The Checklist HSSE INSPECTION CHECKLIST AND MAIN FINDINAGS BUILDING: Administrative Building and Common areas INSPECTION CARRIED OUT BY: Abdulaziz Al Sulayyim OVERALL RISK RATING : High DATE OF INSPECTION: 05/11/2023 DATE OF SUBMISSION: 07/11/2023 EMAIL: AAlsulayyim@adi.edu.sa WORKING ENVIRONMENT M ITEM a) HSSE / Safety Policy statement posted and shared with staff. b) Working temperature c) Adequate ventilation d) Adequate lighting e) The environment is not dusty f) Noise hazard accepted g) CCTV Operations and Physical Security h) Manholes around the place are covered and safe PM NM √ N/A Risk level High Low Low Low Medium Medium High Low √ √ √ √ √ √ √ HOUSEKEEPING M ITEM a) Inspection area tidy, clean and well organized b)Steps and stairs clear of obstructions and clean c) Tripping hazards d) Chemicals and hazardous materials storage, disposal and labelled e) No smoking signage f) Waste management PM √ √ √ NM N/A Risk level Low Medium Low High High High √ √ √ FIRST AID AND EMERGENCY M ITEM a) Emergency contact information (HOTLINES) b) Employyes trained in emergency procedures (evacuation & fire) c) First aid kit d)Automated external defibrillator (AED) e)Evacuation maps are available Confidential information PM NM √ √ √ √ √ HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI N/A Risk level High High High High High Page 1 The Checklist KITCHEN AREAS M ITEM a) Surfaces and floors are clean b) Fire extinguisher /Fire blanket c) Storage d) Cooking/Electrical appliances e) Kitchen hoods, ducts, and suction fans are clean from greases f) Wet chemical fire suppression system at the kitchen hood PM √ NM N/A Risk level Low High High Medium √ √ √ √ √ √ g) Waste Disposal High FIRE PRECAUTIONS M ITEM a) Fire extinguishers (available/inspected) b) Fire hose (available/inspected) c) Fire pump and jockey pump (available/inspected) d) Fire Rated Construction e) Breeching Inlet/Fire Department Connection/Fire hydrant f) Employees trained to use fire-fighting equipment g) Emergency lighting h) Escape routes i) Fire exit doors j) Pull station /brek glasss k) Smoke/heat detectors l) Sprinkler system m) Evacuation plan procedure o) Assembly points p) Participation of Fire drill annually q) Participation of Fire drill annually r) Emergency exit signage PM √ √ NM N/A Risk level High High High High High High High High High High High High High High High High High √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ ELECTRICAL SAFETY M ITEM a)warning signs b)Standard operating procedure (SOP) c) Trailing leads hazards d) Plugs, sockets and extension cord e) Electrical equipment grounded f) Electrical rooms are (maintained,clean, clear of obstruction and ventilated) g) Electrical panels are covered . Confidential information PM NM √ √ √ √ √ √ √ HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI N/A Risk level High Medium Medium High High High Medium Page 2 The Checklist MECHANICAL M ITEM PM a) warning signs b) Mechanical Standard operating procedure (SOP) c) rooms are (maintained,clean, clear of obstruction and ventilated) NM √ √ √ N/A NM N/A √ √ √ √ High Medium High High Low Low √ √ √ e) Emergency stop buttons f) Leakage/ spill g) AC systems Risk level LPG TANKS & GAS CYLINDERS M ITEM a) Solenoid valve is available and functional b) Gas detectors (available/inspected) c) Liquefied petroleum gas (LPG) tanks maintained /inspected d) Safe Work Procedure for gas usage and transport e) Compressed gas cylinders secured with chain f) Contents of cylinders properly identified g) Cylinders are stored safely h) Empty cylinders are separated from full cylinders Confidential information PM √ √ √ √ HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Risk level High High High High Page 3 The Checklist Severity of Risk (impact) Minimal : 1 = first aid injury Minor : 2 = medical aid injury, minor illness, minor property damage. Substantial : 3 = lost time injury or illness, temporary disability, potential injury, substantial property damage. Severe : 4 = Severe (death, serious injury or illness with more than 2 days in the hospital, permanent disability, extensive property damage. Likelihood of Risk (Probability ) Unlikely=1 May Happen=2 Likely=3 Very Likely=4 Risk