QUOTATION
Tel:(852) 2153 3158, 2707 9685
E-mail:hamco@hamco168.com
Fax:2707 4650
Leighton Asia
Ref.: MHA_Q_202071
39/F, Sun Hung Kai Centre,
Date:
15-Oct-21
30 Harbour Road, Hong Kong
Attn.: Roger Wong (Project Director)
Re: H2671 East Kowloon Cultural Centre - Supply, fabricate and install steel frame for
silencer installation
Further to your enquiry, we are pleased to offer our price for the supply, fabrication and
installation in this project according to the information received. Please note the following terms
and conditions.
1.0)
Ref. Document
-
Attachment
2.0)
Price of Supply and Fabrication and Erection
-
Total price of Structure Steelwork:
-
The breakdown see attached BQ:
-
Remeasurement
3.0)
Remark
3.1)
The above price includes Supply
-
Supply steel material (S275/S355);
-
Material wastage;
-
Material procurement;
-
Clean custom duty for import;
3.2)
The above price includes Fabrication
-
Collection material to Site / HK Workshop;
-
Shop drawing;
202071_BQ_Steel frame for silencer installation/TBA
$1,907,500.00 HK$
鴻安建造有限公司
HONGAN CONSTRUCTION COMPANY LIMITED
香港新界荃灣海盛路11號One Midtown 27樓18室
Add:Unit 18, 27/F., One Midtown, 11 Hoi Shing Road, Tsuen Wan, New
Territories, Hong Kong
QUOTATION
Tel:(852) 2153 3158, 2707 9685
E-mail:hamco@hamco168.com
Fax:2707 4650
Leighton Asia
Ref.: MHA_Q_202071
39/F, Sun Hung Kai Centre,
Date:
15-Oct-21
30 Harbour Road, Hong Kong
Attn.: Roger Wong (Project Director)
Re: H2671 East Kowloon Cultural Centre - Supply, fabricate and install steel frame for
silencer installation
Further to your enquiry, we are pleased to offer our price for the supply, fabrication and
installation in this project according to the information received. Please note the following terms
and conditions.
-
Packing;
-
Delivery to site by truck;
-
Clean custom duty for export.
3.3)
The above price includes Erection
-
Tools;
-
Unloading material;
-
Erection;
-
Site clear.
3.4)
The above price excludes
-
Survey setting out for main line;
-
-
Employee Compensation Insurance, thrid party liability;
Supply water and electricity at the working
area;
Design and calculation for permanent steelwork & temporary steelwork;
-
Vertical transportation by client;
-
Tower crane to be allowed to aid installation;
-
Temporary works access or safety fence;
-
202071_BQ_Steel frame for silencer installation/TBA
鴻安建造有限公司
HONGAN CONSTRUCTION COMPANY LIMITED
香港新界荃灣海盛路11號One Midtown 27樓18室
Add:Unit 18, 27/F., One Midtown, 11 Hoi Shing Road, Tsuen Wan, New
Territories, Hong Kong
QUOTATION
Tel:(852) 2153 3158, 2707 9685
E-mail:hamco@hamco168.com
Fax:2707 4650
Leighton Asia
Ref.: MHA_Q_202071
39/F, Sun Hung Kai Centre,
Date:
15-Oct-21
30 Harbour Road, Hong Kong
Attn.: Roger Wong (Project Director)
Re: H2671 East Kowloon Cultural Centre - Supply, fabricate and install steel frame for
silencer installation
Further to your enquiry, we are pleased to offer our price for the supply, fabrication and
installation in this project according to the information received. Please note the following terms
and conditions.
-
Scaffold and installation of scaffold (if need).
3.5)
Others
-
Quotation valid: 14 days.
We trust our price is competitive. Please do not hesitate to contact the undersigned for any
questions.
Thank you for your kind attention.
Yours faithfully,
For and On behalf of
Cc: Melvin Yu ; Wah Sung (HAMCO)
202071_BQ_Steel frame for silencer installation/TBA
鴻安建造有限公司
HONGAN CONSTRUCTION COMPANY LIMITED
香港新界荃灣海盛路11號One Midtown 27樓18室
Add:Unit 18, 27/F., One Midtown, 11 Hoi Shing Road, Tsuen Wan, New
Territories, Hong Kong
Tel:(852) 2153 3158, 2707 9685
E-mail:hamco@hamco168.com
QUOTATION
Fax:2707 4650
Leighton Asia
Ref.: MHA_Q_202071
39/F, Sun Hung Kai Centre,
Date:
15-Oct-21
30 Harbour Road, Hong Kong
Attn.: Roger Wong (Project Director)
Re: H2671 East Kowloon Cultural Centre - Supply, fabricate and install steel frame for
silencer installation
Further to your enquiry, we are pleased to offer our price for the supply, fabrication and
installation in this project according to the information received. Please note the following terms
and conditions.
Leighton Contractors (Asia) Limited
EKCC - Supply, fabricate and install steel frame for silencer installation
Bill of Quantities
Item
Description
Qty
Unit
Rate (HK$)
Amount (HK$)
Supply, fabricate and install steel frame for silencer
installation
1
152 x 76 x 17.9 kg/m GMS channel in vertical posts
7550
kg
70.00
528,500.00
2
102 x 51 x10.4 kg/m GMS channel in vertical posts and
horizontal rails
6600
kg
70.00
462,000.00
3
50 x 50 x 5mm thick GMS angle
1500
kg
70.00
105,000.00
4
GMS steel plate in base plates
800
kg
70.00
56,000.00
5
General painting to steel surface
580
m2
300.00
174,000.00
6
GMS M12 anchor bolts
260
nr
700.00
182,000.00
7
Allow for misc. connection plates, bolts and the like
1
sum
100,000.00
100,000.00
8
Allow for anchor bolt pull out test
1
sum
50,000.00
50,000.00
9
Allow for shop drawing preparation
1
sum
70,000.00
70,000.00
202071_BQ_Steel frame for silencer installation/TBA
鴻安建造有限公司
HONGAN CONSTRUCTION COMPANY LIMITED
香港新界荃灣海盛路11號One Midtown 27樓18室
Add:Unit 18, 27/F., One Midtown, 11 Hoi Shing Road, Tsuen Wan, New
Territories, Hong Kong
Tel:(852) 2153 3158, 2707 9685
E-mail:hamco@hamco168.com
QUOTATION
Fax:2707 4650
Leighton Asia
Ref.: MHA_Q_202071
39/F, Sun Hung Kai Centre,
Date:
15-Oct-21
30 Harbour Road, Hong Kong
Attn.: Roger Wong (Project Director)
Re: H2671 East Kowloon Cultural Centre - Supply, fabricate and install steel frame for
silencer installation
Further to your enquiry, we are pleased to offer our price for the supply, fabrication and
installation in this project according to the information received. Please note the following terms
and conditions.
10
Allow for RPE endorsement to calculation for
Temporary works
1
sum
11
Scaffolding and working platform (provisional)
1
sum
12
Material testing (provisional)
1
sum
13
Weld test need to included
1
sum
Total Amount:
202071_BQ_Steel frame for silencer installation/TBA
80,000.00
80,000.00
100,000.00
100,000.00
1,907,500.00