Design Case Study of 200kW of ON GRID Solar Power Plant Feasibility Study Report of 200kW of ON GRID Solar Power Plant By Prof. Kiran Beldar Instructor at UDEMY Prof. of Renewable Energy in MU Founder of RESG 1 Design Case Study of 200kW of ON GRID Solar Power Plant Site Analysis and Site Topography 2 Design Case Study of 200kW of ON GRID Solar Power Plant Site Details: • St. John College of Engineering and Management is Located in Dist: Palghar, State: Maharashtra, Country: India. SJCEM is Consisting of Two Wings, Each wing is consisting of 3 Floors. Each floor is consisting of Classrooms and Laboratory. To fulfill need of Electricity currently, electricity has been provided by the MSEB, India. The rooftop solar proposal is for the power reduction in SJCEM Under Category – LT (X). The Average Tariff Rate is 8.70 Rs. Per kWh. Latitude and Longitude: 19.6967oN , 72.7699oE 3 Design Case Study of 200kW of ON GRID Solar Power Plant Global Horizontal Irradiance (GHI): Minimum and Average GHI on Site: 4 Design Case Study of 200kW of ON GRID Solar Power Plant 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 5.29 Average 12 Years of Solar Radiation Pattern (kWh/m2/Day) 7.51 7.48 7.05 6.21 5.63 5.26 5.25 4.78 4.02 4.24 Average Temperature on Site: Minimum and Maximum Module Temperature: Minimum Temperature: 8oC Maximum Temperature: 60oC 5 4.97 Design Case Study of 200kW of ON GRID Solar Power Plant Area Assessment of Location 6 Design Case Study of 200kW of ON GRID Solar Power Plant Area Assessment: Area Available: 2900 m2 Area Available: 32,000 Sq. Ft Directional Analysis of Rooftop Area: East South North West 7 Design Case Study of 200kW of ON GRID Solar Power Plant Observation of Shadow Creating Obstacles: Elevator Control Room Parapet Wall Water tank Layout of Site Rooftop Area: 8 Design Case Study of 200kW of ON GRID Solar Power Plant Sun Path Diagram 9 Design Case Study of 200kW of ON GRID Solar Power Plant Sun Path Diagram: Date: 15 July 2020 Time: 12:15 Pm Azimuth Angle: 178.58o Elevation Angle:45o 10 Design Case Study of 200kW of ON GRID Solar Power Plant Substation and Metering Room Details 11 Design Case Study of 200kW of ON GRID Solar Power Plant Metering Room Details: Part View of Main LT Panel SJCEM 500 Amp TPN Bus bar Electricity Metering Room: 12 Design Case Study of 200kW of ON GRID Solar Power Plant Interconnection Incomer and Outgoing to Electricity Meters (500A Cable): 13 Design Case Study of 200kW of ON GRID Solar Power Plant Estimation of Power Demand 14 Design Case Study of 200kW of ON GRID Solar Power Plant Collection of Utility Electricity Bills: A Wing of SJCEM Sr. No Reading Period Units Consumed CC Charges (Rs.) Units Rate/KWh 1.0 151920 Jan & Feb'19 5824 53,114.88 9.12 2.0 158241 Feb & March'19 6321 59,417.40 9.40 3.0 164545 Mar & April'19 6304 58,185.92 9.23 4.0 170902 April & May'19 6357 58,102.98 9.14 5.0 177102 May & June'19 6200 55,676.00 8.98 6.0 182602 June & July'19 5500 46,475.00 8.45 7.0 188538 July & Aug'19 5936 52,118.08 8.78 8.0 194539 Aug & Sept'19 6001 54,789.13 9.13 9.0 200641 Sept & Oct'19 6102 55,955.34 9.17 10.0 206854 Oct & Nov.'19 6213 57,283.86 9.22 11.0 213009 Nov & Dec'19 6155 56,195.15 9.13 12.0 218270 Dec. & Jan'20 5261 42,824.54 8.14 B Wing of SJCEM Sr. No Reading Period Units Consumed 1.0 150310 Jan & Feb'19 5925 54,095.25 9.13 2.0 156676 Feb & March'19 6366 59,967.72 9.42 3.0 163021 Mar & April'19 6345 58,691.25 9.25 15 CC Charges (Rs.) Units Rate/KWh Design Case Study of 200kW of ON GRID Solar Power