PROJECT TITLE : PLEM FABRICATION AND MARINE EQUIPMENT INSTALLATION DOCUMENT TITLE : HANDLING, STORAGE, PACKING AND PRESERVATION PROCEDURE SUBCONTRACTOR : DRIFT CORPORATE SDN BHD 1280A4 - MIF2, PORT DICKSON, MALAYSIA Document No. : P2101-VD-DCSB-QA-PRO-10041 Subcontractor Revison 0 Status Code Petron Approval Eng. Date COMMENT STATUS CODE 1 2 3 4 5 0 B0 B Revision 13.05.2020 22.04.2020 11.03.2020 Date Rejected Comments as Noted Minor Comments, Acceptable No Comments Information Only Approved for Construction Issued for Review Issued for Review Description FAJ FAJ MHS Prepared by BMY BMY BMY Checked By Approved By HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE PROJECT : PROVISION OF FABRICATION, TESTING, ASSEMBLY AND TRANSPORTATION OF PLEM AND PIPELINES TIEIN SPOOL PACKAGE SO NO. LOCATION CLIENT CONTRACTOR PROJECT NO. DOC NO. ORIGINAL DOC. : MTCE/DCSB/003/17122019 : DRFT. CORP FACILITY, PORT KLANG : MTC ENGINEERING SDN BHD : DRIFT CORPORATE SDN BHD : TEC-20-0027 : 0027-HSP-0001 REVISION : 02 : N/A REVISION : N/A STATUS 02 01 00 AFC FOR REVIEW FOR REVIEW PREPARED BY FAJ DATE : 13.05.2020 REVIEWED BY BMY DATE : 13.05.2020 ENDORSED BY MFM DATE : 13.05.2020 APPROVED BY DATE : STANDARD OPERATING PROCEDURES HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Document No.: DRFT-SOP-EC-016 Revision No.: 00 REMINDER: This SOP document is the property of Drift Corporate Sdn Bhd and strictly prohibited from removal, reproduction or duplication unless prior written approval has been obtained. The holder of the document will be solely responsible to ensure its safekeeping at all times. This is a controlled copy document and photocopying is prohibited. CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 2 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 3 of 14 TABULATION OF REVISED PAGES REVISIONS SHEET REVISIONS SHEET B B0 B1 B B0 B1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 3 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 4 of 15 CONTENTS 1 2 INTRODUCTION ..................................................................................................................... 7 1.1 PROJECT OVERVIEW ................................................................................................. 7 1.2 SCOPE DESCRIPTION ................................................................................................ 8 CODES AND STANDARDS ..................................................................................................... 9 2.1 INTERNATIONAL CODES & STANDARD .................................................................... 9 2.2 COMPANY REFERENCE DOCUMENTS...................................................................... 9 2.3 PROJECT REFERENCE DOCUMENTS ....................................................................... 9 3 DEFINITIONS ........................................................................................................................ 10 4 PURPOSE ............................................................................................................................. 11 5 RESPONSIBILITY ................................................................................................................. 12 6 PROCEDURE ........................................................................................................................ 13 6.1 HANDLING.................................................................................................................. 13 6.2 STORAGE................................................................................................................... 13 6.3 PRESERVATION ........................................................................................................ 14 6.4 PACKING AND DELIVERY ......................................................................................... 14 CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 4 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 5 of 15 DISTRIBUTION LISTING Master (signed hardcopy) Document Control Center (DCC) Hardcopy distribution 001 002 003 004 005 006 007 008 009 010 REVISION CONTROL Description of Change Date REV B ISSUED FOR REVIEW (IFR) 11/03/2020 REV B0 RE-ISSUED FOR REVIEW (RIFR) 22/04/2020 REV 0 APPROVED FOR CONSTRUCTION(AFC) 13/05/2020 CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 5 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 6 of 15 ABBREVIATION EPCC Engineering, Procurement, Construction & Commissioning HSE Health, Safety and Environment ITP Inspection Test Plan MTCE MTC Engineering Sdn Bhd PETRON Petron Malaysia Refining & Marketing Bhd PMT Project Management Team CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 6 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 1 INTRODUCTION 1.1 PROJECT OVERVIEW Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 7 of 15 Port Dickson Refinery is located about 90km from Kuala Lumpur in Port Dickson, Negeri Sembilan, and is conveniently