2009 Airbus A330-200 AIRBUS A330-200 AIRCRAFT IDENTIFICATION Aircraft Model Manufacturer Serial Number Manufacture Date Aircraft Registration Engines Model Sharklets/Winglets Noise Abatement Compliance Approach Category ETOPS Over Water AIRBUS A330-223 Q1 – 2009 TBA PW4168A YES Stage IV iaw. ICAO Annex 16, Volume 1 CAT III Capable 180 min YES WEIGHTS, OPERATIONAL Metric Maximum Taxi Weight (MTW) Maximum Take Off Weight (MTOW) Maximum Landing Weight (MLW) Maximum Zero Fuel Weight (MZFW) Operator`s Empty Weight (OEW) Maximum Payload Maximum Fuel Capacity Auxiliary Fuel Capacity 233`900 (kg) 233`000 (kg) 182`000 (kg) 170`000 (kg) 121`397 (kg) 48`632 (kg) 139`090 (Litres) None US Customary 515`661 (lbs.) 513`677 (lbs.) 401`241 (lbs.) 374`786 (lbs.) 267`635 (lbs.) 107`215 (lbs.) 36`746 (USG) None AIRFRAME STATUS Total Airframe Hours 32`048 Total Cycles 6`525 Status Date 23-AUG-2017 NOTE: WV 022 MAINTENANCE STATUS C - Check interval 24 MO 6Y - Check interval 72 MO 12Y - Check interval 144 MO Last C - Check 5C on 26 – APR – 2017 at 32`043 FH & 6`524 FC Last 6Y – Check 10 – NOV – 2014 at 26`331 FH & 4`937 FC Last 12Y – Check NONE Next C – Check APR – 2019 Next 6Y – Check NOV – 2020 Next 12Y - Check JAN – 2021 A330-200 MSN. TBA Page 2 of 10 ENGINE / APU DETAILS Manufacturer Model Thrust Rate ENGINE / APU STATUS Serial Number Total Time Since New Total Cycles Since New Last Shop Visit Hours Since Last Shop Visit Cycles Since Last Shop Visit Last Overhaul Hours Since Last Overhaul Cycles Since Last Overhaul First LLP Limiter Status Date LDG DETAILS Manufacturer Part Number Serial Number Position Cycles Since New Last Overhaul Date Cycles Since Overhaul Remaining Cycles Overhaul Due Date Overhaul Interval Engine 1 Engine 2 Pratt & Whitney PW4168A 68`600 Lbf Pratt & Whitney PW4168A 68`600 Lbf GTCP 331-350C Engine 1 Engine 2 APU TBA 27`336 5`424 MAR-2015 (EPR) 4`745 1`253 NONE N/A N/A 7`176 23-AUG-2017 TBA 27`016 5`413 SEP-2016 (EPR) 7 2 NONE N/A N/A 7`187 23-AUG-2017 TBA 5`746 6`739 NLG D23581100-16 TBA NLG 6`525 NONE N/A 10`475 JAN-2019 17`000 CYC or 10 Years Brakes & Part Number Wheels & Part Number BF Goodrich P/N: 3-1596 23-AUG-2017 Status Date A330-200 MSN. TBA LH MLG APU Honeywell JAN-2016 6 14 JAN-2016 6 14 TBA 23-AUG-2017 RH MLG Messier Dowty 10-210101-003 10-210201-003 TBA TBA LH MLG RH MLG 6`525 6`525 NONE NONE N/A N/A 10`475 10`475 JAN-2019 JAN-2019 17`000 CYC 17`000 CYC or 10 Years or 10 Years BF Goodrich P/N: 2-1577-X BF Goodrich P/N: 3-1546 23-AUG-2017 23-AUG-2017 Page 3 of 10 ENGINE Pos.#1 - LLP STAGE LP COMRESSOR / FAN MODULE LPC - DRUM ROTOR (1.3,1.6,2,3,4 STAGES) LPC - FRONT HUB LPC -/LPT TURB SHAFT COUPLING HP COMRESSOR MODULE HPC - 5TH STAGE DISK HPC - DRIVE SHAFT HPC - DRUM ROTOR (13-15 STAGES) HPC - DRUM ROTOR (6-12 STAGES) HPC - FRONT HUB HPC - INLET/DIFFUSER AIRSEAL (REF 1435) HP TURBINE MODULE HPT - FRONT T1 HUB HPT - REAR INTERMEDIATE T2 HUB HPT - T1 AIRSEAL OUTER ROTATING (REF 1752) HPT - T1 RING AIRSEAL (REF 1756) HPT - T2 AIRSEAL (ROTATING) HPT - T2 BLADE RETAINING PLATE LP TURBINE MODULE LPT - 3RD STAGE AIRSEAL (REF 1224) LPT - 3RD STAGE DISK LPT - 4TH STAGE AIRSEAL LPT - 4TH STAGE DISK LPT - 5TH STAGE AIRSEAL LPT - 5TH STAGE REAR HUB LPT - 6TH STAGE DISK LPT - 3RD STAGE AIRSEAL LPT - 7TH STAGE DISK LPT - SHAFT - FRONT COMPR DRIVE A330-200 PART NO. SERIAL NO. LIMIT 50B882-01 52B021 51A275 CBDUCM1775 CBDUCM9715 CLDLDC1527 15`000 15`000 15`000 9`576 9`576 9`576 54H405 54H767 58H236-01 50S106-01 51H572 54H792 CENCBE4263 CENCC25668 CENCDM3907 CLDLDF3876 CENCCY6561 CENCDG6899 15`000 15`000 15`000 15`000 15`000 15`000 9`576 9`576 10`259 9`576 9`576 9`576 51L901 52L002 50L879 50L664 53L030 50L242 CKLBKC9994 CKLBKE8584 CKLBJS5808 CKLBKD8629 CKLBJ68385 CKLBJ59293 15`000 15`000 12`600 15`000 13`900 15`000 9`576 9`576 7`176 9`576 8`476 9`576 50N521 50N803 51N038 51N404 50N419 51N505 50N886 50N420 50N587 52A519-01 CLDLC19097 CLDLDF9006 CLDLC57216 CLDLDG2564 CLDLC89141 CLDLDB4462 CLDLDG0906 CLDLDE6028 CLDLDB5387 CLDLDF9493 15`000 15`000 15`000 15`000 15`000 15`000 15`000 15`000 15`000 15`000 9`576 9`576 9`576 9`576 9`576 9`576 9`576 9`576 9`576 9`576 MSN. TBA REMAIN Page 4 of 10 ENGINE Pos.