ACTIVITY GUIDE NAME OF PROCESS BSU_ACT_01 Building Surveys – Pre-Inspection and Site Inspection Request information from the building owner with a documentation checklist prior to OVERVIEW: PURPOSE OF THE TASK AND BENEFIT attending site. Establish site constrictions/access issues. Site Inspection survey of the building to enable all of the necessary information to be obtained in order to prepare the Building Survey report. Further investigations and possible testing dependent of what has been identified during the survey. INPUT None TIMING None Chartered Building Surveyor who will take the lead consultant role. ROLES & RESPONSIBILITIES Possible third-party sub-consultants will be coordinated by the Chartered Building Surveyor. Third party sub-consultants to include, Mechanical and Electrical Engineer, Environmental Audit and Cladding/Facade Specialist. Building Surveyors Checklist MCC-BS-FM-030 Institutional Checklist – Retail MCC-BS-FM-029 Institutional Checklist – Industrial Full Vendor Survey SYSTEMS, TOOLS & REFERENCES Full Investment/Occupier Survey Guidance: RICS Guidance Note – Building Surveys and Technical Due Diligence of Commercial Property, 4th Edition. Guidance: RICS Surveying Safely. Guidance: BCIS Online Guidance: RICS Code of Measuring Practice STEPS AND REQUIREMENTS None OUTPUT 1. Pre-Inspection checklist and request to building owner. Establish site constrictions. 2. Site Inspection/survey. 3. Further investigations and testing might be required. 4. Prepare Building Survey Report. QUALITY CHECKPOINTS Chartered Building Surveyor who will take the lead consultant role. Possible third-party sub-consultants will be coordinated by the Chartered Building Surveyor. The third-party sub-consultants depending on the client instruction may include; • Mechanical & Electrical Service Installations inspection - Mechanical & Electrical Services Engineer. • Environmental Audits (Phase 1 and sometimes a Phase 2) – Suitably qualified person. • Cladding/Facade Survey – Cladding Consultant. Further investigation and testing might be required depending on what has been identified on site. This might include material testing for deleterious materials with concrete HAC High Alumina Cement, Calcium Chloride, Asbestos together with a Structural Engineer’s inspection of a particular issue noted.