Plant 4.0 169377 April & May'19 6356 60,064.20 9.45 5.0 175609 May & June'19 6232 57,521.36 9.23 6.0 181174 June & July'19 5565 47,024.25 8.45 7.0 187274 July & Aug'19 6100 56,364.00 9.24 8.0 193505 Aug & Sept'19 6231 57,512.13 9.23 9.0 199637 Sept & Oct'19 6132 56,230.44 9.17 10.0 205850 Oct & Nov.'19 6213 57,283.86 9.22 11.0 212005 Nov & Dec'19 6155 56,195.15 9.13 12.0 217237 Dec. & Jan'20 5232 45,256.80 8.65 MMS Hall and Main Auditorium Sr. No Reading Period Units Consumed 1.0 113490 Jan & Feb'19 2954 22,893.50 7.75 2.0 116990 Feb & March'19 3500 28,420.00 8.12 3.0 120400 Mar & April'19 3410 27,484.60 8.06 4.0 123600 April & May'19 3200 25,632.00 8.01 5.0 126400 May & June'19 2800 21,672.00 7.74 6.0 129521 June & July'19 3121 24,499.85 7.85 7.0 132731 July & Aug'19 3210 25,744.20 8.02 8.0 135833 Aug & Sept'19 3102 24,412.74 7.87 9.0 139154 Sept & Oct'19 3321 27,066.15 8.15 10.0 142254 Oct & Nov.'19 3100 24,304.00 7.84 16 CC Charges (Rs.) Units Rate/KWh Design Case Study of 200kW of ON GRID Solar Power Plant 11.0 145164 Nov & Dec'19 2910 22,930.80 7.88 12.0 147977 Dec. & Jan'20 2813 21,828.88 7.76 Workshop and Machine Shop Sr. No Reading Period Units Consumed CC Charges (Rs.) Units Rate/KWh 1.0 180310 Jan & Feb'19 6003 53,906.94 8.98 2.0 186630 Feb & March'19 6320 60,419.20 9.56 3.0 192941 Mar & April'19 6311 60,270.05 9.55 4.0 199393 April & May'19 6452 62,584.40 9.70 5.0 205625 May & June'19 6232 57,521.36 9.23 6.0 211190 June & July'19 5565 47,079.90 8.46 7.0 217290 July & Aug'19 6100 54,839.00 8.99 8.0 223524 Aug & Sept'19 6234 57,415.14 9.21 9.0 229647 Sept & Oct'19 6123 56,147.91 9.17 10.0 235860 Oct & Nov.'19 6213 57,283.86 9.22 11.0 242015 Nov & Dec'19 6155 56,195.15 9.13 12.0 247647 Dec. & Jan'20 5632 48,716.80 8.65 Hydraulics and SAE Lab Sr. No Reading Period Units Consumed 1.0 160310 Jan & Feb'19 5132 17 CC Charges (Rs.) 42,903.52 Units Rate/KWh 8.36 Design Case Study of 200kW of ON GRID Solar Power Plant 2.0 165541 Feb & March'19 5231 44,515.81 8.51 3.0 170782 Mar & April'19 5241 44,653.32 8.52 4.0 176203 April & May'19 5421 47,487.96 8.76 5.0 181237 May & June'19 5034 40,976.76 8.14 6.0 186471 June & July'19 5234 44,646.02 8.53 7.0 191783 July & Aug'19 5312 45,098.88 8.49 8.0 196896 Aug & Sept'19 5113 42,642.42 8.34 9.0 201901 Sept & Oct'19 5005 40,640.60 8.12 10.0 206813 Oct & Nov.'19 4912 39,246.88 7.99 11.0 211678 Nov & Dec'19 4865 38,628.10 7.94 12.0 216710 Dec. & Jan'20 5032 40,759.20 8.10 Electricity Bill Summary Report: 18 Design Case Study of 200kW of ON GRID Solar Power Plant Recommendation on Case Study 19 Design Case Study of 200kW of ON GRID Solar Power Plant To decide optimum Solar Installation Capacity: The Average units per months = 26,444.92 units in kWh Average Units per Day = 26,444.92/30Days = 881.49 Units 1 kW Solar installation Produces 4 units of electricity per day. Hence kW size required based on daily average consumption = 881.49/4 = 220.37 say 200 kW As a Sanction load Capacity of Electricity Meter is 217.5 kW The Roof top area available is 2900 m2 or 32,000 Sq. Ft 20 Design Case Study of 200kW of ON GRID Solar Power Plant As per the Thumb Rule 1kW of Solar Panel Installation requires 10m2 or 100 Sq. ft of Rooftop Area So, 200 kW will required 2000m2 or 20,000 Sq. ft Considering The state Policy which allows 100% Sanction Load Installation Capacity So, we can go for 200kW of Solar Project against 217.5kW Combined Sanction Load Hence, we recommend 200 kW of Solar System. Hence, we recommend 200kW of Solar System. 21