Uploaded by Yaman

pdfcoffee.com sec-standards-pdf-free

advertisement
INDICES OF APPROVED TRANSMISSION STANDARDS AND SPECIFICATIONS
Standard No.
Title
Rev No.
Rev Approved Date
TMSS
TRANSMISSION MATERIAL STANDARDS AND SPECIFICATION (TMSS)
General Requirements
01-TMSS-01
General Requirements for All Equipment/Materials
1
Mar. 31, 2010
Total =
1
Conductors, Bare
10-TMSS-01
Conductors Bare
1
Apr. 29, 2009
10-TMSS-02
Guy Wire Strand, Galvanized
0
Mar. 13, 2006
10-TMSS-03
Overhead Ground Wire (OGW)
0
Mar. 13, 2006
10-TMSS-04
Optical Ground Wire (OPGW)
0
Mar. 13, 2006
10-TMSS-05
Bare, Copper-clad Steel Grounding Conductor and Ground Rod
1
Sep. 07, 2010
10-TMSS-06
Conductor, Bare, Overhead Line (Heat-Resistance, Aluminum Alloy
Conductor)
0
Feb. 14, 2007
Total =
6
Conductor, Insulated
11-TMSS-01
Power Cable , XLPE, Cu or Al, 1-Core, 69 kV
0
May. 30, 2006
11-TMSS-02
110kV, 115KV, 132KV, 230KV or 380kV, XLPE, Single Core, Copper
Power Cable
0
May. 30, 2006
11-TMSS-03
POWER CABLE, LPOF, CU, 1-CORE, 115kV, 132 kV, 230kV or 380kV
0
May. 30, 2006
11-TMSS-10
Power and/or Control Cable Cu or Al Conductor 600/1000 V Rating
0
Mar. 18, 2006
11-TMSS-11
Instrumentation Cables, Shielded
0
Sep. 07, 2010
Total =
5
Conductor Fittings
12-TMSS-01
Line Hardware
1
Mar. 31, 2010
12-TMSS-02
Compression Type Connectors For O/H T/L
0
Aug. 05, 2006
12-TMSS-03
Obstruction Markers And Conductor Lighting
0
May. 30, 2006
12-TMSS-10
Splice & Termination Kits For Power Cables 69 kV, 115 kV, 132 kV, 230
kV, and 380 kV
0
May. 30, 2006
12-TMSS-11
Link Boxes For Grounding Of U/G Power Cable
0
Dec. 15, 2007
Total =
5
Insulators
15-TMSS-01
Insulators, Station Post Type, Porcelain, Indoor/Outdoor, 69 kV through
380 kV
0
May. 30, 2006
15-TMSS-02
Insulators, Porcelain or Glass, Suspension Type
1
Mar. 31, 2010
15-TMSS-03
Insulators, Porcelain Horizontal Line Post Type
0
Apr. 09, 2006
15-TMSS-04
Insulators, Porcelain, Long Rod Type
1
Jun. 30, 2010
15-TMSS-05
Insulators, Composite, Horizontal Line Post, Suspension and Tension
Type
1
Sep. 08, 2010
15-TMSS-06
Composite Station Post Insulators, 69 kV through 230 kV
0
Feb. 14, 2007
15-TMSS-07
RTV Silicon Rubber Insulator Coating
0
Jun. 25, 2008
Total =
7
Poles, Towers, Structures and Line Supports
20-TMSS-01
Transmission Line And S/S Latticed Steel Structures
0
Aug. 20, 2006
20-TMSS-02
Poles, Steel, Tapered, Tubular For Transmission Lines
0
Aug. 20, 2006
20-TMSS-03
Wood Equivalent Steel Poles, Direct Embedded for Overhead
Transmission Lines.
0
Sep. 01, 2009
Total =
3
Conduits, Fittings & Accesssories
10-Jun-2011
Page 1 of 10
Standard No.
Title
Rev No.