connected to cities via a strong network of transportation routes, enabling the efficient and safe distribution of Petron’s premium products. Figure 1: Location of new PLEM and SPM CALM Buoy and the existing 10” and 20” submarine pipelines Figure 2: Location of the new PLEM and SPM CALM Buoy in relation to existing Petron and neighbouring Marine operators CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 7 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 1.2 Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 8 of 15 SCOPE DESCRIPTION This requisition details the Scope of Supply and Scope of Work for the fabrication, assembly and installation of a new Pipeline End Manifold (PLEM) complete with all associated piping and valves and new 10” and 20” pipelines spools and installation of the complete system together with Single Point Mooring, Catenary Anchor Leg Mooring (SPM CALM) Buoy system for the Petron Malaysia Marine Import Facilities 2 Project located at Port Dickson Refinery, Port Dickson. Petron Malaysia Refining and Marketing Bhd (Petron), hereafter referred to as OWNER, appointed Foster Wheeler E&C (M) Sdn Bhd (Wood) to provide Engineering Consultancy service for the Marine Import Facilities 2 Project, hereafter referred to as PROJECT. The overall project scope defined for this future importation facility is: • To install a new Single Point Mooring (SPM) CALM Buoy system complete with associate equipment and control systems come with marine floating hose(s) to connect to a vessel cargo manifold and submarine hose(s) to connect to a new subsea PLEM • To install a new PLEM with valves and hydraulically control actuators and new pipeline spools all connected to the existing subsea pipelines. CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 8 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 2 CODES AND STANDARDS 2.1 INTERNATIONAL CODES & STANDARD No 2.2 DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 9 of 15 Document Number Document Title [A1] ASME B31.4 Pipeline Transportation – System for Liquid Hydrocarbon and Other Liquids [A2] ASME SECTION II ASME Section II Part A [A3] AFC DRAWING AFC Drawing COMPANY REFERENCE DOCUMENTS No [B1] 2.3 Document No: Document Number P2101-VD-DCSB-PM-PEP-10002 Document Title Project Execution Plan PROJECT REFERENCE DOCUMENTS No Document Number Document Title [C1] P2101-VD-DCSB-PM-PEP-10002 Project Execution Plan [C2] P2101-E-QA-ITP-0001 PLEM, Tie-In Spools and Piles Fabrication Inspection and Test Plan (ITP) CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 9 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 3 Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 10 of 15 DEFINITIONS OWNER PETRON Malaysia Refining & Marketing Bhd PROJECT PLEM Fabrication and Marine Equipment Installation CONTRACTOR MTC Engineering Sdn Bhd SHIPYARD DRFT Fabrication Yard. SUB-CONTRACTOR/ VENDOR WORK Contractor or Vendor appointed by CONTRACTOR All works including construction and installation, engineering as identified in the document and any other services, activities to be performed by the CONTRACTOR as set of forth in the Contract documents CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 10 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 4 Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 11 of 15 PURPOSE The purpose of this procedure is to define the requirements for correct handling, storage, packing, preservation and delivery in order to provide optimum protection against deterioration or damage to the equipment / item / PLEM structure whilst under the care of SUB-CONTRACTOR. CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 11 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 5 Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 12 of 15 RESPONSIBILITY i. Material Coordinator shall ensure the procedures are effectively carried out. ii. QA/QC Engineer is responsible for the final inspection on the repaired / services equipment / item / PLEM Structure before any delivery can be done. However, Service Engineer will take over the responsibility if QA/QC Engineer is not around or on leave. iii. Section Head / Head of Department shall ensure all safety handling is maintained. CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 12 of 15 Printed on 4/22/2020 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 6 PROCEDURE 6.1 HANDLING 6.2 Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 13 of 15 • Material Coordinator or designated shall ensure proper handling of equipment / item / PLEM Structure is maintained and measure to ensure no damage will happen. • Company vehicles and forklift are under Material Coordinator supervision. • Handling of material shall only be performed with the equipment and tools certified to perform the handling. Lifting and transportation of material shall be conducted as per approved lifting procedure. • Only selected employee or driver can drive the Company’s vehicles including