Crews - Standard
Crew No.
Crew A-1
1 Building Laborer
1 Concrete Saw, Gas Manual
Bare Costs
Hr.
Daily
Hr.
$47.25
$378.00
112.72
$70.35
8 L.H., Daily Totals
Crew A-1A
1 Skilled Worker
1 Shot Blaster, 20⬙
$490.72
Hr.
Daily
Hr.
$61.25
$490.00
229.79
$92.00
8 L.H., Daily Totals
Crew A-1B
1 Building Laborer
1 Concrete Saw
$719.79
Hr.
Daily
Hr.
$47.25
$378.00
176.00
$70.35
8 L.H., Daily Totals
Crew A-1C
1 Building Laborer
1 Chain Saw, Gas, 18⬙
$554.00
Hr.
Daily
Hr.
$47.25
$378.00
47.58
$70.35
8 L.H., Daily Totals
Crew A-1D
1 Building Laborer
1 Vibrating Plate, Gas, 18⬙
$425.58
Hr.
Daily
Hr.
$47.25
$378.00
143.82
$70.35
8 L.H., Daily Totals
Crew A-1E
1 Building Laborer
1 Vibrating Plate, Gas, 21⬙
$521.82
Hr.
Daily
Hr.
$47.25
$378.00
146.12
$70.35
8 L.H., Daily Totals
Crew A-1F
1 Building Laborer
1 Rammer/Tamper, Gas, 8⬙
$524.12
Hr.
Daily
Hr.
$47.25
$378.00
73.84
$70.35
8 L.H., Daily Totals
Crew A-1G
1 Building Laborer
1 Rammer/Tamper, Gas, 15⬙
$451.84
Hr.
Daily
Hr.
$47.25
$378.00
88.02
$70.35
8 L.H., Daily Totals
Crew A-1H
1 Building Laborer
1 Exterior Steam Cleaner
Incl.
Subs O&P
$466.02
Hr.
Daily
Hr.
$47.25
$378.00
84.77
$70.35
8 L.H., Daily Totals
$462.77
Crew A-1J
Hr.
Daily
Hr.
1 Building Laborer
1 Cultivator, Walk-Behind, 5 H.P.
$47.25
$378.00
70.72
$70.35
8 L.H., Daily Totals
$448.72
Crew A-1K
Hr.
Daily
Hr.
1 Building Laborer
1 Cultivator, Walk-Behind, 8 H.P.
$47.25
$378.00
89.64
$70.35
8 L.H., Daily Totals
Crew A-1M
1 Building Laborer
1 Snow Blower, Walk-Behind
8 L.H., Daily Totals
$467.64
Hr.
Daily
Hr.
$47.25
$378.00
75.10
$70.35
$453.10
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$562.80
123.99
$47.25
14.09
$70.35
15.50
$686.79
$61.34
$85.85
Daily
Bare
Costs
Incl.
O&P
$736.00
252.77
$61.25
28.72
$92.00
31.60
$988.77
$89.97
$123.60
Daily
Bare
Costs
Incl.
O&P
$562.80
193.60
$47.25
22.00
$70.35
24.20
$756.40
$69.25
$94.55
Daily
Bare
Costs
Incl.
O&P
$562.80
52.34
$47.25
5.95
$70.35
6.54
$615.14
$53.20
$76.89
Daily
Bare
Costs
Incl.
O&P
$562.80
158.20
$47.25
17.98
$70.35
19.78
$721.00
$65.23
$90.13
Daily
Bare
Costs
Incl.
O&P
$562.80
160.73
$47.25
18.27
$70.35
20.09
$723.53
$65.52
$90.44
Daily
Bare
Costs
Incl.
O&P
$562.80
81.22
$47.25
9.23
$70.35
10.15
$644.02
$56.48
$80.50
Daily
Bare
Costs
Incl.
O&P
$562.80
96.82
$47.25
11.00
$70.35
12.10
$659.62
$58.25
$82.45
Daily
Bare
Costs
Incl.
O&P
$562.80
93.25
$47.25
10.60
$70.35
11.66
$656.05
$57.85
$82.01
Daily
Bare
Costs
Incl.
O&P
$562.80
77.79
$47.25
8.84
$70.35
9.72
$640.59
$56.09
$80.07
Daily
Bare
Costs
Incl.
O&P
$562.80
98.60
$47.25
11.21
$70.35
12.33
$661.40
$58.45
$82.68
Daily
Bare
Costs
Incl.
O&P
$562.80
82.61
$47.25
9.39
$70.35
10.33
$645.41
$56.64
$80.68
Crew No.
Crew A-2
2 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.5 Ton
Bare Costs
Hr.
Daily
Hr.
$47.25
52.90
$756.00
423.20
361.95
$70.35
79.00
24 L.H., Daily Totals
Crew A-2A
2 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.5 Ton
1 Concrete Saw
$1541.15
Hr.
Daily
Hr.
$47.25
52.90
$756.00
423.20
361.95
176.00
$70.35
79.00
24 L.H., Daily Totals
Crew A-2B
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.5 Ton
$1717.15
Hr.
Daily
Hr.
$52.90
$423.20
361.95
$79.00
8 L.H., Daily Totals
Crew A-3A
1 Equip. Oper. (light)
1 Pickup Truck, 4x4, 3/4 Ton
Incl.
Subs O&P
$785.15
Hr.
Daily
Hr.
$59.70
$477.60
191.73
$88.85
8 L.H., Daily Totals
Hr.
Daily
Hr.
1 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Dump Truck, 12 C.Y., 400 H.P.
1 F.E. Loader, W.M., 2.5 C.Y.
$63.05
55.45
$504.40
443.60
791.36
658.89
$93.80
82.85
16 L.H., Daily Totals
Crew A-3C
1 Equip. Oper. (light)
1 Loader, Skid Steer, 78 H.P.
$2398.25
Hr.
Daily
Hr.
$59.70
$477.60
429.91
$88.85
8 L.H., Daily Totals
Crew A-3D
1 Truck Driver (light)
1 Pickup Truck, 4x4, 3/4 Ton
1 Flatbed Trailer, 25 Ton
$907.51
Hr.
Daily
Hr.
$52.90
$423.20
191.73
150.61
$79.00
8 L.H., Daily Totals
Crew A-3E
1 Equip. Oper. (crane)
1 Truck Driver (heavy)
1 Pickup Truck, 4x4, 3/4 Ton
$765.54
Hr.
Daily
Hr.
$66.30
55.45
$530.40
443.60
191.73
$98.65
82.85
16 L.H., Daily Totals
$1165.73
Crew A-3F
Hr.
Daily
Hr.
1 Equip. Oper. (crane)
1 Truck Driver (heavy)
1 Pickup Truck, 4x4, 3/4 Ton
1 Truck Tractor, 6x4, 380 H.P.
1 Lowbed Trailer, 75 Ton
$66.30
55.45
$530.40
443.60
191.73
545.98
283.47
$98.65
82.85
16 L.H., Daily Totals
Bare
Costs
Incl.
O&P
$1125.60
632.00
398.14
$49.13
$73.23
15.08
16.59
$2155.74
$64.21
$89.82
Daily
Bare
Costs
Incl.
O&P
$1125.60
632.00
398.14
193.60
$49.13
$73.23
22.41
24.66
$2349.34
$71.55
$97.89
Daily
Bare
Costs
Incl.
O&P
$632.00
398.14
$52.90
45.24
$79.00
49.77
$1030.15
$98.14
$128.77
Daily
Bare
Costs
Incl.
O&P
$710.80
210.90
$59.70
23.97
$88.85
26.36
$921.70
$83.67
$115.21
Daily
Bare
Costs
Incl.
O&P
$750.40
662.80
870.50
724.78
$59.25
$88.33
90.64
99.70
$3008.47
$149.89
$188.03
Daily
Bare
Costs
Incl.
O&P
$710.80
472.90
$59.70
53.74
$88.85
59.11
$1183.70
$113.44
$147.96
Daily
Bare
Costs
Incl.
O&P
$632.00
210.90
165.67
$52.90
$79.00
42.79
47.07
$1008.57
$95.69
$126.07
Daily
Bare
Costs
Incl.
O&P
$789.20
662.80
210.90
$60.88
$90.75
11.98
13.18
$1662.90
$72.86
$103.93
Daily
Bare
Costs
Incl.
O&P
$789.20
662.80
210.90
600.58
311.82
$60.88
$90.75
63.82
70.21
$2575.30
$124.70
$160.96
Daily
$669.33
Crew A-3B
$1995.18
Cost
Per Labor-Hour
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
749
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew A-3G
Hr.
Daily
Hr.
1 Equip. Oper. (crane)
1 Truck Driver (heavy)
1 Pickup Truck, 4x4, 3/4 Ton
1 Truck Tractor, 6x4, 450 H.P.
1 Lowbed Trailer, 75 Ton
$66.30
55.45
$530.40
443.60
191.73
666.04
283.47
$98.65
82.85
16 L.H., Daily Totals
Crew A-3H
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton (Daily)
$2115.24
Hr.
Daily
Hr.
$66.30
$530.40
2150.65
$98.65
8 L.H., Daily Totals
Crew A-3I
1 Equip. Oper. (crane)
1 Hyd. Crane, 25 Ton (Daily)
$2681.05
Hr.
Daily
Hr.
$66.30
$530.40
2273.31
$98.65
8 L.H., Daily Totals
Crew A-3J
1 Equip. Oper. (crane)
1 Hyd. Crane, 40 Ton (Daily)
$2803.71
Hr.
Daily
Hr.
$66.30
$530.40
2446.91
$98.65
8 L.H., Daily Totals
Crew A-3K
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 55 Ton (Daily)
1 P/U Truck, 3/4 Ton (Daily)
$2977.31
Hr.
Daily
Hr.
$66.30
56.40
$530.40
451.20
2461.06
157.41
$98.65
83.90
16 L.H., Daily Totals
Crew A-3L
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 80 Ton (Daily)
1 P/U Truck, 3/4 Ton (Daily)
$3600.07
Hr.
Daily
Hr.
$66.30
56.40
$530.40
451.20
2641.70
157.41
$98.65
83.90
16 L.H., Daily Totals
Crew A-3M
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 100 Ton (Daily)
1 P/U Truck, 3/4 Ton (Daily)
$3780.71
Hr.
Daily
Hr.
$66.30
56.40
$530.40
451.20
2768.24
157.41
$98.65
83.90
16 L.H., Daily Totals
Crew A-3N
1 Equip. Oper. (crane)
1 Tower Crane (monthly)
$3907.25
Hr.
Daily
Hr.
$66.30
$530.40
1891.47
$98.65
8 L.H., Daily Totals
$2421.87
Crew A-3P
Hr.
Daily
Hr.
1 Equip. Oper. (light)
1 A.T. Forklift, 31’ reach, 45’ lift
$59.70
$477.60
673.26
$88.85
8 L.H., Daily Totals
Crew A-3Q
1 Equip. Oper. (light)
1 Pickup Truck, 4x4, 3/4 Ton
1 Flatbed Trailer, 3 Ton
8 L.H., Daily Totals
750
$1150.86
Hr.
Daily
Hr.
$59.70
$477.60
191.73
78.34
$88.85
$747.67
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$789.20
662.80
210.90
732.64
311.82
$60.88
$90.75
71.33
78.46
$2707.36
$132.20
$169.21
Daily
Bare
Costs
Incl.
O&P
$789.20
2365.72
$66.30
268.83
$98.65
295.71
$3154.92
$335.13
$394.36
Daily
Bare
Costs
Incl.
O&P
$789.20
2500.64
$66.30
284.16
$98.65
312.58
$3289.84
$350.46
$411.23
Daily
Bare
Costs
Incl.
O&P
$789.20
2691.60
$66.30
305.86
$98.65
336.45
$3480.80
$372.16
$435.10
Daily
Bare
Costs
Incl.
O&P
$789.20
671.20
2707.17
173.15
$61.35
$91.28
163.65
180.02
$4340.72
$225.00
$271.29
Daily
Bare
Costs
Incl.
O&P
$789.20
671.20
2905.87
173.15
$61.35
$91.28
174.94
192.44
$4539.42
$236.29
$283.71
Daily
Bare
Costs
Incl.
O&P
$789.20
671.20
3045.06
173.15
$61.35
$91.28
182.85
201.14
$4678.61
$244.20
$292.41
Daily
Bare
Costs
Incl.
O&P
$789.20
2080.62
$66.30
236.43
$98.65
260.08
$2869.82
$302.73
$358.73
Daily
Bare
Costs
Incl.
O&P
$710.80
740.59
$59.70
84.16
$88.85
92.57
$1451.39
$143.86
$181.42
Daily
Bare
Costs
Incl.
O&P
$710.80
210.90
86.17
$59.70
$88.85
33.76
37.13
$1007.88
$93.46
$125.98
Daily
Crew No.
Crew A-3R
Bare Costs
Daily
Hr.
1 Equip. Oper. (light)
$59.70
1 Forklift, Smooth Floor, 8,000 Lb.
$477.60
311.06
$88.85
8 L.H., Daily Totals
$788.66
Crew A-4
2 Carpenters
1 Painter, Ordinary
Hr.
Incl.
Subs O&P
Hr.
Daily
Hr.
$58.60
49.65
$937.60
397.20
$87.25
73.55
24 L.H., Daily Totals
$1334.80
Crew A-5
Hr.
Daily
Hr.
2 Laborers
.25 Truck Driver (light)
.25 Flatbed Truck, Gas, 1.5 Ton
$47.25
52.90
$756.00
105.80
90.49
$70.35
79.00
18 L.H., Daily Totals
Crew A-6
1 Instrument Man
1 Rodman/Chainman
1 Level, Electronic
$952.29
Hr.
Daily
Hr.
$61.25
56.05
$490.00
448.40
33.60
$92.00
83.30
16 L.H., Daily Totals
Crew A-7
1 Chief of Party
1 Instrument Man
1 Rodman/Chainman
1 Level, Electronic
$972.00
Hr.
Daily
Hr.
$71.80
61.25
56.05
$574.40
490.00
448.40
33.60
$107.20
92.00
83.30
24 L.H., Daily Totals
Crew A-8
1 Chief of Party
1 Instrument Man
2 Rodmen/Chainmen
1 Level, Electronic
$1546.40
Hr.
Daily
Hr.
$71.80
61.25
56.05
$574.40
490.00
896.80
33.60
$107.20
92.00
83.30
32 L.H., Daily Totals
Crew A-9
1 Asbestos Foreman
7 Asbestos Workers
$1994.80
Hr.
Daily
Hr.
$65.75
65.25
$526.00
3654.00
$100.60
99.80
64 L.H., Daily Totals
Crew A-10A
1 Asbestos Foreman
2 Asbestos Workers
$4180.00
Hr.
Daily
Hr.
$65.75
65.25
$526.00
1044.00
$100.60
99.80
24 L.H., Daily Totals
Crew A-10B
1 Asbestos Foreman
3 Asbestos Workers
$1570.00
Hr.
Daily
Hr.
$65.75
65.25
$526.00
1566.00
$100.60
99.80
32 L.H., Daily Totals
Crew A-10C
3 Asbestos Workers
1 Flatbed Truck, Gas, 1.5 Ton
24 L.H., Daily Totals
$2092.00
Hr.
Daily
Hr.
$65.25
$1566.00
361.95
$99.80
$1927.95
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$710.80
342.17
$59.70
38.88
$88.85
42.77
$1052.97
$98.58
$131.62
Daily
Bare
Costs
Incl.
O&P
$1396.00
588.40
$55.62
$82.68
$1984.40
$55.62
$82.68
Daily
Bare
Costs
Incl.
O&P
$1125.60
158.00
99.54
$47.88
$71.31
5.03
5.53
$1383.14
$52.90
$76.84
Daily
Bare
Costs
Incl.
O&P
$736.00
666.40
36.96
$58.65
$87.65
2.10
2.31
$1439.36
$60.75
$89.96
Daily
Bare
Costs
Incl.
O&P
$857.60
736.00
666.40
36.96
$63.03
$94.17
1.40
1.54
$2296.96
$64.43
$95.71
Daily
Bare
Costs
Incl.
O&P
$857.60
736.00
1332.80
36.96
$61.29
$91.45
1.05
1.16
$2963.36
$62.34
$92.61
Daily
Bare
Costs
Incl.
O&P
$804.80
5588.80
$65.31
$99.90
$6393.60
$65.31
$99.90
Daily
Bare
Costs
Incl.
O&P
$804.80
1596.80
$65.42
$100.07
$2401.60
$65.42
$100.07
Daily
Bare
Costs
Incl.
O&P
$804.80
2395.20
$65.38
$100.00
$3200.00
$65.38
$100.00
Daily
Bare
Costs
Incl.
O&P
$2395.20
398.14
$65.25
15.08
$99.80
16.59
$2793.34
$80.33
$116.39
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew A-10D
2 Asbestos Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hydraulic Crane, 33 Ton
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$65.25
66.30
56.40
$1044.00
530.40
451.20
2429.62
$99.80
98.65
83.90
32 L.H., Daily Totals
$4455.22
Crew A-11
Hr.
Daily
Hr.
1 Asbestos Foreman
7 Asbestos Workers
2 Chip. Hammers, 12 Lb., Elec.
$65.75
65.25
$526.00
3654.00
54.32
$100.60
99.80
64 L.H., Daily Totals
$4234.32
Crew A-12
Hr.
Daily
Hr.
1 Asbestos Foreman
7 Asbestos Workers
1 Trk-Mtd Vac, 14 CY, 1500 Gal.
1 Flatbed Truck, 20,000 GVW
$65.75
65.25
$526.00
3654.00
596.69
223.10
$100.60
99.80
64 L.H., Daily Totals
$4999.79
Crew A-13
Hr.
Daily
Hr.
1 Equip. Oper. (light)
1 Trk-Mtd Vac, 14 CY, 1500 Gal.
1 Flatbed Truck, 20,000 GVW
$59.70
$477.60
596.69
223.10
$88.85
8 L.H., Daily Totals
Crew B-1
1 Labor Foreman (outside)
2 Laborers
$1297.39
Hr.
Daily
Hr.
$49.25
47.25
$394.00
756.00
$73.30
70.35
24 L.H., Daily Totals
Crew B-1A
1 Labor Foreman (outside)
2 Laborers
2 Cutting Torches
2 Sets of Gases
$1150.00
Hr.
Daily
Hr.
$49.25
47.25
$394.00
756.00
28.48
377.34
$73.30
70.35
24 L.H., Daily Totals
Crew B-1B
1 Labor Foreman (outside)
2 Laborers
1 Equip. Oper. (crane)
2 Cutting Torches
2 Sets of Gases
1 Hyd. Crane, 12 Ton
$1555.82
Hr.
Daily
Hr.
$49.25
47.25
66.30
$394.00
756.00
530.40
28.48
377.34
2150.65
$73.30
70.35
98.65
32 L.H., Daily Totals
$4236.87
Crew B-1C
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
1 Telescoping Boom Lift, to 60’
$49.25
47.25
$394.00
756.00
385.68
$73.30
70.35
24 L.H., Daily Totals
$1535.68
Crew B-1D
Hr.
Daily
Hr.
2 Laborers
1 Small Work Boat, Gas, 50 H.P.
1 Pressure Washer, 7 GPM
$47.25
$756.00
131.82
113.42
$70.35
16 L.H., Daily Totals
$1001.24
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1596.80
789.20
671.20
2672.58
$63.30
$95.54
75.93
83.52
$5729.78
$139.23
$179.06
Daily
Bare
Costs
Incl.
O&P
$804.80
5588.80
59.75
$65.31
$99.90
.85
.93
$6453.35
$66.16
$100.83
Daily
Bare
Costs
Incl.
O&P
$804.80
5588.80
656.36
245.41
$65.31
$99.90
12.81
14.09
$7295.37
$78.12
$113.99
Daily
Bare
Costs
Incl.
O&P
$710.80
656.36
245.41
$59.70
Daily
Crew No.
Crew B-1E
1 Labor Foreman (outside)
3 Laborers
1 Work Boat, Diesel, 200 H.P.
2 Pressure Washers, 7 GPM
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1134.00
1574.43
226.84
$73.30
70.35
32 L.H., Daily Totals
$3329.27
Crew B-1F
Hr.
Daily
Hr.
2 Skilled Workers
1 Laborer
1 Small Work Boat, Gas, 50 H.P.
1 Pressure Washer, 7 GPM
$61.25
47.25
$980.00
378.00
131.82
113.42
$92.00
70.35
24 L.H., Daily Totals
$1603.24
Crew B-1G
Hr.
Daily
Hr.
2 Laborers
1 Small Work Boat, Gas, 50 H.P.
$47.25
$756.00
131.82
$70.35
16 L.H., Daily Totals
$887.82
Crew B-1H
Hr.
Daily
Hr.
$88.85
2 Skilled Workers
1 Laborer
1 Small Work Boat, Gas, 50 H.P.
$61.25
47.25
$980.00
378.00
131.82
$92.00
70.35
102.47
112.72
24 L.H., Daily Totals
$1612.57
$162.17
$201.57
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
$47.92
$71.33
$1712.00
$47.92
$71.33
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
31.33
415.07
$47.92
$71.33
16.91
18.60
$2158.40
$64.83
$89.93
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
789.20
31.33
415.07
2365.72
$52.51
$78.16
79.89
87.88
$5313.32
$132.40
$166.04
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
424.25
$47.92
$71.33
16.07
17.68
$2136.25
$63.99
$89.01
Daily
Bare
Costs
Incl.
O&P
$1125.60
145.00
124.76
$47.25
$70.35
15.33
16.86
$1395.36
$62.58
$87.21
Crew B-1J
1 Labor Foreman (inside)
1 Laborer
$1489.82
Hr.
Daily
Hr.
$47.75
47.25
$382.00
378.00
$71.10
70.35
16 L.H., Daily Totals
Crew B-1K
1 Carpenter Foreman (inside)
1 Carpenter
$760.00
Hr.
Daily
Hr.
$59.10
58.60
$472.80
468.80
$88.00
87.25
16 L.H., Daily Totals
Crew B-2
1 Labor Foreman (outside)
4 Laborers
$941.60
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1512.00
$73.30
70.35
40 L.H., Daily Totals
$1906.00
Crew B-2A
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
1 Telescoping Boom Lift, to 60’
$49.25
47.25
$394.00
756.00
385.68
$73.30
70.35
24 L.H., Daily Totals
Crew B-3
$1535.68
Hr.
1 Labor Foreman (outside)
$49.25
2 Laborers
47.25
1 Equip. Oper. (medium)
63.05
2 Truck Drivers (heavy)
55.45
1 Crawler Loader, 3 C.Y.
2 Dump Trucks, 12 C.Y., 400 H.P.
48 L.H., Daily Totals
Crew B-3A
4 Laborers
1 Equip. Oper. (medium)
1 Hyd. Excavator, 1.5 C.Y.
40 L.H., Daily Totals
Daily
Hr.
$394.00
756.00
504.40
887.20
1257.68
1582.72
$73.30
70.35
93.80
82.85
$5382.00
Hr.
Daily
Hr.
$47.25
63.05
$1512.00
504.40
1185.24
$70.35
93.80
$3201.64
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1688.40
1731.87
249.52
$47.75
$71.09
56.29
61.92
$4256.20
$104.04
$133.01
Daily
Bare
Costs
Incl.
O&P
$1472.00
562.80
145.00
124.76
$56.58
$84.78
10.22
11.24
$2304.56
$66.80
$96.02
Daily
Bare
Costs
Incl.
O&P
$1125.60
145.00
$47.25
8.24
$70.35
9.06
$1270.60
$55.49
$79.41
Daily
Bare
Costs
Incl.
O&P
$1472.00
562.80
145.00
$56.58
$84.78
5.49
6.04
$2179.80
$62.08
$90.83
Daily
Bare
Costs
Incl.
O&P
$568.80
562.80
$47.50
$70.72
$1131.60
$47.50
$70.72
Daily
Bare
Costs
Incl.
