ag = 0.9 cm * 0.9 cm = 0.81cm2 EXP NO 1 Average 2 Average Horizontal impact distance from the gates in (cm) Gate 1 Gate 2 Gate 3 Gate 4 10.5 9.5 9 8.5 11 10.5 9.5 9 12 10.5 10 9.5 11.16667 10.16667 9.5 9 Volume collected through individual gates (cm3) Gate 1 Gate 2 Gate 3 Gate 4 772.8 627.9 507.15 338.1 676.2 579.6 458.85 313.95 748.65 652.05 507.15 338.1 732.55 619.85 491.05 330.05 13 12 11.5 10.5 13.5 12.5 12.66667 11.66667 772.8 869.4 1038.45 893.55 Closed 11.5 9.5 11 10.66667 748.65 772.8 941.85 821.1 Closed Actual length of impact from gate = 5cm + Horizontal impact distance from the gates in (cm) EXP NO 1 Average 2 Average EXP No 1st EXP average 2nd EXP average Actual horizontal impact distance from the gates in (cm) Gate 1 Gate 2 Gate 3 Gate 4 15.5 14.5 14 13.5 16 15.5 14.5 14 17 15.5 15 14.5 16.16667 15.16667 14.5 14 18 17 16.5 15.5 18.5 17.5 17.66667 16.66667 Gate 1 Closed 16.5 14.5 16 15.66667 Discharge through individual gate (cm3/s) Total Discharge Gate 2 Gate 3 Gate 4 (cm3/s) 70.17 59.37 47.03 31.61 208.18 84.77 77.9 Closed 63.39 226.06 Velocity calculated from the continuity equation Average velocity of individual gates(cm/s) , V=Q/Ag Gate 1 Gate 2 Gate3 Gate 4 1st EXP 86.63 73.29 58.06 39.02 average 2nd EXP 104.65 96.17 Closed 78.25 average Velocity calculated from jet impact distance Average velocity of individual gates(cm/s) , V=Q/Ag Gate 1 Gate 2 Gate3 Gate 4 1st EXP 213.66 211.85 210.7 209.87 average 2nd EXP 216.56 214.6 Closed 212.62 average 603.75 652.05 748.65 668.15 Total Volume (cm3) Time(s) 2245.95 2028.6 2245.95 2173.5 10.43 10.38 10.51 10.44 2125.2 2294.25 2728.95 2382.8 10.52 10.5 10.6 10.54