사내 각종 제작문서 배포 테이블(생산/QA/구매) - AFC Prepared By : S.C.Hong / APR-09-2018 Rev.8 번호 생산1팀 해당 도면 A2 8 1 Cutting Plan 2 GAD 3 Header Box DWG (Thrust Block) 4 Steel Structure DWG A4 A2 A3 품질보증팀 A4 A2 A3 A4 A2 A3 A4 2 - - 5 2 - 6 - 5 - 15 - 3 3 1 요청시 10 총수량 1 2 3 1 2 5 - Main Frame 1 2 3 1 2 5 - Motor Breacket 1 2 3 1 2 5 - 1 2 3 1 - 5 - 1 2 3 1 - 5 - 1 2 3 1 - 5 - Fan Shaft 1 2 3 1 - 5 - 그외 Driving Unit DWG 1 2 3 1 2 5 - 6 Fan Ring / Plenum DWG 1 1 - 2 - 7 Inlet Bell / Support류 DWG 1 1 - 2 - 8 Walkway Frame DWG 1 2 3 1 2 5 - 9 Hand Rail / Ladder DWG 1 2 3 1 2 5 - 10 Name Plate DWG (Steam Coil) 5 1 - 6 - 11 Driving Unit Assembly DWG 1 1 - 5 - 12 Bundle Frame DWG (Air Seal Plate) 1 1 - 2 - 13 Shipping Frame DWG 3 1 - 4 - 14 Transportation Beam DWG 1 2 3 1 2 5 - 15 Spreaders Beam DWG 1 2 3 1 2 5 - 16 Procedure 17 Shop Erection DWG 18 Purchase Requisition (P.R) 5 8 A3 생산2팀 Anti Rotation Device Driving Unit Fan Guard / Pulley Guard DWG Fan Housing 2 3 3 1 사내공용서버 참조 구매팀, 생산1팀, 품질보증팀 : 각 1부 2 6 0 0 - - - 3 * NOTE - 상기는 최초 배포시 수량이며 제작시작에 필요한 추가도면은 생산팀 담당자가 정식으로 요청한다. - 생산공정 상 추가도면이 예상 될 경우 설계팀 담당자에게 미리 알려주도록 한다. - 도면 배포시 문서배포서와 도면관리대장을 함께 배포하고 접수팀은 이를 바탕으로 최종문서를 관리한다. - 제작도면 배포시 붉은색 'FOR CONSTRUCTION' / 참고용 배포시 푸른색 'FOR REFERENCE' 스탬프 사용한다. 'FOR REFERENCE' 도면은 문서배포서를 작성하지 않고 제작이나 검사에도 사용하지 않는다. - 언급되지 않은 특별한 도면은 관련 파트를 담당하는 팀으로 배포하며 수량은 협의하여 배포한다. - Header Box의 A2 사이즈 도면은 필요한 시점에 생산팀 담당자가 배포를 요청토록 한다. - 생산2팀 관련 도면은 화공기술팀에서 창원공장 경비실을 통해 함안공장으로 전달되도록 한다. - Shipping & Packing 관련 도면과 PR은 화공기술팀에서 사내공용 서버에 업로드하여 공유한다. - 화공기술팀에서 공유하는 전자문서는 참고 및 견적서 작성용 외에 제작문서로의 사용을 금한다. - 제작현장으로 배포되는 제작용 출력/전자문서는 반드시 화공기술팀 담당자에게 요청한다. - 생산2팀 A3 1부는 함안품질팀으로 배포된다. S&T Corporation