O&P
$704.00
698.00
$58.85
$87.63
$1402.00
$58.85
$87.63
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
$47.65
$70.94
$2837.60
$47.65
$70.94
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
424.25
$47.92
$71.33
16.07
17.68
$2136.25
$63.99
$89.01
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
750.40
1325.60
1383.45
1740.99
$52.95
$78.92
59.17
65.09
$6912.44
$112.13
$144.01
Daily
Bare
Costs
Incl.
O&P
$2251.20
750.40
1303.76
$50.41
$75.04
29.63
32.59
$4305.36
$80.04
$107.63
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
751
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-3B
Hr.
Daily
Hr.
2 Laborers
1 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Backhoe Loader, 80 H.P.
1 Dump Truck, 12 C.Y., 400 H.P.
$47.25
63.05
55.45
$756.00
504.40
443.60
357.71
791.36
$70.35
93.80
82.85
32 L.H., Daily Totals
Crew B-3C
3 Laborers
1 Equip. Oper. (medium)
1 Crawler Loader, 4 C.Y.
$2853.07
Hr.
$47.25
63.05
32 L.H., Daily Totals
Crew B-4
1 Labor Foreman (outside)
4 Laborers
1 Truck Driver (heavy)
1 Truck Tractor, 220 H.P.
1 Flatbed Trailer, 40 Ton
1 Labor Foreman (outside)
4 Laborers
2 Equip. Oper. (medium)
1 Air Compressor, 250 cfm
2 Breakers, Pavement, 60 lb.
2 -50’ Air Hoses, 1.5⬙
1 Crawler Loader, 3 C.Y.
$1134.00
504.40
1506.11
Hr.
$70.35
93.80
$3144.51
Hr.
Daily
Hr.
$49.25
47.25
55.45
$394.00
1512.00
443.60
339.98
206.92
$73.30
70.35
82.85
48 L.H., Daily Totals
Crew B-5
Daily
$2896.50
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
1512.00
1008.80
196.28
68.94
47.20
1257.68
$73.30
70.35
93.80
56 L.H., Daily Totals
$4484.90
Crew B-5A
Hr.
Daily
Hr.
1 Labor Foreman (outside)
6 Laborers
2 Equip. Oper. (medium)
1 Equip. Oper. (light)
2 Truck Drivers (heavy)
1 Air Compressor, 365 cfm
2 Breakers, Pavement, 60 lb.
8 -50’ Air Hoses, 1⬙
2 Dump Trucks, 8 C.Y., 220 H.P.
$49.25
47.25
63.05
59.70
55.45
$394.00
2268.00
1008.80
477.60
887.20
389.99
68.94
74.48
834.98
$73.30
70.35
93.80
88.85
82.85
96 L.H., Daily Totals
Crew B-5B
$6403.99
Hr.
1 Powderman
$61.25
2 Equip. Oper. (medium)
63.05
3 Truck Drivers (heavy)
55.45
1 F.E. Loader, W.M., 2.5 C.Y.
3 Dump Trucks, 12 C.Y., 400 H.P.
1 Air Compressor, 365 cfm
48 L.H., Daily Totals
Daily
Hr.
$490.00
1008.80
1330.80
658.89
2374.08
389.99
$92.00
93.80
82.85
$6252.56
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1125.60
750.40
662.80
393.48
870.50
$53.25
$79.34
35.91
39.50
$3802.78
$89.16
$118.84
Daily
Bare
Costs
Incl.
O&P
Daily
$1688.40
750.40
1656.72
$51.20
$76.21
47.07
51.77
$4095.52
$98.27
$127.99
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
662.80
373.98
227.61
$48.95
$72.92
11.39
12.53
$4101.99
$60.34
$85.46
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
1500.80
215.91
75.83
51.92
1383.45
$52.05
$77.47
28.04
30.84
$6065.51
$80.09
$108.31
Daily
Bare
Costs
Incl.
O&P
$586.40
3376.80
1500.80
710.80
1325.60
428.99
75.83
81.93
918.48
$52.45
$78.13
14.25
15.68
$9005.63
$66.71
$93.81
Daily
Bare
Costs
Incl.
O&P
$736.00
1500.80
1988.40
724.78
2611.49
428.99
$58.95
$88.03
71.31
78.44
$7990.46
$130.26
$166.47
Crew No.
Crew B-5C
Hr.
Incl.
Subs O&P
Daily
Hr.
3 Laborers
$47.25
1 Equip. Oper. (medium)
63.05
2 Truck Drivers (heavy)
55.45
1 Equip. Oper. (crane)
66.30
1 Equip. Oper. (oiler)
56.40
2 Dump Trucks, 12 C.Y., 400 H.P.
1 Crawler Loader, 4 C.Y.
1 S.P. Crane, 4x4, 25 Ton
$1134.00
504.40
887.20
530.40
451.20
1582.72
1506.11
927.07
$70.35
93.80
82.85
98.65
83.90
64 L.H., Daily Totals
$7523.10
Crew B-5D
Hr.
Daily
Hr.
1 Labor Foreman (outside)
4 Laborers
2 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Air Compressor, 250 cfm
2 Breakers, Pavement, 60 lb.
2 -50’ Air Hoses, 1.5⬙
1 Crawler Loader, 3 C.Y.
1 Dump Truck, 12 C.Y., 400 H.P.
$49.25
47.25
63.05
55.45
$394.00
1512.00
1008.80
443.60
196.28
68.94
47.20
1257.68
791.36
$73.30
70.35
93.80
82.85
64 L.H., Daily Totals
Crew B-5E
$5719.86
Hr.
1 Labor Foreman (outside)
$49.25
4 Laborers
47.25
2 Equip. Oper. (medium)
63.05
1 Truck Driver (heavy)
55.45
1 Water Tank Trailer, 5000 Gal.
1 High Pressure Water Jet 40 KSI
2 -50’ Air Hoses, 1.5⬙
1 Crawler Loader, 3 C.Y.
1 Dump Truck, 12 C.Y., 400 H.P.
64 L.H., Daily Totals
Crew B-6
2 Laborers
1 Equip. Oper. (light)
1 Backhoe Loader, 48 H.P.
Crew B-6A
.5 Labor Foreman (outside)
1 Laborer
1 Equip. Oper. (medium)
1 Vacuum Truck, 5000 Gal.
Hr.
$394.00
1512.00
1008.80
443.60
169.14
902.38
47.20
1257.68
791.36
$73.30
70.35
93.80
82.85
Hr.
Daily
Hr.
$47.25
59.70
$756.00
477.60
277.19
$70.35
88.85
$1510.79
Hr.
Daily
Hr.
$49.25
47.25
63.05
$197.00
378.00
504.40
408.90
$73.30
70.35
93.80
20 L.H., Daily Totals
Crew B-6B
Daily
$6526.16
24 L.H., Daily Totals
$1488.30
Hr.
2 Labor Foremen (outside)
$49.25
4 Laborers
47.25
1 S.P. Crane, 4x4, 5 Ton
1 Flatbed Truck, Gas, 1.5 Ton
1 Butt Fusion Mach., 4⬙-12⬙ diam.
48 L.H., Daily Totals
752
Bare Costs
Daily
Hr.
$788.00
1512.00
385.89
361.95
332.25
$73.30
70.35
$3380.09
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1688.40
750.40
1325.60
789.20
671.20
1740.99
1656.72
1019.78
$54.80
$81.64
62.75
69.02
$9642.29
$117.55
$150.66
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
1500.80
662.80
215.91
75.83
51.92
1383.45
870.50
$52.48
$78.14
36.90
40.59
$7598.81
$89.37
$118.73
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
1500.80
662.80
186.05
992.62
51.92
1383.45
870.50
$52.48
$78.14
49.50
54.45
$8485.74
$101.97
$132.59
Daily
Bare
Costs
Incl.
O&P
$1125.60
710.80
304.91
$51.40
$76.52
11.55
12.70
$2141.31
$62.95
$89.22
Daily
Bare
Costs
Incl.
O&P
$293.20
562.80
750.40
449.79
$53.97
$80.32
20.45
22.49
$2056.19
$74.42
$102.81
Daily
Bare
Costs
Incl.
O&P
$1172.80
2251.20
424.48
398.14
365.48
$47.92
$71.33
22.50
24.75
$4612.10
$70.42
$96.09
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-6C
Bare Costs
Hr.
2 Labor Foremen (outside)
$49.25
4 Laborers
47.25
1 S.P. Crane, 4x4, 12 Ton
1 Flatbed Truck, Gas, 3 Ton
1 Butt Fusion Mach., 8⬙-24⬙ diam.
48 L.H., Daily Totals
Crew B-6D
.5 Labor Foreman (outside)
1 Laborer
1 Equip. Oper. (medium)
1 Hydro Excavator, 12 C.Y.
Incl.
Subs O&P
Daily
Hr.
$788.00
1512.00
637.99
391.02
787.50
$73.30
70.35
$4116.51
Hr.
$49.25
47.25
63.05
20 L.H., Daily Totals
Daily
$197.00
378.00
504.40
1404.51
Hr.
$73.30
70.35
93.80
$2483.91
Crew B-7
Hr.
Daily
Hr.
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (medium)
1 Brush Chipper, 12⬙, 130 H.P.
1 Crawler Loader, 3 C.Y.
2 Chain Saws, Gas, 36⬙ Long
$49.25
47.25
63.05
$394.00
1512.00
504.40
518.12
1257.68
107.22
$73.30
70.35
93.80
48 L.H., Daily Totals
Crew B-7A
2 Laborers
1 Equip. Oper. (light)
1 Rake w/Tractor
2 Chain Saws, Gas, 18⬙
$4293.42
Hr.
$47.25
59.70
24 L.H., Daily Totals
Daily
$756.00
477.60
161.55
95.16
Hr.
$70.35
88.85
$1490.31
Crew B-7B
Hr.
Daily
Hr.
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Brush Chipper, 12⬙, 130 H.P.
1 Crawler Loader, 3 C.Y.
2 Chain Saws, Gas, 36⬙ Long
1 Dump Truck, 8 C.Y., 220 H.P.
$49.25
47.25
63.05
55.45
$394.00
1512.00
504.40
443.60
518.12
1257.68
107.22
417.49
$73.30
70.35
93.80
82.85
56 L.H., Daily Totals
$5154.51
Crew B-7C
Hr.
Daily
Hr.
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Brush Chipper, 12⬙, 130 H.P.
1 Crawler Loader, 3 C.Y.
2 Chain Saws, Gas, 36⬙ Long
1 Dump Truck, 12 C.Y., 400 H.P.
$49.25
47.25
63.05
55.45
$394.00
1512.00
504.40
443.60
518.12
1257.68
107.22
791.36
$73.30
70.35
93.80
82.85
56 L.H., Daily Totals
$5528.38
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1172.80
2251.20
701.79
430.12
866.25
$47.92
$71.33
37.84
41.63
$5422.16
$85.76
$112.96
Daily
Bare
Costs
Incl.
O&P
Daily
$293.20
562.80
750.40
1544.96
$53.97
$80.32
70.23
77.25
$3151.36
$124.20
$157.57
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
750.40
569.93
1383.45
117.94
$50.22
$74.75
39.23
43.15
$5659.32
$89.45
$117.90
Daily
Bare
Costs
Incl.
O&P
Crew No.
Crew B-8
$51.40
$76.52
10.70
11.77
$2118.78
$62.10
$88.28
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
750.40
662.80
569.93
1383.45
117.94
459.24
$50.96
$75.91
41.08
45.19
$6781.36
$92.04
$121.10
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
750.40
662.80
569.93
1383.45
117.94
870.50
$50.96
$75.91
47.76
52.53
$7192.62
$98.72
$128.44
Hr.
1 Labor Foreman (outside)
$49.25
2 Laborers
47.25
2 Equip. Oper. (medium)
63.05
1 Equip. Oper. (oiler)
56.40
2 Truck Drivers (heavy)
55.45
1 Hyd. Crane, 25 Ton
1 Crawler Loader, 3 C.Y.
2 Dump Trucks, 12 C.Y., 400 H.P.
64 L.H., Daily Totals
Crew B-9
$1125.60
710.80
177.71
104.68
Bare Costs
1 Labor Foreman (outside)
4 Laborers
1 Air Compressor, 250 cfm
2 Breakers, Pavement, 60 lb.
2 -50’ Air Hoses, 1.5⬙
Incl.
Subs O&P
Daily
Hr.
$394.00
756.00
1008.80
451.20
887.20
2273.31
1257.68
1582.72
$73.30
70.35
93.80
83.90
82.85
$8610.91
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1512.00
196.28
68.94
47.20
$73.30
70.35
40 L.H., Daily Totals
$2218.42
Crew B-9A
Hr.
Daily
Hr.
2 Laborers
1 Truck Driver (heavy)
1 Water Tank Trailer, 5000 Gal.
1 Truck Tractor, 220 H.P.
2 -50’ Discharge Hoses, 3⬙
$47.25
55.45
$756.00
443.60
169.14
339.98
9.76
$70.35
82.85
24 L.H., Daily Totals
$1718.48
Crew B-9B
Hr.
Daily
Hr.
2 Laborers
1 Truck Driver (heavy)
2 -50’ Discharge Hoses, 3⬙
1 Water Tank Trailer, 5000 Gal.
1 Truck Tractor, 220 H.P.
1 Pressure Washer
$47.25
55.45
$756.00
443.60
9.76
169.14
339.98
104.23
$70.35
82.85
24 L.H., Daily Totals
Crew B-9D
1 Labor Foreman (outside)
4 Common Laborers
1 Air Compressor, 250 cfm
2 -50’ Air Hoses, 1.5⬙
2 Air Powered Tampers
$1822.71
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1512.00
196.28
47.20
114.04
$73.30
70.35
40 L.H., Daily Totals
$2263.52
Crew B-9E
Hr.
Daily
Hr.
1 Cement Finisher
1 Laborer
1 Chip. Hammers, 12 Lb., Elec.
$55.00
47.25
$440.00
378.00
27.16
$80.45
70.35
16 L.H., Daily Totals
Crew B-10
1 Equip. Oper. (medium)
.5 Laborer
$845.16
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
$93.80
70.35
12 L.H., Daily Totals
$693.40
Crew B-10A
Hr.
Daily
Hr.
1 Equip. Oper. (medium)
.5 Laborer
1 Roller, 2-Drum, W.B., 7.5 H.P.
$63.05
47.25
$504.40
189.00
157.50
$93.80
70.35
12 L.H., Daily Totals
$850.90
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1125.60
1500.80
671.20
1325.60
2500.64
1383.45
1740.99
$54.64
$81.40
79.90
87.89
$10834.68
$134.55
$169.29
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
215.91
75.83
51.92
$47.65
$70.94
7.81
8.59
$3181.26
$55.46
$79.53
Daily
Bare
Costs
Incl.
O&P
$1125.60
662.80
186.05
373.98
10.74
$49.98
$74.52
21.62
23.78
$2359.17
$71.60
$98.30
Daily
Bare
Costs
Incl.
O&P
$1125.60
662.80
10.74
186.05
373.98
114.65
$49.98
$74.52
25.96
28.56
$2473.82
$75.95
$103.08
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
215.91
51.92
125.44
$47.65
$70.94
8.94
9.83
$3230.87
$56.59
$80.77
Daily
Bare
Costs
Incl.
O&P
$643.60
562.80
29.88
$51.13
$75.40
1.70
1.87
$1236.28
$52.82
$77.27
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
$57.78
$85.98
$1031.80
$57.78
$85.98
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
173.25
$57.78
$85.98
13.13
14.44
$1205.05
$70.91
$100.42
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
753
Crews - Standard
Crew No.
Crew B-10B
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 200 H.P.
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1382.36
$93.80
70.35
12 L.H., Daily Totals
$2075.76
Crew B-10C
Hr.
Daily
Hr.
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 200 H.P.
1 Vibratory Roller, Towed, 23 Ton
$63.05
47.25
$504.40
189.00
1382.36
681.59
$93.80
70.35
12 L.H., Daily Totals
Crew B-10D
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 200 H.P.
1 Sheepsft. Roller, Towed
$2757.35
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1382.36
444.83
$93.80
70.35
12 L.H., Daily Totals
Crew B-10E
1 Equip. Oper. (medium)
.5 Laborer
1 Tandem Roller, 5 Ton
$2520.59
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
287.45
$93.80
70.35
12 L.H., Daily Totals
Crew B-10F
1 Equip. Oper. (medium)
.5 Laborer
1 Tandem Roller, 10 Ton
$980.85
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
379.22
$93.80
70.35
12 L.H., Daily Totals
Crew B-10G
1 Equip. Oper. (medium)
.5 Laborer
1 Sheepsfoot Roller, 240 H.P.
$1072.62
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
765.47
$93.80
70.35
12 L.H., Daily Totals
Crew B-10H
1 Equip. Oper. (medium)
.5 Laborer
1 Diaphragm Water Pump, 2⬙
1 -20’ Suction Hose, 2⬙
2 -50’ Discharge Hoses, 2⬙
$1458.87
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
61.92
4.37
8.18
$93.80
70.35
12 L.H., Daily Totals
Crew B-10I
1 Equip. Oper. (medium)
.5 Laborer
1 Diaphragm Water Pump, 4⬙
1 -20’ Suction Hose, 4⬙
2 -50’ Discharge Hoses, 4⬙
$767.87
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
150.72
19.04
28.30
$93.80
70.35
12 L.H., Daily Totals
Crew B-10J
1 Equip. Oper. (medium)
.5 Laborer
1 Centrifugal Water Pump, 3⬙
1 -20’ Suction Hose, 3⬙
2 -50’ Discharge Hoses, 3⬙
12 L.H., Daily Totals
754
$891.46
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
82.39
8.96
9.76
$93.80
70.35
$794.51
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$750.40
281.40
1520.60
$57.78
$85.98
115.20
126.72
$2552.40
$172.98
$212.70
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1520.60
749.75
$57.78
$85.98
172.00
189.20
$3302.15
$229.78
$275.18
Daily
Crew B-10K
1 Equip. Oper. (medium)
.5 Laborer
1 Centr. Water Pump, 6⬙
1 -20’ Suction Hose, 6⬙
2 -50’ Discharge Hoses, 6⬙
Incl.
O&P
$750.40
281.40
1520.60
489.31
$57.78
$85.98
152.27
167.49
$3041.71
$210.05
$253.48
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
316.19
$57.78
$85.98
23.95
26.35
$1347.99
$81.74
$112.33
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
417.14
$57.78
$85.98
31.60
34.76
$1448.94
$89.39
$120.75
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
842.02
$57.78
$85.98
63.79
70.17
$1873.82
$121.57
$156.15
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
68.11
4.81
9.00
$57.78
$85.98
6.21
6.83
$1113.72
$63.99
$92.81
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
165.79
20.94
31.13
$57.78
$85.98
16.50
18.16
$1249.67
$74.29
$104.14
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
90.63
9.86
10.74
$57.78
$85.98
8.43
9.27
$1143.02
$66.21
$95.25
Bare Costs
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 80 H.P.
Daily
Hr.
$63.05
47.25
$504.40
189.00
386.48
28.12
39.98
$93.80
70.35
$1147.98
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
591.82
$93.80
70.35
12 L.H., Daily Totals
Crew B-10M
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 300 H.P.
$1285.22
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1674.53
$93.80
70.35
12 L.H., Daily Totals
Crew B-10N
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, T.M., 1.5 C.Y.
$2367.93
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
627.38
$93.80
70.35
12 L.H., Daily Totals
Crew B-10O
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, T.M., 2.25 C.Y.
$1320.78
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
958.76
$93.80
70.35
12 L.H., Daily Totals
Crew B-10P
1 Equip. Oper. (medium)
.5 Laborer
1 Crawler Loader, 3 C.Y.
$1652.16
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1257.68
$93.80
70.35
12 L.H., Daily Totals
Crew B-10Q
1 Equip. Oper. (medium)
.5 Laborer
1 Crawler Loader, 4 C.Y.
$1951.08
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1506.11
$93.80
70.35
12 L.H., Daily Totals
Crew B-10R
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, W.M., 1 C.Y.
$2199.51
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
394.79
$93.80
70.35
12 L.H., Daily Totals
Crew B-10S
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, W.M., 1.5 C.Y.
$1088.19
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
455.32
$93.80
70.35
12 L.H., Daily Totals
Crew B-10T
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, W.M., 2.5 C.Y.
12 L.H., Daily Totals
Incl.
Subs O&P
Hr.
12 L.H., Daily Totals
Crew B-10L
Bare
Costs
Daily
Crew No.
$1148.72
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
658.89
$93.80
70.35
$1352.29
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$750.40
281.40
425.13
30.93
43.98
$57.78
$85.98
37.88
41.67
$1531.84
$95.67
$127.65
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
651.00
$57.78
$85.98
49.32
54.25
$1682.80
$107.10
$140.23
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1841.98
$57.78
$85.98
139.54
153.50
$2873.78
$197.33
$239.48
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
690.12
$57.78
$85.98
52.28
57.51
$1721.92
$110.07
$143.49
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1054.64
$57.78
$85.98
79.90
87.89
$2086.44
$137.68
$173.87
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1383.45
$57.78
$85.98
104.81
115.29
$2415.25
$162.59
$201.27
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1656.72
$57.78
$85.98
125.51
138.06
$2688.52
$183.29
$224.04
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
434.27
$57.78
$85.98
32.90
36.19
$1466.07
$90.68
$122.17
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
500.85
$57.78
$85.98
37.94
41.74
$1532.65
$95.73
$127.72
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
724.78
$57.78
$85.98
54.91
60.40
$1756.58
$112.69
$146.38
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-10U
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, W.M., 5.5 C.Y.
Bare Costs
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1186.42
$93.80
70.35
12 L.H., Daily Totals
Crew B-10V
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 700 H.P.
$1879.82
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
4098.16
$93.80
70.35
12 L.H., Daily Totals
Crew B-10W
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 105 H.P.
$4791.56
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
702.68
$93.80
70.35
12 L.H., Daily Totals
Crew B-10X
1 Equip. Oper. (medium)
.5 Laborer
1 Dozer, 410 H.P.
$1396.08
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
2535.96
$93.80
70.35
12 L.H., Daily Totals
Crew B-10Y
1 Equip. Oper. (medium)
.5 Laborer
1 Vibr. Roller, Towed, 12 Ton
$3229.36
Hr.
$63.05
47.25
12 L.H., Daily Totals
Crew B-11A
1 Equipment Oper. (med.)
1 Laborer
1 Dozer, 200 H.P.
1 Equipment Oper. (light)
1 Laborer
1 Air Powered Tamper
1 Air Compressor, 365 cfm
2 -50’ Air Hoses, 1.5⬙
Hr.
$63.05
47.25
1 Equipment Oper. (med.)
1 Laborer
1 Backhoe Loader, 48 H.P.
Hr.
$59.70
47.25
1 Equipment Oper. (med.)
1 Laborer
1 Grader, 30,000 Lbs.
1 Ripper, Beam & 1 Shank
16 L.H., Daily Totals
$93.80
70.35
Daily
$504.40
378.00
1382.36
Hr.
$93.80
70.35
Daily
$477.60
378.00
57.02
389.99
47.20
Hr.
$88.85
70.35
$1349.81
Hr.
Daily
Hr.
$63.05
47.25
$504.40
378.00
277.19
$93.80
70.35
16 L.H., Daily Totals
Crew B-11J
$504.40
189.00
346.96
Hr.
$2264.76
16 L.H., Daily Totals
Crew B-11C
Daily
$1040.36
16 L.H., Daily Totals
Crew B-11B
Incl.
Subs O&P
$1159.59
Hr.
$63.05
47.25
Daily
$504.40
378.00
1091.19
100.54
$2074.13
Hr.
$93.80
70.35
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$750.40
281.40
1305.06
$57.78
$85.98
98.87
108.76
$2336.86
$156.65
$194.74
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
4507.98
$57.78
$85.98
341.51
375.66
$5539.78
$399.30
$461.65
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
772.95
$57.78
$85.98
58.56
64.41
$1804.75
$116.34
$150.40
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
2789.56
$57.78
$85.98
211.33
232.46
$3821.36
$269.11
$318.45
Daily
Bare
Costs
Incl.
O&P
Daily
$750.40
281.40
381.66
$57.78
$85.98
28.91
31.80
$1413.46
$86.70
$117.79
Daily
Bare
Costs
Incl.
