QUALITY ASSURANCE PLAN Doc NO : IMS-QH-QAP-009-001 Date: 23.12.2015 Rev No :07 Item : Inverter Transformer & Aux. Transformer (Oil Filled) Mahindra SUSTEN Rating: up to 33 KV SL. COMPONENT & No. OPERATION 1.01 Core Lamination 1.02 Winding conductor (PICC) CLASS CHARACTERISTICS 1 Thickness Critical 2 Edge Burr Major 3 Specific core Loss Critical TYPE OF QUANTUM REFERENCE ACCEPTANCE FORMAT OF CHECK OF CHECK DOCUMENT NORMS RECORD S M C/E Physical Measurement Physical Measurement Electrical Each Lot S/M/C Drawing S/M/C Spec Supplier TC / QA report P P V " S/M/C Spec S/M/C Spec " P P P P P V V Vendor to share the Work Procedures V for transportation and handling of CRGO V P P P P V V " S/M/C Spec/IS3024/IS649 S/M/C Spec/IS3024/IS650 " 4 Source - Japanese & Corian Mills (Posco, Nippon) 5 Dimensions Critical MTC review " Susten Requirement Susten Requirement MTC Minor Physical Measurement " S/M/C Drawing S/M/C Spec " 1 Dimensions- Bare & Covered Major Physical Measurement Each Lot 2 Conductivity Critical Electrical Test " S/M/C Spec/IS13730/IS18971983 " 3 Hardness Critical Mechanical Test " 4 Tensile Strength Critical Mechanical Test 5 Elongation Major 6 No of Papers Major 7 Source - Sterlite, Hindusthan Copper 8 Paper Application (Overlap) Major 1 Thickness 2 Apparent Density Major Major 1.03 Pressboard AGENCY QC Rep./TC S/M/C Spec/IS13730/IS1897-1983 " QC Rep./TC P P V " " QC Rep./TC P P V " " " supplier TC / P V V Mechanical Test " " " " P V V Physical Measurement MTC review " " " " P P V " " " MTC P V V Physical Measurement " " " " P P V S/M/C Spec/IS1576 S/M/C Spec/IS1576 supplier TC / P P V " " " P V V Physical Measurement Each Lot & Size Mechanical Test " REMARK Major 3 Tensile Strength Mechanical Test " " " " P V V Mechanical Test " " " " P V V Mechanical Test " " " " P V V Major 4 Air- Shrinkage Major 5 Moisture Content Major Mechanical Test " " " " P V V Chemical Test " " " " P V V Major Major Chemical Test " " " " P V V Critical Major Electrical Test Chemical Test " P P V V V V 6 Oil absorption Major 7 Conductivity of Aqueous extract 8 pH of Aqueous extract 9 Electrical Strength 10 Ash Content PREPARED BY : ( Mahindra SUSTEN) " " LEGEND : " " " " CHP - Customer Hold Point S: Supplier, M- Manufacturer/Vendor C - Customer, E- End User P - Agency Performing The Test V - Agency Verifying The Test Reports W - Agency Witnessing The Test Note: Customer specifications supersedes IS for routine and type tests " Page No : 1 of 5 QUALITY ASSURANCE PLAN Doc NO : IMS-QH-QAP-009-001 Date: 23.12.2015 Rev No :07 Item : Inverter Transformer & Aux. Transformer (Oil Filled) Mahindra SUSTEN Rating: up to 33 KV SL. COMPONENT & No. OPERATION Core Lamination 1.01 Densified Laminated 1.04 Wood 1.05 1.06 1.07 Transformer Oil Gaskets Structural Steel CLASS TYPE OF QUANTUM REFERENCE ACCEPTANCE FORMAT OF CHECK OF CHECK DOCUMENT NORMS RECORD S M C/E Each Lot & Size " S/M/C Spec/IS 3513 S/M/C Spec/IS 3513 supplier TC P P V Major Physical Measurement Measure " " " P V V Major Mechanical. " " " " P V 4 Oil absorption Major Measure " " " " P V 5 Moisture Content 6 Cross Breaking Strength Major Measure " " " " P V Mechanical. " " " " P V V Vendor to share the V Work Procedures for transportation V and handling of V CRGO CHARACTERISTICS Thickness 1 Thickness 2 Density 3 Tensile Strength Major AGENCY REMARK 7 Compression