NESTCON BUILDERS SDN BHD
HIRADC Form (Hazard Identification, Risk Assessment, Determining Control)
Process
Bricklaying Work
Location
@Jalan Puchong
Name
Project
THE NEST 2 RESIDENCES
Designati
on
Project
Ref
Legal
Req.
Prepared By
Approved By
MUHAMMAD
HAZIM
MASDI YUSOF
HAMZAH
KUAH CHIN HWA
SITE ENGINEER
AST. PROJECT
MANAGER
SAFETY
OFFICER
PROJECT
MNAGER
Ref No:
NBSB/HSE/HIRA
DC/10
Rev No: 00
NBSB/NB015
FMA 1967 Act 139,
( BOWEC )
OHSA 1994 Act 514
Signature
Effective Date
22 OCT 2021
Date
Risk Assessment (RA)
Severit
y
Hazard Identification (HI)
N
o
Activity
Hazard
1
Mixing the cement
Wire insulation
damaged/deterio
ration
2
Review By
Bricklaying
Rati
ng
Wet floor
Effect
Electrical
shock
Slip, trip
and fall
Current Control
- All supervisor to check all
wire to ensure it is in good
condition
- Wearing safety shoes while
work
- Provide wire stand /
hanger
- To clear water ponding by
doing regular housekeeping
3
- clearing water ponding by
doing regular housekeeping
- To wear proper PPE
2
Determining Control (DC)
Likelihoo
d
Risk
Rating
2
6
Recommended Control
Responsibility
- Safety briefing before work
start
-Monthly inspection by
electrician on machinery /
wire every month
PM/APM/SE/P.I.C/
SAFETY DEPART
2
4
Severity
Severity
Rating
Likelihood
(Probability)
5
Numerous fatalities, irrecoverable property damage and productivity
5
Most likely
4
Approximately 1 single fatality, major property damage if hazard realized
4
Possible
Lev
el
3
Non-fatality injury, permanent disability. Serious bodily injury, serious work related ill
health (occupational poisoning / diseases)
3
Conceivable
H
2
Disabling but not permanent injury. Ill health requiring medical treatment
2
Remote
M
1
Minor abrasions, bruises, cuts, first aid type injury. Ill health requiring first aid
treatment only, no loss of work time
1
Inconceivable
L
Downloaded by Steven (stevenkoh171@gmail.com)
- Safety briefing before work
start
Risk Rating
Likeliho
od
1
2
3
4
5
5
5
10
15
20
25
4
4
8
12
16
20
3
3
6
9
12
15
2
2
4
6
8
10
1
1
2
3
4
5
Score
High
15 – 25
Medium
5 – 12
Low
1–4
lOMoARcPSD|33640237
NESTCON BUILDERS SDN BHD
- Repetitive
movement
- Prolong
standing
Rati
ng
Back pain,
numbness
and tingling
- Take 5 minute break and
rest.
- To provide frequently
minor break
- Implement buddy system
2
3
6
Severity
Severity
Rating
Likelihood
(Probability)
5
Numerous fatalities, irrecoverable property damage and productivity
5
Most likely
4
Approximately 1 single fatality, major property damage if hazard realized
4
Possible
Lev
el
3
Non-fatality injury, permanent disability. Serious bodily injury, serious work related ill
health (occupational poisoning / diseases)
3
Conceivable
H
2
Disabling but not permanent injury. Ill health requiring medical treatment
2
Remote
M
1
Minor abrasions, bruises, cuts, first aid type injury. Ill health requiring first aid
treatment only, no loss of work time
1
Inconceivable
L
Downloaded by Steven (stevenkoh171@gmail.com)
- Safety briefing before work
start
- to implement a shift
rotation
Risk Rating
Likeliho
od
1
2
3
4
5
5
5
10
15
20
25
4
4
8
12
16
20
3
3
6
9
12
15
2
2
4
6
8
10
1
1
2
3
4
5
Score
High
15 – 25
Medium
5 – 12
Low
1–4