O&P
$750.40
562.80
1520.60
$55.15
$82.08
86.40
95.04
$2833.80
$141.55
$177.11
Daily
Bare
Costs
Incl.
O&P
$710.80
562.80
62.72
428.99
51.92
$53.48
$79.60
30.89
33.98
$1817.23
$84.36
$113.58
Daily
Bare
Costs
Incl.
O&P
$750.40
562.80
304.91
$55.15
$82.08
17.32
19.06
$1618.11
$72.47
$101.13
Daily
Bare
Costs
Incl.
O&P
Crew No.
Crew B-11K
1 Equipment Oper. (med.)
1 Laborer
1 Trencher, Chain Type, 8’ D
Crew B-11L
1 Equipment Oper. (med.)
1 Laborer
1 Grader, 30,000 Lbs.
1 Equipment Oper. (med.)
1 Laborer
1 Backhoe Loader, 80 H.P.
$82.08
74.48
81.93
$2624.10
$129.63
$164.01
Hr.
$63.05
47.25
$504.40
378.00
2079.03
$93.80
70.35
$2961.43
Hr.
Daily
Hr.
$63.05
47.25
$504.40
378.00
1091.19
$93.80
70.35
$1973.59
Hr.
Daily
Hr.
$63.05
47.25
$504.40
378.00
357.71
$93.80
70.35
16 L.H., Daily Totals
$1240.11
Crew B-11N
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Equipment Operators (med.)
6 Truck Drivers (heavy)
1 F.E. Loader, W.M., 5.5 C.Y.
1 Dozer, 410 H.P.
6 Dump Trucks, Off Hwy., 50 Ton
$49.25
63.05
55.45
$394.00
1008.80
2661.60
1186.42
2535.96
12225.60
$73.30
93.80
82.85
72 L.H., Daily Totals
Crew B-11Q
1 Equipment Operator (med.)
.5 Laborer
1 Dozer, 140 H.P.
$20012.38
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
757.89
$93.80
70.35
12 L.H., Daily Totals
Crew B-11R
1 Equipment Operator (med.)
.5 Laborer
1 Dozer, 200 H.P.
$1451.29
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1382.36
$93.80
70.35
12 L.H., Daily Totals
1 Equipment Operator (med.)
.5 Laborer
1 Dozer, 300 H.P.
1 Ripper, Beam & 1 Shank
$2075.76
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1674.53
100.54
$93.80
70.35
12 L.H., Daily Totals
Crew B-11T
$55.15
Daily
16 L.H., Daily Totals
Crew B-11M
Incl.
Subs O&P
Hr.
16 L.H., Daily Totals
Crew B-11S
$750.40
562.80
1200.31
110.59
Bare Costs
1 Equipment Operator (med.)
.5 Laborer
1 Dozer, 410 H.P.
1 Ripper, Beam & 2 Shanks
$2468.47
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
2535.96
154.19
$93.80
70.35
12 L.H., Daily Totals
Crew B-11U
1 Equipment Operator (med.)
.5 Laborer
1 Dozer, 520 H.P.
12 L.H., Daily Totals
$3383.55
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
2569.55
$93.80
70.35
$3262.95
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$750.40
562.80
2286.93
$55.15
$82.08
129.94
142.93
$3600.13
$185.09
$225.01
Daily
Bare
Costs
Incl.
O&P
$750.40
562.80
1200.31
$55.15
$82.08
68.20
75.02
$2513.51
$123.35
$157.09
Daily
Bare
Costs
Incl.
O&P
$750.40
562.80
393.48
$55.15
$82.08
22.36
24.59
$1706.68
$77.51
$106.67
Daily
Bare
Costs
Incl.
O&P
$586.40
1500.80
3976.80
1305.06
2789.56
13448.16
$56.45
$84.22
221.50
243.65
$23606.78
$277.95
$327.87
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
833.68
$57.78
$85.98
63.16
69.47
$1865.48
$120.94
$155.46
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1520.60
$57.78
$85.98
115.20
126.72
$2552.40
$172.98
$212.70
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1841.98
110.59
$57.78
$85.98
147.92
162.71
$2984.38
$205.71
$248.70
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
2789.56
169.61
$57.78
$85.98
224.18
246.60
$3990.97
$281.96
$332.58
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
2826.51
$57.78
$85.98
214.13
235.54
$3858.30
$271.91
$321.53
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
755
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-11V
Hr.
Daily
Hr.
3 Laborers
1 Roller, 2-Drum, W.B., 7.5 H.P.
$47.25
$1134.00
157.50
$70.35
24 L.H., Daily Totals
Crew B-11W
$1291.50
Hr.
1 Equipment Operator (med.)
$63.05
1 Common Laborer
47.25
10 Truck Drivers (heavy)
55.45
1 Dozer, 200 H.P.
1 Vibratory Roller, Towed, 23 Ton
10 Dump Trucks, 8 C.Y., 220 H.P.
96 L.H., Daily Totals
Daily
Hr.
$504.40
378.00
4436.00
1382.36
681.59
4174.90
$93.80
70.35
82.85
$11557.25
Crew B-11Y
Hr.
Daily
Hr.
1 Labor Foreman (outside)
5 Common Laborers
3 Equipment Operators (med.)
1 Dozer, 80 H.P.
2 Rollers, 2-Drum, W.B., 7.5 H.P.
4 Vibrating Plates, Gas, 21⬙
$49.25
47.25
63.05
$394.00
1890.00
1513.20
591.82
315.00
584.48
$73.30
70.35
93.80
72 L.H., Daily Totals
Crew B-12A
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 1 C.Y.
$5288.50
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
986.56
$98.65
70.35
16 L.H., Daily Totals
Crew B-12B
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 1.5 C.Y.
$1894.96
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1185.24
$98.65
70.35
16 L.H., Daily Totals
Crew B-12C
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 2 C.Y.
$2093.64
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1096.14
$98.65
70.35
16 L.H., Daily Totals
Crew B-12D
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 3.5 C.Y.
$2004.54
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
2394.44
$98.65
70.35
16 L.H., Daily Totals
Crew B-12E
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, .5 C.Y.
$3302.84
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
764.88
$98.65
70.35
16 L.H., Daily Totals
Crew B-12F
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, .75 C.Y.
16 L.H., Daily Totals
$1673.28
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
915.34
$98.65
70.35
$1823.74
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$1688.40
173.25
$47.25
6.56
$70.35
7.22
$1861.65
$53.81
$77.57
Daily
Bare
Costs
Incl.
O&P
$750.40
562.80
6628.00
1520.60
749.75
4592.39
$55.40
$82.72
64.99
71.49
$14803.93
$120.39
$154.21
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
2251.20
651.00
346.50
642.93
$52.74
$78.49
20.71
22.78
$7292.03
$73.45
$101.28
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1085.22
$56.77
$84.50
61.66
67.83
$2437.22
$118.44
$152.33
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1303.76
$56.77
$84.50
74.08
81.49
$2655.76
$130.85
$165.99
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1205.75
$56.77
$84.50
68.51
75.36
$2557.75
$125.28
$159.86
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
2633.88
$56.77
$84.50
149.65
164.62
$3985.88
$206.43
$249.12
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
841.37
$56.77
$84.50
47.81
52.59
$2193.37
$104.58
$137.09
Crew B-12G
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 15 Ton
1 Clamshell Bucket, .5 C.Y.
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 25 Ton
1 Clamshell Bucket, 1 C.Y.
Crew B-12I
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 20 Ton
1 Dragline Bucket, .75 C.Y.
Daily
Hr.
$66.30
47.25
$530.40
378.00
898.84
37.28
$98.65
70.35
$1844.52
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1274.00
46.89
$98.65
70.35
$2229.29
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1120.87
29.54
$98.65
70.35
16 L.H., Daily Totals
Crew B-12J
1 Equip. Oper. (crane)
1 Laborer
1 Gradall, 5/8 C.Y.
$2058.81
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
880.91
$98.65
70.35
16 L.H., Daily Totals
Crew B-12K
1 Equip. Oper. (crane)
1 Laborer
1 Gradall, 3 Ton, 1 C.Y.
$1789.31
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1520.84
$98.65
70.35
16 L.H., Daily Totals
Incl.
O&P
$789.20
562.80
1006.87
$56.77
$84.50
57.21
62.93
$2358.87
$113.98
$147.43
Crew B-12L
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 15 Ton
1 F.E. Attachment, .5 C.Y.
$2429.24
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
898.84
72.55
$98.65
70.35
16 L.H., Daily Totals
Crew B-12M
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 20 Ton
1 F.E. Attachment, .75 C.Y.
$1879.79
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1120.87
78.31
$98.65
70.35
16 L.H., Daily Totals
Crew B-12N
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 25 Ton
1 F.E. Attachment, 1 C.Y.
$2107.58
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1274.00
59.18
$98.65
70.35
16 L.H., Daily Totals
Crew B-12O
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 40 Ton
1 F.E. Attachment, 1.5 C.Y.
Incl.
Subs O&P
Hr.
16 L.H., Daily Totals
16 L.H., Daily Totals
756
Bare Costs
16 L.H., Daily Totals
Crew B-12H
Bare
Costs
Daily
Crew No.
$2241.58
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1362.63
97.47
$98.65
70.35
$2368.50
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$789.20
562.80
988.72
41.01
$56.77
$84.50
58.51
64.36
$2381.73
$115.28
$148.86
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1401.40
51.58
$56.77
$84.50
82.56
90.81
$2804.98
$139.33
$175.31
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1232.96
32.49
$56.77
$84.50
71.90
79.09
$2617.45
$128.68
$163.59
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
969.00
$56.77
$84.50
55.06
60.56
$2321.00
$111.83
$145.06
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1672.92
$56.77
$84.50
95.05
104.56
$3024.92
$151.83
$189.06
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
988.72
79.81
$56.77
$84.50
60.71
66.78
$2420.53
$117.49
$151.28
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1232.96
86.14
$56.77
$84.50
74.95
82.44
$2671.10
$131.72
$166.94
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1401.40
65.10
$56.77
$84.50
83.32
91.66
$2818.50
$140.10
$176.16
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1498.89
107.22
$56.77
$84.50
91.26
100.38
$2958.11
$148.03
$184.88
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-12P
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 40 Ton
1 Dragline Bucket, 1.5 C.Y.
Bare Costs
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
1362.63
37.32
$98.65
70.35
16 L.H., Daily Totals
Crew B-12Q
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 5/8 C.Y.
$2308.35
Hr.
$66.30
47.25
16 L.H., Daily Totals
Crew B-12S
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 2.5 C.Y.
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 75 Ton
1 F.E. Attachment, 3 C.Y.
Crew B-12V
1 Equip. Oper. (crane)
2 Laborers
1 Hyd. Excavator, 3.5 C.Y.
Hr.
$66.30
47.25
$530.40
378.00
1683.69
$98.65
70.35
$2592.09
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
2189.46
127.10
$98.65
70.35
$3224.96
Hr.
Daily
Hr.
$66.30
47.25
$530.40
378.00
2189.46
51.71
$98.65
70.35
$3149.57
Hr.
Daily
Hr.
$66.30
47.25
$530.40
756.00
2394.44
$98.65
70.35
24 L.H., Daily Totals
Crew B-12Z
1 Equip. Oper. (crane)
2 Laborers
1 Hyd. Excavator, 2.5 C.Y.
$3680.84
Hr.
Daily
Hr.
$66.30
47.25
$530.40
756.00
1683.69
$98.65
70.35
24 L.H., Daily Totals
Crew B-13
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 25 Ton
56 L.H., Daily Totals
$98.65
70.35
Daily
16 L.H., Daily Totals
Crew B-12Y
$530.40
378.00
813.17
Hr.
Hr.
16 L.H., Daily Totals
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 75 Ton
1 Dragline Bucket, 3 C.Y.
Daily
$1721.57
16 L.H., Daily Totals
Crew B-12T
Incl.
Subs O&P
$2970.09
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1512.00
530.40
451.20
2273.31
$73.30
70.35
98.65
83.90
$5160.91
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$789.20
562.80
1498.89
41.05
$56.77
$84.50
87.50
96.25
$2891.95
$144.27
$180.75
Daily
Bare
Costs
Incl.
O&P
Daily
$789.20
562.80
894.49
$56.77
$84.50
50.82
55.91
$2246.49
$107.60
$140.41
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
1852.06
$56.77
$84.50
105.23
115.75
$3204.06
$162.01
$200.25
Bare
Costs
Incl.
O&P
$789.20
562.80
2408.41
139.81
$56.77
$84.50
144.79
159.26
$3900.22
$201.56
$243.76
Daily
Bare
Costs
Incl.
O&P
$789.20
562.80
2408.41
56.88
$56.77
$84.50
140.07
154.08
$3817.29
$196.85
$238.58
Daily
Bare
Costs
Incl.
O&P
$789.20
1125.60
2633.88
$53.60
$79.78
99.77
109.75
$4548.68
$153.37
$189.53
Daily
Bare
Costs
Incl.
O&P
$789.20
1125.60
1852.06
$53.60
$79.78
70.15
77.17
$3766.86
$123.75
$156.95
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
789.20
671.20
2500.64
$51.56
$76.75
40.59
44.65
$6798.64
$92.16
$121.40
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-13A
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
2 Equipment Operators (med.)
2 Truck Drivers (heavy)
1 Crawler Crane, 75 Ton
1 Crawler Loader, 4 C.Y.
2 Dump Trucks, 8 C.Y., 220 H.P.
$49.25
47.25
63.05
55.45
$394.00
756.00
1008.80
887.20
2189.46
1506.11
834.98
$73.30
70.35
93.80
82.85
56 L.H., Daily Totals
Crew B-13B
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 55 Ton
$7576.55
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1512.00
530.40
451.20
2461.06
$73.30
70.35
98.65
83.90
56 L.H., Daily Totals
Crew B-13C
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 100 Ton
$5348.66
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1512.00
530.40
451.20
1552.12
$73.30
70.35
98.65
83.90
56 L.H., Daily Totals
Crew B-13D
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Excavator, 1 C.Y.
1 Trench Box
$4439.72
Hr.
Daily
Hr.
$47.25
66.30
$378.00
530.40
986.56
131.49
$70.35
98.65
16 L.H., Daily Totals
Crew B-13E
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Excavator, 1.5 C.Y.
1 Trench Box
$2026.45
Hr.
Daily
Hr.
$47.25
66.30
$378.00
530.40
1185.24
131.49
$70.35
98.65
16 L.H., Daily Totals
Crew B-13F
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Excavator, 3.5 C.Y.
1 Trench Box
$2225.13
Hr.
Daily
Hr.
$47.25
66.30
$378.00
530.40
2394.44
131.49
$70.35
98.65
16 L.H., Daily Totals
Crew B-13G
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Excavator, .75 C.Y.
1 Trench Box
$3434.33
Hr.
Daily
Hr.
$47.25
66.30
$378.00
530.40
915.34
131.49
$70.35
98.65
16 L.H., Daily Totals
Crew B-13H
1 Laborer
1 Equip. Oper. (crane)
1 Gradall, 5/8 C.Y.
1 Trench Box
16 L.H., Daily Totals
$1955.23
Hr.
Daily
Hr.
$47.25
66.30
$378.00
530.40
880.91
131.49
$70.35
98.65
$1920.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1125.60
1500.80
1325.60
2408.41
1656.72
918.48
$54.39
$81.04
80.90
88.99
$9522.00
$135.30
$170.04
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
789.20
671.20
2707.17
$51.56
$76.75
43.95
48.34
$7005.17
$95.51
$125.09
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
789.20
671.20
1707.33
$51.56
$76.75
27.72
30.49
$6005.33
$79.28
$107.24
Daily
Bare
Costs
Incl.
O&P
$562.80
789.20
1085.22
144.64
$56.77
$84.50
69.88
76.87
$2581.86
$126.65
$161.37
Daily
Bare
Costs
Incl.
O&P
$562.80
789.20
1303.76
144.64
$56.77
$84.50
82.30
90.53
$2800.40
$139.07
$175.03
Daily
Bare
Costs
Incl.
O&P
$562.80
789.20
2633.88
144.64
$56.77
$84.50
157.87
173.66
$4130.52
$214.65
$258.16
Daily
Bare
Costs
Incl.
O&P
$562.80
789.20
1006.87
144.64
$56.77
$84.50
65.43
71.97
$2503.51
$122.20
$156.47
Daily
Bare
Costs
Incl.
O&P
$562.80
789.20
969.00
144.64
$56.77
$84.50
63.27
69.60
$2465.64
$120.05
$154.10
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
757
Crews - Standard
Crew No.
Crew B-13I
1 Laborer
1 Equip. Oper. (crane)
1 Gradall, 3 Ton, 1 C.Y.
1 Trench Box
Bare Costs
Hr.
Daily
Hr.
$47.25
66.30
$378.00
530.40
1520.84
131.49
$70.35
98.65
16 L.H., Daily Totals
Crew B-13J
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Excavator, 2.5 C.Y.
1 Trench Box
$2560.73
Hr.
Daily
Hr.
$47.25
66.30
$378.00
530.40
1683.69
131.49
$70.35
98.65
16 L.H., Daily Totals
Crew B-13K
2 Equip. Opers. (crane)
1 Hyd. Excavator, .75 C.Y.
1 Hyd. Hammer, 4000 ft-lb
1 Hyd. Excavator, .75 C.Y.
$2723.58
Hr.
Daily
Hr.
$66.30
$1060.80
915.34
715.03
915.34
$98.65
16 L.H., Daily Totals
Crew B-13L
2 Equip. Opers. (crane)
1 Hyd. Excavator, 1.5 C.Y.
1 Hyd. Hammer, 5000 ft-lb
1 Hyd. Excavator, .75 C.Y.
$3606.51
Hr.
Daily
Hr.
$66.30
$1060.80
1185.24
776.94
915.34
$98.65
16 L.H., Daily Totals
Crew B-13M
2 Equip. Opers. (crane)
1 Hyd. Excavator, 2.5 C.Y.
1 Hyd. Hammer, 8000 ft-lb
1 Hyd. Excavator, 1.5 C.Y.
$3938.32
Hr.
Daily
Hr.
$66.30
$1060.80
1683.69
1011.13
1185.24
$98.65
16 L.H., Daily Totals
Crew B-13N
2 Equip. Opers. (crane)
1 Hyd. Excavator, 3.5 C.Y.
1 Hyd. Hammer, 12,000 ft-lb
1 Hyd. Excavator, 1.5 C.Y.
$4940.86
Hr.
Daily
Hr.
$66.30
$1060.80
2394.44
1162.80
1185.24
$98.65
16 L.H., Daily Totals
Crew B-14
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (light)
1 Backhoe Loader, 48 H.P.
$5803.28
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
1512.00
477.60
277.19
$73.30
70.35
88.85
48 L.H., Daily Totals
Crew B-14A
1 Equip. Oper. (crane)
.5 Laborer
1 Hyd. Excavator, 4.5 C.Y.
$2660.79
Hr.
Daily
Hr.
$66.30
47.25
$530.40
189.00
3788.37
$98.65
70.35
12 L.H., Daily Totals
Crew B-14B
1 Equip. Oper. (crane)
.5 Laborer
1 Hyd. Excavator, 6 C.Y.
12 L.H., Daily Totals
758
Incl.
Subs O&P
$4507.77
Hr.
Daily
Hr.
$66.30
47.25
$530.40
189.00
3843.97
$98.65
70.35
$4563.37
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$562.80
789.20
1672.92
144.64
$56.77
$84.50
1 Equip. Oper. (crane)
.5 Laborer
1 Hyd. Excavator, 7 C.Y.
103.27
113.60
12 L.H., Daily Totals
$3169.56
$160.05
$198.10
Daily
Bare
Costs
Incl.
O&P
$562.80
789.20
1852.06
144.64
$56.77
$84.50
113.45
124.79
$3348.70
$170.22
$209.29
Daily
Bare
Costs
Incl.
O&P
$1578.40
1006.87
786.53
1006.87
$66.30
$98.65
159.11
175.02
$4378.68
$225.41
$273.67
Daily
Bare
Costs
Incl.
O&P
$1578.40
1303.76
854.63
1006.87
$66.30
$98.65
179.85
197.83
$4743.67
$246.15
$296.48
Daily
Bare
Costs
Incl.
O&P
$1578.40
1852.06
1112.24
1303.76
$66.30
$98.65
242.50
266.75
$5846.47
$308.80
$365.40
Daily
Bare
Costs
Incl.
O&P
$1578.40
2633.88
1279.08
1303.76
$66.30
$98.65
296.40
326.05
$6795.13
$362.70
$424.70
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
710.80
304.91
$49.66
$73.92
5.77
6.35
$3853.31
$55.43
$80.28
Daily
Bare
Costs
Incl.
O&P
$789.20
281.40
4167.21
$59.95
$89.22
315.70
347.27
$5237.81
$375.65
$436.48
Crew B-17A
Hr.
Daily
Hr.
Daily
Bare
Costs
Incl.
O&P
$789.20
281.40
4228.37
$59.95
$89.22
2 Labor Foremen (outside)
6 Laborers
1 Skilled Worker Foreman (out)
1 Skilled Worker
$49.25
47.25
63.25
61.25
$788.00
2268.00
506.00
490.00
$73.30
70.35
95.00
92.00
320.33
352.36
$5298.97
$380.28
$441.58
Daily
Crew B-14C
Crew B-14F
1 Equip. Oper. (crane)
.5 Laborer
1 Hyd. Shovel, 7 C.Y.
Hr.
Daily
Hr.
$66.30
47.25
$530.40
189.00
4206.21
$98.65
70.35
$4925.61
Hr.
Daily
Hr.
$66.30
47.25
$530.40
189.00
4549.05
$98.65
70.35
12 L.H., Daily Totals
Crew B-14G
1 Equip. Oper. (crane)
.5 Laborer
1 Hyd. Shovel, 12 C.Y.
$5268.45
Hr.
Daily
Hr.
$66.30
47.25
$530.40
189.00
6601.66
$98.65
70.35
12 L.H., Daily Totals
Crew B-14J
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, 8 C.Y.
$7321.06
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
1999.44
$93.80
70.35
12 L.H., Daily Totals
Crew B-14K
1 Equip. Oper. (medium)
.5 Laborer
1 F.E. Loader, 10 C.Y.
$2692.84
Hr.
Daily
Hr.
$63.05
47.25
$504.40
189.00
2862.71
$93.80
70.35
12 L.H., Daily Totals
Crew B-15
$3556.11
Hr.
1 Equipment Oper. (med.)
$63.05
.5 Laborer
47.25
2 Truck Drivers (heavy)
55.45
2 Dump Trucks, 12 C.Y., 400 H.P.
1 Dozer, 200 H.P.
28 L.H., Daily Totals
Daily
Hr.
$504.40
189.00
887.20
1582.72
1382.36
$93.80
70.35
82.85
$4545.68
Crew B-16
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
1 Truck Driver (heavy)
1 Dump Truck, 12 C.Y., 400 H.P.
$49.25
47.25
55.45
$394.00
756.00
443.60
791.36
$73.30
70.35
82.85
32 L.H., Daily Totals
$2384.96
Crew B-17
Hr.
Daily
Hr.
2 Laborers
1 Equip. Oper. (light)
1 Truck Driver (heavy)
1 Backhoe Loader, 48 H.P.
1 Dump Truck, 8 C.Y., 220 H.P.
$47.25
59.70
55.45
$756.00
477.60
443.60
277.19
417.49
$70.35
88.85
82.85
32 L.H., Daily Totals
80 L.H., Daily Totals
$2371.88
$4052.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$789.20
281.40
4626.83
$59.95
$89.22
350.52
385.57
$5697.43
$410.47
$474.79
Daily
Bare
Costs
Incl.
O&P
$789.20
281.40
5003.95
$59.95
$89.22
379.09
417.00
$6074.56
$439.04
$506.21
Daily
Bare
Costs
Incl.
