Scaffold hand over certificate The scaffold hand over certificate releases the scaffold(s) to the client. The scaffold(s) have been inspected by the client and has been erected to the client’s requirements. All scaffolds have been erected as per the requirements of the Best Practice Guidelines for Scaffolding in New Zealand. The client undertakes to control the use, and users of the scaffold structure(s) while under their control as required by the Health and Safety Act and Regulations. Scaffold hand over certificate Client: Location: Description: Comments: Special conditions: Authorised Foreman / Client (Please print clearly) Scaffolding Representative (Please print clearly) Signature Date Signature Date Note: Scaffolding over 5.0m or more is notifiable work and the erection/dismantling or alterations including the movement of planks, can only be carried out under the supervision of a Scaffolder holding a current Certificate of Competency. Scaffold Notifiable Yes No Levels planked Ladder, stair access bays Working levels with double hand rails Scaffold ties Screening Levels with kickboards Scaffold Register Yes Light duty 225Kg per bay Useable lifts per bay 4 Medium duty 450Kg per bay Useable lifts per bay 2 Heavy duty 675Kg per bay Useable lifts per bay 1 Special duty Useable lifts per bay Scaffolding and Rigging New Zealand (SARNZ), 2009. Limitations No