Value = Likelihood of Risk X Severity of Risk Risk Level R = 10 up to16, Very High Risk (take immediate action to eliminate the risk or implement appropriate controls to lower the risk) R = 6 up to 9, High Risk (take immediate action to eliminate the risk or implement appropriate controls to lower the risk) R= 4 up to 11, Medium Risk (take timely action to implement appropriate controls to lower or minimize risk) R= 0 up to 3, Low Risk (continued operation is permissible with minimal controls) Risk Assessment Matrix LEGENDS : M: Meet the safety requirements PM : Partially Meet the safety requirements NM: Not Meet the safety requirements N/A: Not applicable Final Result M PM NM 0 21 37 OVERALL RESULT M PM NM 0% 36% 64% Confidential information HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Page 4 The Main Findings HSSE INSPECTION CHECKLIST AND MAIN FINDINAGS BUILDING : Administrative Building and Common areas DATE OF INSPECTION: 05/11/2023 INSPECTION CARRIED OUT BY: Abdulaziz Al Sulayyim DATE OF SUBMISSION: 07/11/2023 OVERALL RISK RATING : High S.NO EMAIL: AAlsulayyim@adi.edu.sa MAIN FINDINAGS LOCATION RISK LEVEL All ADI premises High Poor CCTV Operations 1 Access Control & Time Attendance 2 ACTION REQUIRED ACTION BY OBSERVATION •It has been observed that CCTV is not performing well having lags and not live-timing due to connectivity, DVR etc. •Only 64 cams partially working •Many blind spots are found. SFCL ACTION REQUIRED: •93 cams must be fully operated. RECOMMENDATIONS (To be discussed later on) •Increasing surveillance camera quantities as per site survey. •Upgrade the exciting system. TIME FRAME one week OBSERVATION •There is no system to protect access to all ADI facilities. •Time attendance is not available. All ADI premises High ACTION REQUIRED: There is a new system developed by Dahua that can be used to do both of the above observations in one device (biometric), using AI software. Access card is not recommended for ADI business, neither for employees, subcontractors nor for students. SFCL TBD SFCL 3 days NOTE: (Dahua Technology is a world-leading videocentric AIoT solution and service provider). 3 It has been observed there is no Permit-to-work (PTW) such as Hot work permit, general permit, working at height, Confined Spaces entry, Fire protection impairment permit, etc.. Confidential information All ADI premises High ACTION REQUIRED: The PTW is a mandatory procedure for ADI facilities operations on a daily basis, also it is mandatory for insurer's claims, especially the hot work permit and Fire protection impairment permit). HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Page 5 The Main Findings It has been observed that all Fire Pump sets (Jockey, Electrical, and Diesel) are in OFF mode due to some leakages , this critical point lead to not having pressurized water flow in the sprinkler system and fire hose reel. 4 Pumps Room ACTION REQUIRED: •The fire pumps shall repair immediately to avoid system failure, notice that the test shall be performed by a specialized company so that no water leakage occurs during the testing. •Consideration shall be given to proper maintenance of the firefighting water pump system. Based on Standard No. (25) from American National Fire Protection Association (NFPA). •Electrical fire pumps are required to run once a week at least (10) minutes. •Diesel engine pumps should be run once a week at least (30) minutes. •As per Saudi civil defense and SBC code, fire pump shall be listed and approved by any of the following: FM, UL, LPCB, BSI, VDS, UL, IBS, PSB, KTL, ITS, WFRC •The design of the fire pump and water tank needs to re-evaluate by a third-party company. SFCL Immediate action within 3 weeks. High ACTION REQUIRED: •All fire alarm panels must be repaired immediately to avoid system failure. •Service provider of fire safety systems (i.e., fire alarm, fire pump, fire suppression system, and sprinkler systems, etc.) to provide method Statement for testing and maintenance of each system, the rectification of the system, planning, and schedule or frequency of testing and maintenance, etc. in accordance with SBC and NFPA codes. SFCL Immediate action within 3 weeks. High ACTION REQUIRED: •Fire suppression system and fire Alarm system shall be installed (aerosol, CO2, NOVEC, or FM200). As to optimize the cost, a CO2 fire suppression system is applicable for this room. •The generator room and all similar rooms must be cleaned and maintained well, not containing combustible materials such as clothing and so on. •Considering the redesigning of the room, we do not want dust to affect the extinguishing system and release it for nothing. SFCL 4 weeks High Fire Alarm System: It has been observed that all fire alarm panels are in OFF mode as well as the fire alarm panel of the suppression systems FM200 is OFF due to test issues. •Administrative building •Main storage •SFCL offices 5 It has been observed that there is no fire suppression system or fire alarm system as well as poor housekeeping. 6 Confidential information Generator room HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Page 6 The Main Findings •It has been observed the pressure gauge of FM200 cylinder, is overcharging meaning the contents are under too much pressure or the room has temperature issues (it must be on the green section). •Poor housekeeping below the raised floor. GF, COMM.Room (Data centre) 7 High ACTION REQUIRED: •Service provider of fire safety systems (i.e., fire alarm, fire pump, fire suppression system, and sprinkler systems, etc.) to provide method Statement for testing and maintenance of each system, the rectification of the system, planning, and schedule or frequency of testing and maintenance, etc. in accordance with SBC and NFPA codes. •The surface below the raised floor must be clean from any waste material, dust accumulations, etc. SFCL Immediate action within 3 weeks. SFCL 8 weeks Fire Rated Construction (penetrations): It has been observed that all cabling shafts are exposed. 8 Confidential information All ELEC,COMM.Rooms Medium ACTION REQUIRED: •Fire-rated walls must extend to the ceiling, all gaps and penetrations must be covered by approved fire-stop material. •The method of sealing shall restore the original fire-resistance rating of the enclosure as required by NFPA 2001, 2018, Section 8.5.4. HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Page 7 The Main Findings Unsecured ( Substation units) All substation units in ADI premises 9 Medium ACTION REQUIRED: Fence or Protective barriers must be placed. SFCL 4 weeks ACTION REQUIRED: •As per SBC 801 code (304.1): Waste material, accumulations of waste paper, wood, hay, straw, weeds, litter, or combustible or flammable waste or rubbish of any type shall not be permitted to remain on a roof or in any court, yard, vacant lot, alley, parking lot, open space, or beneath a grandstand, bleacher, pier, wharf, manufactured home, recreational vehicle or other similar structure. •All flammable liquids shall be removed from ADI premises or you can use the proper safety cabinet (fire-rated). •Rearrange all storage rooms according to the category of each material on shelves considering the separation of combustible materials from others. •West management plan must be provided. •Any material should have a Safety Data Sheet (SDS). SFCL Immediate action within 2 days •Unsafe storage of combustible and flammable liquid (Gasoline). •There is no waste management plan. 10 Confidential information Main Storage Room High HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Page 8 The Main Findings Unsafe transporting , storage of Compressed gas cylinders It is usually practiced around ADI premises 11 High Poor Relocatable power (extension cord) 12 Confidential information SFCL offices High ACTION REQUIRED: Be aware that compressed gas must meet the following: •Contents must be properly identified. •Clearly identify the empty cylinders from others. •Protective caps on all cylinders when not in use. •Provide proper storage, safe moving, handling and ventilation area. •Compressed gases must be Secured with a chain around upper third of cylinder, or in a storage cage. ACTION REQUIRED: •As per Saudi Building Code (SBC 801 fire code): Extension cords and flexible cords shall not be a substitute for permanent wiring. •Relocatable power taps (extension cord) shall be used as a temporary solution of the