O&P
$789.20
281.40
7261.83
$59.95
$89.22
550.14
605.15
$8332.43
$610.09
$694.37
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
2199.38
$57.78
$85.98
166.62
183.28
$3231.18
$224.40
$269.27
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
3148.98
$57.78
$85.98
238.56
262.42
$4180.78
$296.34
$348.40
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
1325.60
1740.99
1520.60
$56.45
$84.19
105.90
116.49
$5618.99
$162.35
$200.68
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
662.80
870.50
$49.80
$74.21
24.73
27.20
$3245.30
$74.53
$101.42
Daily
Bare
Costs
Incl.
O&P
$1125.60
710.80
662.80
304.91
459.24
$52.41
$78.10
21.71
23.88
$3263.35
$74.12
$101.98
Daily
Bare
Costs
Incl.
O&P
$1172.80
3376.80
760.00
736.00
$50.65
$75.57
$6045.60
$50.65
$75.57
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-17B
Hr.
Daily
Hr.
2 Laborers
1 Equip. Oper. (light)
1 Truck Driver (heavy)
1 Backhoe Loader, 48 H.P.
1 Dump Truck, 12 C.Y., 400 H.P.
$47.25
59.70
55.45
$756.00
477.60
443.60
277.19
791.36
$70.35
88.85
82.85
32 L.H., Daily Totals
Crew B-17C
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (heavy)
1 Truck Driver (heavy)
1 Hyd. Excavator, 2 C.Y.
1 Dump Truck, 12 C.Y., 400 H.P.
1 P/U, 3/4 ton, Tool Truck
$2745.75
Hr.
$49.25
47.25
66.30
55.45
48 L.H., Daily Totals
Crew B-18
1 Labor Foreman (outside)
2 Laborers
1 Vibrating Plate, Gas, 21⬙
Daily
$394.00
1134.00
530.40
443.60
1096.14
791.36
157.41
Hr.
$73.30
70.35
98.65
82.85
$4546.91
Hr.
Daily
Hr.
$49.25
47.25
$394.00
756.00
146.12
$73.30
70.35
24 L.H., Daily Totals
$1296.12
Crew B-19
Hr.
Daily
Hr.
1 Pile Driver Foreman (outside)
4 Pile Drivers
2 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 40 Ton
1 Lead, 90’ High
1 Hammer, Diesel, 22k ft-lb
$62.50
60.50
66.30
56.40
$500.00
1936.00
1060.80
451.20
1362.63
409.90
485.21
$96.70
93.60
98.65
83.90
64 L.H., Daily Totals
$6205.74
Crew B-19A
Hr.
Daily
Hr.
1 Pile Driver Foreman (outside)
4 Pile Drivers
2 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 75 Ton
1 Lead, 90’ High
1 Hammer, Diesel, 41k ft-lb
$62.50
60.50
66.30
56.40
$500.00
1936.00
1060.80
451.20
2189.46
409.90
640.74
$96.70
93.60
98.65
83.90
64 L.H., Daily Totals
$7188.10
Crew B-19B
Hr.
Daily
Hr.
1 Pile Driver Foreman (outside)
4 Pile Drivers
2 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 40 Ton
1 Lead, 90’ High
1 Hammer, Diesel, 22k ft-lb
1 Barge, 400 Ton
$62.50
60.50
66.30
56.40
$500.00
1936.00
1060.80
451.20
1362.63
409.90
485.21
957.33
$96.70
93.60
98.65
83.90
64 L.H., Daily Totals
$7163.07
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1125.60
710.80
662.80
304.91
870.50
$52.41
$78.10
33.39
36.73
$3674.61
$85.80
$114.83
Daily
Bare
Costs
Incl.
O&P
Daily
$586.40
1688.40
789.20
662.80
1205.75
870.50
173.15
$52.13
$77.64
42.60
46.86
$5976.20
$94.73
$124.50
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
160.73
$47.92
$71.33
6.09
6.70
$1872.73
$54.01
$78.03
Daily
Bare
Costs
Incl.
O&P
$773.60
2995.20
1578.40
671.20
1498.89
450.89
533.73
$61.69
$94.04
35.28
38.80
$8501.91
$96.96
$132.84
Daily
Bare
Costs
Incl.
O&P
$773.60
2995.20
1578.40
671.20
2408.41
450.89
704.81
$61.69
$94.04
50.63
55.69
$9582.51
$112.31
$149.73
Daily
Bare
Costs
Incl.
O&P
$773.60
2995.20
1578.40
671.20
1498.89
450.89
533.73
1053.06
$61.69
$94.04
50.24
55.26
$9554.98
$111.92
$149.30
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-19C
Hr.
Daily
Hr.
1 Pile Driver Foreman (outside)
4 Pile Drivers
2 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 75 Ton
1 Lead, 90’ High
1 Hammer, Diesel, 41k ft-lb
1 Barge, 400 Ton
$62.50
60.50
66.30
56.40
$500.00
1936.00
1060.80
451.20
2189.46
409.90
640.74
957.33
$96.70
93.60
98.65
83.90
64 L.H., Daily Totals
Crew B-20
1 Labor Foreman (outside)
1 Skilled Worker
1 Laborer
$8145.43
Hr.
Daily
Hr.
$49.25
61.25
47.25
$394.00
490.00
378.00
$73.30
92.00
70.35
24 L.H., Daily Totals
Crew B-20A
1 Labor Foreman (outside)
1 Laborer
1 Plumber
1 Plumber Apprentice
$1262.00
Hr.
Daily
Hr.
$49.25
47.25
72.05
57.65
$394.00
378.00
576.40
461.20
$73.30
70.35
107.45
85.95
32 L.H., Daily Totals
Crew B-21
1 Labor Foreman (outside)
1 Skilled Worker
1 Laborer
.5 Equip. Oper. (crane)
.5 S.P. Crane, 4x4, 5 Ton
$1809.60
Hr.
Daily
Hr.
$49.25
61.25
47.25
66.30
$394.00
490.00
378.00
265.20
192.94
$73.30
92.00
70.35
98.65
28 L.H., Daily Totals
Crew B-21A
1 Labor Foreman (outside)
1 Laborer
1 Plumber
1 Plumber Apprentice
1 Equip. Oper. (crane)
1 S.P. Crane, 4x4, 12 Ton
$1720.15
Hr.
Daily
Hr.
$49.25
47.25
72.05
57.65
66.30
$394.00
378.00
576.40
461.20
530.40
637.99
$73.30
70.35
107.45
85.95
98.65
40 L.H., Daily Totals
Crew B-21B
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton
$2977.99
Hr.
Daily
Hr.
$49.25
47.25
66.30
$394.00
1134.00
530.40
2150.65
$73.30
70.35
98.65
40 L.H., Daily Totals
Crew B-21C
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
2 Cutting Torches
2 Sets of Gases
1 Lattice Boom Crane, 90 Ton
56 L.H., Daily Totals
$4209.05
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1512.00
530.40
451.20
28.48
377.34
2689.54
$73.30
70.35
98.65
83.90
$5982.96
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$773.60
2995.20
1578.40
671.20
2408.41
450.89
704.81
1053.06
$61.69
$94.04
65.58
72.14
$10635.57
$127.27
$166.18
Daily
Bare
Costs
Incl.
O&P
$586.40
736.00
562.80
$52.58
$78.55
$1885.20
$52.58
$78.55
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
859.60
687.60
$56.55
$84.26
$2696.40
$56.55
$84.26
Daily
Bare
Costs
Incl.
O&P
$586.40
736.00
562.80
394.60
212.24
$54.54
$81.42
6.89
7.58
$2492.04
$61.43
$89.00
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
859.60
687.60
789.20
701.79
$58.50
$87.14
15.95
17.54
$4187.39
$74.45
$104.68
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
789.20
2365.72
$51.46
$76.60
53.77
59.14
$5429.72
$105.23
$135.74
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
789.20
671.20
31.33
415.07
2958.49
$51.56
$76.75
55.27
60.80
$7702.90
$106.84
$137.55
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
759
Crews - Standard
Crew No.
Crew B-22
1 Labor Foreman (outside)
1 Skilled Worker
1 Laborer
.75 Equip. Oper. (crane)
.75 S.P. Crane, 4x4, 5 Ton
Bare Costs
Hr.
Daily
Hr.
$49.25
61.25
47.25
66.30
$394.00
490.00
378.00
397.80
289.42
$73.30
92.00
70.35
98.65
30 L.H., Daily Totals
Crew B-22A
$1949.22
Hr.
1 Labor Foreman (outside)
$49.25
1 Skilled Worker
61.25
2 Laborers
47.25
1 Equipment Operator, Crane
66.30
1 S.P. Crane, 4x4, 5 Ton
1 Butt Fusion Mach., 4⬙-12⬙ diam.
40 L.H., Daily Totals
Crew B-22B
Incl.
Subs O&P
Daily
Hr.
$394.00
490.00
756.00
530.40
385.89
332.25
$73.30
92.00
70.35
98.65
$2888.54
Hr.
1 Labor Foreman (outside)
$49.25
1 Skilled Worker
61.25
2 Laborers
47.25
1 Equip. Oper. (crane)
66.30
1 S.P. Crane, 4x4, 5 Ton
1 Butt Fusion Mach., 8⬙-24⬙ diam.
40 L.H., Daily Totals
Daily
Hr.
$394.00
490.00
756.00
530.40
385.89
787.50
$73.30
92.00
70.35
98.65
$3343.79
Crew B-22C
Hr.
Daily
Hr.
1 Skilled Worker
1 Laborer
1 Butt Fusion Mach., 2⬙-8⬙ diam.
$61.25
47.25
$490.00
378.00
280.48
$92.00
70.35
16 L.H., Daily Totals
Crew B-23
1 Labor Foreman (outside)
4 Laborers
1 Drill Rig, Truck-Mounted
1 Flatbed Truck, Gas, 3 Ton
$1148.48
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1512.00
856.23
391.02
$73.30
70.35
40 L.H., Daily Totals
Crew B-23A
1 Labor Foreman (outside)
1 Laborer
1 Equip. Oper. (medium)
1 Drill Rig, Truck-Mounted
1 Pickup Truck, 3/4 Ton
$3153.25
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
378.00
504.40
856.23
122.56
$73.30
70.35
93.80
24 L.H., Daily Totals
Crew B-23B
1 Labor Foreman (outside)
1 Laborer
1 Equip. Oper. (medium)
1 Drill Rig, Truck-Mounted
1 Pickup Truck, 3/4 Ton
1 Centr. Water Pump, 6⬙
$2255.19
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
378.00
504.40
856.23
122.56
386.48
$73.30
70.35
93.80
24 L.H., Daily Totals
Crew B-24
1 Cement Finisher
1 Laborer
1 Carpenter
24 L.H., Daily Totals
760
$2641.67
Hr.
Daily
Hr.
$55.00
47.25
58.60
$440.00
378.00
468.80
$80.45
70.35
87.25
$1286.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
736.00
562.80
591.90
318.36
$55.33
$82.57
9.65
10.61
$2795.46
$64.97
$93.18
Daily
Bare
Costs
Incl.
O&P
$586.40
736.00
1125.60
789.20
424.48
365.48
$54.26
$80.93
17.95
19.75
$4027.15
$72.21
$100.68
Daily
Bare
Costs
Incl.
O&P
$586.40
736.00
1125.60
789.20
424.48
866.25
$54.26
$80.93
29.33
32.27
$4527.93
$83.59
$113.20
Daily
Bare
Costs
Incl.
O&P
$736.00
562.80
308.53
$54.25
$81.17
17.53
19.28
$1607.33
$71.78
$100.46
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
941.85
430.12
$47.65
$70.94
31.18
34.30
$4209.57
$78.83
$105.24
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
750.40
941.85
134.82
$53.18
$79.15
40.78
44.86
$2976.27
$93.97
$124.01
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
750.40
941.85
134.82
425.13
$53.18
$79.15
56.89
62.57
$3401.40
$110.07
$141.72
Daily
Bare
Costs
Incl.
O&P
$643.60
562.80
698.00
$53.62
$79.35
$1904.40
$53.62
$79.35
Daily
Crew No.
Crew B-25
1 Labor Foreman (outside)
7 Laborers
3 Equip. Oper. (medium)
1 Asphalt Paver, 130 H.P.
1 Tandem Roller, 10 Ton
1 Roller, Pneum. Whl., 12 Ton
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
2646.00
1513.20
2352.46
379.22
384.55
$73.30
70.35
93.80
88 L.H., Daily Totals
Crew B-25B
1 Labor Foreman (outside)
7 Laborers
4 Equip. Oper. (medium)
1 Asphalt Paver, 130 H.P.
2 Tandem Rollers, 10 Ton
1 Roller, Pneum. Whl., 12 Ton
$7669.43
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
2646.00
2017.60
2352.46
758.44
384.55
$73.30
70.35
93.80
96 L.H., Daily Totals
Crew B-25C
1 Labor Foreman (outside)
3 Laborers
2 Equip. Oper. (medium)
1 Asphalt Paver, 130 H.P.
1 Tandem Roller, 10 Ton
Incl.
Subs O&P
$8553.05
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
1134.00
1008.80
2352.46
379.22
$73.30
70.35
93.80
48 L.H., Daily Totals
$5268.48
Crew B-25D
Hr.
Daily
Hr.
1 Labor Foreman (outside)
3 Laborers
2.130 Equip. Oper. (medium)
.13 Truck Driver (heavy)
.13 Truck Tractor, 6x4, 380 H.P.
.13 Dist. Tanker, 3000 Gallon
1 Asphalt Paver, 130 H.P.
1 Tandem Roller, 10 Ton
$49.25
47.25
63.05
55.45
$394.00
1134.00
1074.37
57.67
70.98
47.72
2352.46
379.22
$73.30
70.35
93.80
82.85
50.08 L.H., Daily Totals
$5510.42
Crew B-25E
Hr.
Daily
Hr.
1 Labor Foreman (outside)
3 Laborers
2.250 Equip. Oper. (medium)
.25 Truck Driver (heavy)
.25 Truck Tractor, 6x4, 380 H.P.
.25 Dist. Tanker, 3000 Gallon
1 Asphalt Paver, 130 H.P.
1 Tandem Roller, 10 Ton
$49.25
47.25
63.05
55.45
$394.00
1134.00
1134.90
110.90
136.50
91.78
2352.46
379.22
$73.30
70.35
93.80
82.85
52 L.H., Daily Totals
Crew B-26
1 Labor Foreman (outside)
6 Laborers
2 Equip. Oper. (medium)
1 Rodman (reinf.)
1 Cement Finisher
1 Grader, 30,000 Lbs.
1 Paving Mach. & Equip.
88 L.H., Daily Totals
$5733.75
Hr.
Daily
Hr.
$49.25
47.25
63.05
64.55
55.00
$394.00
2268.00
1008.80
516.40
440.00
1091.19
2747.64
$73.30
70.35
93.80
96.40
80.45
$8466.03
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
3939.60
2251.20
2587.71
417.14
423.01
$51.74
$77.01
35.41
38.95
$10205.05
$87.15
$115.97
Daily
Bare
Costs
Incl.
O&P
$586.40
3939.60
3001.60
2587.71
834.28
423.01
$52.68
$78.41
36.41
40.05
$11372.59
$89.09
$118.46
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
1500.80
2587.71
417.14
$52.85
$78.66
56.91
62.60
$6780.45
$109.76
$141.26
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
1598.35
86.16
78.08
52.50
2587.71
417.14
$53.12
$79.06
56.92
62.61
$7094.73
$110.03
$141.67
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
1688.40
165.70
150.14
100.95
2587.71
417.14
$53.34
$79.40
56.92
62.61
$7384.85
$110.26
$142.02
Daily
Bare
Costs
Incl.
O&P
$586.40
3376.80
1500.80
771.20
643.60
1200.31
3022.40
$52.58
$78.17
43.62
47.99
$11101.51
$96.20
$126.15
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-26A
1 Labor Foreman (outside)
6 Laborers
2 Equip. Oper. (medium)
1 Rodman (reinf.)
1 Cement Finisher
1 Grader, 30,000 Lbs.
1 Paving Mach. & Equip.
1 Concrete Saw
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
63.05
64.55
55.00
$394.00
2268.00
1008.80
516.40
440.00
1091.19
2747.64
176.00
$73.30
70.35
93.80
96.40
80.45
88 L.H., Daily Totals
Crew B-26B
1 Labor Foreman (outside)
6 Laborers
3 Equip. Oper. (medium)
1 Rodman (reinf.)
1 Cement Finisher
1 Grader, 30,000 Lbs.
1 Paving Mach. & Equip.
1 Concrete Pump, 110’ Boom
$8642.03
Hr.
Daily
Hr.
$49.25
47.25
63.05
64.55
55.00
$394.00
2268.00
1513.20
516.40
440.00
1091.19
2747.64
1069.53
$73.30
70.35
93.80
96.40
80.45
96 L.H., Daily Totals
Crew B-26C
1 Labor Foreman (outside)
6 Laborers
1 Equip. Oper. (medium)
1 Rodman (reinf.)
1 Cement Finisher
1 Paving Mach. & Equip.
1 Concrete Saw
$10039.96
Hr.
Daily
Hr.
$49.25
47.25
63.05
64.55
55.00
$394.00
2268.00
504.40
516.40
440.00
2747.64
176.00
$73.30
70.35
93.80
96.40
80.45
80 L.H., Daily Totals
Crew B-27
1 Labor Foreman (outside)
3 Laborers
1 Berm Machine
$7046.44
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1134.00
897.16
$73.30
70.35
32 L.H., Daily Totals
Crew B-28
2 Carpenters
1 Laborer
$2425.16
Hr.
Daily
Hr.
$58.60
47.25
$937.60
378.00
$87.25
70.35
24 L.H., Daily Totals
Crew B-29
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Gradall, 5/8 C.Y.
$1315.60
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1512.00
530.40
451.20
880.91
$73.30
70.35
98.65
83.90
56 L.H., Daily Totals
Crew B-30
$3768.51
Hr.
1 Equip. Oper. (medium)
$63.05
2 Truck Drivers (heavy)
55.45
1 Hyd. Excavator, 1.5 C.Y.
2 Dump Trucks, 12 C.Y., 400 H.P.
24 L.H., Daily Totals
Incl.
Subs O&P
Daily
Hr.
$504.40
887.20
1185.24
1582.72
$93.80
82.85
$4159.56
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
3376.80
1500.80
771.20
643.60
1200.31
3022.40
193.60
$52.58
$78.17
45.62
50.19
$11295.11
$98.20
$128.35
Daily
Bare
Costs
Incl.
O&P
$586.40
3376.80
2251.20
771.20
643.60
1200.31
3022.40
1176.48
$53.45
$79.47
51.13
56.24
$13028.40
$104.58
$135.71
Daily
Bare
Costs
Incl.
O&P
$586.40
3376.80
750.40
771.20
643.60
3022.40
193.60
$51.53
$76.61
36.55
40.20
$9344.40
$88.08
$116.81
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
986.88
$47.75
$71.09
28.04
30.84
$3261.68
$75.79
$101.93
Daily
Bare
Costs
Incl.
O&P
$1396.00
562.80
$54.82
$81.62
$1958.80
$54.82
$81.62
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
789.20
671.20
969.00
$51.56
$76.75
15.73
17.30
$5267.00
$67.29
$94.05
Daily
Bare
Costs
Incl.
O&P
$750.40
1325.60
1303.76
1740.99
$57.98
$86.50
115.33
126.86
$5120.76
$173.32
$213.36
Daily
Crew No.
Crew B-31
1 Labor Foreman (outside)
3 Laborers
1 Carpenter
1 Air Compressor, 250 cfm
1 Sheeting Driver
2 -50’ Air Hoses, 1.5⬙
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
58.60
$394.00
1134.00
468.80
196.28
8.19
47.20
$73.30
70.35
87.25
40 L.H., Daily Totals
Crew B-32
1 Laborer
3 Equip. Oper. (medium)
1 Grader, 30,000 Lbs.
1 Tandem Roller, 10 Ton
1 Dozer, 200 H.P.
$2248.47
Hr.
Daily
Hr.
$47.25
63.05
$378.00
1513.20
1091.19
379.22
1382.36
$70.35
93.80
32 L.H., Daily Totals
Crew B-32A
1 Laborer
2 Equip. Oper. (medium)
1 Grader, 30,000 Lbs.
1 Roller, Vibratory, 25 Ton
$4743.97
Hr.
Daily
Hr.
$47.25
63.05
$378.00
1008.80
1091.19
529.68
$70.35
93.80
24 L.H., Daily Totals
Crew B-32B
1 Laborer
2 Equip. Oper. (medium)
1 Dozer, 200 H.P.
1 Roller, Vibratory, 25 Ton
$3007.67
Hr.
Daily
Hr.
$47.25
63.05
$378.00
1008.80
1382.36
529.68
$70.35
93.80
24 L.H., Daily Totals
Crew B-32C
1 Labor Foreman (outside)
2 Laborers
3 Equip. Oper. (medium)
1 Grader, 30,000 Lbs.
1 Tandem Roller, 10 Ton
1 Dozer, 200 H.P.
$3298.84
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
756.00
1513.20
1091.19
379.22
1382.36
$73.30
70.35
93.80
48 L.H., Daily Totals
Crew B-33A
1 Equip. Oper. (medium)
.5 Laborer
.25 Equip. Oper. (medium)
1 Scraper, Towed, 7 C.Y.
1.25 Dozers, 300 H.P.
$5515.97
Hr.
Daily
Hr.
$63.05
47.25
63.05
$504.40
189.00
126.10
141.88
2093.16
$93.80
70.35
93.80
14 L.H., Daily Totals
Crew B-33B
1 Equip. Oper. (medium)
.5 Laborer
.25 Equip. Oper. (medium)
1 Scraper, Towed, 10 C.Y.
1.25 Dozers, 300 H.P.
14 L.H., Daily Totals
Incl.
Subs O&P
$3054.54
Hr.
Daily
Hr.
$63.05
47.25
63.05
$504.40
189.00
126.10
177.45
2093.16
$93.80
70.35
93.80
$3090.11
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1688.40
698.00
215.91
9.01
51.92
$49.92
$74.32
6.29
6.92
$3249.64
$56.21
$81.24
Daily
Bare
Costs
Incl.
O&P
$562.80
2251.20
1200.31
417.14
1520.60
$59.10
$87.94
89.15
98.06
$5952.05
$148.25
$186.00
Daily
Bare
Costs
Incl.
O&P
$562.80
1500.80
1200.31
582.65
$57.78
$85.98
67.54
74.29
$3846.56
$125.32
$160.27
Daily
Bare
Costs
Incl.
O&P
$562.80
1500.80
1520.60
582.65
$57.78
$85.98
79.67
87.64
$4166.84
$137.45
$173.62
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
2251.20
1200.31
417.14
1520.60
$55.48
$82.57
59.43
65.38
$7101.25
$114.92
$147.94
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
187.60
156.07
2302.48
$58.54
$87.10
159.65
175.61
$3677.95
$218.18
$262.71
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
187.60
195.19
2302.48
$58.54
$87.10
162.19
178.41
$3717.07
$220.72
$265.51
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
761
Crews - Standard
Crew No.
Crew B-33C
1 Equip. Oper. (medium)
.5 Laborer
.25 Equip. Oper. (medium)
1 Scraper, Towed, 15 C.Y.
1.25 Dozers, 300 H.P.
Bare Costs
Hr.
Daily
Hr.
$63.05
47.25
63.05
$504.40
189.00
126.10
196.46
2093.16
$93.80
70.35
93.80
14 L.H., Daily Totals
Crew B-33D
1 Equip. Oper. (medium)
.5 Laborer
.25 Equip. Oper. (medium)
1 S.P. Scraper, 14 C.Y.
.25 Dozer, 300 H.P.
$3109.12
Hr.
Daily
Hr.
$63.05
47.25
63.05
$504.40
189.00
126.10
2168.71
418.63
$93.80
70.35
93.80
14 L.H., Daily Totals
Crew B-33E
1 Equip. Oper. (medium)
.5 Laborer
.25 Equip. Oper. (medium)
1 S.P. Scraper, 21 C.Y.
.25 Dozer, 300 H.P.
$3406.84
Hr.
Daily
Hr.