Rev Approved Date
23-TMSS-01
PVC Conduits & Fittings for Underground Cables
0
Oct. 09, 2007
23-TMSS-02
Duct Sealing Units
0
Aug. 05, 2006
23-TMSS-04
Cable Clamps for Power Cables
0
Apr. 02, 2011
Total =
3
Wire ways, Cable Trays, Boxes and Enclosures
24-TMSS-01
Metallic Cable Tray Systems
0
Mar. 18, 2006
Total =
1
Line Switches and Disconnecting Devices
30-TMSS-01
Air Break Disconnect Switches and Grounding Switches, 33Kv Through
380Kv
0
Feb. 22, 2006
Total =
1
Substation Panels
31-TMSS-01
Relay and Control Panels
0
Feb. 22, 2006
31-TMSS-02
Auxiliary AC/DC Panels
0
May. 30, 2006
31-TMSS-06
Terminal Blocks
0
Aug. 31, 2009
Total =
3
Switchgear
32-TMSS-01
Metal Clad Switchgear 11kV, 13.8kV, 33kV or 34.5kV
1
Jun. 30, 2010
32-TMSS-02
SF6 Gas Insulated Switchgear, 69kV through 380kV
1
Jun. 30, 2010
32-TMSS-03
Metal Clad Gas Insulated Medium Voltage Switchgear
(11kV,13.8kV.33kV or 34.5kV)
0
Dec. 24, 2008
32-TMSS-04
Hybrid SF6 Gas Insulated Switchgear Rated 69kV and Above
0
Apr. 02, 2011
32-TMSS-07
SF6 Non-Extensible Ring Main Unit, 13.8 kV
0
Jan. 07, 2007
Total =
5
Lightning & Surge Protection Devices
35-TMSS-01
Surge Arrester
0
Oct. 10, 2007
Total =
1
Circuit Breakers
37-TMSS-01
Circuit Breaker, SF6, Dead Tank, 69 kV Through 380 kV
0
Aug. 20, 2006
37-TMSS-02
Circuit Breaker, SF6, Live Tank, 69 kV Through 380 kV
0
May. 07, 2007
37-TMSS-03
LV Circuit Breakers
0
Mar. 31, 2010
Total =
3
Power Line Carrier, Supervisory Control
38-TMSS-01
Line Trap
0
Feb. 14, 2007
38-TMSS-02
Line Tuner
0
Oct. 10, 2007
38-TMSS-03
Remote Terminal Unit
1
Aug. 31, 2009
38-TMSS-04
Sequence of Events Recorder System
0
Mar. 25, 2007
38-TMSS-05
Annunciator Systems
0
Aug. 06, 2006
38-TMSS-06
DYNAMIC SYSTEM MONITOR
0
Dec. 24, 2008
38-TMSS-07
On-Line Partial Discharge Monitoring System
0
Jun. 30, 2010
38-TMSS-08
Coupling Capacitor Voltage Transformer for 69kV Thru 380kV System
Voltage
0
Dec. 15, 2007
Total =
8
Meters
40-TMSS-02
Metering Devices
0
Mar. 25, 2007
40-TMSS-03
AUTOMATIC METER READING (AMR) SYSTEM
0
Dec. 03, 2007
Total =
10-Jun-2011
2
Page 2 of 10
Standard No.
Title
Rev No.
Rev Approved Date
0
Aug. 23, 2006
Capacitor
43-TMSS-01
Shunt Capacitor Bank, Substation Type 13.8 kV through 380 kV
Total =
1
Batteries and Power Supplies
46-TMSS-01
Vented Type Lead Acid Stationary Battery
0
Mar. 18, 2006
46-TMSS-02
Battery Chargers
0
Mar. 13, 2006
46-TMSS-03
UPS 5 kVA thru 100 kVA
0
Dec. 16, 2006
46-TMSS-04
Valve Regulated Lead Acid (VRLA) Stationary Battery Bank
0
Jan. 07, 2007
46-TMSS-05
48 V Communication Battery Charger
0
Mar. 25, 2007
46-TMSS-06
Vented Nickel - Cadmium Stationary Battery Bank
0
Jan. 07, 2007
46-TMSS-07
DC-DC CONVERTORS
0
Apr. 29, 2009
Total =
7
Communications & Fiber Optic Equipment
48-TMSS-01
Pilot Wire Cables
0
Aug. 21, 2006
48-TMSS-02
Non Metallic Fiber Optic Cables
0
Aug. 21, 2006
48-TMSS-03
Pilot Cable Termination Box
0
Sep. 27, 2006
48-TMSS-04
Pilot Cable Termination Equipment
0
Aug. 21, 2006
48-TMSS-05
Pilot Cable Termination Equipment With Cabinet
0
Aug. 21, 2006
48-TMSS-06
Medium Density Fiber Optics Terminal Equipment
0
Aug. 21, 2006
Total =
6
Transformers, Current and Potential
50-TMSS-01
Current Transformer, 11 kV through 380 kV
0
May. 30, 2006
50-TMSS-02
Capacitor Voltage Transformers (CVT), 110 kV through 380 kV
