Design Case Study of 200kW of ON GRID Solar Power Plant
Site Analysis and Site Topography
2
Design Case Study of 200kW of ON GRID Solar Power Plant
 Site Details:
•
St. John College of Engineering and Management is Located in Dist: Palghar, State: Maharashtra,
Country: India. SJCEM is Consisting of Two Wings, Each wing is consisting of 3 Floors. Each floor is
consisting of Classrooms and Laboratory. To fulfill need of Electricity currently, electricity has been
provided by the MSEB, India. The rooftop solar proposal is for the power reduction in SJCEM Under
Category – LT (X). The Average Tariff Rate is 8.70 Rs. Per kWh.
 Latitude and Longitude: 19.6967oN , 72.7699oE
3
Design Case Study of 200kW of ON GRID Solar Power Plant
 Global Horizontal Irradiance (GHI):
 Minimum and Average GHI on Site:
4
Design Case Study of 200kW of ON GRID Solar Power Plant
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
5.29
Average 12 Years of Solar Radiation Pattern (kWh/m2/Day)
7.51 7.48
7.05
6.21
5.63
5.26
5.25
4.78
4.02 4.24
 Average Temperature on Site:
 Minimum and Maximum Module Temperature:
Minimum Temperature: 8oC
Maximum Temperature: 60oC
5
4.97
Design Case Study of 200kW of ON GRID Solar Power Plant
Area Assessment of Location
6
Design Case Study of 200kW of ON GRID Solar Power Plant
 Area Assessment:
Area Available: 2900 m2
Area Available: 32,000 Sq. Ft
 Directional Analysis of Rooftop Area:
East
South
North
West
7
Design Case Study of 200kW of ON GRID Solar Power Plant
 Observation of Shadow Creating Obstacles:
Elevator Control Room
Parapet Wall
Water tank
 Layout of Site Rooftop Area:
8
Design Case Study of 200kW of ON GRID Solar Power Plant
Sun Path Diagram
9
Design Case Study of 200kW of ON GRID Solar Power Plant
 Sun Path Diagram:
Date: 15 July 2020
Time: 12:15 Pm
Azimuth Angle: 178.58o
Elevation Angle:45o
10
Design Case Study of 200kW of ON GRID Solar Power Plant
Substation and Metering Room Details
11
Design Case Study of 200kW of ON GRID Solar Power Plant
 Metering Room Details:
Part View of Main LT Panel SJCEM 500 Amp TPN Bus bar
 Electricity Metering Room:
12
Design Case Study of 200kW of ON GRID Solar Power Plant
 Interconnection Incomer and Outgoing to Electricity Meters (500A Cable):
13
Design Case Study of 200kW of ON GRID Solar Power Plant
Estimation of Power Demand
14
Design Case Study of 200kW of ON GRID Solar Power Plant
 Collection of Utility Electricity Bills:
A Wing of SJCEM
Sr.
No
Reading
Period
Units
Consumed
CC Charges
(Rs.)
Units
Rate/KWh
1.0
151920
Jan & Feb'19
5824
53,114.88
9.12
2.0
158241
Feb & March'19
6321
59,417.40
9.40
3.0
164545
Mar & April'19
6304
58,185.92
9.23
4.0
170902
April & May'19
6357
58,102.98
9.14
5.0
177102
May & June'19
6200
55,676.00
8.98
6.0
182602
June & July'19
5500
46,475.00
8.45
7.0
188538
July & Aug'19
5936
52,118.08
8.78
8.0
194539
Aug & Sept'19
6001
54,789.13
9.13
9.0
200641
Sept & Oct'19
6102
55,955.34
9.17
10.0
206854
Oct & Nov.'19
6213
57,283.86
9.22
11.0
213009
Nov & Dec'19
6155
56,195.15
9.13
12.0
218270
Dec. & Jan'20
5261
42,824.54
8.14
B Wing of SJCEM
Sr.
No
Reading
Period
Units
Consumed
1.0
150310
Jan & Feb'19
5925
54,095.25
9.13
2.0
156676
Feb & March'19
6366
59,967.72
9.42
3.0
163021
Mar & April'19
6345
58,691.25
9.25
15
CC Charges
(Rs.)
Units
Rate/KWh
Design Case Study of 200kW of ON GRID Solar Power Plant
4.0
169377
April & May'19
6356
60,064.20
9.45
5.0
175609
May & June'19
6232
57,521.36
9.23
6.0
181174
June & July'19
5565
47,024.25
8.45
7.0
187274
July & Aug'19
6100
56,364.00
9.24
8.0
193505
Aug & Sept'19
6231
57,512.13
9.23
9.0
199637
Sept & Oct'19
6132
56,230.44
9.17
10.0
205850
Oct & Nov.'19
6213
57,283.86
9.22
11.0
212005
Nov & Dec'19
6155
56,195.15
9.13
12.0
217237
Dec. & Jan'20
5232
45,256.80
8.65
MMS Hall and Main Auditorium
Sr.
