PROJECT DRAWING M900, DOMESTIC HOT WATER LAYOUT
Floor
Elevation
70.9 m
22
67.4 m
21
64.4 m
20
19
18
~ 63.0 m
61.5 m
58.5 m
55.6 m
Loads / Expansion Joint Travel / Operating Deflection
Top, Deflection= 3.5 mm (0.1-in)
Estimated operating load= -1,050 N (-230 lbs.)
Estimated max (staged) load= -7,630 N (-1,710 lbs.)
Details / Branch / Equipment
Size
- --------------- Min. distance to first support= 914 mm.
DN50
DN50
xxx
Estimated design expansion= 49.5 mm (1.9-in)
Between anchors= 47.2 m (154.9ft)
Anchor 1, Connected per Structural Eng's instructions
Part No: 3501-131-4, Carbon Steel
DN50
Pressure (including pump)= 291 kPag (42 psig)
DN50
DN50
Offset, Min. riser to support= 875 mm (2.9')
DN50
17
52.6 m
Offset, Min. riser to support= 875 mm (2.9')
DN50
16
15
14
13
12
11
10
9
7
6
5
4
3
2
49.7 m
46.7 m
43.8 m
40.8 m
37.9 m
34.9 m
32.0 m
29.0 m
23.1 m
20.1 m
17.2 m
14.3 m
11.3 m
11.3 m
DN50
DN50
DN50
DN50
DN50
DN50
DN50
DN50
DN50
Estimated operating load= 8,500 N (1,900 lbs.)
Estimated max (design) load= 13,000 N (2,800 lbs.)
Bottom, Deflection= -3.2 mm (-0.1-in)
8.4 m
PROJECT NAME & RISER MATERIALS:
DN50
xxx
RISER TITLE:
HOT WATER DUMMY
LEVEL 2 TO LEVEL 22
Mineral Wool insulation
Carbon steel STD pipe (CS)
PROJECT #
Anchor 2, Connected per Structural Eng's instructions
DN50
DN50
- --------------- Min. distance to first support= 875 mm.
DN50
Pressure (including pump)= 805 kPag (115 psig)
DATE:
RISER CALCULATION No.
Jul 27, 2020
SHEET
M900
1
OF
REV.
1
0
Using RISERCALC version 1606.59.18.35