0
Aug. 06, 2006
50-TMSS-03
Potential Transformer, 33 kV through 380 kV
0
Aug. 28, 2006
Total =
3
Transformers, Station Service, up to 2MVA
51-TMSS-01
Pad Mounted Station Service Transformer up to 2 MVA
0
Mar. 18, 2006
Total =
1
Transformer, Specialty
52-TMSS-01
Grounding Transformer, 13.8kV, 33kV or 34.5kV
0
May. 30, 2006
52-TMSS-02
Air Core Neutral Grounding Reactor for 11 kV through 132 kV System
0
Jan. 08, 2007
Total =
2
Power Transformer, Rated Above 2MVA
53-TMSS-01
Power Transformers, Rated 2 MVA Up to 100 MVA
1
Apr. 02, 2011
53-TMSS-02
Power Transformers, Rated Above 100 MVA
1
Apr. 02, 2011
53-TMSS-03
Online Gas Analyzer
0
Aug. 31, 2009
Total =
3
Electrical Insulating oil
54-TMSS-01
Mineral Insulating Oil for Electrical Apparatus
1
Sep. 01, 2009
Total =
1
Resistor
57-TMSS-01
Neutral Grounding Resistor, 11 kV through 34.5 kV
0
Jan. 08, 2007
Total =
1
Reactor
58-TMSS-01
Oil Immersed Reactor, 33 kV through 380 kV
0
Jul. 29, 2006
58-TMSS-02
Air Core Series Reactor, 13.8 kV through 380 kV
0
Aug. 06, 2006
10-Jun-2011
Page 3 of 10
Standard No.
Title
Rev No.
Rev Approved Date
Total =
2
CONSTRUCTION MATERIALS AND SUPPLIES
70-TMSS-01
Shop Applied Internal Cement Mortar Lining Of Steel Pipes
0
Oct. 10, 2007
70-TMSS-02
Chainlink Fence
0
Apr. 09, 2006
70-TMSS-03
Normal Weight Ready Mixed Cement Concrete
0
Apr. 10, 2006
Total =
3
CONSTRUCTION MATERIAL II
71-TMSS-02
Prefabricated portable bldg
0
Dec. 16, 2007
71-TMSS-03
Pre-Engineered Metal Building
0
Jun. 23, 2008
Total =
2
AIR CONDITIONING EQUIPMENT
73-TMSS-01
Air Conditioning Unit, Packaged
0
May. 30, 2006
73-TMSS-02
Packaged Air Cooled Water Chiller with Screw-Type Compressor
0
Aug. 06, 2006
73-TMSS-03
Air handling Units, Chilled Water Type
0
Dec. 16, 2007
73-TMSS-04
HVAC Pumps
0
Jul. 17, 2007
73-TMSS-05
Centrifugal Exhaust Fans
0
Jul. 17, 2007
Total =
5
PIPES, HOSES, TUBINGS AND FITTINGS
75-TMSS-01
Plastic piping for plumbing systems
0
Dec. 03, 2008
75-TMSS-02
Vitreous China Plumbing Fixtures
0
Apr. 02, 2011
75-TMSS-03
Enameled Cast Iron Plumbing Fixtures
0
Jul. 17, 2007
Total =
3
BOLTS; NUTS; WASHERS
76-TMSS-02
Irrigation Controllers And Valves
0
Jul. 15, 2007
Total =
1
ABRASIVES; PAINT; PROTECTIVE COATING, OTHER
78-TMSS-01
Catalytically Cured Epoxy Phenolic Coating For Atmospheric Service
0
Oct. 10, 2007
78-TMSS-02
Catalytically Cured Epoxies & Epoxy Phenolics For Immersion And Damp
Services
0
Oct. 10, 2007
78-TMSS-03
Primers: Zinc Chromate
0
Mar. 29, 2008
78-TMSS-04
Paints: Enamel, Emulsion, Varnish And Laquers
0
Jun. 23, 2008
78-TMSS-05
Paints: Chlorinated Rubber Systems
0
Jun. 23, 2008
78-TMSS-06
Paints: Aluminum And Steel
0
Jun. 23, 2008
78-TMSS-07
Non-Skid Deck Paint
0
Jun. 23, 2008
78-TMSS-08
Miscellaneous Materials For Paints and Repairs
0
Jun. 23, 2008
78-TMSS-09
Primers-Others
0
Dec. 03, 2008
78-TMSS-10
Paints for Interiors
0
Dec. 03, 2008
78-TMSS-11
Coating and Water Proofing
0
Dec. 03, 2008
78-TMSS-12
Floor Systems For Substations
0
Mar. 11, 2009
Total =
12
WATER TREATMENT & STORAGE EQUIPMENT
80-TMSS-01
Shop Assembled Storage Tank
0
Jul. 15, 2007
Total =
1
GENERATOR; PORTABLE; PUMPS; ENGINES; MOTOR
83-TMSS-01
Submersible Sump Pumps
0
Oct. 10, 2007
Total =
10-Jun-2011
1
Page 4 of 10
Standard No.
