Document ID No : MEHF-1-SF- 018 Classified as MARAFIQ Internal Use Power and Water Utility Company for Jubail and Yanbu Page 1 of 1 Rev. No.: 0 RISK ASSESSMENT Date: 09 01 2019 SECTION 1 - Marafiq Department /Contractor: - SIEMENS ENERGY LTD. Date: 15/9/2022 Validity: Three year from the date of approval or till completion of the specified activity. Facility / Department: Job Location: Specify Activity to be assessed: - Assessment team member Signature Reviewed By (Marafiq coordinating Dept.) Anas Jalabi QA/QC Project Engineer Ehtesamul Haque 2 APR Muhammad ElMorsi 3 Safety Officer (92/2018) Reviewed By (Marafiq OHS Section) Approved By (Marafiq Operations Dept.) Name: Name: Name: Signature: Signature: Signature Date: Date: Date: Time: Time: Time: 3rd Party Projects 10J Substation Manual Replacement and Installation of New DFR/DSM (Digital Fault Recorder, Dynamic System Monitor panel). PROPRIETARY NOTICE THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ. IMPORTANT Only documents with stamps are considered official. 1 Reviewed By DC: Stamp Control