Uploaded by Pratap Biswas

PRATAP BISWAS Lead QAQC Engineer compressed

advertisement
PRATAP BISWAS # Lead QAQC Engineer
C O N T AC T
+974-33051278 (QATAR)
+91-7866006242 (INDIA)
+917866006242 (WhatsApp)
pratap.biswas@rediffmail.com
www.linkedin.com/in/pratapbiswas-113ba74b/
West Bengal, India
CAREE ABRIDGEM ENT
To achieve a challenging position in a professional organization through
self - improvement by excelling in all responsibilities with sincere hard
work, dedication & commitment. To work towards the development of
the organization & grow with it.
KEY SKILLS
Teamwork
Work Ethic
Organization skills
Detail Oriented
Communication
Time Management
Punctual
Quick Learner
Leadership
Interpersonal Ability
Hardworking
Analytic Skills
ACADEMIC CREDENTIALS
BACHELOR’S IN MECHANICAL
ENGINEERING|2000 -2004
- University of North Bengal.
HIGHER SECONDARY
- West Bengal Board o f
Secondary Education ,
BRIEF
-
Holding position QA/QC Engineer and QC Inspector in Onshore / Offshore
Piping / Pipeline, (Welding Fabrication and Erection), Structure and pipe
support (Fabrication and Erection), including Painting and Coating, Welding,
Testing, and NDT activity.
-
Completed various large National & international LNG & CN G and other
Hydrocarbon proje ct, sour service, cryogenic gas service, sea w ater service,
nitrogen gas service, water services.
-
Worked with various material like SS, CS, LTCS, DSS, etc.…
-
Experience in Welding Engineering, Multidisciplinary EPC Inspection, QMS
Auditing Supervision and Documentation.
-
Having good knowledge in plant shutdown activity.
CERTIFICATIONS
ISO 9001-2015
(Certificate No: 01029009).
▪
CSWIP3.1 Welding
Inspector(Certificate No:
450000).
▪
AWS-CWI.
(Certificate No: 14051601).
▪
API 570.
Approximately 16 + years’ experience (11+ years GULF) in Oil & Gas Refinery
Project.
Experience in Piping, Pipeline & Welding: - (15+ years).
-
West Bengal, India
▪
PR OF ILE
EM P L O Y M E N T C H RO N IC L E
(Certificate No: 62553).
ENGINEER QAQC – MECHANICAL | JUN 2022 to -presentGALFAR
▪
BGAS GR 2.
AL MISNAD ENGG. & CONTG. W.L.L., QATAR.
▪
(Certificate No: 101297).
ASNT NDT level 2 in [UT, PT, MT
& RT].
COMPUTER PROFICIENCY
Project
Client
SR QAQC ENGINEER| DEC 2019 - SEPT 2021
ANWESHA INFRATECH & RESEARCH PVT LTD (INDIA)
Project
: RWSP SUNDARGARH, ODISHA, (DRINKING WATER
MS Office & Outlook
Basic Operation
Internet & E- Mail
: NORTH FIELD EXPANSION PROJECT-2 (LNG)
: SAMSUNG CT / QATAR GAS, QATAR
PROJECT)
Client
: VOLTAS (INDIA)
OFFSHORE TRAININGS
Basic offshore safety induction &
emergency training Certificate No.
OERC/IB OSIET /11479/2022 -23
(Date of Expiry: 04/01/2027)
Helicopter under water escape
training Certificate No. OERC/
H U ET /507/2022-23 (Date of Expiry:
12/09/2025)
MEMBERSHIP
Member of Kuwait Society o f
Engineer (K SE) Certificate no .35138
QAQC ENGINEER| SEPT 2015 - OCT 2019
ALGHANIM INTERNATIONAL GENERAL TRADING & CONTRACTING CO. W.L.L, KUWAIT
1) Project
: AL-ZOUR REFINERY PROJECT PKG 1B |2015-2019
Client
: SAIPEM/KIPIC, KUWAIT
2) Project
Client
: AL-ZOUR REFINERY PROJECT PKG 3. |2015-2019
: SAIPEM/KIPIC, KUWAIT
QAQC ENGINEER | JUL 2013 - JUL 2015
GS ENGINEERING AND CONSTRUCTION (EPC) KUWAIT
Project
: NORTH LPG TANK FARM/ SMP-2 (LNG)
Client
: KNPC, KUWAIT
QAQC WELDING INSPECTOR |MAR 2012 - MAR 2013
HANWHA ENGINEERING & CONSTRUCTION (EPC) KUWAIT
Project
: HALON PHASE OUT (FIRE WATER LINE)
Client
: KNPC, KUWAIT
QC ENGINEER |SEPT 2008 - OCT 2011
BAHWAN ENGINEERING COMPANY LLC, PDO, OMAN.