Title
Rev No.
Rev Approved Date
SAFETY AND SECURITY EQUIPMENT
90-TMSS-01
Fire Protective Signaling Panel
0
Mar. 25, 2007
90-TMSS-02
Fire Water Pumps
0
Mar. 29, 2008
90-TMSS-03
Portable Fire Extinguishers
0
Jun. 24, 2008
90-TMSS-04
Carbon Steel Pipes For Fire Protection Systems
0
Dec. 03, 2008
90-TMSS-08
Emergency shower and eye (and face) wash equipment.
0
Apr. 29, 2009
90-TMSS-09
Valve Inspection And Testing Requirements
0
Jun. 23, 2008
90-TMSS-10
Fire Water Sprinklers
0
Dec. 16, 2007
Total =
7
FURNISHINGS, MISCELLANEOUS APPLIANCES
94-TMSS-01
Automatic Electric Water Heaters
0
Jun. 23, 2008
94-TMSS-02
Drinking Water Coolers
0
Jun. 23, 2008
Total =
2
TES
TRANSMISSION ENGINEERING SPECIFICATION (TES)
FIRE PROTECTION SYSTEM
TES-B-106.01
Fire Detection And Alarm Systems
0
Dec. 17, 2007
TES-B-106.03
CO2 Total Flooding System
0
Dec. 03, 2008
TES-B-106.04
Deluge System
0
Apr. 29, 2009
TES-B-106.05
HFC-227ea Clean Agent Extinguishing Systems
0
Dec. 03, 2008
TES-B-106.06
FK 5-1-12 Fixed Installation Total Flooding Clean-agent Fire
Extinguishing System
0
Nov. 11, 2009
Total =
5
PAINT AND COATINGS
TES-H-107.01
Painting
0
Dec. 03, 2008
TES-H-107.02
Paint Color Codes and Standards
0
Dec. 03, 2008
Total =
2
AIR CONDITIONING , HEATING
TES-K-100.01
Heating, Ventilating and Air Conditioning System Design
0
Aug. 20, 2006
Total =
1
BATTERIES AND UPS STANDARDS
TES-P-103.01
Introduction to Batteries and UPS Standards.
0
Oct. 09, 2007
TES-P-103.02
Storage Battery Selection and Capacity Determination
0
Jul. 15, 2007
TES-P-103.03
Battery Charger Sizing
0
Mar. 25, 2007
TES-P-103.04
Storage Battery Installation
0
Jan. 08, 2007
TES-P-103.05
Uninterruptible Power System
0
Jul. 15, 2007
TES-P-103.06
Communication DC Power Systems
0
Oct. 09, 2007
Total =
6
UNDERGROUND CABLE ENGINEERING STANDARDS
TES-P-104.01
General Engineering Requirements For U/G Cables
0
Dec. 16, 2006
TES-P-104.02
Cable Construction
0
Dec. 16, 2006
TES-P-104.03
Cable Sizing & Selection
0
Dec. 16, 2006
TES-P-104.04
Splice & Termination
0
Dec. 16, 2006
TES-P-104.05
Cable Installations, Engineering Requirements
0
Feb. 18, 2007
TES-P-104.08
Bonding and Grounding of Insulated Metallic Sheath of Power Cable
System (69kV to 380kV)
1
Mar. 30, 2011
Total =
6
Substation Design Standards
10-Jun-2011
Page 5 of 10
Standard No.
Title
Rev No.
