PLANT UE TR RTH NORTH O N 953° PIPE RACK 25.0 PLANT UE NORTH R T H RT NO TANK FARM AREA 2.0-CWA-9 ROAD N M L ROAD K ° 953 25.0 ROAD J US-2 MAIN BUILDING H G F E D B A 500 C PLANT NORTH TRUE NORTH 25.095317° 5500 1 2 3 4 5 6 7 2.0-CWA-2 8 9 10 11 12 1314 15 2.0-CWA-3 16 17 18 19 2.1-CWA-4 20 21 22 23 24 25 26 ROAD 31 32 33 27 28 29 30 2.1-CWA-5 34 35 36 37 38 39 40 41 42 43 44 45 46 47 2.1-CWA-7(1) 2.1-CWA-6 48 49 50 51 52 2.1-CWA-7(2) THIS DRAWING 1 1 3 2 9000 9000 9000.0000 2 9000 9000 9000.0000 3 1 2 9000 1 3 9000 2 3 9000 9000 1 3 2 9000 9000 9000 KEYPLAN 9000 9000.0000 GENERAL NOTES: 1. EMERGENCY EXIT DUMB WAITER RADIO's N 1460 ESCAPE ROUTE UP EMERGENCY EXIT FACILITIES CUPBOARD MEETING ROOM SHOWERS 49.9m² GLAZED QUIET ROOM WC NAP ROOM GLAZED WNDOWS TO CORRIDOR ENGINEERING OFFICE M GLAZED PANEL FRIDGE UNDER DRINKS DISPENSING DISHWASHER UNDER WC WINDOW PANELS TO WEST FACE OF HEADBLOCK (ALL BAYS) AS SHOWN EL +103.000 ESCAPE STAIR EL FFL +100.000 SSL +100.000 FFL EL+108.400 FFL EL+106.000 FFL EL+103000 UP EMERGENCY EXIT FFL EL+108000 ESCAPE STAIR UP 8250 ESCAPE ROUTE 8250 DIRTY CORRIDOR TOWELS LOBBY CLEAN CORRIDOR WHB TOWELS TOWELS WC FRIDGE UNDER FRIDGE UNDER WC RAISED ACCESS FLOOR CCR CLEAN LOCKER ROOM 'L05-A2' (171 TOTAL) DIRTY LOCKER ROOM 'L05-A1' (168 TOTAL) SHOE RACK METRES - DD-Mmm-YY REV SERVICES SHAFT ESCAPE STAIR UP SERVICES SHAFT FFL EL+119500 UP SECONDARY DATA ROOM WINDOW PANELS TO STAIR FFL EL+116750 UP FFL EL+122.250 ESCAPE STAIR UP FFL EL+124500 E/E STAIR LOBBY UP LEVEL 05 AIR FFL. EL+124500 SHOWER DATE Issued For LEVEL 03 FFL EL+114000 - ISSUE, SCOPE OF REVISION PREP - - CHK LEAD ENG - - APPR CLIENT APPR DISCLAIMER: This document has been prepared on behalf of and for the exclusive use of Northvolt Ett, and is subject to and issued in accordance with the agreement between Northvolt Ett and Worley Europe Ltd. Worley Europe Ltd accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this report by any third party. Copying this report without the permission of Northvolt Ett and Worley Europe Ltd is not permitted. CONTRACTOR CLIENT R RADIO's NORTHVOLT ETT US2 LEVEL 04 LEVEL 02 FFL EL+106000 25 LIFT ACCESS FROM PROCESS FFL EL+124000 AND HEADBLOCK FFL EL+124500? DRAWING TITLE LEVEL 01 FFL EL+100000 20 TOWELS SHOES LOBBY FFL EL+114000 15 DIRTY LAUNDRY GOODS LIFT UP 10 STORE FRIDGE UNDER FFL EL+114000 5 WC TOWELS FRIDGE UNDER 0 SCALE 1:250 WC DISHWASHER UNDER M DN CHARGING AREA FOR FORKLIFTS UP 5 SHOWERS STORE GLAZED PANEL WC WASTE BIN M UP WC DISHWASHER UNDER M SHALL BE USED ONLY FOR THE ORIGINAL PURPOSE INTENDED. COPYING IN ANY FORM OR DISTRIBUTION OF THE ORIGINAL OR COPIES SHALL REQUIRE WRITTEN PERMISSION FROM THE DRAWING OWNER.. DRINKS DISPENSING M CANTEEN TO INCLUDE BEVERAGE DISPENSING AND FOOD WARMING SERVICES SHAFT WC STORE ROOM TOWELS FRIDGE UNDER M CRASH BARRIER SERVICES SHAFT WC SHOWERS 1 FORKLIFT PALLET DELIVERY PLATFORM