Project
: SAHRAWAL DEPLETION COMPRESSION (SRDC-1) (LNG)
Client
: TR / PDO, OMAN
QC INSPECTOR (WELDING)|SEPT 2004 - JUL 2008
NEO STRUCTO CONSTRUCTION LTD, (INDIA)
2) Project
: PTE3 (POLI TETRA ETHELENE)
Client
: RELIANCE, INDIA
AREA OF EXPERTISE
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
Quality Assurance
ISO 9000 Standards
Quality Management
Systems
Audits
Quality Control
Material Inspections
Fabrication Inspections
Installation & Testing
Pre-Commissioning
Commissioning
Project Completion &
Final Handovers
Quality Documentations
EPC Projects
Inspection Co-Ordination
3)
Project
Client
: MUMBAI HPCL SHOOTDOWN
: TPL/ HPCL, MUMBAI, INDIA.
DETAI LED TA SKSH AND LED I NV ARIO US PRO JECTS
-
Preparation & Implementation of QC Procedures.
-
Preparation inspection test plans (ITP), wielding procedure specification (WPS)
for various areas of project execution including establishing of procedure
qualification records (PQR).
-
Wetness for WQT, along with Contractor delegates.
-
Responsible for supervision of the project QC inspection team.
-
Welding inspection before during & after.
-
To conduct fit up and dimension inspections (Material line class, Color
Code, Internal Cleaning of the pipe, Orientation of the welding horizontal
seam, bevel angle, root gap Etc. as per WPS, Drawing, or other documents.).
-
Welding Visual Inspection including dimension check of fabr ic ated ite ms
and along with applicable documents like code, standard, procedure.
-
Inspection of all incoming Material like pipe, plate, channel, welding
consumable, etc.
LANGUAGE KNOWN
-
To coordinate with clients to undertake Procedure Qualification Tests
(PQT) and inspections of prepared test specimens also witness of
destructive tests of it.
English
100 %
Hindi
Bengali
100 %
-
Intemperate RT& X-ray film as per relevant code.
100 %
-
Interposition of NDT Reports.
-
Pre-Inspection Meetings to ensure that the quality requirements and
expectations are fully understood and implemented prior to it.
-
Lead the NCR management process for identified non-conformances –
including NCR/CAR issue, disposition approval and close-out.
-
Preparation of QAQC monthly report.
-
Control calibrated measuring and test equipment used on the project.
Ensure stage-wise inspections are carried out as required and related
reports are generated.
-
Coordinate all inspections, monitor the required tests, and record
inspections and tests made pas the Contract Plan and Contrac t
Specifications.
-
Witness of pressure test and pneumatic test.
-
Responsible for project punch-list coordination and close-out prior to
mechanical acceptance.
-
Review the project scope of work, to determine the nature, extent, and
frequency of quality verification activities commencement of work
activities.
-
Conducting and monitoring Pneumatic tests/Air blowing /Drying
/Nitrogen filling and Nitrogen (Jet Fuel Pre- preservation activities
Commissioning activities.
-
Prepare Project handing over documents like Close out Dossier, Test H
helicopter packages.
DRIVING LICENSE DETAILS
Holder of Valid INDIA Driving License
NO: WB- 25213170004
Date of Issue: 07/06/2013
Date of expiry: 31/12/2029
Place of issue: INDIA
PERMANENT ADDRESS
Vill- Ganti
PO- Thakurnagar
PS-Gaighata
Dist-North 24 Parganas
Pin-743287, WB, India
PRESENT ADDRESS
Galfar Al Misnad villa
Building 30, zone74,
street 801, Qatar
PASSPORT DETAILS
Passport no : Z 6424627
Date of Issue: 01/10/2021
Date of expiry: 30/09/2031
Place of issue: Kolkata
PERSONAL DOSSIER
Father : Gurudhan Biswas
Spouse : Sudipta Biswas
Nationality: Indian.
Date of birth :01/01/ 1980.
Gender: Male.
A DDITIONA L
DETAILS
-
Present Day Rate : QR 15000 / M
-
Expected day rate : Negotiable
-
Notice period
: IMMEDIATE (Able to join within 10 days)
D E C LA RA TIO N
I, hereby declare that the information furnished above is true to the best
of my knowledge and if any discrepancy is noticed I am fully responsible
for it.
Pratap Biswas
Date:15/10/2022
Download