ASTM C191-21 Standard Test Methods for Time of Setting of Hydraulic Cement by Vicat Needle Time Started: 3:20 pm Molding Time: 3:25 pm TRIAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TIME 3:35 pm 3:40 pm 3:45 pm 3:50 pm 3:55 pm 4:00 pm 4:05 pm 4:10 pm 4:15 pm 4:20 pm 4:25 pm 4:30 pm 4:35 pm 4:40 pm 4:45 pm 4:50 pm 4:55 pm Initial Setting Time: 4:55 pm Initial Setting Time Duration: 1 hour and 20 minutes Final Setting Time: 7:05 pm Final Setting Time Duration: 2 hours and 10 minutes Overall Duration from Time Started: 3 hours and 45 minutes DEPTH (cm) 41 41 38 38 37 35 34.5 37 34 31 29 30 30 28 26 27 25 Water Content: 0.85 x 300 x 0.3 = 76.5 cc Cement Content: 1360.27 - 1060.20 = 300.07 g