Rev Approved Date
TES-P-119.01
Introduction to Substation Design Standards
0
Jan. 30, 2007
TES-P-119.02
Basic Design Aspects
0
Aug. 04, 2007
TES-P-119.05
Insulation Coordination
0
Oct. 17, 2006
TES-P-119.06
Surge Protection
0
Oct. 16, 2006
TES-P-119.07
Shielding
0
Oct. 16, 2006
TES-P-119.08
Clearances
0
Aug. 04, 2007
TES-P-119.09
Busbars and Supporting Structures
1
Nov. 29, 2010
TES-P-119.10
Grounding
0
Oct. 16, 2006
TES-P-119.11
Substation Insulators
0
Jan. 30, 2007
TES-P-119.12
Application Criteria for Electrical Equipment
0
Feb. 19, 2007
TES-P-119.18
Outdoor Equipment Foundation
0
Dec. 17, 2007
TES-P-119.19
Substation Building and Site Developement
0
Dec. 17, 2007
TES-P-119.20
LV Cable Raceways & Cable Installation Practices
0
Dec. 16, 2006
TES-P-119.21
Fire & Loss Prevention Requirements
0
Jun. 24, 2008
TES-P-119.25
Lighting and Receptacles for Substation Yard & Building
0
Dec. 16, 2006
TES-P-119.26
Control Schemes for Substation Equipments
1
Nov. 29, 2010
TES-P-119.27
Supervisory Control and Data Acquisition (SCADA)
1
Jun. 30, 2010
TES-P-119.28
Protection and Metering Instrument Transformers CT & PT Sizing
Calculation
0
Sep. 08, 2010
TES-P-119.29
LV Cable Selection and Sizing (600 V & Below)
0
Oct. 09, 2007
TES-P-119.30
Auxiliary Power Systems (AC/DC)
0
Mar. 25, 2007
TES-P-119.31
Metering
0
Dec. 16, 2006
TES-P-119.33
Substation Electrical Diagrams
0
Dec. 16, 2006
TES-P-119.34
Application Of System Grounding
0
Dec. 15, 2007
TES-P-119.35
Station Auxiliary Transformer Sizing
0
Mar. 30, 2011
TES-P-119.38
Transformer Regulation and On Load Tap Changer Selection
0
Mar. 30, 2011
TES-P-119.41
Non-Linear Resistor Application in GIS
0
Mar. 30, 2011
Total =
26
TRANSMISSION LINE DESIGN STANDARDS
TES-P-122.01
Basic Design Requirements
0
Oct. 17, 2006
TES-P-122.03
Conductors And Overhead Ground Wires
0
Oct. 17, 2006
TES-P-122.04
Line Hardware and Fittings for Conductors and Overhead Ground Wires
1
Sep. 07, 2010
TES-P-122.05-PI
Transmission Line Structures – Part I: Latticed Steel Towers
0
May. 07, 2007
TES-P-122.05-PII
Transmission Line Structure – Part II: Steel Poles
0
Oct. 17, 2006
TES-P-122.06
Transmission Structure Foundations
0
Sep. 08, 2008
TES-P-122.07
Transmission Structure Spotting
0
Oct. 18, 2006
TES-P-122.08
Survey Guidlines
0
Feb. 18, 2007
TES-P-122.09
Clearance & ROW Requirments
0
Dec. 12, 2007
TES-P-122.10
Transmission Line Grounding
0
Feb. 18, 2007
TES-P-122.11
Access Roads and Structure Pads
0
Mar. 29, 2008
TES-P-122.12
Upgrading Of Overhead Transmission Lines
0
Jun. 25, 2008
Total =
12
SAFETY AND SECURITY
TES-S-101.01
Safety and Security - Introduction
0
Dec. 15, 2007
TES-S-101.02
Safety & Security - Security Fence
0
Dec. 15, 2007
TES-S-101.03
Safety & Security - Category II Fence
0
Dec. 15, 2007
TES-S-101.04
Safety & Security - Catergory III Fence
0
Dec. 15, 2007
10-Jun-2011
Page 6 of 10
Standard No.
Title
Rev No.
