Purpose of the Rules • To classify the unit states as well as outages of generating units • To have a uniform technical code for the unit states and outage classification of the generating units • To monitor the reliability performance of generating plants at both operations and maintenance levels • To determine and specify the reliability performance of the grid using a probabilistic and deterministic approach • To promote accountability of grid companies to achieve greater operation and economic efficiency Outage Reclassification SCHEDULED / UNSCHEDULED PLANNED / UNPLANNED / OMC Capacity-Weighted Calculations Load Factor Use Factor Capacity Factor Availability Factor Reliability Factor