#2 - LLP STAGE LP COMRESSOR / FAN MODULE LPC - DRUM ROTOR (1.3,1.6,2,3,4 STAGES) LPC - FRONT HUB LPC -/LPT TURB SHAFT COUPLING HP COMRESSOR MODULE HPC - 5TH STAGE DISK HPC - DRIVE SHAFT HPC - DRUM ROTOR (13-15 STAGES) HPC - DRUM ROTOR (6-12 STAGES) HPC - FRONT HUB HPC - INLET/DIFFUSER AIRSEAL (REF 1435) HP TURBINE MODULE HPT - FRONT T1 HUB HPT - REAR INTERMEDIATE T2 HUB HPT - T1 AIRSEAL OUTER ROTATING (REF 1752) HPT - T1 RING AIRSEAL (REF 1756) HPT - T2 AIRSEAL (ROTATING) HPT - T2 BLADE RETAINING PLATE LP TURBINE MODULE LPT - 3RD STAGE AIRSEAL (REF 1224) LPT - 3RD STAGE DISK LPT - 4TH STAGE AIRSEAL LPT - 4TH STAGE DISK LPT - 5TH STAGE AIRSEAL LPT - 5TH STAGE REAR HUB LPT - 6TH STAGE DISK LPT - 7TH STAGE DISK LPT - SHAFT - FRONT COMPR DRIVE LPT - THRUST BALANCE AIRSEAL A330-200 PART NO. SERIAL NO. LIMIT 50B882-01 52B001 51A274 CBDUCM1776 CBDUCN0661 CLDLDC1537 15`000 15`000 15`000 9`587 9`587 9`587 54H405 54H767 58H236-01 50S106-01 51H572 54H792 CENCBE4258 CENCDL8184 CENCDM3917 CLDLDF3882 CENCCY6546 CENCDG6901 15`000 15`000 15`000 15`000 15`000 15`000 9`587 9`587 9`587 9`587 9`587 9`587 51L901 52L002 50L879 50L664 53L030 50L242 CKLBKE8188 CKLBKE8437 CKLBJS5815 CKLBKD8631 CKLBJ68380 CKLBJ59303 15`000 15`000 12`600 15`000 13`900 15`000 9`587 9`587 7`187 9`587 8`487 9`587 50N521 50N803 51N038 51N404 50N419 51N505 50N886 50N587 52A519-01 50N420 CLDLC19088 CLDLDF0486 CLDLC57162 CLDLDG2568 CLDLC89118 CLDLDH0002 CLDLDG0908 CLDLDB5370 CLDLDF9499 CLDLDE6029 15`000 15`000 15`000 15`000 15`000 15`000 15`000 15`000 15`000 15`000 9`587 9`587 9`587 9`587 9`587 9`587 9`587 9`587 9`587 9`587 MSN. TBA REMAIN Page 5 of 10 MAJOR AVIONICS EQUIPMENT DESCRIPTION ATA 22 – Automatic Flight Controls Flight Management Guidance Computer MCDU (Multifunction Control Display Unit) MANUFACTURER PART NUMBER QTY Thales Avionics Thales Avionics C13039CA01 C19266BA01 3 Thales Avionics Rockwell Collins Rockwell Collins L3-COMM. C12848CA01 822-1250-020 822-0330-020 2100-1020-02 3 3 2 1 Thales Avionics S1821502-02 1 AIRBUS SAS L3-COMM. LA2E20202T40000 2100-4043-02 2 1 Litton Aero Products L3-COMM. Thales Avionics ACSS Rockwell Collins Thales Optronique Rockwell Collins Rockwell Collins Honeywell 465020-03030316 7517800-10005 C12404AB02 9000000-11414 822-1710-203 9599-607-19502 822-0297-020 822-0329-020 066-50014-0202 3 2 1 1 2 2 2 2 1 2 ATA 23 – Communications RADIO Management Panel VHF COMM. Transceivers (Incl. 8.33 & FM imm.) HF COMM. Transceivers SSCVR (Cockpit Voice Recorder) (120 min) ATA 25 – Furnishings ELT – Emergency Locator Transmitter Fixed (121.5 / 243 / 406 MHz) ATA 31 - Indication and Recording System FWC (Flight Warning Computer) SSFDR (Solid State Flight Data Recorder) (25 Hr&256 Words/sec) ATA 34 – Navigation ADIRU (Air Data Inertial Reference Unit) ATC Transponder (Mode S – ELS & EHS Compliant) ATC / TCAS Control Unit T2CAS Computer (TAWS) WR (Weather Radar) Transceiver RA (Radio Altimeter) Transceiver VOR (VHF Omnidirectional Range) (Incl. FM imm.) DME (Distance Measurement Equipment) Interrogator ADF Receiver CAA REQUIREMENTS EASA TCDS EGPWS Area Navigation Elementary Surveillance (ELS) Enhanced Surveillance (EHS) Predictive Windshear GPS Installed SATCOM Installed ELT 121.5 / 406 MHz RVSM / FM Immunity & 8.33 KHz Chanel spacing TCAS Cockpit Door