Rev Approved Date
TES-S-101.05
Safety & Security - Category III Fence (Alternative)
0
Dec. 15, 2007
TES-S-101.06
Safety & Security - Gates in Perimeter Fences
0
Dec. 15, 2007
TES-S-101.07
Safety & Security - Gates in Woven Wire Fabric Fences
0
Dec. 15, 2007
TES-S-101.08
Safety & Security - Barbed "S" Wire Concertina
0
Dec. 15, 2007
TES-S-101.09
Safety & Security - Security and Emergency Exit Doors
0
Dec. 15, 2007
TES-S-101.10
Safety & Security - Locks Used on Security Doors, Perimeter Fences and
Emergency Exits
0
Dec. 15, 2007
TES-S-101.11
Safety & Security - Building Housing Vital Equipment
0
Dec. 15, 2007
TES-S-101.12
Safety & Security - Protection Of Vital Equipments
0
Dec. 15, 2007
TES-S-101.13
Safety & Security - Power Supplies
0
Dec. 15, 2007
TES-S-101.14
Safety & Security - Communications
0
Dec. 15, 2007
TES-S-101.15
Safety & Security - Security Lighting Systems
0
Dec. 15, 2007
TES-S-101.16
Safety & Security - Check Point Lighting
0
Dec. 15, 2007
TES-S-101.17
Safety & Security - Intruder Detection Systems
0
Dec. 15, 2007
TES-S-101.18
Safety & Security - Automatic Control of Entry
0
Dec. 15, 2007
TES-S-101.19
Safety & Security - Gate House and Vehicle Lock
0
Dec. 15, 2007
TES-S-101.20
Safety & Security - Fire Fighting Equipments
0
Dec. 15, 2007
TES-S-101.21
Safety & Security - Work Permit Procedures
0
Dec. 15, 2007
TES-S-101.22
Safety & Security - Expanded Metal Mesh
0
Dec. 15, 2007
TES-S-101.23
Safety & Security - Protection of Diesel Engines
0
Dec. 15, 2007
TES-S-101.24
Safety & Security - Gasoline Filling Stations
0
Dec. 15, 2007
TES-S-101.25
Safety & Security - Automatic Control of Entry
0
Dec. 15, 2007
TES-S-101.26
Safety & Security - Turn Isles for Entry Control
0
Dec. 15, 2007
TES-S-101.27
Safety & Security - Internal Tank Cleaning
0
Dec. 15, 2007
TES-S-101.28
Safety & Security - Blast Resistant Control Building
0
Dec. 15, 2007
TES-S-101.29
Safety & Security - Tank Spacing-Dikes And Drainage
0
Dec. 15, 2007
TES-S-101.30
Safety & Security - The safe design, Construction, Operation and MTCC
of On-Shore Pipelines for the Conveyance of Petrol
0
Dec. 15, 2007
TES-S-101.31
General Procedures / Safety Standards For Blasting Near SEC Facilities.
0
Dec. 15, 2007
Total =
31
COMMUNICATIONS
TES-T-111.02
Communication Facility Grounding
0
Mar. 29, 2008
TES-T-111.03
Communications Facility Lightning and Electrical Protection
0
Mar. 31, 2010
TES-T-111.05
General And VF Level Circuit Performance
0
Feb. 14, 2007
TES-T-111.06
Fiber Optic and PCM Circuit Performance
0
Dec. 03, 2008
TES-T-111.07
PLC/SSB Circuit Performance
0
Dec. 03, 2008
TES-T-111.08
ACC/FDM Circuit Performance
0
Dec. 03, 2008
TES-T-111.10
Communications Feeder Cables
0
Dec. 03, 2008
TES-T-111.12
Outside Plant (Communications) Standards and Practices for Facility
Area Plan Design and Remote Distribution Area Plan Design
0
Nov. 11, 2009
TES-T-111.17
Fire Protection Of Communication Facilities
0
Jun. 25, 2008
TES-T-111.18
Environmental Considerations For Communications Sites And Remote
Communications Terminals
0
Jan. 30, 2007
TES-T-111.19
Design Criteria For Communication Tower
0
Jul. 15, 2007
Total =
11
WELDING
TES-W-109.01
General Welding Criteria
0
Mar. 30, 2011
Total =
10-Jun-2011
1
Page 7 of 10
Standard No.
Title
Rev No.
Rev Approved Date
TCS
TRANSMISSION CONSTRUCTION SPECIFICATION (TCS)
AIR CONDITIONING, HEATING
TCS-K-100.01
HVAC Systems and Equipment Installation
0
Dec. 03, 2008
Total =
1
BUILDING CODE
TCS-M-112.01
General Purpose Fencing
0
Dec. 03, 2008
Total =
1
UNDERGROUND CABLE CONSTRUCTION STANDARDS
TCS-P-104.01
General Requirments
0
Aug. 04, 2007
TCS-P-104.02
Cable Reels Handling & Storage
0
Oct. 09, 2007
TCS-P-104.03
Trenches and Ducts
0
Jun. 25, 2008
TCS-P-104.06
Cable Installation, Field Handling Procedures
0
Feb. 14, 2007
TCS-P-104.08
Field Testing of Power Cables Rated 110kV, 115kV, 132kV, 230kV or
380kV
0
Dec. 16, 2007
Total =
5
COMMISSIONING TESTS AND CHECKS OF POWER
TRANSMISSION NETWORK EQUIPMENT
TCS-P-105
Precommissioning Tests/Procedures for SEC Transmission Electrical
Installations
0
Sep. 21, 2004
Total =
1
TRANSMISSION LINE CONSTRUCTION STANDARDS
TCS-P-122.01
Safety in Construction of Transmission Lines
0
Oct. 10, 2007
TCS-P-122.02
Material Handling
0
Oct. 17, 2006
TCS-P-122.03
Structure Staking
0
Jun. 23, 2008
TCS-P-122.05
Installation Of Steel Structure Foundations
0
Dec. 16, 2006
TCS-P-122.06
Assembly And Erection Of Steel Structure
0
Dec. 16, 2006
TCS-P-122.07
Installation of Overhead Line Conductors & Ground Wires
0
Dec. 16, 2006
TCS-P-122.08
Composite OPGW Strand Installation
0
Jan. 09, 2007
TCS-P-122.09
Storage, Handling & Installation of Composite Insulators
0
Aug. 04, 2007
TCS-P-122.21
Transmission Line Structure Details for 69kV to 380kV.