Strength Major Major Mechanical. " " " " P V V 8 Electrical Strength Critical Electrical Test " " " " P V V Critical Minor Major Major Major Major Major Major Major Major Major Electrical Physical Measure Chemical Chemical Chemical Chemical Chemical Chemical Chemical Chemical IS:6855 " " " " " " " " " " S/M/C Spec/IS 335 " " " " " " " " " " S/M/C Spec/IS335 " " " " " " " " " " QC Rep./TC " P P P P P P P P P P P P P V V V V V V V V V V V V V V V V V V V V P P V P P P P P P P V P V V V V V V V V V V V Not applicable in V case of nitryl gaskets P P P P V V V V V 1 2 3 4 5 6 7 8 9 10 11 Electrical Strength Appearance Density Viscosity Interfacial tension Flash Point Pour Point Neutralisation Value Corrosive Sulphur Tan Delta Water Content (ppm) supplier TC " " " " " " " " 1 Thickness Major Measure Each Size S/M/C Spec/IS 4253 for Cork gaskets & IS 11149 for Nitry gaskets S/M/C Spec/IS 4253 for Cork gaskets & IS 11149 for Nitry gaskets QC Rep./TC 2 3 4 5 6 7 8 Major Major Major Major Major Major Major Mechanical. Mechanical. Mechanical. Measure Measure Measure Chemical " " " " " " " " " " " " " " " " " " " " " supplier TC Major Measure Each Lot S/M/C Spec/IS2062 S/M/C Spec/IS2062 QC Rep./TC Major Major Mechanical. Mechanical. Tensile Strength Hardness Compressibility Recovery Flexibility Compression Set ph Value of Water Extract 1 Dimensions 2 Tensile Strength 3 Chemical Comp. PREPARED BY : ( Mahindra SUSTEN) " " LEGEND : " " " " CHP - Customer Hold Point S: Supplier, M- Manufacturer/Vendor C - Customer, E- End User P - Agency Performing The Test V - Agency Verifying The Test Reports W - Agency Witnessing The Test Note: Customer specifications supersedes IS for routine and type tests QC Rep./TC supplier TC " " " " " " Page No : 2 of 5 QUALITY ASSURANCE PLAN Doc NO : IMS-QH-QAP-009-001 Date: 23.12.2015 Rev No :07 Item : Inverter Transformer & Aux. Transformer (Oil Filled) Mahindra SUSTEN Rating: up to 33 KV SL. COMPONENT & No. OPERATION Core Lamination 1.01 1.08 Tank CLASS CHARACTERISTICS TYPE OF QUANTUM REFERENCE ACCEPTANCE FORMAT OF CHECK OF CHECK DOCUMENT NORMS RECORD 1 Thickness Dimensions Major Measure Each Unit S/M/C Drawing/Spec S/M/C Drawing/Spec 2 Welder Qualifications Critical Testing S/M/C Spec/ ASME Sec IX, WPS, PQR S/M/C Spec/ ASME Sec IX, WPS, PQR 3 Matching and Alignment of Components Major Physical Each person Each unit S/M/C Drawing/Spec S/M/C Drawing/Spec 5 Surface preparation check 6 Paint thickness & Peel Off test 7 Raw Material grade Major Mechanical. " " " Critical Measure " MTC Final inspection by Transformer Manufacturer at Tank Supplier's premise AGENCY M P W P P V W P W P W P V P W For Inverter W Transformer MSUSTEN will V witness Vendor tothe share Air the V Pressure, Work Procedures Vacuum for transportation Test, Leak test, DP andSurface handling of Test, CRGO Prepration check, W Dimensions of main Tank for One V unit only and thereafter on V random basis for different W Fabricators. P P P P W V P P W V V V P P P P P V V V V P P P P P P P P P P V P V V P V P P V P V V V V V V V V V V P P V P P P P P P P V V V V Busbars to be send V loose while V transportation to V avoid LV breakages V of LV insulators 8 DP Test 1.09 Instruments WTI / OTI/B Relay MOG & 9 Air Pressure Test, Vacuume Pressure Test, Leak Test 1 Model /Make 2 Calibration 3 Operational checks