$63.05
47.25
63.05
$504.40
189.00
126.10
2239.60
418.63
$93.80
70.35
93.80
14 L.H., Daily Totals
Crew B-33F
1 Equip. Oper. (medium)
.5 Laborer
.25 Equip. Oper. (medium)
1 Elev. Scraper, 11 C.Y.
.25 Dozer, 300 H.P.
$3477.73
Hr.
Daily
Hr.
$63.05
47.25
63.05
$504.40
189.00
126.10
1022.46
418.63
$93.80
70.35
93.80
14 L.H., Daily Totals
Crew B-33G
1 Equip. Oper. (medium)
.5 Laborer
.25 Equip. Oper. (medium)
1 Elev. Scraper, 22 C.Y.
.25 Dozer, 300 H.P.
Incl.
Subs O&P
$2260.59
Hr.
Daily
Hr.
$63.05
47.25
63.05
$504.40
189.00
126.10
2005.03
418.63
$93.80
70.35
93.80
14 L.H., Daily Totals
$3243.16
Crew B-33H
Hr.
Daily
Hr.
.5 Laborer
1 Equipment Operator (med.)
.25 Equipment Operator (med.)
1 S.P. Scraper, 44 C.Y.
.25 Dozer, 410 H.P.
$47.25
63.05
63.05
$189.00
504.40
126.10
3440.19
633.99
$70.35
93.80
93.80
14 L.H., Daily Totals
Crew B-33J
1 Equipment Operator (med.)
1 S.P. Scraper, 14 C.Y.
$4893.68
Hr.
Daily
Hr.
$63.05
$504.40
2168.71
$93.80
8 L.H., Daily Totals
$2673.11
Crew B-33K
Hr.
Daily
Hr.
1 Equipment Operator (med.)
.25 Equipment Operator (med.)
.5 Laborer
1 S.P. Scraper, 31 C.Y.
.25 Dozer, 410 H.P.
$63.05
63.05
47.25
$504.40
126.10
189.00
2972.09
633.99
$93.80
93.80
70.35
14 L.H., Daily Totals
762
$4425.58
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$750.40
281.40
187.60
216.11
2302.48
$58.54
$87.10
163.54
179.90
$3737.98
$222.08
$267.00
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
187.60
2385.58
460.50
$58.54
$87.10
184.81
203.29
$4065.48
$243.35
$290.39
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
187.60
2463.56
460.50
$58.54
$87.10
189.87
208.86
$4143.46
$248.41
$295.96
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
187.60
1124.71
460.50
$58.54
$87.10
102.94
113.23
$2804.60
$161.47
$200.33
Daily
Bare
Costs
Incl.
O&P
$750.40
281.40
187.60
2205.53
460.50
$58.54
$87.10
173.12
190.43
$3885.43
$231.65
$277.53
Crew B-34H
Hr.
Daily
Hr.
Bare
Costs
Incl.
O&P
1 Truck Driver (heavy)
1 Dump Truck, Off Hwy., 65 Ton
$55.45
$443.60
2126.70
$82.85
Daily
$281.40
750.40
187.60
3784.21
697.39
$58.54
$87.10
291.01
320.11
$5701.00
$349.55
$407.21
Daily
Bare
Costs
Incl.
O&P
$750.40
2385.58
$63.05
271.09
$93.80
298.20
$3135.98
$334.14
$392.00
Daily
Bare
Costs
Incl.
O&P
$750.40
187.60
281.40
3269.30
697.39
$58.54
$87.10
257.58
283.33
$5186.09
$316.11
$370.43
Daily
Crew B-34A
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Dump Truck, 8 C.Y., 220 H.P.
$55.45
$443.60
417.49
$82.85
8 L.H., Daily Totals
$861.09
Crew B-34B
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Dump Truck, 12 C.Y., 400 H.P.
$55.45
$443.60
791.36
$82.85
8 L.H., Daily Totals
$1234.96
Crew B-34C
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Truck Tractor, 6x4, 380 H.P.
1 Dump Trailer, 16.5 C.Y.
$55.45
$443.60
545.98
151.94
$82.85
8 L.H., Daily Totals
$1141.52
Crew B-34D
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Truck Tractor, 6x4, 380 H.P.
1 Dump Trailer, 20 C.Y.
$55.45
$443.60
545.98
168.66
$82.85
8 L.H., Daily Totals
$1158.24
Crew B-34E
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Dump Truck, Off Hwy., 25 Ton
$55.45
$443.60
1471.16
$82.85
8 L.H., Daily Totals
$1914.76
Crew B-34F
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Dump Truck, Off Hwy., 35 Ton
$55.45
$443.60
1508.36
$82.85
8 L.H., Daily Totals
$1951.96
Crew B-34G
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Dump Truck, Off Hwy., 50 Ton
$55.45
$443.60
2037.60
$82.85
8 L.H., Daily Totals
$2481.20
8 L.H., Daily Totals
$2570.30
Crew B-34I
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Dump Truck, 18 C.Y., 450 H.P.
$55.45
$443.60
788.42
$82.85
8 L.H., Daily Totals
Crew B-34J
$1232.02
Hr.
1 Truck Driver (heavy)
$55.45
1 Dump Truck, Off Hwy., 100 Ton
8 L.H., Daily Totals
Daily
Hr.
$443.60
3040.18
$82.85
$3483.78
Crew B-34K
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Truck Tractor, 6x4, 450 H.P.
1 Lowbed Trailer, 75 Ton
$55.45
$443.60
666.04
283.47
$82.85
8 L.H., Daily Totals
$1393.11
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$662.80
459.24
$55.45
52.19
$82.85
57.40
$1122.04
$107.64
$140.25
Daily
Bare
Costs
Incl.
O&P
$662.80
870.50
$55.45
98.92
$82.85
108.81
$1533.30
$154.37
$191.66
Daily
Bare
Costs
Incl.
O&P
$662.80
600.58
167.13
$55.45
$82.85
87.24
95.96
$1430.51
$142.69
$178.81
Daily
Bare
Costs
Incl.
O&P
$662.80
600.58
185.53
$55.45
$82.85
89.33
98.26
$1448.90
$144.78
$181.11
Daily
Bare
Costs
Incl.
O&P
$662.80
1618.28
$55.45
183.90
$82.85
202.28
$2281.08
$239.35
$285.13
Daily
Bare
Costs
Incl.
O&P
$662.80
1659.20
$55.45
188.54
$82.85
207.40
$2322.00
$244.00
$290.25
Daily
Bare
Costs
Incl.
O&P
$662.80
2241.36
$55.45
254.70
$82.85
280.17
$2904.16
$310.15
$363.02
Daily
Bare
Costs
Incl.
O&P
$662.80
2339.37
$55.45
265.84
$82.85
292.42
$3002.17
$321.29
$375.27
Daily
Bare
Costs
Incl.
O&P
$662.80
867.26
$55.45
98.55
$82.85
108.41
$1530.06
$154.00
$191.26
Daily
Bare
Costs
Incl.
O&P
$662.80
3344.20
$55.45
380.02
$82.85
418.02
$4007.00
$435.47
$500.87
Daily
Bare
Costs
Incl.
O&P
$662.80
732.64
311.82
$55.45
$82.85
118.69
130.56
$1707.26
$174.14
$213.41
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-34L
1 Equip. Oper. (light)
1 Flatbed Truck, Gas, 1.5 Ton
Bare Costs
Hr.
Daily
Hr.
$59.70
$477.60
361.95
$88.85
8 L.H., Daily Totals
Crew B-34M
1 Equip. Oper. (light)
1 Flatbed Truck, Gas, 3 Ton
Incl.
Subs O&P
$839.55
Hr.
Daily
Hr.
$59.70
$477.60
391.02
$88.85
8 L.H., Daily Totals
$868.62
Crew B-34N
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Equip. Oper. (medium)
1 Truck Tractor, 6x4, 380 H.P.
1 Flatbed Trailer, 40 Ton
$55.45
63.05
$443.60
504.40
545.98
206.92
$82.85
93.80
16 L.H., Daily Totals
Crew B-34P
1 Pipe Fitter
1 Truck Driver (light)
1 Equip. Oper. (medium)
1 Flatbed Truck, Gas, 3 Ton
1 Backhoe Loader, 48 H.P.
$1700.90
Hr.
Daily
Hr.
$72.55
52.90
63.05
$580.40
423.20
504.40
391.02
277.19
$108.20
79.00
93.80
24 L.H., Daily Totals
$2176.21
Crew B-34Q
Hr.
Daily
Hr.
1 Pipe Fitter
1 Truck Driver (light)
1 Equip. Oper. (crane)
1 Flatbed Trailer, 25 Ton
1 Dump Truck, 8 C.Y., 220 H.P.
1 Hyd. Crane, 25 Ton
$72.55
52.90
66.30
$580.40
423.20
530.40
150.61
417.49
2273.31
$108.20
79.00
98.65
24 L.H., Daily Totals
$4375.41
Crew B-34R
Hr.
Daily
Hr.
1 Pipe Fitter
1 Truck Driver (light)
1 Equip. Oper. (crane)
1 Flatbed Trailer, 25 Ton
1 Dump Truck, 8 C.Y., 220 H.P.
1 Hyd. Crane, 25 Ton
1 Hyd. Excavator, 1 C.Y.
$72.55
52.90
66.30
$580.40
423.20
530.40
150.61
417.49
2273.31
986.56
$108.20
79.00
98.65
24 L.H., Daily Totals
$5361.97
Crew B-34S
Hr.
Daily
Hr.
2 Pipe Fitters
1 Truck Driver (heavy)
1 Equip. Oper. (crane)
1 Flatbed Trailer, 40 Ton
1 Truck Tractor, 6x4, 380 H.P.
1 Hyd. Crane, 80 Ton
1 Hyd. Excavator, 2 C.Y.
$72.55
55.45
66.30
$1160.80
443.60
530.40
206.92
545.98
2641.70
1096.14
$108.20
82.85
98.65
32 L.H., Daily Totals
$6625.54
Crew B-34T
Hr.
Daily
Hr.
2 Pipe Fitters
1 Truck Driver (heavy)
1 Equip. Oper. (crane)
1 Flatbed Trailer, 40 Ton
1 Truck Tractor, 6x4, 380 H.P.
1 Hyd. Crane, 80 Ton
$72.55
55.45
66.30
$1160.80
443.60
530.40
206.92
545.98
2641.70
$108.20
82.85
98.65
32 L.H., Daily Totals
$5529.40
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$710.80
398.14
$59.70
45.24
$88.85
49.77
$1108.94
$104.94
$138.62
Daily
Bare
Costs
Incl.
O&P
$710.80
430.12
$59.70
48.88
$88.85
53.77
$1140.92
$108.58
$142.62
Daily
Bare
Costs
Incl.
O&P
$662.80
750.40
600.58
227.61
$59.25
$88.33
47.06
51.76
$2241.39
$106.31
$140.09
Bare
Costs
Incl.
O&P
$865.60
632.00
750.40
430.12
304.91
$62.83
$93.67
27.84
30.63
$2983.03
$90.68
$124.29
Daily
Bare
Costs
Incl.
O&P
$865.60
632.00
789.20
165.67
459.24
2500.64
$63.92
$95.28
118.39
130.23
$5412.35
$182.31
$225.51
Daily
Bare
Costs
Incl.
O&P
$865.60
632.00
789.20
165.67
459.24
2500.64
1085.22
$63.92
$95.28
159.50
175.45
$6497.57
$223.42
$270.73
Daily
Bare
Costs
Incl.
O&P
$1731.20
662.80
789.20
227.61
600.58
2905.87
1205.75
$66.71
$99.47
140.34
154.37
$8123.01
$207.05
$253.84
Daily
Bare
Costs
Incl.
O&P
$1731.20
662.80
789.20
227.61
600.58
2905.87
$66.71
$99.47
106.08
116.69
$6917.26
$172.79
$216.16
Daily
Crew No.
Crew B-34U
1 Truck Driver (heavy)
1 Equip. Oper. (light)
1 Truck Tractor, 220 H.P.
1 Flatbed Trailer, 25 Ton
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$55.45
59.70
$443.60
477.60
339.98
150.61
$82.85
88.85
16 L.H., Daily Totals
$1411.79
Crew B-34V
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Equip. Oper. (crane)
1 Equip. Oper. (light)
1 Truck Tractor, 6x4, 450 H.P.
1 Equipment Trailer, 50 Ton
1 Pickup Truck, 4x4, 3/4 Ton
$55.45
66.30
59.70
$443.60
530.40
477.60
666.04
336.69
191.73
$82.85
98.65
88.85
24 L.H., Daily Totals
$2646.06
Crew B-34W
Hr.
Daily
Hr.
5 Truck Drivers (heavy)
2 Equip. Opers. (crane)
1 Equip. Oper. (mechanic)
1 Laborer
4 Truck Tractors, 6x4, 380 H.P.
2 Equipment Trailers, 50 Ton
2 Flatbed Trailers, 40 Ton
1 Pickup Truck, 4x4, 3/4 Ton
1 S.P. Crane, 4x4, 20 Ton
$55.45
66.30
66.40
47.25
$2218.00
1060.80
531.20
378.00
2183.92
673.38
413.84
191.73
760.97
$82.85
98.65
98.80
70.35
72 L.H., Daily Totals
Crew B-35
1 Labor Foreman (outside)
1 Skilled Worker
2 Welders
1 Laborer
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
2 Welder, Electric, 300 amp
1 Hyd. Excavator, .75 C.Y.
$8411.84
Hr.
Daily
Hr.
$49.25
61.25
72.05
47.25
66.30
56.40
$394.00
490.00
1152.80
378.00
530.40
451.20
128.34
915.34
$73.30
92.00
107.45
70.35
98.65
83.90
56 L.H., Daily Totals
$4440.08
Crew B-35A
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
1 Skilled Worker
1 Welder (plumber)
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Welder, Gas Engine, 300 amp
1 Crawler Crane, 75 Ton
$49.25
47.25
61.25
72.05
66.30
56.40
$394.00
756.00
490.00
576.40
530.40
451.20
147.09
2189.46
$73.30
70.35
92.00
107.45
98.65
83.90
56 L.H., Daily Totals
Crew B-36
1 Labor Foreman (outside)
2 Laborers
2 Equip. Oper. (medium)
1 Dozer, 200 H.P.
1 Aggregate Spreader
1 Tandem Roller, 10 Ton
40 L.H., Daily Totals
$5534.55
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
756.00
1008.80
1382.36
67.49
379.22
$73.30
70.35
93.80
$3987.87
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$662.80
710.80
373.98
165.67
$57.58
$85.85
30.66
33.73
$1913.25
$88.24
$119.58
Daily
Bare
Costs
Incl.
O&P
$662.80
789.20
710.80
732.64
370.36
210.90
$60.48
$90.12
49.77
54.75
$3476.71
$110.25
$144.86
Daily
Bare
Costs
Incl.
O&P
$3314.00
1578.40
790.40
562.80
2402.31
740.72
455.22
210.90
837.07
$58.17
$86.74
58.66
64.53
$10891.82
$116.83
$151.28
Daily
Bare
Costs
Incl.
O&P
$586.40
736.00
1719.20
562.80
789.20
671.20
141.17
1006.87
$60.65
$90.44
18.64
20.50
$6212.85
$79.29
$110.94
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
736.00
859.60
789.20
671.20
161.80
2408.41
$57.11
$85.14
41.72
45.90
$7338.20
$98.83
$131.04
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
1500.80
1520.60
74.24
417.14
$53.97
$80.32
45.73
50.30
$5224.78
$99.70
$130.62
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
763
Crews - Standard
Crew No.
Crew B-36A
1 Labor Foreman (outside)
2 Laborers
4 Equip. Oper. (medium)
1 Dozer, 200 H.P.
1 Aggregate Spreader
1 Tandem Roller, 10 Ton
1 Roller, Pneum. Whl., 12 Ton
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
756.00
2017.60
1382.36
67.49
379.22
384.55
$73.30
70.35
93.80
56 L.H., Daily Totals
$5381.22
Crew B-36B
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
4 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Grader, 30,000 Lbs.
1 F.E. Loader, Crl, 1.5 C.Y.
1 Dozer, 300 H.P.
1 Roller, Vibratory, 25 Ton
1 Truck Tractor, 6x4, 450 H.P.
1 Water Tank Trailer, 5000 Gal.
$49.25
47.25
63.05
55.45
$394.00
756.00
2017.60
443.60
1091.19
733.70
1674.53
529.68
666.04
169.14
$73.30
70.35
93.80
82.85
64 L.H., Daily Totals
$8475.48
Crew B-36C
Hr.
Daily
Hr.
1 Labor Foreman (outside)
3 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Grader, 30,000 Lbs.
1 Dozer, 300 H.P.
1 Roller, Vibratory, 25 Ton
1 Truck Tractor, 6x4, 450 H.P.
1 Water Tank Trailer, 5000 Gal.
$49.25
63.05
55.45
$394.00
1513.20
443.60
1091.19
1674.53
529.68
666.04
169.14
$73.30
93.80
82.85
40 L.H., Daily Totals
Crew B-36D
1 Labor Foreman (outside)
3 Equip. Oper. (medium)
1 Grader, 30,000 Lbs.
1 Dozer, 300 H.P.
1 Roller, Vibratory, 25 Ton
$6481.38
Hr.
Daily
Hr.
$49.25
63.05
$394.00
1513.20
1091.19
1674.53
529.68
$73.30
93.80
32 L.H., Daily Totals
Crew B-37
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (light)
1 Tandem Roller, 5 Ton
$5202.60
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
1512.00
477.60
287.45
$73.30
70.35
88.85
48 L.H., Daily Totals
Crew B-37A
2 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.5 Ton
1 Tar Kettle, T.M.
$2671.05
Hr.
Daily
Hr.
$47.25
52.90
$756.00
423.20
361.95
199.54
$70.35
79.00
24 L.H., Daily Totals
Crew B-37B
3 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.5 Ton
1 Tar Kettle, T.M.
32 L.H., Daily Totals
764
$1740.69
Hr.
Daily
Hr.
$47.25
52.90
$1134.00
423.20
361.95
199.54
$70.35
79.00
$2118.69
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1125.60
3001.60
1520.60
74.24
417.14
423.01
$56.56
$84.17
39.53
43.48
$7148.58
$96.09
$127.65
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
3001.60
662.80
1200.31
807.07
1841.98
582.65
732.64
186.05
$56.42
$84.01
76.00
83.60
$10727.11
$132.43
$167.61
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
662.80
1200.31
1841.98
582.65
732.64
186.05
$58.77
$87.51
103.26
113.59
$8044.04
$162.03
$201.10
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
1200.31
1841.98
582.65
$59.60
$88.67
102.98
113.28
$6462.54
$162.58
$201.95
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
710.80
316.19
$49.66
$73.92
5.99
6.59
$3864.59
$55.65
$80.51
Daily
Bare
Costs
Incl.
O&P
$1125.60
632.00
398.14
219.49
$49.13
$73.23
23.40
25.73
$2375.24
$72.53
$98.97
Daily
Bare
Costs
Incl.
O&P
$1688.40
632.00
398.14
219.49
$48.66
$72.51
17.55
19.30
$2938.04
$66.21
$91.81
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-37C
Hr.
Daily
Hr.
2 Laborers
2 Truck Drivers (light)
2 Flatbed Trucks, Gas, 1.5 Ton
1 Tar Kettle, T.M.
$47.25
52.90
$756.00
846.40
723.90
199.54
$70.35
79.00
32 L.H., Daily Totals
Crew B-37D
1 Laborer
1 Truck Driver (light)
1 Pickup Truck, 3/4 Ton
$2525.84
Hr.
Daily
Hr.
$47.25
52.90
$378.00
423.20
122.56
$70.35
79.00
16 L.H., Daily Totals
$923.76
Crew B-37E
Hr.
Daily
Hr.
3 Laborers
1 Equip. Oper. (light)
1 Equip. Oper. (medium)
2 Truck Drivers (light)
4 Barrels w/ Flasher
1 Concrete Saw
1 Rotary Hammer Drill
1 Hammer Drill Bit
1 Loader, Skid Steer, 30 H.P.
1 Conc. Hammer Attach.
1 Vibrating Plate, Gas, 18⬙
2 Flatbed Trucks, Gas, 1.5 Ton
$47.25
59.70
63.05
52.90
$1134.00
477.60
504.40
846.40
11.36
176.00
34.98
26.61
260.99
126.94
143.82
723.90
$70.35
88.85
93.80
79.00
56 L.H., Daily Totals
Crew B-37F
3 Laborers
1 Truck Driver (light)
4 Barrels w/ Flasher
1 Concrete Mixer, 10 C.F.
1 Air Compressor, 60 cfm
1 -50’ Air Hose, 3/4⬙
1 Spade (Chipper)
1 Flatbed Truck, Gas, 1.5 Ton
$4467.00
Hr.
Daily
Hr.
$47.25
52.90
$1134.00
423.20
11.36
149.77
173.21
8.16
9.37
361.95
$70.35
79.00
32 L.H., Daily Totals
Crew B-37G
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (light)
1 Berm Machine
1 Tandem Roller, 5 Ton
$2271.02
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
1512.00
477.60
897.16
287.45
$73.30
70.35
88.85
48 L.H., Daily Totals
Crew B-37H
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (light)
1 Tandem Roller, 5 Ton
1 Flatbed Truck, Gas, 1.5 Ton
1 Tar Kettle, T.M.
48 L.H., Daily Totals
$3568.21
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
1512.00
477.60
287.45
361.95
199.54
$73.30
70.35
88.85
$3232.54
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1125.60
1264.00
796.29
219.49
$50.08
$74.67
28.86
31.74
$3405.38
$78.93
$106.42
Daily
Bare
Costs
Incl.
O&P
$562.80
632.00
134.82
$50.08
$74.67
7.66
8.43
$1329.62
$57.73
$83.10
Daily
Bare
Costs
Incl.
O&P
$1688.40
710.80
750.40
1264.00
12.50
193.60
38.48
29.27
287.09
139.63
158.20
796.29
$52.90
$78.81
26.87
29.55
$6068.66
$79.77
$108.37
Daily
Bare
Costs
Incl.
O&P
$1688.40
632.00
12.50
164.75
190.53
8.98
10.31
398.14
$48.66
$72.51
22.31
24.54
$3105.60
$70.97
$97.05
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
710.80
986.88
316.19
$49.66
$73.92
24.68
27.15
$4851.47
$74.34
$101.07
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
710.80
316.19
398.14
219.49
$49.66
$73.92
17.69
19.45
$4482.23
$67.34
$93.38
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-37I
Hr.
Daily
Hr.
3 Laborers
1 Equip. Oper. (light)
1 Equip. Oper. (medium)
2 Truck Drivers (light)
4 Barrels w/ Flasher
1 Concrete Saw
1 Rotary Hammer Drill
1 Hammer Drill Bit
1 Air Compressor, 60 cfm
1 -50’ Air Hose, 3/4⬙
1 Spade (Chipper)
1 Loader, Skid Steer, 30 H.P.
1 Conc. Hammer Attach.
1 Concrete Mixer, 10 C.F.
1 Vibrating Plate, Gas, 18⬙
2 Flatbed Trucks, Gas, 1.5 Ton
$47.25
59.70
63.05
52.90
$1134.00
477.60
504.40
846.40
11.36
176.00
34.98
26.61
173.21
8.16
9.37
260.99
126.94
149.77
143.82
723.90
$70.35
88.85
93.80
79.00
56 L.H., Daily Totals
$4807.51
Crew B-37J
Hr.
Daily
Hr.
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (light)
1 Air Compressor, 60 cfm
1 -50’ Air Hose, 3/4⬙
2 Concrete Mixers, 10 C.F.
2 Flatbed Trucks, Gas, 1.5 Ton
1 Shot Blaster, 20⬙
$49.25
47.25
59.70
$394.00
1512.00
477.60
173.21
8.16
299.54
723.90
229.79
$73.30
70.35
88.85
48 L.H., Daily Totals
$3818.20
Crew B-37K
Hr.
Daily
Hr.