SHOWERS WC M QUIET ROOMS DISHWASHER UNDER PALLET CRUSHER WC SHOWERS C B TOWELS WC STORE ROOM WASTE BIN CRASH BARRIER L1.US2-0002-A-DGA-00018 NORTHVOLT ETT UPSTREAM 2 CWA-2 HEADBLOCK GENERAL ARRANGEMENT LEVEL 05 DIRTY LAUNDRY LOBBY PRINT/ RECORDS L1.US2-0002-A-DGA-00017 NORTHVOLT ETT UPSTREAM 2 CWA-2 HEADBLOCK GENERAL ARRANGEMENT LEVEL 04 GLAZED QUIET ROOM WC LOADING BAY LOADING BAY ROLLER SHUTTER EL FFL+125.000 WC STORE CLEAN LOCKER ROOM 'L05-B2' (171 TOTAL) GLAZED QUIET ROOM LOCKER ROOM L03-A2 (60 TOTAL) WC DIRTY LOCKER ROOM 'L05-B1' (164 TOTAL) GLAZED QUIET ROOM WC L1.US2-0002-A-DGA-00016 NORTHVOLT ETT UPSTREAM 2 CWA-2 HEADBLOCK GENERAL ARRANGEMENT LEVEL 03 TO PROCESS AREA WC WC CANTEEN STORE RISER HVAC WC WC WC WC WC WC V MAIN EQUIPMENT ROOM SHOWER SHOES TOWELS RISER HVAC EL FFL+119.500 EL +119.500 FACILITIES CUPBOARD WC WC V WC STORE ESCAPE ROUTE PALLET LIFT LOBBY KITCHEN REFRESHMENTS DISPENSING TRAINING AREA RAF STORE L1.US2-0002-A-DGA-00015 NORTHVOLT ETT UPSTREAM 2 CWA-2 HEADBLOCK GENERAL ARRANGEMENT LEVEL 02 DIRTY CORRIDOR WHB WINDOW PANELS TO WEST FACE OF HEADBLOCK (ALL BAYS) AS SHOWN PALLET LIFT 5 BAY LOADING DOCK PRINT/ STORE DESCRIPTION L1.US2-0002-A-DGA-00014 NORTHVOLT ETT UPSTREAM 2 CWA-2 HEADBLOCK GENERAL ARRANGEMENT LEVEL 01 SERVICES SHAFTS CLEAN CORRIDOR MEETING ROOM LOCKER ROOM L03-A1 (58 TOTAL) REFERENCE DRAWINGS: DRAWING.NO. WHB PPE WC EDGE OF LOADING BAY D WC WC PALLET LIFT DISABLED TOILET 2 FEMALE TOILETS WHB PALLET LIFT LOADING BAY ROLLER SHUTTER MEETING ROOM WC CORRIDOR E 8250 TRAINING AREA RAF DISABLED TOILET AND CHANGE CLOAKROOM M HOLD LIST: HOLD 1 - NOTES HOLD 2 - LEVEL 02 TO BE ADVISED HOLD 3 - STAIRS MAIN PPE STORE WHB CRASH BARRIER 3 LOADING BAY ROLLER SHUTTER M PERSONNEL CORRIDOR GRADE EL +100.000 FFL LOADING BAY LEVEL = GRADE + 1.2m 8250 NAP ROOM JANITOR MALE TOILETS 8250 PALLET LIFT N D LOADING BAY ROLLER SHUTTER PALLET LIFT FEMALE TOILETS STORE ROOM MAIN JANITOR STORE CENTRAL ACCESS STAIR UP JANITOR CUPBOARD JANITOR FOLDING DIVIDER WALL EDGE OF LOADING BAY @ GRADE +1.2m FFL TOILET SERVICES CORRIDOR SERVICES SHAFTS CORRIDOR F PALLET LIFT UP UP CENTRAL ACCESS STAIR WC SHOWERS LAUNDRY COLLECTION & CHUTES CLEAN CORRIDOR EQUIPMENT ENTRANCE CORRIDOR CORRIDOR CRASH BARRIER CCR CLOAKROOM WC SHOWERS WC ACCESS HATCH MALE TOILETS DISABLED TOILET SERVICES SHAFTS WAREHOUSING EL +100.000 FFL 4 LAUNDRY CHUTE COLLECTION LABORATORY UP CENTRAL ACCESS STAIR LIFT LOBBY WHB CORRIDOR AT APPROX 4304mm FROM BARRIER, HEADROOM WILL BE 5100mm ROLL CAGE STORAGE LOBBY ESCAPE ROUTE UP GLAZED WINDOWS TO LIFT LOBBY WC LOBBY WC RISER ELECTRICAL 101.5m² WC LAUNDRY CHUTE COLLECTION DIRTY LOCKER ROOM 'L05-C1' (125 TOTAL) LOBBY MAIN CONFERENCE ROOM RISER ELECTRICAL 2 No. 17 PERSON LIFTS RISER HVAC ROLL CAGE STORAGE FACILITIES CUPBOARD CRASH BARRIER LIFT LOBBY EL FFL+114.000 ROLLER SHUTTER RISER ELECTRICAL 2 No. 17 PERSON LIFTS LIFT LOBBY CLEAN LOCKER