COST BREAK DOWN ITEM Rev. 0 / Apr. 7th, 2023 DESCRIPTION BAY BUN TOTAL (USD) A. Basic items - Refer to attached technical proposal for detail scope of supply( work ). 1) Main Equipment R92-E-301 Propane TVR Condenser 4 8 " Included " R92-E-351 Butane TVR Condenser 2 4 " Included " R92-E-401 Propane TVR Condenser 4 8 " Included " R92-E-451 Butane TVR Condenser 2 4 " Included " R93-E-501 Propane Refrigeration Condenser 10 20 " Included " R93-E-351 Butane Refrigeration Condenser 8 16 " Included " 30 60 Sub-Total 2) Supply Items & Services 1. Service Walkway for Header ( Both Side ) " Included " 2. Service Walkway for Motor Maintenance " by Purchaser " 3. Service Walkway for Side Connection " Included " 4. Motor Trolley 1 Set " Included " 5. Lifting Frame with Shackle and Wire Sling 2 Set " Included " 6. Header Heat Protection Guard " Included " 7. Fintube Protection Guard (for Forced Draft) " Included " 8. Fireproofing Clip " Included " 9. Thrust Block for Multi Bays " Included " 10. Air Seal plate between bays " Included " 11. Anti Reverse Rotation Device " Included " 12. Wireless Vibration Sensor, Bently Nevada : Ranger Pro 70M303 ( 1 set per Fan) " Included " 13. Low Voltage Induction Motor(Class 1, Zone 2, NEMA Design) " Included " 14. VSDS ( Inverter with Panel ) " by Purchaser " 15. Push Button Station for Motor, 1 Set per Motor " by Purchaser " 16. Cable Tray Supports for Motor " Included " 17. Application of Set-On Nozzle Attachment Design for Group II Items " Included " 18. Application of Avoiding Weld Encroachment for All Items " Included " 19. Al Sleeve on Unfinned Tube Ends " Included " 20. Module Assembly " Included " 21. Shop Run-in Test, 1 bay per Item " Included " 22. ASME Stamp " Included " 23. See Packing " Included " 24. DDP JOB SITE " Included " 25. VAT " Not Included " 26. Special Tools " Included " 27. Spare Part for Pre-Commissioning " Included " B. Delivery : 15.5 Months after purchase order - C. Delivery Condition : DDP Job Site in KSA ( Semi-module Condition ) - D. Optional Items (Required by Client) 1. Hard wired Vibration Transmitter instead of the Wireless Vibration Sensor "Cost Adder" 35,600 - Vibration Transmitter(Metrix, ST5484E) " Included " - Cable, Cable Gland " Included " - Cable Tray and Support " Included " - Junction Box " Included " 2. Stair 3. Lifting Frame ( Spreader Beam 1 set ) with Shackle and Wire Sling 2023-04-06 / Attachment #1. Scope of supply - R0 4 Sets 14,000 per Set 35,000 COST BREAK DOWN ITEM Rev. 0 / Apr. 7th, 2023 DESCRIPTION BAY BUN TOTAL (USD) 4. Additional Structure per Ton 3,000 5. Additional Platform per Ton 3,500 6. Pipe Support per Ton 3,000 - Applied Load / Horizontal Direction : Max. 500 kg, Vertical Direction : Max. 1,000 kg 7. Spare Part for 2 Years Operation 8. Engineering Fee for Technical Amendment 9. Supervision Fee ( per Manday ) 10. Supervision Fee for Fan and Motor ( per Manday ) 2023-04-06 / Attachment #1. Scope of supply - R0 14,100 per Hour 60 1,000 2,500