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (light)
1 Air Compressor, 60 cfm
1 -50’ Air Hose, 3/4⬙
2 Flatbed Trucks, Gas, 1.5 Ton
1 Shot Blaster, 20⬙
$49.25
47.25
59.70
$394.00
1512.00
477.60
173.21
8.16
723.90
229.79
$73.30
70.35
88.85
48 L.H., Daily Totals
Crew B-38
1 Labor Foreman (outside)
2 Laborers
1 Equip. Oper. (light)
1 Equip. Oper. (medium)
1 Backhoe Loader, 48 H.P.
1 Hyd. Hammer (1200 lb.)
1 F.E. Loader, W.M., 4 C.Y.
1 Pvmt. Rem. Bucket
$3518.66
Hr.
Daily
Hr.
$49.25
47.25
59.70
63.05
$394.00
756.00
477.60
504.40
277.19
194.78
789.98
70.14
$73.30
70.35
88.85
93.80
40 L.H., Daily Totals
Crew B-39
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (light)
1 Air Compressor, 250 cfm
2 Breakers, Pavement, 60 lb.
2 -50’ Air Hoses, 1.5⬙
48 L.H., Daily Totals
$3464.09
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
1512.00
477.60
196.28
68.94
47.20
$73.30
70.35
88.85
$2696.02
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1688.40
710.80
750.40
1264.00
12.50
193.60
38.48
29.27
190.53
8.98
10.31
287.09
139.63
164.75
158.20
796.29
$52.90
$78.81
32.95
36.24
$6443.22
$85.85
$115.06
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
710.80
190.53
8.98
329.49
796.29
252.77
$49.66
$73.92
29.89
32.88
$5126.46
$79.55
$106.80
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
710.80
190.53
8.98
796.29
252.77
$49.66
$73.92
23.65
26.01
$4796.97
$73.31
$99.94
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
710.80
750.40
304.91
214.26
868.98
77.15
$53.30
$79.33
33.30
36.63
$4638.50
$86.60
$115.96
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
710.80
215.91
75.83
51.92
$49.66
$73.92
6.51
7.16
$3892.06
$56.17
$81.08
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-40
Hr.
Daily
Hr.
1 Pile Driver Foreman (outside)
4 Pile Drivers
2 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 40 Ton
1 Vibratory Hammer & Gen.
$62.50
60.50
66.30
56.40
$500.00
1936.00
1060.80
451.20
1362.63
2518.21
$96.70
93.60
98.65
83.90
64 L.H., Daily Totals
Crew B-40B
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Lattice Boom Crane, 40 Ton
$7828.84
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1134.00
530.40
451.20
2371.83
$73.30
70.35
98.65
83.90
48 L.H., Daily Totals
Crew B-41
1 Labor Foreman (outside)
4 Laborers
.25 Equip. Oper. (crane)
.25 Equip. Oper. (oiler)
.25 Crawler Crane, 40 Ton
$4881.43
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1512.00
132.60
112.80
340.66
$73.30
70.35
98.65
83.90
44 L.H., Daily Totals
$2492.06
Crew B-42
Hr.
Daily
Hr.
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Welder
1 Hyd. Crane, 25 Ton
1 Welder, Gas Engine, 300 amp
1 Horz. Boring Csg. Mch.
$49.25
47.25
66.30
56.40
64.55
$394.00
1512.00
530.40
451.20
516.40
2273.31
147.09
437.50
$73.30
70.35
98.65
83.90
99.40
64 L.H., Daily Totals
Crew B-43
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Drill Rig, Truck-Mounted
$6261.90
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1134.00
530.40
451.20
856.23
$73.30
70.35
98.65
83.90
48 L.H., Daily Totals
$3365.83
Crew B-44
Hr.
Daily
Hr.
1 Pile Driver Foreman (outside)
4 Pile Drivers
2 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 40 Ton
1 Lead, 60’ High
1 Hammer, Diesel, 15K ft.-lbs.
$62.50
60.50
66.30
47.25
$500.00
1936.00
1060.80
378.00
1362.63
233.36
687.50
$96.70
93.60
98.65
70.35
64 L.H., Daily Totals
$6158.29
Crew B-45
Hr.
Daily
Hr.
1 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Dist. Tanker, 3000 Gallon
1 Truck Tractor, 6x4, 380 H.P.
$63.05
55.45
$504.40
443.60
367.10
545.98
$93.80
82.85
16 L.H., Daily Totals
$1861.08
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$773.60
2995.20
1578.40
671.20
1498.89
2770.03
$61.69
$94.04
60.64
66.70
$10287.32
$122.33
$160.74
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
789.20
671.20
2609.01
$52.28
$77.82
49.41
54.35
$6344.21
$101.70
$132.17
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
197.30
167.80
374.72
$48.90
$72.79
7.74
8.52
$3577.42
$56.64
$81.31
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
789.20
671.20
795.20
2500.64
161.80
481.25
$53.19
$79.58
44.65
49.12
$8236.89
$97.84
$128.70
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
789.20
671.20
941.85
$52.28
$77.82
17.84
19.62
$4677.05
$70.12
$97.44
Daily
Bare
Costs
Incl.
O&P
$773.60
2995.20
1578.40
562.80
1498.89
256.70
756.25
$60.54
$92.34
35.68
39.25
$8421.84
$96.22
$131.59
Daily
Bare
Costs
Incl.
O&P
$750.40
662.80
403.81
600.58
$59.25
$88.33
57.07
62.77
$2417.59
$116.32
$151.10
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
765
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-46
Hr.
Daily
Hr.
1 Pile Driver Foreman (outside)
2 Pile Drivers
3 Laborers
1 Chain Saw, Gas, 36⬙ Long
$62.50
60.50
47.25
$500.00
968.00
1134.00
53.61
$96.70
93.60
70.35
48 L.H., Daily Totals
Crew B-47
1 Blast Foreman (outside)
1 Driller
1 Equip. Oper. (light)
1 Air Track Drill, 4⬙
1 Air Compressor, 600 cfm
2 -50’ Air Hoses, 3⬙
$2655.61
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
378.00
477.60
1191.15
466.11
93.52
$73.30
70.35
88.85
24 L.H., Daily Totals
Crew B-47A
1 Drilling Foreman (outside)
1 Equip. Oper. (heavy)
1 Equip. Oper. (oiler)
1 Air Track Drill, 5⬙
$3000.38
Hr.
Daily
Hr.
$49.25
66.30
56.40
$394.00
530.40
451.20
1191.15
$73.30
98.65
83.90
24 L.H., Daily Totals
Crew B-47C
1 Laborer
1 Equip. Oper. (light)
1 Air Compressor, 750 C.F.M.
2 -50’ Air Hoses, 3⬙
1 Air Track Drill, 4⬙
$2566.75
Hr.
Daily
Hr.
$47.25
59.70
$378.00
477.60
655.87
93.52
1191.15
$70.35
88.85
16 L.H., Daily Totals
Crew B-47E
1 Labor Foreman (outside)
3 Laborers
1 Flatbed Truck, Gas, 3 Ton
$2796.14
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1134.00
391.02
$73.30
70.35
32 L.H., Daily Totals
Crew B-47G
1 Labor Foreman (outside)
2 Laborers
1 Equip. Oper. (light)
1 Air Track Drill, 4⬙
1 Air Compressor, 600 cfm
2 -50’ Air Hoses, 3⬙
1 Gunite Pump Rig
$1919.02
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
756.00
477.60
1191.15
466.11
93.52
352.58
$73.30
70.35
88.85
32 L.H., Daily Totals
$3730.96
Crew B-47H
Hr.
Daily
Hr.
1 Skilled Worker Foreman (out)
3 Skilled Workers
1 Flatbed Truck, Gas, 3 Ton
$63.25
61.25
$506.00
1470.00
391.02
$95.00
92.00
32 L.H., Daily Totals
$2367.02
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$773.60
1497.60
1688.40
58.97
$54.21
$82.49
1.12
1.23
$4018.57
$55.33
$83.72
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
710.80
1310.27
512.72
102.87
$52.07
$77.50
72.95
80.24
$3785.86
$125.02
$157.74
Daily
Bare
Costs
Incl.
O&P
$586.40
789.20
671.20
1310.27
$57.32
$85.28
49.63
54.59
$3357.07
$106.95
$139.88
Daily
Bare
Costs
Incl.
O&P
$562.80
710.80
721.46
102.87
1310.27
$53.48
$79.60
121.28
133.41
$3408.19
$174.76
$213.01
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
430.12
$47.75
$71.09
12.22
13.44
$2704.92
$59.97
$84.53
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
710.80
1310.27
512.72
102.87
387.84
$50.86
$75.71
65.73
72.30
$4736.50
$116.59
$148.02
Daily
Bare
Costs
Incl.
O&P
$760.00
2208.00
430.12
$61.75
$92.75
12.22
13.44
$3398.12
$73.97
$106.19
Daily
Crew No.
Crew B-48
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Equip. Oper. (light)
1 Centr. Water Pump, 6⬙
1 -20’ Suction Hose, 6⬙
1 -50’ Discharge Hose, 6⬙
1 Drill Rig, Truck-Mounted
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
59.70
$394.00
1134.00
530.40
451.20
477.60
386.48
28.12
19.99
856.23
$73.30
70.35
98.65
83.90
88.85
56 L.H., Daily Totals
Crew B-49
1 Labor Foreman (outside)
3 Laborers
2 Equip. Oper. (crane)
2 Equip. Oper. (oilers)
1 Equip. Oper. (light)
2 Pile Drivers
1 Hyd. Crane, 25 Ton
1 Centr. Water Pump, 6⬙
1 -20’ Suction Hose, 6⬙
1 -50’ Discharge Hose, 6⬙
1 Drill Rig, Truck-Mounted
$4278.02
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
59.70
60.50
$394.00
1134.00
1060.80
902.40
477.60
968.00
2273.31
386.48
28.12
19.99
856.23
$73.30
70.35
98.65
83.90
88.85
93.60
88 L.H., Daily Totals
$8500.93
Crew B-50
Hr.
Daily
Hr.
2 Pile Driver Foremen (outside)
6 Pile Drivers
2 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
3 Laborers
1 Crawler Crane, 40 Ton
1 Lead, 60’ High
1 Hammer, Diesel, 15K ft.-lbs.
1 Air Compressor, 600 cfm
2 -50’ Air Hoses, 3⬙
1 Chain Saw, Gas, 36⬙ Long
$62.50
60.50
66.30
56.40
47.25
$1000.00
2904.00
1060.80
451.20
1134.00
1362.63
233.36
687.50
466.11
93.52
53.61
$96.70
93.60
98.65
83.90
70.35
112 L.H., Daily Totals
Crew B-51
1 Labor Foreman (outside)
4 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.5 Ton
$9446.73
Hr.
Daily
Hr.
$49.25
47.25
52.90
$394.00
1512.00
423.20
361.95
$73.30
70.35
79.00
48 L.H., Daily Totals
Crew B-52
1 Carpenter Foreman (outside)
1 Carpenter
3 Laborers
1 Cement Finisher
.5 Rodman (reinf.)
.5 Equip. Oper. (medium)
.5 Crawler Loader, 3 C.Y.
$2691.15
Hr.
Daily
Hr.
$60.60
58.60
47.25
55.00
64.55
63.05
$484.80
468.80
1134.00
440.00
258.20
252.20
628.84
$90.20
87.25
70.35
80.45
96.40
93.80
56 L.H., Daily Totals
Crew B-53
1 Equip. Oper. (light)
1 Trencher, Chain, 12 H.P.
8 L.H., Daily Totals
766
Incl.
Subs O&P
$3666.84
Hr.
Daily
Hr.
$59.70
$477.60
202.47
$88.85
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1688.40
789.20
671.20
710.80
425.13
30.93
21.99
941.85
$53.34
$79.39
23.05
25.36
$5865.90
$76.39
$104.75
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
1578.40
1342.40
710.80
1497.60
2500.64
425.13
30.93
21.99
941.85
$56.10
$84.14
40.50
44.55
$11324.54
$96.60
$128.69
Daily
Bare
Costs
Incl.
O&P
$1547.20
4492.80
1578.40
671.20
1688.40
1498.89
256.70
756.25
512.72
102.87
58.97
$58.48
$89.09
25.86
28.45
$13164.40
$84.35
$117.54
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
632.00
398.14
$48.52
$72.28
7.54
8.29
$3867.74
$56.07
$80.58
Daily
Bare
Costs
Incl.
O&P
$721.60
698.00
1688.40
643.60
385.60
375.20
691.72
$54.25
$80.58
11.23
12.35
$5204.12
$65.48
$92.93
Daily
Bare
Costs
Incl.
O&P
$710.80
222.72
$59.70
25.31
$88.85
27.84
$933.52
$85.01
$116.69
Daily
$680.07
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-54
1 Equip. Oper. (light)
1 Trencher, Chain, 40 H.P.
Bare Costs
Hr.
Daily
Hr.
$59.70
$477.60
386.50
$88.85
8 L.H., Daily Totals
Crew B-54A
.17 Labor Foreman (outside)
1 Equipment Operator (med.)
1 Wheel Trencher, 67 H.P.
$864.10
Hr.
Daily
Hr.
$49.25
63.05
$66.98
504.40
1248.89
$73.30
93.80
9.36 L.H., Daily Totals
Crew B-54B
.25 Labor Foreman (outside)
1 Equipment Operator (med.)
1 Wheel Trencher, 150 H.P.
$1820.27
Hr.
Daily
Hr.
$49.25
63.05
$98.50
504.40
1338.44
$73.30
93.80
10 L.H., Daily Totals
Crew B-54C
1 Laborer
1 Equipment Operator (med.)
1 Wheel Trencher, 67 H.P.
$1941.34
Hr.
Daily
Hr.
$47.25
63.05
$378.00
504.40
1248.89
$70.35
93.80
16 L.H., Daily Totals
Crew B-54D
1 Laborer
1 Equipment Operator (med.)
1 Rock Trencher, 6⬙ Width
$2131.29
Hr.
Daily
Hr.
$47.25
63.05
$378.00
504.40
992.44
$70.35
93.80
16 L.H., Daily Totals
Crew B-54E
1 Laborer
1 Equipment Operator (med.)
1 Rock Trencher, 18⬙ Width
$1874.84
Hr.
Daily
Hr.
$47.25
63.05
$378.00
504.40
1079.31
$70.35
93.80
16 L.H., Daily Totals
Crew B-55
2 Laborers
1 Truck Driver (light)
1 Truck-Mounted Earth Auger
1 Flatbed Truck, Gas, 3 Ton
$1961.71
Hr.
Daily
Hr.
$47.25
52.90
$756.00
423.20
446.91
391.02
$70.35
79.00
24 L.H., Daily Totals
Crew B-56
1 Laborer
1 Equip. Oper. (light)
1 Air Track Drill, 4⬙
1 Air Compressor, 600 cfm
1 -50’ Air Hose, 3⬙
16 L.H., Daily Totals
Incl.
Subs O&P
$2017.13
Hr.
Daily
Hr.
$47.25
59.70
$378.00
477.60
1191.15
466.11
46.76
$70.35
88.85
$2559.62
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$710.80
425.15
$59.70
48.31
$88.85
53.14
$1135.95
$108.01
$141.99
Daily
Bare
Costs
Incl.
O&P
$99.69
750.40
1373.78
$61.04
$90.82
133.43
146.77
$2223.87
$194.47
$237.59
Daily
Bare
Costs
Incl.
O&P
$146.60
750.40
1472.28
$60.29
$89.70
133.84
147.23
$2369.28
$194.13
$236.93
Daily
Bare
Costs
Incl.
O&P
$562.80
750.40
1373.78
$55.15
$82.08
78.06
85.86
$2686.98
$133.21
$167.94
Daily
Bare
Costs
Incl.
O&P
$562.80
750.40
1091.68
$55.15
$82.08
62.03
68.23
$2404.88
$117.18
$150.31
Daily
Bare
Costs
Incl.
O&P
$562.80
750.40
1187.24
$55.15
$82.08
67.46
74.20
$2500.44
$122.61
$156.28
Daily
Bare
Costs
Incl.
O&P
$1125.60
632.00
491.60
430.12
$49.13
$73.23
34.91
38.41
$2679.32
$84.05
$111.64
Daily
Bare
Costs
Incl.
O&P
$562.80
710.80
1310.27
512.72
51.44
$53.48
$79.60
106.50
117.15
$3148.02
$159.98
$196.75
Crew No.
Crew B-57
1 Labor Foreman (outside)
2 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (light)
1 Equip. Oper. (oiler)
1 Crawler Crane, 25 Ton
1 Clamshell Bucket, 1 C.Y.
1 Centr. Water Pump, 6⬙
1 -20’ Suction Hose, 6⬙
20 -50’ Discharge Hoses, 6⬙
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
66.30
59.70
56.40
$394.00
756.00
530.40
477.60
451.20
1274.00
46.89
386.48
28.12
399.80
$73.30
70.35
98.65
88.85
83.90
48 L.H., Daily Totals
Crew B-58
2 Laborers
1 Equip. Oper. (light)
1 Backhoe Loader, 48 H.P.
1 Small Helicopter, w/ Pilot
Incl.
Subs O&P
$4744.49
Hr.
Daily
Hr.
$47.25
59.70
$756.00
477.60
277.19
5810.29
$70.35
88.85
24 L.H., Daily Totals
$7321.08
Crew B-59
Hr.
Daily
Hr.
1 Truck Driver (heavy)
1 Truck Tractor, 220 H.P.
1 Water Tank Trailer, 5000 Gal.
$55.45
$443.60
339.98
169.14
$82.85
8 L.H., Daily Totals
$952.72
Crew B-59A
Hr.
Daily
Hr.
2 Laborers
1 Truck Driver (heavy)
1 Water Tank Trailer, 5000 Gal.
1 Truck Tractor, 220 H.P.
$47.25
55.45
$756.00
443.60
169.14
339.98
$70.35
82.85
24 L.H., Daily Totals
Crew B-60
1 Labor Foreman (outside)
2 Laborers
1 Equip. Oper. (crane)
2 Equip. Oper. (light)
1 Equip. Oper. (oiler)
1 Crawler Crane, 40 Ton
1 Lead, 60’ High
1 Hammer, Diesel, 15K ft.-lbs.
1 Backhoe Loader, 48 H.P.
$1708.72
Hr.
Daily
Hr.
$49.25
47.25
66.30
59.70
56.40
$394.00
756.00
530.40
955.20
451.20
1362.63
233.36
687.50
277.19
$73.30
70.35
98.65
88.85
83.90
56 L.H., Daily Totals
Crew B-61
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (light)
1 Cement Mixer, 2 C.Y.
1 Air Compressor, 160 cfm
$5647.48
Hr.
Daily
Hr.
$49.25
47.25
59.70
$394.00
1134.00
477.60
119.22
244.12
$73.30
70.35
88.85
40 L.H., Daily Totals
Crew B-62
2 Laborers
1 Equip. Oper. (light)
1 Loader, Skid Steer, 30 H.P.
24 L.H., Daily Totals
$2368.94
Hr.
Daily
Hr.
$47.25
59.70
$756.00
477.60
260.99
$70.35
88.85
$1494.59
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1125.60
789.20
710.80
671.20
1401.40
51.58
425.13
30.93
439.78
$54.36
$80.90
44.49
48.93
$6232.02
$98.84
$129.83
Daily
Bare
Costs
Incl.
O&P
$1125.60
710.80
304.91
6391.32
$51.40
$76.52
253.65
279.01
$8532.63
$305.05
$355.53
Daily
Bare
Costs
Incl.
O&P
$662.80
373.98
186.05
$55.45
$82.85
63.64
70.00
$1222.83
$119.09
$152.85
Daily
Bare
Costs
Incl.
O&P
$1125.60
662.80
186.05
373.98
$49.98
$74.52
21.21
23.33
$2348.43
$71.20
$97.85
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
789.20
1421.60
671.20
1498.89
256.70
756.25
304.91
$55.12
$82.04
45.73
50.30
$7410.75
$100.85
$132.33
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
710.80
131.14
268.53
$50.14
$74.64
9.08
9.99
$3385.27
$59.22
$84.63
Daily
Bare
Costs
Incl.
O&P
$1125.60
710.80
287.09
$51.40
$76.52
10.87
11.96
$2123.49
$62.27
$88.48
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
767
Crews - Standard
Crew No.
Crew B-62A
2 Laborers
1 Equip. Oper. (light)
1 Loader, Skid Steer, 30 H.P.
1 Trencher Attachment
Bare Costs
Hr.
Daily
Hr.
$47.25
59.70
$756.00
477.60
260.99
88.83
$70.35
88.85
24 L.H., Daily Totals
Crew B-63
4 Laborers
1 Equip. Oper. (light)
1 Loader, Skid Steer, 30 H.P.
$1583.42
Hr.
Daily
Hr.
$47.25
59.70
$1512.00
477.60
260.99
$70.35
88.85
40 L.H., Daily Totals
Crew B-63B
1 Labor Foreman (inside)
2 Laborers
1 Equip. Oper. (light)
1 Loader, Skid Steer, 78 H.P.
$2250.59
Hr.
$47.75
47.25
59.70
32 L.H., Daily Totals
Crew B-64
1 Laborer
1 Truck Driver (light)
1 Power Mulcher (small)
1 Flatbed Truck, Gas, 1.5 Ton
1 Laborer
1 Truck Driver (light)
1 Power Mulcher (Large)
1 Flatbed Truck, Gas, 1.5 Ton
Hr.
$47.25
52.90
1 Equip. Oper. (light)
1 Loader-Backhoe, 40 H.P.
1 Millwright
1 Equip. Oper. (light)
1 R.T. Forklift, 5,000 Lb., diesel
1 Millwright Foreman (inside)
1 Millwright
Daily
$378.00
423.20
264.41
361.95
Hr.
$70.35
79.00
Daily
Hr.
$47.25
52.90
$378.00
423.20
633.63
361.95
$70.35
79.00
$1796.78
Hr.
Daily
Hr.
$59.70
$477.60
222.27
$88.85
$699.87
Hr.
$62.85
59.70
16 L.H., Daily Totals
Crew B-67B
$71.10
70.35
88.85
Hr.
8 L.H., Daily Totals
Crew B-67
$382.00
756.00
477.60
429.91
Hr.
$1427.56
16 L.H., Daily Totals
Crew B-66
Daily
$2045.51
16 L.H., Daily Totals
Crew B-65
Incl.
Subs O&P
Daily
$502.80
477.60
349.30
Hr.
$90.80
88.85
$1329.70
Hr.
Daily
Hr.
$63.35
62.85
$506.80
502.80
$91.55
90.80
16 L.H., Daily Totals
$1009.60
Crew B-68
Hr.
Daily
Hr.
2 Millwrights
1 Equip. Oper. (light)
1 R.T. Forklift, 5,000 Lb., diesel
$62.85
59.70
$1005.60
477.60
349.30
$90.80
88.85
24 L.H., Daily Totals
Crew B-68A
$1832.50
Hr.
1 Millwright Foreman (inside)
$63.35
2 Millwrights
62.85
1 Forklift, Smooth Floor, 8,000 Lb.
24 L.H., Daily Totals
768
Daily
Hr.
$506.80
1005.60
311.06
$91.55
90.80
$1823.46
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1125.60
710.80
287.09
97.71
$51.40
$76.52
14.58
16.03
$2221.20
$65.98
$92.55
Daily
Bare
Costs
Incl.
O&P
$2251.20
710.80
287.09
$49.74
$74.05
6.52
7.18
$3249.09
$56.26
$81.23
Daily
Bare
Costs
Incl.
O&P
Daily
$568.80
1125.60
710.80
472.90
$50.49
$75.16
13.43
14.78
$2878.10
$63.92
$89.94
Daily
Bare
Costs
Incl.
O&P
Crew No.
Crew B-68B
1 Millwright Foreman (inside)
2 Millwrights
2 Electricians
2 Plumbers
1 R.T. Forklift, 5,000 Lb., gas
Crew B-68C
1 Millwright Foreman (inside)
1 Millwright
1 Electrician
1 Plumber
1 R.T. Forklift, 5,000 Lb., gas
$50.08
39.15
43.06
$1883.80
$89.22
$117.74
Daily
Bare
Costs
Incl.