No
Reading
Period
Units
Consumed
1.0
113490
Jan & Feb'19
2954
22,893.50
7.75
2.0
116990
Feb & March'19
3500
28,420.00
8.12
3.0
120400
Mar & April'19
3410
27,484.60
8.06
4.0
123600
April & May'19
3200
25,632.00
8.01
5.0
126400
May & June'19
2800
21,672.00
7.74
6.0
129521
June & July'19
3121
24,499.85
7.85
7.0
132731
July & Aug'19
3210
25,744.20
8.02
8.0
135833
Aug & Sept'19
3102
24,412.74
7.87
9.0
139154
Sept & Oct'19
3321
27,066.15
8.15
10.0
142254
Oct & Nov.'19
3100
24,304.00
7.84
16
CC Charges
(Rs.)
Units
Rate/KWh
Design Case Study of 200kW of ON GRID Solar Power Plant
11.0
145164
Nov & Dec'19
2910
22,930.80
7.88
12.0
147977
Dec. & Jan'20
2813
21,828.88
7.76
Workshop and Machine Shop
Sr.
No
Reading
Period
Units
Consumed
CC Charges
(Rs.)
Units
Rate/KWh
1.0
180310
Jan & Feb'19
6003
53,906.94
8.98
2.0
186630
Feb & March'19
6320
60,419.20
9.56
3.0
192941
Mar & April'19
6311
60,270.05
9.55
4.0
199393
April & May'19
6452
62,584.40
9.70
5.0
205625
May & June'19
6232
57,521.36
9.23
6.0
211190
June & July'19
5565
47,079.90
8.46
7.0
217290
July & Aug'19
6100
54,839.00
8.99
8.0
223524
Aug & Sept'19
6234
57,415.14
9.21
9.0
229647
Sept & Oct'19
6123
56,147.91
9.17
10.0
235860
Oct & Nov.'19
6213
57,283.86
9.22
11.0
242015
Nov & Dec'19
6155
56,195.15
9.13
12.0
247647
Dec. & Jan'20
5632
48,716.80
8.65
Hydraulics and SAE Lab
Sr.
No
Reading
Period
Units
Consumed
1.0
160310
Jan & Feb'19
5132
17
CC Charges
(Rs.)
42,903.52
Units
Rate/KWh
8.36
Design Case Study of 200kW of ON GRID Solar Power Plant
2.0
165541
Feb & March'19
5231
44,515.81
8.51
3.0
170782
Mar & April'19
5241
44,653.32
8.52
4.0
176203
April & May'19
5421
47,487.96
8.76
5.0
181237
May & June'19
5034
40,976.76
8.14
6.0
186471
June & July'19
5234
44,646.02
8.53
7.0
191783
July & Aug'19
5312
45,098.88
8.49
8.0
196896
Aug & Sept'19
5113
42,642.42
8.34
9.0
201901
Sept & Oct'19
5005
40,640.60
8.12
10.0
206813
Oct & Nov.'19
4912
39,246.88
7.99
11.0
211678
Nov & Dec'19
4865
38,628.10
7.94
12.0
216710
Dec. & Jan'20
5032
40,759.20
8.10
 Electricity Bill Summary Report:
18
Design Case Study of 200kW of ON GRID Solar Power Plant
Recommendation on Case Study
19
Design Case Study of 200kW of ON GRID Solar Power Plant
 To decide optimum Solar Installation Capacity:
 The Average units per months = 26,444.92 units in kWh
 Average Units per Day = 26,444.92/30Days = 881.49 Units
 1 kW Solar installation Produces 4 units of electricity per day. Hence kW size required
based on daily average consumption = 881.49/4 = 220.37 say 200 kW
 As a Sanction load Capacity of Electricity Meter is 217.5 kW
 The Roof top area available is 2900 m2 or 32,000 Sq. Ft
20
Design Case Study of 200kW of ON GRID Solar Power Plant
 As per the Thumb Rule 1kW of Solar Panel Installation requires 10m2 or 100 Sq. ft of
Rooftop Area
 So, 200 kW will required 2000m2 or 20,000 Sq. ft
 Considering The state Policy which allows 100% Sanction Load Installation Capacity
 So, we can go for 200kW of Solar Project against 217.5kW Combined Sanction Load
 Hence, we recommend 200 kW of Solar System.
Hence, we recommend 200kW of Solar System.