Question individual of what system voltage they have worked ELV 50 (VAC) or 120 (VDC), LV below 1,000 VAC or 1500 VDC - I have worked with 220V, 380V (IEC 60038) HV above 1,000 V. I have worked with 6 KV, 11KV and participated in the 500KV SS cabling and termination with ABB representative. 400KV for my thesis Ask them what type of designs and studies they’ve completed. Accurate fault locator for EHV transmission lines based on radial basis function neural networks : fault resistance [0, 100] fault angle, [0, 90] (') sources capacity, [under the Min. source capacity, above the Max. source capacity] (MVA) (1) DC component. (2) Fundamental component (50H2). (3) Components over 100-350H2 range. (4) Components over 400-1000 Hz range. (5) Components over 1050-1950 Hz range. Sampling hardware interface: (1) A converter unit. (AD1674A ND converter) (2) A control unit (AT89C5l microcontroller). (3) A communication unit (ISA card that receives signals from the control unit via DB25 computer port) Protection coordination study of oil and gas facility 50/51 - Instantaneous/Time-delayed Overcurrent Relay 27 - Undervoltage Relay 59 - Overvoltage Relay 87 - Differential Relay 32 - Directional Power Relay 46 - Reverse Power Relay : Protects against reverse power flow, which may indicate a generator motoring condition 49 - Thermal Overload Relay 40 - Loss of Excitation 47 - Phase-Sequence 64 - Ground Protective Relay 60N - Neutral Current Unbalance 66 - Maximum Starting Rate/Starts per Hour/Time Between Starts 67 - AC Directional Overcurrent Relay 63 - Buchholz relays with a float-type sensing element 71 - Buchholz relays with a pressure-type sensing element Want to identify the following: Low voltage switchboard designs - No High Voltage Switchboards o seeking distribution board only or motor control boards with relays. No Protection System Designs – only coordination study and rectify the some settings , and protection test. Building Services. Yes I can Site connections- termination and joint up to 33KV, observed the 500KV Lighting Yes, I can Lightning MCOV, TOV, lightning impulse , discharge voltage, equipment BIL, IEEE 142 – Grounding standard, IEEE C62.11 maximum spacing recommended by the NFPA between lightning rods: 25ft (7.6m) (NFPA) 780-2004 standard, titled "Standard for the Installation of Lightning Protection Systems Site Electrical reticulations- electrical reticulation allows safe , reliable distribution of electrical power, yes, transformer arrangement, feeder arrangement, bus bar arrangement Overhead Lines Yes, I can, Geometry, Sag and span, Tension, Route, Cost, , Insulation coordination, Lightning, , pvDesign Want to identify if the individual carried out any sizing of the electrical infrastructures Maximum Demand : overload relay setting, generator and Backup Power sizing, switchgear, and transformer sizing, cable sizing and PLANNING. Prevent Overloading, Generator Sizing: big motors (starting method, total , expansion) Cable Sizing : yes for 11kv motor driven compressors, considering Short-Circuit Current, Derating Factors, Power Factor, Load Characteristics, Installation Method, Voltage Drop. Switchgear sizing, DC/AC, Load, SC Level, type of load, V, F, phase, Environmental Factors, Future Expansion Want to identify the type of studies they have completed themselves: Overhead Line Designs Short Circuit: Yes, cable , and breaker sizing Protection Coordination o Can they read time current curves? Yes Arc Flash (Ask if AC or DC Systems)- No Earthing Studies o Have they completed earth system testing (LFI, Fall of potential, step and touch): Cathodic Protection, Insulating Joints, Shielding o Have they carried out soil resistivity testing. Yes Lighting Studies Hazardous Area : o Zone 0: An area where flammable gases or vapors are present continuously, for long periods, or frequently. o Zone 1: An area where flammable gases or vapors are likely to occur under normal operating conditions. o Zone 2: An area where flammable gases or vapors are not likely to occur under normal operating conditions, and if they do, it will be for a short period. Low Frequency Induction on Pipelines Renewable Studies Generator Connection (R1 and R2) Want to identify what software packages used SKM PTW- Power System Analysis ATP- Power System Analysis ETAP- Power System Analysis EMTP- is commonly used for electromagnetic transient analysis in power systems, including studies related to insulation coordination, relay protection, and the behavior of surge arresters. Power Factory - Power System Analysis PSCAD- Power System Analysis HOMER - Renewable Calculation Software PSSE- Siemens- Power System Analysis o Can they model protection devices? o If so, how do they go about ascertaining the data? Ground Mat - Earthing Design Safegrid - Earthing Design AutoCAD or AutoCAD Electrical – Drafting, commenting Microstation - Drafting PowerPac - Cable Calculations PowerCAD- LV Switchgear Designs Do they have site experience? Was it data collection, site testing, project support, site support or commissioning? What were their responsibilities on site? Did they complete JSA, take 5’s while on site? Stop, Look, Assess ,Manage, Proceed Competency Questions Low voltage switchboard designs High Voltage Switchboards Building Services Site connections Site Electrical reticulations Overhead Lines Protection System What standards or references did they use for the designs: Some sample question to probe their insight of the standards Power Study Questions Load Flow, identify what the load flow study was used for. Short Circuit, identify what the intent of the short circuit was and how minimum and maximum fault levels was used. - Design of ANN based fault locator Protection Coordination- Run through time current curves. Yes , I have done protection study for oil and gas facility. o Are they familiar with ANSI Protection code numbers. Yes I have done full protection test (Primary and secondary injection) of 18MW generator coupled to a gas turbine o 50/51, 50/51N, 87, 64 Arc Flash Studies o What control can reduce arc flash incident energy Have they modelled new protection devices in the power system software?