Surveillance System A330-200 COMPLIANCE EASA.A.004 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes MSN. TBA NOTEs BRNAV & PRNAV Change 7.1 Page 6 of 10 INTERIOR CONFIGURATION Galleys 5 (G1; G2; G5; G6; G7) 7 (1+4+2) Lavatories 11 Attendant Seats In Flight Entertainment Yes (Panasonic eX2 ISV) Seats Business Class Economy Class A330-200 Catering Standard Cargo Configuration Cockpit Configuration CREW Rest ATLAS Semi-Auto CLS + Bulk Standard (2+2) 2 Bunks (FWD) Quantity Manufacturer Part Number 24 259 SICMA WEBER AIRCRAFT 14052XX-XXX 862082-XXX MSN. TBA Page 7 of 10 CARGO CONFIGURATION Cargo Configuration Cargo Volume Load Limitation A330-200 CLS + Bulk 132.4 3Metres 37`578 Kg Designee (Fire Detection/Protection) class ULDs Main Cargo Door(s) MSN. TBA C 26 x LD-3 106” x 66” Page 8 of 10 PERFORMANCE A330-200 MSN. TBA Page 9 of 10 DELIVERY CONDITIONS The Aircraft will be delivered at an EASA or FAA approved maintenance facility in a location to be advised. Airframe: In January 2017, the Aircraft shall be fresh out of a C-Check. At delivery, there shall be no scheduled tasks accomplishment required before January 2019, 6,000 flight hours and 1,500 cycles, whichever is the most limiting factor. Engines: Each Engine shall have no more than 5,000 flight hours and 1,500 cycles since last performance restoration shop visit and sufficient EGT margin, with no defect present, to allow at least 6,000 flight hours and 1,500 cycles until next expected removal. Each engine LLP shall have no less than 1,500 cycles life remaining until removal. APU: The APU shall have no more than 2,000 APU hours since last APU performance restoration. Landing Gear: Landing gear shall not be due restoration before January 2019, or within 4,000 cycles, according to the manufacturer MPD. Components: Each component installed on the Aircraft shall be serviceable and be supported by an EASA Form 1 or FAA Form 8130. Each component installed on the Aircraft that has a flight hour, cycle or calendar limit, shall not be due removal before April 2018, 6,000 flight hours, 1,500 cycles, whichever is the most limiting factor. Paint: Aircraft shall be painted white. Interior Configuration: Aircraft shall be in 24 B/C 259 Y/C configuration. Airworthiness Directives: All airworthiness directives issued by EASA and / or the FAA which require compliance before January 2018, 1,450 flight hours or 275 cycles, whichever is most limiting, from delivery of the Aircraft shall have been complied with. Aircraft Documents: Aircraft shall have complete, up to date technical records, documentation and manuals and shall include full back to birth traceability for life limited parts. Certification: Aircraft shall meet all the requirements for, and be eligible for an immediate certificate of airworthiness issued by, and registration with, an EASA member state and immediate operation in an EASA member state in full compliance with EASAOPS regulation. Aircraft shall have either a certificate of airworthiness or an export certificate of airworthiness. Inspection: A330-200 At Buyer’s cost, the Seller will perform a maximum power assurance run on each Engine and at Bayer’s cost the Seller will perform an acceptance flight, of a duration not more than 2 hours as necessary to demonstrate the satisfactory operation of the Aircraft, with the Buyer or Buyer’s representative as observer. Following such acceptance flight, a representative of the Buyer, at Buyer’s cost, will perform a complete hot and cold section video borescope on each Engine. Buyer shall not be obliged to accept delivery of the Aircraft unless any defects or deficiencies found during such inspections have been rectified at Seller’s cost. MSN. TBA Page 10 of 10