PT. TRIDASA PRAWIRA
SALES ENGINEERING, MANUFACTURING, CONTRACTING & SERVICE
ESPECIALLY IN MATERIAL HANDLING & TRANSPORT EQUIPMENT
Jl. Pulomas Utara Raya No.46, Kayu Putih, Jakarta Timur 13210, Indonesia
Phone No. +62-21-4750704, 4707061, Fax. No. +62-21-4707062, e-mail: tdp@cbn.net.id
No. Dokumen: QHS-FR-ENG-15
No. Revisi: 00
Tanggal Berlaku: 04-5-2010
Halaman: 1 Dari 1 Hal
FIELD ACTIVITY REPORT
Customer
: PT. HUTAMA KARYA
Project Name
: JAWA 9&10 COAL FIRED STEAM POWER PLANT
Equipment Name
: OHC CWPH 100T
Location
: SURALAYA
Working
No.
NO. : FAR-23011/HK/XI/23
Date : 24 October 2023
Time
Day
Work Description
Remarks
TIME SHEET INSTALLASI OVERHEAD CRANE CWPH 100T
1 Senin
23/10/2023
06.00~10.00
- Perjalanan ke Merak
13.30~17.00
- Pengecekan Instalasi CWPH
- Outstanding work instalation
1. Pemasangan festoon tertukar antara main dan aux hoist
2. Towing arm main hoist 100T belum tersetting dan tightening
3. Trigger limit switch trolley main & aux hoist belum terpasang
4. Trigger limit switch travelling belum terpasang
5. Limit switch ultimate di hook upper untuk main dan aux hoist
belum terpasang
6. Platform dan handrail aux. hoist belum terpasang
7. Megger dan insulation motor
- Pengecekan Instalasi Monorail GSPH
Sepervisi hari ke
28 of 80
- Outstanding work instalation
1. Kekurangan c-track belum terpasang
2. kabel festoon belum terpasang dan belum terminsai
3. Trigger limit switch trolley belum terpasang
- Pengecekan Instalasi Monorail GSPH
- Outstanding work instalation
1. Kekurangan c-track belum terpasang
2. kabel festoon belum terpasang dan belum terminsai
3. Trigger limit switch trolley belum terpasang
4. Di temukan monorail beam twist mohon dapat di perbaiki
monorail beam twist akan mengakibatkan jalan trolley tersendat
Note :
CONDUCTED & WITNESSED BY
: PT. TRIDASA PRAWIRA
: PT. HUTAMA KARYA
Date : 24 October 2023
Date : 24 October 2023
Signature :
Signature :
Name : M. Riski
Name :
page 1 of 2
PT. TRIDASA PRAWIRA
SALES ENGINEERING, MANUFACTURING, CONTRACTING & SERVICE
ESPECIALLY IN MATERIAL HANDLING & TRANSPORT EQUIPMENT
Jl. Pulomas Utara Raya No.46, Kayu Putih, Jakarta Timur 13210, Indonesia
Phone No. +62-21-4750704, 4707061, Fax. No. +62-21-4707062, e-mail: tdp@cbn.net.id
No. Dokumen: QHS-FR-ENG-15
No. Revisi: 00
Tanggal Berlaku: 04-5-2010
Halaman: 1 Dari 1 Hal
FIELD ACTIVITY REPORT
Customer
: PT. HUTAMA KARYA
Project Name
: JAWA 9&10 COAL FIRED STEAM POWER PLANT
Equipment Name
: OHC CWPH 100T
Location
: SURALAYA
Working
No.
Time
Day
NO. : FAR-23011/HK/XI/23
Date : 24 October 2023
Work Description
Remarks
TIME SHEET INSTALLASI OVERHEAD CRANE CWPH 100T
1 Senin
24/10/2023
08.30~17.00
- Pengecekan Instalasi CWPH
1. Pengecekan span rail to rail
2. Supervisi perbaikan festoon
3. Pengecekan terminasi
4. Pengecekan material trigger limit switch
Sepervisi hari ke
29 of 80
Note :
CONDUCTED & WITNESSED BY
: PT. TRIDASA PRAWIRA
: PT. HUTAMA KARYA
Date : 24 October 2023
Date : 24 October 2023
Signature :
Signature :
Name : M. Riski
Name :
page 2 of 2