WEEKLY ADMINISTRATION REPORT UPDATE 30/01/2023 ACTIVITIES DONE THE PREVIOUS WEEK MAIN PLANS FOR THIS WEEK KEY RESULT AREA 1 TRANSPORT AND LOGISTICS MANAGEMENT To make a follow up with procurement department on the repair of GHCW 1141, GHCW 1561, GHCW 1052 and GHCW 1117. REPORT: 30/01/23 FUEL BALANCES Malaria programs Office EPI EQA Balance - Consumed PMD duties Quality Improvement ZAPS Office various duties MPH loan - 705 L 6255 L 6220L 240L 13420L To make a follow-up of Tollgate exemption certificates from ZINARA 960L (Sept, Oct, Nov) 160L 120L 300L 200L GHCC 2881 - the vehicle is in good condition GHCC 2897 - the vehicle is in good condition, it requires jack handle. GHCC 2717 - the vehicle is in good condition GHCC 2859 - the vehicle needs handbrake repairs. Paperwork has been done and it shall be fitted on Monday 30 January 2023 GHCW 2663 - the vehicle is in good condition GHCW 1051 - Due for service, need attention to tail gate and fuel tank lid, showing timing belt check light. GHCW 1052 - The vehicle is at Mike Harris and it needs replacement of complete fuse box 1 GHCW 1561 - The vehicle is at Mike Harris and it needs a front right wheel hub repairs GHCW 1117 - The vehicle is at Mike Harris and it Electricals problem (fuel pumping), need a new battery. GHCW 931 - The vehicle is at Toyota Msasa and it needs an engine overhaul procedure. GHCW 969 - The vehicle is at Mike Harris and engine overhaul done, awaiting computer box GHCW 1141 - The vehicle is at Toyota Msasa and it requires major service. ABW 7890 - The vehicle is due for service, need attention to brakes ABX 2459 - The vehicle is due for service GHCW 0174 - The vehicle is at King Cruiser and had alternator problems when it sent to garage and requests had been made for the towing of the vehicle. KEY RESULT AREA 2 ASSET AND STORES MANAGEMENT Approval was given to accept a donation of an Ambulance and fleece blankets for Mahusekwa District Hospital was received from the MoHCC head office. KEY RESULT AREA 3 PSIPS AND MAINTENANCE OF EXISTING EQUIPMENT AND INFRASTRUCTURE Submitted 2023 projects and programme plans to the Minister of State, Provincial Affairs and Devolution To continue maintaining the existing grounds and infrastructure at the PMD’s office. Maintained the PMD’s office grounds. Construction of staff accommodation at Mahusekwa District Hospital Plastering, plumbing, electricals work commenced Hospital Refurbishment at Murewa District Hospital There was no budget release for the programme 2 Approval was received to virement Covid 19 funds for vehicle hiring and the funds were mainly for supporting Mahusekwa District Hospital staff house construction. To make a follow up with districts on the progress of health facility construction projects and consolidate a report. KEY RESULT AREA 4 LEADERSHIP, GOVERNANCE, AND STRATEGIC MANAGEMENT Attended the Monday Morning HOD’s meeting Board of Survey Status as at 30/01/23 STATION STATUS PMD Mash East The office is compiling last items to be auctioned. Marondera Hospital The hospital has submitted its board of survey for submission to head office. Wedza Board of survey was approved and they are preparing for auction Ruwa They are compiling their obsolete assets for boarding Makumbe Waiting for DMO to approve payment of 5 Motorcycles which needs to be assessed. Sadza Pending signing of the papers by CMED Mutawatawa Compiling the obsolete items to be boarded Mutoko Pending response from head office Mudzi Compiling the list of obsolete items to be boarded Murewa Needs to be sent to the Head Office Chivhu Board of survey was approved 3 4