O&P
$562.80
632.00
696.99
398.14
$50.08
$74.67
62.22
68.45
$2289.94
$112.30
$143.12
Daily
Bare
Costs
Incl.
O&P
$710.80
244.50
$59.70
27.78
$88.85
30.56
$955.30
$87.48
$119.41
Daily
Bare
Costs
Incl.
O&P
$74.67
$61.27
21.83
24.01
$1821.43
$83.11
$113.84
Daily
Bare
Costs
Incl.
O&P
$732.40
726.40
$63.10
$91.17
$1458.80
$63.10
$91.17
Daily
Bare
Costs
Incl.
O&P
$1452.80
710.80
384.23
$61.80
$90.15
14.55
16.01
$2547.83
$76.35
$106.16
Daily
Bare
Costs
Incl.
O&P
$732.40
1452.80
342.17
$63.02
$91.05
12.96
14.26
$2527.37
$75.98
$105.31
Hr.
$63.35
62.85
67.35
72.05
$506.80
1005.60
1077.60
1152.80
422.09
$91.55
90.80
100.10
107.45
$4164.89
Hr.
Daily
Hr.
$63.35
62.85
67.35
72.05
$506.80
502.80
538.80
576.40
422.09
$91.55
90.80
100.10
107.45
$2546.89
Hr.
Daily
Hr.
$47.75
47.25
59.70
$382.00
378.00
477.60
422.09
$71.10
70.35
88.85
24 L.H., Daily Totals
Crew B-68E
$726.40
710.80
384.23
Daily
32 L.H., Daily Totals
1 Labor Foreman (inside)
1 Laborer
1 Equip. Oper. (light)
1 R.T. Forklift, 5,000 Lb., gas
Incl.
Subs O&P
Hr.
56 L.H., Daily Totals
Crew B-68D
$562.80
632.00
290.85
398.14
Bare Costs
$1659.69
Hr.
1 Struc. Steel Foreman (inside)
$65.05
3 Struc. Steel Workers
64.55
1 Welder
64.55
1 Forklift, Smooth Floor, 8,000 Lb.
40 L.H., Daily Totals
Daily
Hr.
$520.40
1549.20
516.40
311.06
$100.20
99.40
99.40
$2897.06
Crew B-68F
Hr.
Daily
Hr.
1 Skilled Worker Foreman (out)
2 Skilled Workers
1 R.T. Forklift, 5,000 Lb., gas
$63.25
61.25
$506.00
980.00
422.09
$95.00
92.00
24 L.H., Daily Totals
Crew B-68G
2 Structural Steel Workers
1 R.T. Forklift, 5,000 Lb., gas
$1908.09
Hr.
Daily
Hr.
$64.55
$1032.80
422.09
$99.40
16 L.H., Daily Totals
$1454.89
Bare
Costs
Incl.
O&P
$732.40
1452.80
1601.60
1719.20
464.30
$66.84
$98.32
7.54
8.29
$5970.30
$74.37
$106.61
Daily
Bare
Costs
Incl.
O&P
$732.40
726.40
800.80
859.60
464.30
$66.40
$97.47
13.19
14.51
$3583.50
$79.59
$111.98
Daily
Bare
Costs
Incl.
O&P
$568.80
562.80
710.80
464.30
$51.57
$76.77
17.59
19.35
$2306.70
$69.15
$96.11
Daily
Bare
Costs
Incl.
O&P
$801.60
2385.60
795.20
342.17
$64.65
$99.56
7.78
8.55
$4324.57
$72.43
$108.11
Daily
Bare
Costs
Incl.
O&P
$760.00
1472.00
464.30
$61.92
$93.00
17.59
19.35
$2696.30
$79.50
$112.35
Daily
Bare
Costs
Incl.
O&P
$1590.40
464.30
$64.55
26.38
$99.40
29.02
$2054.70
$90.93
$128.42
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
789.20
671.20
2905.87
$52.28
$77.82
55.04
60.54
$6641.07
$107.32
$138.36
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
750.40
643.60
1181.65
$51.51
$76.43
22.38
24.62
$4850.45
$73.89
$101.05
Daily
$89.83
Crew B-69
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 80 Ton
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1134.00
530.40
451.20
2641.70
$73.30
70.35
98.65
83.90
48 L.H., Daily Totals
Crew B-69A
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (medium)
1 Concrete Finisher
1 Curb/Gutter Paver, 2-Track
48 L.H., Daily Totals
$5151.30
Hr.
Daily
Hr.
$49.25
47.25
63.05
55.00
$394.00
1134.00
504.40
440.00
1074.23
$73.30
70.35
93.80
80.45
$3546.63
Cost
Per Labor-Hour
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-69B
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (medium)
1 Cement Finisher
1 Curb/Gutter Paver, 4-Track
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
63.05
55.00
$394.00
1134.00
504.40
440.00
1156.49
$73.30
70.35
93.80
80.45
48 L.H., Daily Totals
Crew B-70
1 Labor Foreman (outside)
3 Laborers
3 Equip. Oper. (medium)
1 Grader, 30,000 Lbs.
1 Ripper, Beam & 1 Shank
1 Road Sweeper, S.P., 8’ wide
1 F.E. Loader, W.M., 1.5 C.Y.
$3628.89
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
1134.00
1513.20
1091.19
100.54
538.01
455.32
$73.30
70.35
93.80
56 L.H., Daily Totals
Crew B-70A
1 Laborer
4 Equip. Oper. (medium)
1 Grader, 40,000 Lbs.
1 F.E. Loader, W.M., 2.5 C.Y.
1 Dozer, 80 H.P.
1 Roller, Pneum. Whl., 12 Ton
$5226.26
Hr.
Daily
Hr.
$47.25
63.05
$378.00
2017.60
1254.97
658.89
591.82
384.55
$70.35
93.80
40 L.H., Daily Totals
Crew B-71
1 Labor Foreman (outside)
3 Laborers
3 Equip. Oper. (medium)
1 Pvmt. Profiler, 750 H.P.
1 Road Sweeper, S.P., 8’ wide
1 F.E. Loader, W.M., 1.5 C.Y.
$5285.83
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
1134.00
1513.20
3680.74
538.01
455.32
$73.30
70.35
93.80
56 L.H., Daily Totals
Crew B-72
1 Labor Foreman (outside)
3 Laborers
4 Equip. Oper. (medium)
1 Pvmt. Profiler, 750 H.P.
1 Hammermill, 250 H.P.
1 Windrow Loader
1 Mix Paver, 165 H.P.
1 Roller, Pneum. Whl., 12 Ton
Incl.
Subs O&P
$7715.27
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
1134.00
2017.60
3680.74
806.43
1473.50
1265.22
384.55
$73.30
70.35
93.80
64 L.H., Daily Totals
$11156.04
Crew B-73
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
5 Equip. Oper. (medium)
1 Road Mixer, 310 H.P.
1 Tandem Roller, 10 Ton
1 Hammermill, 250 H.P.
1 Grader, 30,000 Lbs.
.5 F.E. Loader, W.M., 1.5 C.Y.
.5 Truck Tractor, 220 H.P.
.5 Water Tank Trailer, 5000 Gal.
$49.25
47.25
63.05
$394.00
756.00
2522.00
2108.32
379.22
806.43
1091.19
227.66
169.99
84.57
$73.30
70.35
93.80
64 L.H., Daily Totals
$8539.38
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1688.40
750.40
643.60
1272.14
$51.51
$76.43
24.09
26.50
$4940.94
$75.60
$102.94
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
2251.20
1200.31
110.59
591.81
500.85
$54.31
$80.82
39.02
42.92
$6929.57
$93.33
$123.74
Daily
Bare
Costs
Incl.
O&P
$562.80
3001.60
1380.47
724.78
651.00
423.01
$59.89
$89.11
72.26
79.48
$6743.65
$132.15
$168.59
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
2251.20
4048.81
591.81
500.85
$54.31
$80.82
83.47
91.81
$9667.48
$137.77
$172.63
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
3001.60
4048.81
887.07
1620.85
1391.74
423.01
$55.40
$82.44
118.91
130.80
$13647.88
$174.31
$213.25
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
3752.00
2319.15
417.14
887.07
1200.31
250.43
186.99
93.03
$57.38
$85.38
76.05
83.66
$10818.12
$133.43
$169.03
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-74
Hr.
Daily
Hr.
1 Labor Foreman (outside)
1 Laborer
4 Equip. Oper. (medium)
2 Truck Drivers (heavy)
1 Grader, 30,000 Lbs.
1 Ripper, Beam & 1 Shank
2 Stabilizers, 310 H.P.
1 Flatbed Truck, Gas, 3 Ton
1 Chem. Spreader, Towed
1 Roller, Vibratory, 25 Ton
1 Water Tank Trailer, 5000 Gal.
1 Truck Tractor, 220 H.P.
$49.25
47.25
63.05
55.45
$394.00
378.00
2017.60
887.20
1091.19
100.54
1713.46
391.02
87.61
529.68
169.14
339.98
$73.30
70.35
93.80
82.85
64 L.H., Daily Totals
$8099.42
Crew B-75
Hr.
Daily
Hr.
1 Labor Foreman (outside)
1 Laborer
4 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Grader, 30,000 Lbs.
1 Ripper, Beam & 1 Shank
2 Stabilizers, 310 H.P.
1 Dist. Tanker, 3000 Gallon
1 Truck Tractor, 6x4, 380 H.P.
1 Roller, Vibratory, 25 Ton
$49.25
47.25
63.05
55.45
$394.00
378.00
2017.60
443.60
1091.19
100.54
1713.46
367.10
545.98
529.68
$73.30
70.35
93.80
82.85
56 L.H., Daily Totals
$7581.15
Crew B-76
Hr.
Daily
Hr.
1 Dock Builder Foreman (outside)
5 Dock Builders
2 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 50 Ton
1 Barge, 400 Ton
1 Hammer, Diesel, 15K ft.-lbs.
1 Lead, 60’ High
1 Air Compressor, 600 cfm
2 -50’ Air Hoses, 3⬙
$62.50
60.50
66.30
56.40
$500.00
2420.00
1060.80
451.20
1704.33
957.33
687.50
233.36
466.11
93.52
$96.70
93.60
98.65
83.90
72 L.H., Daily Totals
Crew B-76A
1 Labor Foreman (outside)
5 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 50 Ton
1 Barge, 400 Ton
$8574.15
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
1890.00
530.40
451.20
1704.33
957.33
$73.30
70.35
98.65
83.90
64 L.H., Daily Totals
Crew B-77
1 Labor Foreman (outside)
3 Laborers
1 Truck Driver (light)
1 Crack Cleaner, 25 H.P.
1 Crack Filler, Trailer Mtd.
1 Flatbed Truck, Gas, 3 Ton
40 L.H., Daily Totals
$5927.26
Hr.
Daily
Hr.
$49.25
47.25
52.90
$394.00
1134.00
423.20
167.33
201.26
391.02
$73.30
70.35
79.00
$2710.81
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
562.80
3001.60
1325.60
1200.31
110.59
1884.81
430.12
96.37
582.65
186.05
373.98
$57.45
$85.57
69.10
76.01
$10341.28
$126.55
$161.58
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
3001.60
662.80
1200.31
110.59
1884.81
403.81
600.58
582.65
$57.74
$85.96
77.64
85.41
$9596.34
$135.38
$171.36
Daily
Bare
Costs
Incl.
O&P
$773.60
3744.00
1578.40
671.20
1874.76
1053.06
756.25
256.70
512.72
102.87
$61.56
$93.99
57.53
63.28
$11323.57
$119.09
$157.27
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
789.20
671.20
1874.76
1053.06
$51.02
$75.95
41.59
45.75
$7788.63
$92.61
$121.70
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
632.00
184.06
221.39
430.12
$48.78
$72.67
18.99
20.89
$3742.37
$67.77
$93.56
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
769
Crews - Standard
Crew No.
Crew B-78
1 Labor Foreman (outside)
4 Laborers
1 Truck Driver (light)
1 Paint Striper, S.P., 40 Gallon
1 Flatbed Truck, Gas, 3 Ton
1 Pickup Truck, 3/4 Ton
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
52.90
$394.00
1512.00
423.20
73.74
391.02
122.56
$73.30
70.35
79.00
48 L.H., Daily Totals
Crew B-78A
Incl.
Subs O&P
$2916.52
Hr.
1 Equip. Oper. (light)
$59.70
1 Line Rem. (Metal Balls) 115 H.P.
8 L.H., Daily Totals
Daily
$477.60
1648.72
Hr.
$88.85
$2126.32
Crew B-78B
Hr.
Daily
Hr.
2 Laborers
.25 Equip. Oper. (light)
1 Pickup Truck, 3/4 Ton
1 Line Rem.,11 H.P.,Walk Behind
.25 Road Sweeper, S.P., 8’ wide
$47.25
59.70
$756.00
119.40
122.56
214.39
134.50
$70.35
88.85
18 L.H., Daily Totals
Crew B-78C
1 Labor Foreman (outside)
4 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Flatbed Truck, Gas, 3 Ton
1 Pickup Truck, 3/4 Ton
$1346.85
Hr.
Daily
Hr.
$49.25
47.25
52.90
$394.00
1512.00
423.20
673.88
391.02
122.56
$73.30
70.35
79.00
48 L.H., Daily Totals
Crew B-78D
2 Labor Foremen (outside)
7 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Flatbed Truck, Gas, 3 Ton
3 Pickup Trucks, 3/4 Ton
1 Air Compressor, 60 cfm
1 -50’ Air Hose, 3/4⬙
1 Breaker, Pavement, 60 lb.
$3516.66
Hr.
Daily
Hr.
$49.25
47.25
52.90
$788.00
2646.00
423.20
673.88
391.02
367.68
173.21
8.16
34.47
$73.30
70.35
79.00
80 L.H., Daily Totals
Crew B-78E
2 Labor Foremen (outside)
9 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Flatbed Truck, Gas, 3 Ton
4 Pickup Trucks, 3/4 Ton
2 Air Compressors, 60 cfm
2 -50’ Air Hoses, 3/4⬙
2 Breakers, Pavement, 60 lb.
96 L.H., Daily Totals
$5505.62
Hr.
Daily
Hr.
$49.25
47.25
52.90
$788.00
3402.00
423.20
673.88
391.02
490.24
346.42
16.32
68.94
$73.30
70.35
79.00
$6600.02
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
2251.20
632.00
81.11
430.12
134.82
$48.52
$72.28
12.24
13.46
$4115.65
$60.76
$85.74
Daily
Bare
Costs
Incl.
O&P
Daily
$710.80
1813.59
$59.70
206.09
$88.85
226.70
$2524.39
$265.79
$315.55
Daily
Bare
Costs
Incl.
O&P
$1125.60
177.70
134.82
235.83
147.95
$48.63
$72.41
26.19
28.81
$1821.90
$74.83
$101.22
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
632.00
741.27
430.12
134.82
$48.52
$72.28
24.74
27.21
$4775.81
$73.26
$99.50
Daily
Bare
Costs
Incl.
O&P
$1172.80
3939.60
632.00
741.27
430.12
404.45
190.53
8.98
37.92
$48.22
$71.81
20.61
22.67
$7557.66
$68.82
$94.47
Daily
Bare
Costs
Incl.
O&P
$1172.80
5065.20
632.00
741.27
430.12
539.26
381.06
17.95
75.83
$48.05
$71.56
20.70
22.77
$9055.50
$68.75
$94.33
Crew No.
Crew B-78F
2 Labor Foremen (outside)
11 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Flatbed Truck, Gas, 3 Ton
7 Pickup Trucks, 3/4 Ton
3 Air Compressors, 60 cfm
3 -50’ Air Hoses, 3/4⬙
3 Breakers, Pavement, 60 lb.
Crew B-79
1 Labor Foreman (outside)
3 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Heating Kettle, 115 Gallon
1 Flatbed Truck, Gas, 3 Ton
2 Pickup Trucks, 3/4 Ton
Daily
Hr.
$49.25
47.25
52.90
$788.00
4158.00
423.20
673.88
391.02
857.92
519.63
24.48
103.41
$73.30
70.35
79.00
$7939.54
Hr.
Daily
Hr.
$49.25
47.25
52.90
$394.00
1134.00
423.20
673.88
169.64
391.02
245.12
$73.30
70.35
79.00
40 L.H., Daily Totals
Crew B-79A
$3430.86
Hr.
1.5 Equip. Oper. (light)
$59.70
.5 Line Remov. (Grinder) 115 H.P.
1 Line Rem. (Metal Balls) 115 H.P.
12 L.H., Daily Totals
Crew B-79B
1 Laborer
1 Set of Gases
1 Labor Foreman (outside)
5 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Heating Kettle, 115 Gallon
1 Flatbed Truck, Gas, 3 Ton
3 Pickup Trucks, 3/4 Ton
1 Air Compressor, 60 cfm
1 -50’ Air Hose, 3/4⬙
1 Breaker, Pavement, 60 lb.
2 Labor Foremen (outside)
5 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Heating Kettle, 115 Gallon
1 Flatbed Truck, Gas, 3 Ton
4 Pickup Trucks, 3/4 Ton
1 Air Compressor, 60 cfm
1 -50’ Air Hose, 3/4⬙
1 Breaker, Pavement, 60 lb.
Hr.
$716.40
843.37
1648.72
$88.85
Hr.
Daily
Hr.
$47.25
$378.00
188.67
$70.35
Hr.
Daily
Hr.
$49.25
47.25
52.90
$394.00
1890.00
423.20
673.88
169.64
391.02
367.68
173.21
8.16
34.47
$73.30
70.35
79.00
$4525.26
Hr.
Daily
Hr.
$49.25
47.25
52.90
$788.00
1890.00
423.20
673.88
169.64
391.02
490.24
173.21
8.16
34.47
$73.30
70.35
79.00
$5041.82
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1172.80
6190.80
632.00
741.27
430.12
943.71
571.59
26.93
113.75
$47.94
$71.39
22.95
25.24
$10822.97
$70.89
$96.63
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
632.00
741.27
186.60
430.12
269.63
$48.78
$72.67
36.99
40.69
$4534.43
$85.77
$113.36
Daily
Bare
Costs
Incl.
O&P
$1066.20
927.71
1813.59
$59.70
$88.85
207.67
228.44
$3807.50
$267.37
$317.29
Daily
Bare
Costs
Incl.
O&P
$562.80
207.54
$47.25
23.58
$70.35
25.94
$770.34
$70.83
$96.29
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
632.00
741.27
186.60
430.12
404.45
190.53
8.98
37.92
$48.34
$72.01
32.47
35.71
$6032.27
$80.81
$107.72
Daily
Bare
Costs
Incl.
O&P
$1172.80
2814.00
632.00
741.27
186.60
430.12
539.26
190.53
8.98
37.92
$48.46
$72.17
30.32
33.35
$6753.48
$78.78
$105.52
Daily
$566.67
56 L.H., Daily Totals
Crew B-79D
Daily
$3208.49
8 L.H., Daily Totals
Crew B-79C
Incl.
Subs O&P
Hr.
112 L.H., Daily Totals
64 L.H., Daily Totals
770
Bare Costs
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-79E
2 Labor Foremen (outside)
7 Laborers
1 Truck Driver (light)
1 Paint Striper, T.M., 120 Gal.
1 Heating Kettle, 115 Gallon
1 Flatbed Truck, Gas, 3 Ton
5 Pickup Trucks, 3/4 Ton
2 Air Compressors, 60 cfm
2 -50’ Air Hoses, 3/4⬙
2 Breakers, Pavement, 60 lb.
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
52.90
$788.00
2646.00
423.20
673.88
169.64
391.02
612.80
346.42
16.32
68.94
$73.30
70.35
79.00
80 L.H., Daily Totals
Crew B-80
1 Labor Foreman (outside)
1 Laborer
1 Truck Driver (light)
1 Equip. Oper. (light)
1 Flatbed Truck, Gas, 3 Ton
1 Earth Auger, Truck-Mtd.
$6136.22
Hr.
Daily
Hr.
$49.25
47.25
52.90
59.70
$394.00
378.00
423.20
477.60
391.02
153.97
$73.30
70.35
79.00
88.85
32 L.H., Daily Totals
Crew B-80A
3 Laborers
1 Flatbed Truck, Gas, 3 Ton
Incl.
Subs O&P
$2217.79
Hr.
Daily
Hr.
$47.25
$1134.00
391.02
$70.35
24 L.H., Daily Totals
$1525.02
Crew B-80B
Hr.
Daily
Hr.
3 Laborers
1 Equip. Oper. (light)
1 Crane, Flatbed Mounted, 3 Ton
$47.25
59.70
$1134.00
477.60
596.44
$70.35
88.85
32 L.H., Daily Totals
$2208.04
Crew B-80C
Hr.
Daily
Hr.
2 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.5 Ton
1 Manual Fence Post Auger, Gas
$47.25
52.90
$756.00
423.20
361.95
52.21
$70.35
79.00
24 L.H., Daily Totals
$1593.36
Crew B-81
Hr.
Daily
Hr.
1 Laborer
1 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Hydromulcher, T.M., 3000 Gal.
1 Truck Tractor, 220 H.P.
$47.25
63.05
55.45
$378.00
504.40
443.60
745.16
339.98
$70.35
93.80
82.85
24 L.H., Daily Totals
$2411.14
Crew B-81A
Hr.
Daily
Hr.
1 Laborer
1 Truck Driver (light)
1 Hydromulcher, T.M., 600 Gal.
1 Flatbed Truck, Gas, 3 Ton
$47.25
52.90
$378.00
423.20
234.78
391.02
$70.35
79.00
16 L.H., Daily Totals
Crew B-82
1 Laborer
1 Equip. Oper. (light)
1 Horiz. Borer, 6 H.P.
16 L.H., Daily Totals
$1427.00
Hr.
Daily
Hr.
$47.25
59.70
$378.00
477.60
114.54
$70.35
88.85
$970.14
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1172.80
3939.60
632.00
741.27
186.60
430.12
674.08
381.06
17.95
75.83
$48.22
$71.81
28.49
31.34
$8251.32
$76.70
$103.14
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
632.00
710.80
430.12
169.37
$52.27
$77.88
17.03
18.73
$3091.49
$69.31
$96.61
Daily
Bare
Costs
Incl.
O&P
$1688.40
430.12
$47.25
16.29
$70.35
17.92
$2118.52
$63.54
$88.27
Daily
Bare
Costs
Incl.
O&P
$1688.40
710.80
656.08
$50.36
$74.97
18.64
20.50
$3055.28
$69.00
$95.48
Daily
Bare
Costs
Incl.
O&P
$1125.60
632.00
398.14
57.43
$49.13
$73.23
17.26
18.98
$2213.18
$66.39
$92.22
Daily
Bare
Costs
Incl.
O&P
$562.80
750.40
662.80
819.68
373.98
$55.25
$82.33
45.21
49.74
$3169.65
$100.46
$132.07
Daily
Bare
Costs
Incl.
O&P
$562.80
632.00
258.26
430.12
$50.08
$74.67
39.11
43.02
$1883.18
$89.19
$117.70
Daily
Bare
Costs
Incl.
O&P
$562.80
710.80
125.99
$53.48
$79.60
7.16
7.87
$1399.59
$60.63
$87.47
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-82A
Hr.
Daily
Hr.
2 Laborers
2 Equip. Opers. (light)
2 Dump Truck, 8 C.Y., 220 H.P.
1 Flatbed Trailer, 25 Ton
1 Horiz. Dir. Drill, 20k lb. Thrust
1 Mud Trailer for HDD, 1500 Gal.
1 Pickup Truck, 4x4, 3/4 Ton
1 Flatbed Trailer, 3 Ton
1 Loader, Skid Steer, 78 H.P.
$47.25
59.70
$756.00
955.20
834.98
150.61
685.30
696.17
191.73
78.34
429.91
$70.35
88.85
32 L.H., Daily Totals
$4778.24
Crew B-82B
Hr.
Daily
Hr.
