INTEGRATED WAVES CONTRACTING EST,
Safety department of IWC,
November 26, 2023
Team JHAH
Department of safety
Johns Hopkins Aramco Healthcare,
Al hasa,
To,Team JHAH:
During the imminent onset of our waterproofing project, a thoughtfully devised waste management
approach becomes paramount. In the course of our work, debris and surplus materials are an inevitable
byproduct. To efficiently tackle this, we propose a meticulously planned setup involving a drum
positioned at the lower levels, seamlessly interconnected through a pipe originating from above. This
strategic maneuver offers a plethora of advantages: it efficiently conserves time, obviates the necessity
of transporting waste from a distant rooftop container, and optimizes our workforce by assigning a
dedicated team of two to three individuals for this specific task. Additionally, this method significantly
mitigates the looming risk of potential damage to vehicles, pedestrians, or nearby flora that could arise
from haphazardly discarding debris from an elevated point. By adopting this meticulously structured
waste management system, our primary goals encompass augmenting safety measures, saving
valuable time, and streamlining overall project operations for enhanced efficiency and productivity.
Integrated waves contracting Est,