69. FITUP REPORT OF 1st SHELL COARSE HORIZONTAL JOINTS. CS1(COD)

advertisement
Report No: AZ/JS-911/FU/0069
Fit-up Inspection
Report
Sheet: 01 of 01
JOB REFERENCE
: Water Quality Improvement Project -South Strategic
Project Title
Location
Network & Reservoirs Dammam project 5
Equipment Name
Equipment
Sr.No
: Potable Water Storage Tank
: AL-Khorayef
Client
Tag
:D5-AWP-011-TK1-MEC-DD-005021
Drawing rev#
WQIP-D5-AWP-T-00382
: D5-011-TK-01
: JF / JS – 911
AZ Job No
ILF/NWC
Reference Procedure
CENTRAL STEEL TANKS
FIT UP OF 1st SHELL COARSE HORIZONTAL SEAM JOINTS
(FOR COD)
SN
ITP
Step#
Heat No
A
Joint #
B
Inspection Status
Tack
Welder ID
WPS #
Result
M
R
B
F
OK
OK
OK
OK
TEST OBSERVATIONS
01
233193300
234189400
5.3
CS-1
2166
ACC
AZ-080. Rev.5
Legends:
M= Misalignment, B= Bevel angle, R= Root Gap, F= Root Face.
Inspected by AZ: QCI
Name
AL-Khorayef
Rajesab S
Ahmed Mustafa
28-10-2023
28-10-2023
Signature
Date
AZ-QCF-19 Rev-02