polarized or grounded type, equipped with overcurrent protection, and shall be listed in accordance with UL 1363 and SASO. HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI SFCL Immediate action within 1 day SFCL Immediate action within 1 day Page 9 The Main Findings Poor housekeeping 13 14 There is no fire extinguisher ,fire blanket in kitchens •Rooftop. •Elevator room. Medium ACTION REQUIRED: •Area must be clean from any waste material, dust accumulations, etc. SFCL Immediate action within 3 days All kitchens High ACTION REQUIRED: •One ABC powder Fire extinguisher and one fire blanket must be added for each Kitchen. SFCL Immediate action within 3 days G,1ST&2nd Floors High ACTION REQUIRED: •6 first aid kits (4 kits for each floor) and 2 AEDs. SFCL There is no first aid kits and AEDs 15 Confidential information HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI • Aid kits = one week •AED = 4 weeks Page 10 The Main Findings Portable Fire Extinguishers Adjusmnet :It has been observed that the height of fire extinguishers is higher than NFPA, SBC standard ACTION REQUIRED: •Please follow below image instruction All ADI Fire Extinguishers places 16 Low Fire Department Connection not inspected /tested 17 Outside ADI perimeter walls High Behind the main Store Room High ACTION REQUIRED: •Service provider of fire safety systems (i.e., fire alarm, fire pump, fire suppression system, and sprinkler systems, etc.) to provide method Statement for testing and maintenance of each system, the rectification of the system, planning, and schedule or frequency of testing and maintenance, etc. in accordance with SBC and NFPA codes. •The surface below the raised floor must be clean from any waste material, dust accumulations, etc. SFCL 2 weeks SFCL one week SFCL Immediate action within 1 day SFCL 4 Weeks SFCL 3 days SFCL TBD Uneven walking surfaces hazard 18 19 There are no Evacuation maps All floors of Administrative Building High 20 There are no Assembly points All ADI premises High 21 There is no Emergency lighting All floors of Administrative Building High Confidential information ACTION REQUIRED: Remove or utilize the area for required traffic signage. ACTION REQUIRED: •Evacuation maps must be added as per building requirements. •Locations will be decided by HSE head. ACTION REQUIRED: •Assembly points must be added as per building requirements. •Locations will be decided by HSE head. ACTION REQUIRED: •To be agreed with Facilities Lead. HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Page 11 The Main Findings (No smoking signage) is not available. 22 All ADI premises High TBD Low ACTION REQUIRED: •Smoking signage must be distributed around ADI facilities as per HSE requirement. SFCL 2 weeks TBD TBD High ACTION REQUIRED: When a fire alarm is triggered: •The HVAC must be shut down to avoid the spread of smoke/fire. •The elevator must go down to the ground level and its doors must open automatically. SFCL 4 Weeks High ACTION REQUIRED: •Remove •Such action not representing ADI DNA, Security patrolling must be applied each 20 minutes for (24/7). Conducting security patrols is one of the core services provided by a security guard company and is one of the primary duties of the security personnel. SFCL Continuously Security signage (no-photos-or-video-allowed) 23 24 It has been observed that the fire alarm system is not integrated with HVAC systems and elevators. All floors of Administrative Building TBD •It has been observed there is Fire remnants. •Writing on ADI walls. 25 Confidential information All ADI premises HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI Page 12 The Main Findings 26 A standard operating procedure (SOP) are not in place Confidential information As per room/facilities requirement Low •A standard operating procedure ( SOP), is a set of step-by-step instructions compiled by a manufactory to help workers carry out routine operations. •SOPs aim to achieve efficiency, quality output, and uniformity of performance while reducing miscommunication and failure to comply with industry regulations. •It should be posted inside electrical, mechanical rooms, etc.. HSSE_INSPECTION_HECKLIST_AND_MAIN FINDINAGS_ADI SFCL 4 Weeks Page 13