0
Aug. 18, 2009
TCS-P-122.22
Application of Silicon Rubber Protective Coating on Ceramic Insulators
0
Sep. 01, 2009
Total =
10
CONCRETE FOUNDATIONS
TCS-Q-113.01
Asphalt Concrete Paving
0
Apr. 10, 2006
TCS-Q-113.02
Earthworks
0
Apr. 10, 2006
TCS-Q-113.03
Cast - In - Place Concrete
0
Apr. 10, 2006
TCS-Q-113.04
Precast Concrete works
0
Dec. 17, 2007
Total =
4
COMMUNICATIONS/UNDERGROUND COMMUNICATION
(TELEPHONE/OPTICAL FIBER/PILOT) CABLE INSTALLATION
TCS-T-111.01
Acceptance/Commissioning, Test and Inspection of Communications
Network Equipment
0
Feb. 14, 2007
TCS-T-111.02
Conduit Sealing For Underground Communication Cable
0
Dec. 03, 2008
TCS-T-111.03
Communication Cable Splicing
0
Nov. 29, 2010
TCS-T-111.04
Underground Telephone Cable Installation
0
Mar. 31, 2010
TCS-T-111.05
Long Pulls And Reel Length Limitations Of Underground Telephone
Cables
0
Mar. 29, 2008
TCS-T-111.06
Optical Fiber Cables Splicing
0
Dec. 03, 2008
TCS-T-111.08
Installation of Underground Non Metallic Fiber Cable
0
Mar. 29, 2008
10-Jun-2011
Page 8 of 10
Standard No.
Title
Rev No.
Rev Approved Date
TCS-T-111.10
Underground Installation, Splicing and Testing / Acceptance of Pilot
Cables
0
Dec. 03, 2008
TCS-T-111.11
Design And Installation Of Underground Communications Conduit And
Manhole System
0
Mar. 29, 2008
Total =
9
TSD
TRANSMISSION DEVELOPMENT SPECIFICATION (TSD)
TRANSMISSION STANDARD DRAWINGS
TA-800001
110 /115 KV High/Low Bus Support & Disconnect Switch Structures
0
Mar. 25, 2007
TA-800002
Plan, Elevation, Section And Details Of Standard Switch Operating
Platform
0
Mar. 25, 2007
TA-800004
Lighting/Lightning Steel Monopoles
0
Mar. 25, 2007
TA-800005
110 kV to 115 kV "A" Frame Take Off Structure
0
Oct. 09, 2007
TA-800006
110/115 kV Take Off Structure – Lattice Gantry Structure
0
Jul. 15, 2007
TA-800012
Precast Concrete Boundary Wall (Plan, Elevation & Details)
0
Apr. 29, 2009
TA-800013
Boundary Wall for Substation Location in Urban Areas
0
Aug. 31, 2009
TA-800022
Gate in Woven Wire Fabric Fence (SAG SSD/5A:TES-S-101.07)
0
Oct. 12, 2009
TA-800023
Door Schedule & Details
0
Apr. 29, 2009
TA-800024
Finish Schedule / Miscellaneous Details
0
Apr. 29, 2009
TA-800039
Plans, Elevations & Sections for Gatehouse
0
Jun. 30, 2010
TA-800040
Foundation, Roof Plan & Details for Gatehouse
0
Jun. 30, 2010
TA-800041
Miscellaneous Details for Gatehouse
0
Jun. 30, 2010
TA-800042
Miscellaneous Details, Security Mesh & Bar Bending Schedule for
Gatehouse
0
Jun. 30, 2010
TA-800062
Typical Duct Bank Sections, Concrete Duct Bank 69kV to 380kV
0
Mar. 11, 2009
TA-800063
Highway Crossings for 69kV to 380kV Cables
0
Mar. 11, 2009
TA-800068
Highway Under Crossing for 110kV to 380kV U/G Power Cables by
Directional Drilling
0
Nov. 23, 2009
TA-800078
Typical Detail of Conduit Mounting on the Gantry Structure for
Non-Metallic Fiber Optic Cables
0
Nov. 11, 2009
TA-800096
Service Manhole Type-1 (1.20m x 1.5m x 1.85m) Details and
Reinforcement
0
Mar. 30, 2011
TA-800097
Service Manhole Type-2 (1.50m x 2.75m x 2.00m) Details and
Reinforcement
0
Mar. 30, 2011
TA-800098
Manhole/Handhole Accessories for Communications
0
Nov. 29, 2010
TA-800100
132 kV Steel Take Off Structure and Details
0
Jun. 23, 2008
TA-800101
132kV "A” Frame Take-Off Structure
0
Nov. 23, 2009
TA-800102
132 kV High/Low Bus Support & Disconnect Switch Structures.