ROOM 'L05-C2' (125 TOTAL) STORE ROOM WC NE ZO N TOILET 4304 8250 PPE DELIVERY ESCAPE ROUTE GLAZED WNDOWS TO CORRIDOR TOWELS GLAZED MEETING ROOM OFFICE CLOAKROOM G LOADING BAY ROLLER SHUTTER SHOES LOBBY LOBBY NAP ROOM DOOR TO LOBBY @ EL. +114.000 EL FFL +106.000 CENTRAL ACCESS STAIR AR CH ITE 8250 5 UP DRIVERS RECEPTION, CHECK-IN & RESTROOM QUIET ROOM MEETING ROOM LAUNDRY CHUTE COLLECTION AND BAGGING E/E 1 DIRTY LOCKER ROOM 'L05-D1' (51 TOTAL) DIRTY LAUNDRY MEETING ROOM PHONE PHONE BOOTH BOOTH QUIET ROOM ACCESS HATCH JANITOR STORE STORE DIRTY LAUNDRY WAREHOUSING EL +100.000 FFL EL FFL +111.334 H WINDOW PANELS TO WEST FACE OF HEADBLOCK (ALL BAYS) AS SHOWN LAB OFFICE EL +108.667 ENTRANCE AREA TOWELS COPY STATIONARY ROOM QUIET ROOM EX LIFT LOBBY GLAZED SCREEN WINDOW PANELS TO WEST FACE OF HEADBLOCK (ALL BAYS) AS SHOWN CT UR AL 8250 ESCAPE ROUTE RISER HVAC DISABLED ENTRANCE / EXIT ELECTRICAL ROOM EL +103.000 ACCESS TO DISABLED PARKING BAYS 2 No. 17 PERSON LIFTS J SHOWERS WC's MEETING ROOM WC's 18 Lockers STORE CLEAN LOCKER ROOM 'L05-D2' (52 TOTAL) MEETING ROOM CL US IO ESCAPE ROUTE 8250 WINTER PPE CHANGE LOBBY TOWELS MAIN OFFICE 12 Lockers GUEST CHANGE CANOPY OVER DISABLED PARKING BAYS DIRTY LAUNDRY LOBBY ESCAPE ROUTE 10 PERSON MEETING ROOM STORE STORE TOWELS REFUSE COLLECTION AND TEMPORARY STORAGE EXTERNAL WINDOW DIRTY LOCKER ROOM 'L05-E1' (53 TOTAL) WC's LOBBY LOBBY LABORATORY CORRIDOR 8250 K TOWELS E/E CLEAN LOCKER ROOM 'L05-E2' (59 TOTAL) MEETING ROOM FACILITIES WAREHOUSING ROOM EL +100.000 FFL GLAZED SCREEN UP WHB L FIRST AID SHOWERS WHB LABORATORY WAREHOUSE 1 MAIN ENTRANCE / EXIT WITH SLIDING DOORS PROCESS AREA EL+124.500 LOBBY REFRESHMENTS/ BREAK OUT AREA TO INCLUDE DISHWASHER & SMALL FRIDGE, CABINETS FOR CROCKERY AND A WASTE/RECYCLING AREA. SINGLE BAR WITH NO SEATING IS REQUIRED ESCAPE ROUTE Store Room 2 PAVED PEDESTRIAN ACCESS TO HEADBLOCK ENTRANCE AIR SHOWER EL+124.500 WHB EOC ROOM STAIR 1 TOWELS 8250 SCANNING 4 ELECTRON MICROSCOPE ROOM 3 UP ESCAPE CORRIDOR LEVEL 05 EL+124.500 EL+124.500 WINDOW PANELS TO STAIR 2 No. 17 PERSON LIFTS 5 10.075x2mx2m Dp BASE FOR ELECTRON MICROSCOPES EL+116.750 EL FFL+125.000 M LABORATORY LIFT PRIMARY DATA ROOM EL +120500 FFL UP EL+119.500 CLEAN CORRIDOR 6 EL+111.200 ESCAPE ROUTE SEM Control UP UP EL+114.000 LABORATORY LIFT 4 No. 1.5m³ CONTAMINATED WASTE TANKS FROM LABORATORY UP UP EL+105.600 EL+108.400 LABORATORY LIFT ESCAPE ROUTE EL +103.000 EL FFL +100.000 SSL +100.000 8250 EMERGENCY EXIT A THIS DRAWING TO BE READ IN CONJUNCTION WITH THE FOLLOWING: FURNITURE LAYOUT DRAWINGS. ARCHITECTURAL SECTIONS. ELEVATIONS. EQUIPMENT LAYOUT DRAWINGS. STRUCTURAL DRAWINGS. DUMB WAITER LEVEL 04 FFL EL+119500 LEVEL 05 FFL EL+124500 NORTHVOLT ETT UPSTREAM 2 HEADBLOCK GENERAL ARRANGEMENT LEVELS 01 THRO 05 PROJECT CWA 315000-00026 SCALE 1:250 SIZE A1 A DRAWING NO L1.US2-0002-A-DGA-XXXXX SHEET REV 01 - A1[841x594]_Northvolt_A1.dwg