forklift. • The path for vehicle and mobile construction equipment shall be defined, and material shall not be put within this passage, even for a short time. B0 STORAGE • Material Coordinator or the designated shall be ensure that no unauthorized personnel can enter the storeroom. • Upon receipt of goods into the storeroom, Material Coordinator shall ensure to update the stock list / inventory record and place the goods in proper place in the storeroom. • Material Coordinator with the assigned auditor shall physically stock check on project basis. Shorts or damages shall be reported to the Service Manager / Designated Manager for necessary action. • In issuing a stock item, Material Coordinator shall record into the Inventory Record Book B0 before issuing the equipment / item / PLEM Structure. • The controlled material and flammable goods such as paint, thinner, gas, metal shaft, etc. shall be stored at dedicated storage area. Material Coordinator has a full control on these items and all requests should be in controlled quantity. • The movement of those controlled material and Material Coordinator shall closely monitor flammable goods and the reconciliation shall be made on monthly basis. • For material issued for intermediate treatment such as CNC cutting, painting and blasting prior to issuance for fabrication, the temporary material release note shall be issued by the time material is dispatched from the storage, with the specific detail of material (including heat number, serial number, etc). The identification shall be cross checked again when the material is received after the intermediate treatment, and ensure the identification are matched. CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 13 of 15 Printed on 4/22/2020 B0 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE 6.3 Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 14 of 15 PRESERVATION • All bare machined equipment / item / PLEM Structure surfaces must be sprayed or coated with antirust preservation e.g. CRC, WD 40 anti-rust coating, etc. • All serviced / repaired equipment / item / part shall be placed on the wooden pallet or plastic basket and strictly prohibited to place them directly on floor or mixed together with any metal especially for chrome material (where applicable). • Such equipment / item / like pipe spool, structure, etc. shall not be placed directly on the ground to avoid any damages and rusty condition. • All internal components shall be sprayed with anti-rust preservation and covered with plastic to prevent any corrosion problem. • All electrical part / box shall be covered from water ingress to prevent any malfunction or damage with wrapping plastic. All electrical material shall be placed indoor storage facility. • All opening hole or any track connectors shall be covered with suitable material / item to prevent any damage and water ingress. 6.4 PACKING AND DELIVERY • All the following procedures shall be followed: i. Equipment / item shall be strap down by using nylon or metal strap as appropriate. ii. Repaired equipment / item shall be pack inside the wooden crates or special metal container according to customer request. iii. Old or damaged items shall be pack and relocated at rejected or pending area with clear identification to avoid any misuse. iv. • Equipment / item shall be wrapped and tie up properly during delivery. A complete Job Card and Job Report shall be submitted to QA/QC Engineer or designated for his / her review before any delivery can be made. However, if the services / repaired equipment / item are a very top urgent job, an acceptance will be given. But the complete Job Card and Job Report must be submitted to QA/QC Engineer immediately. • QA/QC Engineer or designated shall do the In-Process Quality Check (IPQC) Report and Out Going Inspection (OGI) Report to all services / repaired equipment / item. • Material Coordinator or designate shall be label the equipment / item to be delivered with a delivery sticker. • All accepted services / repaired equipment / item shall have an “Accepted” sticker from QA/QC Engineer before any delivery can be made. Material Coordinator or designated shall prepare the Delivery Order. CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 14 of 15 Printed on 4/22/2020 B0 DRIFT CORPORATE SDN BHD HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE • Document No: DRFT-SOP-EC-016 Revision: 00 Date: 16th January 2020 Page: Page 15 of 15 All items to be dispatched shall be placed in the Outgoing Area. In the event where there is insufficient allocated space, equipment / item shall be identified and placed in other clearly identified designated area, on a temporary basis. • Driver is responsible to ensure no damage will occur to the equipment / item when loading, unloading and between the delivery processes. CONFIDENTIAL & CONTROLLED File: HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY PROCEDURE Page 15 of 15 Printed on 4/22/2020