Critical Mechanical " " " Minor Major Major Physical Testing Testing Each Unit " " S/M/C Spec S/M/C Spec QC Rep./TC " " " " " " 1 2 3 4 Open Shut marking Size Leakage Test Operational check Major Major Major Major Physical Physical Physical Physical Each unit S/M/C Spec S/M/C Spec Supplier TC " " " " " " " " " " " " 1 2 3 1 2 3 1 2 3 4 Type/ Model Leakage Test Silica gel capacity Type /rating Dimension Operational Check Dimensions Leakage test Visual check Paint Shade,thickness & peel off Major Major Major Major Major Major Major Major Major Major Physical Physical Physical Physical Measure Physical Physical Physical Measure Measure Each unit S/M/C Spec S/M/C Spec Supplier TC " " " " " " " " Each unit S/M/C Spec S/M/C Spec Supplier TC " " " " " " " " Each unit S/M/C Spec S/M/C Spec Supplier TC " " " " " " " " " " " " Major Physical Each unit Major Major Major Physical Mechanical. Electrical Electrical " " " " " " " " " " " " " " " " REMARK S C/E balance instruments 1.10 1.11 1.12 1.13 Valves Silica Gel Breather OCTC Radiator 1 Dimensions 1.14 S/M/C Spec/IS 3347/2099 S/M/C Spec/IS 3347/2099 Supplier TC Bushings 2 Rating /Type 3 Porosity test 4 Temp Cycle test 5 Electrical Routine Test PREPARED BY : ( Mahindra SUSTEN) Major LEGEND : CHP - Customer Hold Point S: Supplier, M- Manufacturer/Vendor C - Customer, E- End User P - Agency Performing The Test V - Agency Verifying The Test Reports W - Agency Witnessing The Test Note: Customer specifications supersedes IS for routine and type tests Page No : 3 of 5 QUALITY ASSURANCE PLAN Doc NO : IMS-QH-QAP-009-001 Date: 23.12.2015 Rev No :07 Item : Inverter Transformer & Aux. Transformer (Oil Filled) Mahindra SUSTEN Rating: up to 33 KV SL. COMPONENT & No. OPERATION Lamination 1.01 Core 1.15 Marshalling Box 2.00 In process Checks 2.01 Winding 2.02 Core 2.03 Core Coil Assembly CLASS CHARACTERISTICS 1 2 3 4 2.05 Core Coil Assembly REFERENCE ACCEPTANCE FORMAT OF OF CHECK DOCUMENT NORMS RECORD S M C/E Physical Meas. Meas. Meas. Each unit S/M/C Spec S/M/C Spec QC Rep. " " " " " " " " P P P P V P V V V " " " " P P V P P NA P NA P NA NA NA NA NA NA NA P P P P P P P P " " " 1 Dimensions 2 Block Alignment,Position and tightness Major Meas. Each unit S/M/C Spec S/M/C Spec QC Rep. 3 Absence of Interstand short circuit (ContinuityBefore and After coil Pressing) Major Physical " " " " 4 5 6 1 2 3 1 Major Major Major Major Major Major Major Physical Electrical Physical Meas. Meas. Meas. Physical " " " " " " " " " " " " Each unit Each unit Each unit Each unit S/M/C Spec S/M/C Spec QC Rep. " " QC Rep. " " QC Rep. S/M/C Spec S/M/C Spec QC Rep. Major Major Physical Electrical Each unit Each unit " " QC Rep. " " QC Rep. Major Electrical Each unit " " QC Rep. Insulation Scheme Resistance Insulation condition Dimensions Core Diameter Stack Thickness Coil Supporting Arrangement Assembly of Windings 2 kV test between core & frame Turns ratio and Vector group verification Ovening Temp Meas. Major " " 3 Polarisation Index " " S/M/C Spec S/M/C Spec Major Meas. Each Unit 2 Insulation Resistance Visual Each unit Tanked PREPARED BY : ( Mahindra SUSTEN) Vendor to share the Work Procedures for transportation and handling of V CRGO P NA P V NA P V NA NA P P NA S/M/C Spec 1 Electrical clearances REMARK V SUSTEN reserve the right to do the on stage V inspection of Transformer at any