Document ID No : MEHF-1-SF- 018
Classified as MARAFIQ Internal Use Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Rev. No.: 0
RISK ASSESSMENT
Date: 09 01 2019
SECTION 1 - Marafiq Department /Contractor: -
SIEMENS ENERGY LTD.
Date: 15/9/2022
Validity: Three year from the date of approval or till completion of the specified activity.
Facility /
Department:
Job Location:
Specify Activity to be assessed: -
Assessment team member
Signature
Reviewed By (Marafiq coordinating Dept.)
Anas Jalabi
QA/QC Project Engineer
Ehtesamul Haque
2
APR
Muhammad ElMorsi
3
Safety Officer (92/2018)
Reviewed By (Marafiq OHS Section)
Approved By (Marafiq Operations Dept.)
Name:
Name:
Name:
Signature:
Signature:
Signature
Date:
Date:
Date:
Time:
Time:
Time:
3rd Party
Projects
10J
Substation
Manual Replacement and Installation of
New DFR/DSM (Digital Fault Recorder,
Dynamic System Monitor panel).
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
1
Reviewed By DC:
Stamp Control
Download