Uploaded by Talha Bhutto

Presentation1

advertisement
o
o
o
o
o
o
o
o
o
Rapid Implementation of the
necessary field surveys
Preparation of detailed engineering
design
Preparation of BOQ, Engineer’s
Estimate
Preparation of revised PC-1, etc.
DETAILED
ENGINEERING
DESIGN
Timely provision of pre-qualification
document
Timely submission of bidding
document
Professional assistance to client in
Prequalification of Contractors
Bid Evaluation and Preparation of
Bid Evaluation Report
Further assistance to client in
bidding process
EFFECTIVE
TENDER
ASSISTANCE





Overall control of progress and cost
of the Project
Strict supervision of construction as
the Engineer on behalf of client
Sound review/ approval of drawing
and documents prepared by the
contractors
Assessment and continuous
monitoring of natural, social and
environmental issues on behalf of
client
Providing professional assistance to
client in coordinating with other
departments
CONSTRUCTION
SUPERVISION
SCHEDULED
START OF THE
CONSTRUCTION
Download