of the manufacturing V stages mentioned V in this QAP before V final inspection, V SUSTEN can also V check the QC V process of any Supplier of Vendor V and vendor has to V fecilitate the same in all respect V without any further V financial implications. V NA S/M/C Spec 1 AGENCY " Major 4 Ovening Major Major Major Major QUANTUM CHECK 5 Paint Shade,thickness & peel off 2 3 2.04 Thickness Dimensions Wiring Quality-Tidiness HV Test 2kv for 1 Min Operational check TYPE OF LEGEND : QC Rep. " CHP - Customer Hold Point S: Supplier, M- Manufacturer/Vendor C - Customer, E- End User P - Agency Performing The Test V - Agency Verifying The Test Reports W - Agency Witnessing The Test Note: Customer specifications supersedes IS for routine and type tests Page No : 4 of 5 QUALITY ASSURANCE PLAN Doc NO : IMS-QH-QAP-009-001 Date: 23.12.2015 Rev No :07 Item : Inverter Transformer & Aux. Transformer (Oil Filled) Mahindra SUSTEN Rating: up to 33 KV SL. COMPONENT & No. OPERATION 1.01 3.00 Core FinalLamination Testing 3.01 Routine tests CLASS TYPE OF QUANTUM REFERENCE ACCEPTANCE FORMAT OF CHECK OF CHECK DOCUMENT NORMS RECORD Critical Electrical Each Unit " Critical " " Critical " Critical CHARACTERISTICS Thickness 1 Measurement of Winding Resistance AGENCY S REMARK M C/E Manufacturer Test Rep. P W " " P at all tap Positions Vendor to share the Work Procedures for transportation all Tap of andathandling W Positions CRGO " " " P W " " " " P W Critical " " " " P W Critical " " " " P W P W P W 2 Measurement of Voltage ratio and check for Vector relationship 3 Measurement of Impedance Voltage & short Circuit Impedance 4 Measurement of No Load Losses & Current 5 Measurement of Load Losses 6 Induced Over voltage Withstand test 7 Magnetic Balance Test Critical 8 Separate Source Voltage withstand test As per customer specifications/GTP (In absence of customer specifications as per IS 2026) Critical " " " Critical " " P W Critical " " IR on each unit, PI on one unit of each rating " P W " P W " P W " P W " P W accessories 9 Oil BDV Test 10 Insulation Resistance & Polarization Index 11 Lightning Impulse Test One Unit for Each Rating Critical 13 Calculation of Efficiency & Regulation 14 DPT Test for welding Critical Major 15 Oil Pressure Test Critical " " " Chemical Random Mechanical Each Unit on any Tr & at any portion of welding with radiator & all connected to main tank 16 Temperature Rise Test Critical 4.00 Electrical One Unit for Each Rating 1 Packing of accessories Dispatch 2 Touch up Painting Major Physical Each Unit " " " " P QC Rep P " " P S/M/C Spec/ Dispatch clearance " P " S/M/C Spec " S/M/C Spec CHP, Radiators to be 3 Packing and Dispatch (Packing should be done as per the attached SOP for Packing & dispacth ) " " " W dispatched in disassembled/loose condition, Every loose accessories must be specific identification no., Cable Terminations & dressing must be completed in all respect on Tr. Tank & at MB end Note : For trafo more than 5 MVA rating vendor has to dispatch along with Impact Recorder. PREPARED BY : ( Mahindra SUSTEN) LEGEND : CHP - Customer Hold Point S: Supplier, M- Manufacturer/Vendor C - Customer, E- End User P - Agency Performing The Test V - Agency Verifying The Test Reports W - Agency Witnessing The Test Note: Customer specifications supersedes IS for routine and type tests Page No : 5 of 5