0
Jun. 23, 2008
TA-800106
Fire Protection System, Miscellaneous Details
0
Mar. 29, 2008
TA-800111
Substation Signboard at Gate House
0
Mar. 29, 2008
TA-800112
Decorative Steel Fence
0
Apr. 29, 2009
TA-800113
Chain Link Boundary Fence
0
Apr. 29, 2009
TA-800133
Removable Crash Barrier, Location Plan and Detail in Substation
0
Sep. 08, 2010
TA-800134
Septic Tank Installation Details for Non-Traffic Area
0
Sep. 08, 2010
TA-800135
Disposal System Layout & Seepage Pit Installation Details
0
Sep. 08, 2010
TA-800136
Miscellaneous Field Installation Details for Sanitary Works
0
Sep. 08, 2010
TA-800137
Sanitary Sewer Manhole Precast Concrete Plan, Section & Details
0
Sep. 08, 2010
TA-800138
Drainage Sump, Drainage Channel and Sewer Manhole Cover Details
0
Sep. 08, 2010
TA-800139
Counter Weight for Vehicle Entry Gate
0
Nov. 29, 2010
TA-800140
Water Proofing for Duct Banks, Manhole/Handhole and Alternate Roof
Drainage Details
0
Nov. 29, 2010
TB-800014
Pipe Line Crossing for SEC Access Roads
0
Sep. 08, 2010
10-Jun-2011
Page 9 of 10
Standard No.
Title
Rev No.
Rev Approved Date
TB-800067
Direct Buried Cable Trench Details in Rocky Area (Communications).
0
Aug. 31, 2009
TB-800069
Standard Trench detail Joint Communication & Power Cables
0
Aug. 31, 2009
TB-800076
Standard Precast Handhole for Communication in Non Traffic Areas
(1.20m x 1.20m x 1.20m)
0
Nov. 11, 2009
TB-800077
Standard Precast Hand-Hole for Communication in Traffic Areas (1.20m
x 1.20m x 1.20m)
0
Mar. 31, 2010
TB-800079
PVC Conduit Installation Concrete Encased (Vital Communications)
0
Sep. 08, 2010
TB-800090
PVC Conduit Installation Concrete Encased (Non-Vital Communications)
0
Sep. 08, 2010
TB-800091
Concrete Encased Duct Detail for Rocky Areas (Vital Communications)
0
Nov. 11, 2009
TC-800003
Signboard on Substation Building
0
Jul. 15, 2007
TC-800115
Transformer-Medium Voltage Switchgear Connection: Cable
Arrangement
0
Jun. 30, 2010
TD-800007
Standard Sign Danger High Voltage Keep Away
0
Oct. 09, 2007
TD-800008
Standard Sign Danger High Voltage-Bone Skull
0
Jul. 15, 2007
TD-800061
Typical Tower Structure Configuration 380kV, 230kV, 132kV, 115kV &
110kV
0
Aug. 19, 2009
TE-800110
SEC Monogram for equipment Mounting
0
Dec. 03, 2008
Total =
50
SEEDS
SAUDI ELECTRICITY COMPANY ENGINEERING DRAWINGS STANDARD(SEEDS)
ENGINEERING DRAWINGS STANDARD
SEEDS-I
PREPARING, PROCESSING & MANAGING TRANSMISSION
DRAWINGS/DOCUMENTS
0
Apr. 29, 2009
Total =
1
ENGINEERING DRAWINGS STANDARD FOR CONTRACTORS
SEEDS-II
PREPARING, PROCESSING & MANAGING TRANSMISSION FOR
CONTRACTORS
0
Oct. 19, 2004
Total =
TMSS
118
10-Jun-2011
TES
101
TCS
31
TSD
50
SEEDS
2
TOTAL
1
302
Page 10 of 10
Download