2 Laborers
2 Equip. Opers. (light)
2 Dump Truck, 8 C.Y., 220 H.P.
1 Flatbed Trailer, 25 Ton
1 Horiz. Dir. Drill, 30k lb. Thrust
1 Mud Trailer for HDD, 1500 Gal.
1 Pickup Truck, 4x4, 3/4 Ton
1 Flatbed Trailer, 3 Ton
1 Loader, Skid Steer, 78 H.P.
$47.25
59.70
$756.00
955.20
834.98
150.61
740.76
696.17
191.73
78.34
429.91
$70.35
88.85
32 L.H., Daily Totals
$4833.70
Crew B-82C
Hr.
Daily
Hr.
2 Laborers
2 Equip. Opers. (light)
2 Dump Truck, 8 C.Y., 220 H.P.
1 Flatbed Trailer, 25 Ton
1 Horiz. Dir. Drill, 50k lb. Thrust
1 Mud Trailer for HDD, 1500 Gal.
1 Pickup Truck, 4x4, 3/4 Ton
1 Flatbed Trailer, 3 Ton
1 Loader, Skid Steer, 78 H.P.
$47.25
59.70
$756.00
955.20
834.98
150.61
869.81
696.17
191.73
78.34
429.91
$70.35
88.85
32 L.H., Daily Totals
$4962.75
Crew B-82D
Hr.
Daily
Hr.
1 Equip. Oper. (light)
1 Mud Trailer for HDD, 1500 Gal.
$59.70
$477.60
696.17
$88.85
8 L.H., Daily Totals
Crew B-83
1 Tugboat Captain
1 Tugboat Hand
1 Tugboat, 250 H.P.
$1173.77
Hr.
Daily
Hr.
$63.05
47.25
$504.40
378.00
793.50
$93.80
70.35
16 L.H., Daily Totals
Crew B-84
1 Equip. Oper. (medium)
1 Rotary Mower/Tractor
$1675.90
Hr.
Daily
Hr.
$63.05
$504.40
238.84
$93.80
8 L.H., Daily Totals
$743.24
Crew B-85
Hr.
Daily
Hr.
3 Laborers
1 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Telescoping Boom Lift, to 80’
1 Brush Chipper, 12⬙, 130 H.P.
1 Pruning Saw, Rotary
$47.25
63.05
55.45
$1134.00
504.40
443.60
710.06
518.12
27.37
$70.35
93.80
82.85
40 L.H., Daily Totals
$3337.55
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1125.60
1421.60
918.48
165.67
753.83
765.79
210.90
86.17
472.90
$53.48
$79.60
95.84
105.43
$5920.94
$149.32
$185.03
Daily
Bare
Costs
Incl.
O&P
$1125.60
1421.60
918.48
165.67
814.84
765.79
210.90
86.17
472.90
$53.48
$79.60
97.58
107.34
$5981.95
$151.05
$186.94
Daily
Bare
Costs
Incl.
O&P
$1125.60
1421.60
918.48
165.67
956.79
765.79
210.90
86.17
472.90
$53.48
$79.60
101.61
111.77
$6123.90
$155.09
$191.37
Daily
Bare
Costs
Incl.
O&P
$710.80
765.79
$59.70
87.02
$88.85
95.72
$1476.59
$146.72
$184.57
Daily
Bare
Costs
Incl.
O&P
$750.40
562.80
872.85
$55.15
$82.08
49.59
54.55
$2186.05
$104.74
$136.63
Daily
Bare
Costs
Incl.
O&P
$750.40
262.72
$63.05
29.86
$93.80
32.84
$1013.12
$92.91
$126.64
Daily
Bare
Costs
Incl.
O&P
$1688.40
750.40
662.80
781.07
569.93
30.11
$52.05
$77.54
31.39
34.53
$4482.70
$83.44
$112.07
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
771
Crews - Standard
Crew No.
Crew B-86
1 Equip. Oper. (medium)
1 Stump Chipper, S.P.
Bare Costs
Hr.
Daily
Hr.
$63.05
$504.40
263.85
$93.80
8 L.H., Daily Totals
Crew B-86A
1 Equip. Oper. (medium)
1 Grader, 30,000 Lbs.
$768.25
Hr.
Daily
Hr.
$63.05
$504.40
1091.19
$93.80
8 L.H., Daily Totals
Crew B-86B
1 Equip. Oper. (medium)
1 Dozer, 200 H.P.
$1595.59
Hr.
Daily
Hr.
$63.05
$504.40
1382.36
$93.80
8 L.H., Daily Totals
Crew B-87
1 Laborer
4 Equip. Oper. (medium)
2 Feller Bunchers, 100 H.P.
1 Log Chipper, 22⬙ Tree
1 Dozer, 105 H.P.
1 Chain Saw, Gas, 36⬙ Long
$1886.76
Hr.
Daily
Hr.
$47.25
63.05
$378.00
2017.60
2244.42
686.57
702.68
53.61
$70.35
93.80
40 L.H., Daily Totals
Crew B-88
1 Laborer
6 Equip. Oper. (medium)
2 Feller Bunchers, 100 H.P.
1 Log Chipper, 22⬙ Tree
2 Log Skidders, 50 H.P.
1 Dozer, 105 H.P.
1 Chain Saw, Gas, 36⬙ Long
$6082.88
Hr.
Daily
Hr.
$47.25
63.05
$378.00
3026.40
2244.42
686.57
931.94
702.68
53.61
$70.35
93.80
56 L.H., Daily Totals
Crew B-89
1 Equip. Oper. (light)
1 Truck Driver (light)
1 Flatbed Truck, Gas, 3 Ton
1 Concrete Saw
1 Water Tank, 65 Gal.
$8023.62
Hr.
Daily
Hr.
$59.70
52.90
$477.60
423.20
391.02
176.00
97.09
$88.85
79.00
16 L.H., Daily Totals
Crew B-89A
1 Skilled Worker
1 Laborer
1 Core Drill (Large)
$1564.91
Hr.
Daily
Hr.
$61.25
47.25
$490.00
378.00
118.14
$92.00
70.35
16 L.H., Daily Totals
Crew B-89B
1 Equip. Oper. (light)
1 Truck Driver (light)
1 Wall Saw, Hydraulic, 10 H.P.
1 Generator, Diesel, 100 kW
1 Water Tank, 65 Gal.
1 Flatbed Truck, Gas, 3 Ton
$986.14
Hr.
Daily
Hr.
$59.70
52.90
$477.60
423.20
111.53
568.06
97.09
391.02
$88.85
79.00
16 L.H., Daily Totals
Crew B-89C
1 Cement Finisher
1 Masonry cut-off saw, gas
8 L.H., Daily Totals
772
Incl.
Subs O&P
$2068.50
Hr.
Daily
Hr.
$55.00
$440.00
68.42
$80.45
$508.42
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$750.40
290.24
$63.05
32.98
$93.80
36.28
$1040.64
$96.03
$130.08
Daily
Bare
Costs
Incl.
O&P
$750.40
1200.31
$63.05
136.40
$93.80
150.04
$1950.71
$199.45
$243.84
Daily
Bare
Costs
Incl.
O&P
$750.40
1520.60
$63.05
172.79
$93.80
190.07
$2271.00
$235.85
$283.87
Daily
Bare
Costs
Incl.
O&P
$562.80
3001.60
2468.86
755.23
772.95
58.97
$59.89
$89.11
92.18
101.40
$7620.41
$152.07
$190.51
Daily
Bare
Costs
Incl.
O&P
$562.80
4502.40
2468.86
755.23
1025.13
772.95
58.97
$60.79
$90.45
82.49
90.73
$10146.34
$143.28
$181.18
Daily
Bare
Costs
Incl.
O&P
$710.80
632.00
430.12
193.60
106.80
$56.30
$83.92
41.51
45.66
$2073.32
$97.81
$129.58
Daily
Bare
Costs
Incl.
O&P
$736.00
562.80
129.95
$54.25
$81.17
7.38
8.12
$1428.75
$61.63
$89.30
Daily
Bare
Costs
Incl.
O&P
$710.80
632.00
122.68
624.87
106.80
430.12
$56.30
$83.92
72.98
80.28
$2627.27
$129.28
$164.20
Daily
Bare
Costs
Incl.
O&P
$643.60
75.26
$55.00
8.55
$80.45
9.41
$718.86
$63.55
$89.86
Crew No.
Crew B-90
1 Labor Foreman (outside)
3 Laborers
2 Equip. Oper. (light)
2 Truck Drivers (heavy)
1 Road Mixer, 310 H.P.
1 Dist. Truck, 2000 Gal.
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
59.70
55.45
$394.00
1134.00
955.20
887.20
2108.32
333.32
$73.30
70.35
88.85
82.85
64 L.H., Daily Totals
Crew B-90A
1 Labor Foreman (outside)
2 Laborers
4 Equip. Oper. (medium)
2 Graders, 30,000 Lbs.
1 Tandem Roller, 10 Ton
1 Roller, Pneum. Whl., 12 Ton
$5812.04
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
756.00
2017.60
2182.38
379.22
384.55
$73.30
70.35
93.80
56 L.H., Daily Totals
Crew B-90B
1 Labor Foreman (outside)
2 Laborers
3 Equip. Oper. (medium)
1 Roller, Pneum. Whl., 12 Ton
1 Road Mixer, 310 H.P.
$6113.75
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
756.00
1513.20
384.55
2108.32
$73.30
70.35
93.80
48 L.H., Daily Totals
Crew B-90C
1 Labor Foreman (outside)
4 Laborers
3 Equip. Oper. (medium)
3 Truck Drivers (heavy)
3 Road Mixers, 310 H.P.
$5156.07
Hr.
Daily
Hr.
$49.25
47.25
63.05
55.45
$394.00
1512.00
1513.20
1330.80
6324.96
$73.30
70.35
93.80
82.85
88 L.H., Daily Totals
Crew B-90D
1 Labor Foreman (outside)
6 Laborers
3 Equip. Oper. (medium)
3 Truck Drivers (heavy)
3 Road Mixers, 310 H.P.
$11074.96
Hr.
Daily
Hr.
$49.25
47.25
63.05
55.45
$394.00
2268.00
1513.20
1330.80
6324.96
$73.30
70.35
93.80
82.85
104 L.H., Daily Totals
Crew B-90E
1 Labor Foreman (outside)
4 Laborers
3 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Road Mixer, 310 H.P.
Incl.
Subs O&P
$11830.96
Hr.
Daily
Hr.
$49.25
47.25
63.05
55.45
$394.00
1512.00
1513.20
443.60
2108.32
$73.30
70.35
93.80
82.85
72 L.H., Daily Totals
$5971.12
Crew B-91
Hr.
Daily
Hr.
1 Labor Foreman (outside)
2 Laborers
4 Equip. Oper. (medium)
1 Truck Driver (heavy)
1 Dist. Tanker, 3000 Gallon
1 Truck Tractor, 6x4, 380 H.P.
1 Aggreg. Spreader, S.P.
1 Roller, Pneum. Whl., 12 Ton
1 Tandem Roller, 10 Ton
$49.25
47.25
63.05
55.45
$394.00
756.00
2017.60
443.60
367.10
545.98
941.36
384.55
379.22
$73.30
70.35
93.80
82.85
64 L.H., Daily Totals
$6229.41
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1688.40
1421.60
1325.60
2319.15
366.65
$52.66
$78.47
38.15
41.97
$7707.80
$90.81
$120.43
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
3001.60
2400.62
417.14
423.01
$56.56
$84.17
52.61
57.87
$7954.36
$109.17
$142.04
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
2251.20
423.01
2319.15
$55.48
$82.57
51.93
57.13
$6705.36
$107.42
$139.69
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
2251.20
1988.40
6957.46
$53.98
$80.42
71.87
79.06
$14034.66
$125.85
$159.48
Daily
Bare
Costs
Incl.
O&P
$586.40
3376.80
2251.20
1988.40
6957.46
$52.94
$78.87
60.82
66.90
$15160.26
$113.76
$145.77
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
2251.20
662.80
2319.15
$53.65
$79.88
29.28
32.21
$8070.75
$82.93
$112.09
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
3001.60
662.80
403.81
600.58
1035.50
423.01
417.14
$56.42
$84.01
40.91
45.00
$8256.43
$97.33
$129.01
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew B-91B
1 Laborer
1 Equipment Oper. (med.)
1 Road Sweeper, Vac. Assist.
Bare Costs
Hr.
Daily
Hr.
$47.25
63.05
$378.00
504.40
1900.22
$70.35
93.80
16 L.H., Daily Totals
Crew B-91C
1 Laborer
1 Truck Driver (light)
1 Catch Basin Cleaning Truck
Incl.
Subs O&P
$2782.62
Hr.
Daily
Hr.
$47.25
52.90
$378.00
423.20
594.04
$70.35
79.00
16 L.H., Daily Totals
$1395.24
Crew B-91D
Hr.
Daily
Hr.
1 Labor Foreman (outside)
5 Laborers
5 Equip. Oper. (medium)
2 Truck Drivers (heavy)
1 Aggreg. Spreader, S.P.
2 Truck Tractors, 6x4, 380 H.P.
2 Dist. Tankers, 3000 Gallon
2 Pavement Brushes, Towed
2 Rollers Pneum. Whl., 12 Ton
$49.25
47.25
63.05
55.45
$394.00
1890.00
2522.00
887.20
941.36
1091.96
734.20
194.16
769.10
$73.30
70.35
93.80
82.85
104 L.H., Daily Totals
Crew B-92
1 Labor Foreman (outside)
3 Laborers
1 Crack Cleaner, 25 H.P.
1 Air Compressor, 60 cfm
1 Tar Kettle, T.M.
1 Flatbed Truck, Gas, 3 Ton
$9423.98
Hr.
Daily
Hr.
$49.25
47.25
$394.00
1134.00
167.33
173.21
199.54
391.02
$73.30
70.35
32 L.H., Daily Totals
Crew B-93
1 Equip. Oper. (medium)
1 Feller Buncher, 100 H.P.
$2459.10
Hr.
Daily
Hr.
$63.05
$504.40
1122.21
$93.80
8 L.H., Daily Totals
Crew B-94A
1 Laborer
1 Diaphragm Water Pump, 2⬙
1 -20’ Suction Hose, 2⬙
2 -50’ Discharge Hoses, 2⬙
$1626.61
Hr.
Daily
Hr.
$47.25
$378.00
61.92
4.37
8.18
$70.35
8 L.H., Daily Totals
Crew B-94B
1 Laborer
1 Diaphragm Water Pump, 4⬙
1 -20’ Suction Hose, 4⬙
2 -50’ Discharge Hoses, 4⬙
$452.47
Hr.
Daily
Hr.
$47.25
$378.00
150.72
19.04
28.30
$70.35
8 L.H., Daily Totals
Crew B-94C
1 Laborer
1 Centrifugal Water Pump, 3⬙
1 -20’ Suction Hose, 3⬙
2 -50’ Discharge Hoses, 3⬙
8 L.H., Daily Totals
$576.06
Hr.
Daily
Hr.
$47.25
$378.00
82.39
8.96
9.76
$70.35
$479.11
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$562.80
750.40
2090.24
$55.15
$82.08
118.76
130.64
$3403.44
$173.91
$212.72
Daily
Bare
Costs
Incl.
O&P
$562.80
632.00
653.44
$50.08
$74.67
37.13
40.84
$1848.24
$87.20
$115.52
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
3752.00
1325.60
1035.50
1201.16
807.62
213.58
846.01
$54.74
$81.52
35.87
39.46
$12581.86
$90.62
$120.98
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
184.06
190.53
219.49
430.12
$47.75
$71.09
29.10
32.01
$3299.01
$76.85
$103.09
Daily
Bare
Costs
Incl.
O&P
$750.40
1234.43
$63.05
140.28
$93.80
154.30
$1984.83
$203.33
$248.10
Daily
Bare
Costs
Incl.
O&P
$562.80
68.11
4.81
9.00
$47.25
$70.35
9.31
10.24
$644.72
$56.56
$80.59
Daily
Bare
Costs
Incl.
O&P
$562.80
165.79
20.94
31.13
$47.25
$70.35
24.76
27.23
$780.67
$72.01
$97.58
Daily
Bare
Costs
Incl.
O&P
$562.80
90.63
9.86
10.74
$47.25
$70.35
12.64
13.90
$674.02
$59.89
$84.25
Daily
Crew No.
Crew B-94D
1 Laborer
1 Centr. Water Pump, 6⬙
1 -20’ Suction Hose, 6⬙
2 -50’ Discharge Hoses, 6⬙
Bare Costs
Hr.
Daily
Hr.
$47.25
$378.00
386.48
28.12
39.98
$70.35
8 L.H., Daily Totals
Crew C-1
3 Carpenters
1 Laborer
$832.58
Hr.
Daily
Hr.
$58.60
47.25
$1406.40
378.00
$87.25
70.35
32 L.H., Daily Totals
Crew C-2
1 Carpenter Foreman (outside)
4 Carpenters
1 Laborer
$1784.40
Hr.
Daily
Hr.
$60.60
58.60
47.25
$484.80
1875.20
378.00
$90.20
87.25
70.35
48 L.H., Daily Totals
Crew C-2A
1 Carpenter Foreman (outside)
3 Carpenters
1 Cement Finisher
1 Laborer
$2738.00
Hr.
Daily
Hr.
$60.60
58.60
55.00
47.25
$484.80
1406.40
440.00
378.00
$90.20
87.25
80.45
70.35
48 L.H., Daily Totals
Crew C-3
1 Rodman Foreman (outside)
4 Rodmen (reinf.)
1 Equip. Oper. (light)
2 Laborers
3 Stressing Equipment
.5 Grouting Equipment
$2709.20
Hr.
Daily
Hr.
$66.55
64.55
59.70
47.25
$532.40
2065.60
477.60
756.00
51.87
97.91
$99.40
96.40
88.85
70.35
64 L.H., Daily Totals
Crew C-4
1 Rodman Foreman (outside)
3 Rodmen (reinf.)
3 Stressing Equipment
$3981.38
Hr.
Daily
Hr.
$66.55
64.55
$532.40
1549.20
51.87
$99.40
96.40
32 L.H., Daily Totals
Crew C-4A
2 Rodmen (reinf.)
4 Stressing Equipment
$2133.47
Hr.
Daily
Hr.
$64.55
$1032.80
69.16
$96.40
16 L.H., Daily Totals
Crew C-5
1 Rodman Foreman (outside)
4 Rodmen (reinf.)
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 25 Ton
$1101.96
Hr.
Daily
Hr.
$66.55
64.55
66.30
56.40
$532.40
2065.60
530.40
451.20
2273.31
$99.40
96.40
98.65
83.90
56 L.H., Daily Totals
Crew C-6
1 Labor Foreman (outside)
4 Laborers
1 Cement Finisher
2 Gas Engine Vibrators
48 L.H., Daily Totals
Incl.
Subs O&P
$5852.91
Hr.
Daily
Hr.
$49.25
47.25
55.00
$394.00
1512.00
440.00
59.36
$73.30
70.35
80.45
$2405.36
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$562.80
425.13
30.93
43.98
$47.25
$70.35
56.82
62.50
$1062.84
$104.07
$132.85
Daily
Bare
Costs
Incl.
O&P
$2094.00
562.80
$55.76
$83.03
$2656.80
$55.76
$83.03
Daily
Bare
Costs
Incl.
O&P
$721.60
2792.00
562.80
$57.04
$84.92
$4076.40
$57.04
$84.92
Daily
Bare
Costs
Incl.
O&P
$721.60
2094.00
643.60
562.80
$56.44
$83.79
$4022.00
$56.44
$83.79
Daily
Bare
Costs
Incl.
O&P
$795.20
3084.80
710.80
1125.60
57.06
107.70
$59.87
$89.32
2.34
2.57
$5881.15
$62.21
$91.89
Daily
Bare
Costs
Incl.
O&P
$795.20
2313.60
57.06
$65.05
$97.15
1.62
1.78
$3165.86
$66.67
$98.93
Daily
Bare
Costs
Incl.
O&P
$1542.40
76.08
$64.55
4.32
$96.40
4.75
$1618.48
$68.87
$101.15
Daily
Bare
Costs
Incl.
O&P
$795.20
3084.80
789.20
671.20
2500.64
$63.92
$95.36
40.59
44.65
$7841.04
$104.52
$140.02
Daily
Bare
Costs
Incl.
O&P
$586.40
2251.20
643.60
65.30
$48.88
$72.53
1.24
1.36
$3546.50
$50.11
$73.89
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
773
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew C-6A
Hr.
Daily
Hr.
2 Cement Finishers
1 Concrete Vibrator, Elec, 2 HP
$55.00
$880.00
32.92
$80.45
16 L.H., Daily Totals
Crew C-7
1 Labor Foreman (outside)
5 Laborers
1 Cement Finisher
1 Equip. Oper. (medium)
1 Equip. Oper. (oiler)
2 Gas Engine Vibrators
1 Concrete Bucket, 1 C.Y.
1 Hyd. Crane, 55 Ton
$912.92
Hr.
Daily
Hr.
$49.25
47.25
55.00
63.05
56.40
$394.00
1890.00
440.00
504.40
451.20
59.36
50.97
2461.06
$73.30
70.35
80.45
93.80
83.90
72 L.H., Daily Totals
Crew C-7A
1 Labor Foreman (outside)
5 Laborers
2 Truck Drivers (heavy)
2 Conc. Transit Mixers
$6250.99
Hr.
Daily
Hr.
$49.25
47.25
55.45
$394.00
1890.00
887.20
1400.52
$73.30
70.35
82.85
64 L.H., Daily Totals
$4571.72
Crew C-7B
Hr.
Daily
Hr.
1 Labor Foreman (outside)
5 Laborers
1 Equipment Operator, Crane
1 Equipment Oiler
1 Conc. Bucket, 2 C.Y.
1 Lattice Boom Crane, 165 Ton
$49.25
47.25
66.30
56.40
$394.00
1890.00
530.40
451.20
76.52
2672.17
$73.30
70.35
98.65
83.90
64 L.H., Daily Totals
Crew C-7C
1 Labor Foreman (outside)
5 Laborers
2 Equipment Operators (med.)
2 F.E. Loaders, W.M., 4 C.Y.
$6014.29
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
1890.00
1008.80
1579.96
$73.30
70.35
93.80
64 L.H., Daily Totals
Crew C-7D
1 Labor Foreman (outside)
5 Laborers
1 Equip. Oper. (medium)
1 Concrete Conveyer
$4872.76
Hr.
Daily
Hr.
$49.25
47.25
63.05
$394.00
1890.00
504.40
194.76
$73.30
70.35
93.80
56 L.H., Daily Totals
Crew C-8
1 Labor Foreman (outside)
3 Laborers
2 Cement Finishers
1 Equip. Oper. (medium)
1 Concrete Pump (Small)
$2983.16
Hr.
Daily
Hr.
$49.25
47.25
55.00
63.05
$394.00
1134.00
880.00
504.40
827.49
$73.30
70.35
80.45
93.80
56 L.H., Daily Totals
Crew C-8A
1 Labor Foreman (outside)
3 Laborers
2 Cement Finishers
48 L.H., Daily Totals
$3739.89
Hr.
Daily
Hr.
$49.25
47.25
55.00
$394.00
1134.00
880.00
$73.30
70.35
80.45
$2408.00
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$1287.20
36.21
$55.00
2.06
$80.45
2.26
$1323.41
$57.06
$82.71
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
643.60
750.40
671.20
65.30
56.07
2707.17
$51.11
$75.91
35.71
39.29
$8294.13
$86.82
$115.20
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
1325.60
1540.57
$49.55
$73.84
21.88
24.07
$6266.57
$71.43
$97.92
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
789.20
671.20
84.17
2939.39
$51.02
$75.95
42.95
47.24
$7884.36
$93.97
$123.19
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
1500.80
1737.96
$51.45
$76.58
24.69
27.16
$6639.16
$76.14
$103.74
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
750.40
214.24
$49.79
$74.12
3.48
3.83
$4365.04
$53.27
$77.95
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
1287.20
750.40
910.24
$52.01
$77.01
14.78
16.25
$5222.64
$66.78
$93.26
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
1287.20
$50.17
$74.21
$3562.00
$50.17
$74.21
Crew No.
Crew C-8B
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (medium)
1 Vibrating Power Screed
1 Roller, Vibratory, 25 Ton
1 Dozer, 200 H.P.
Crew C-8C
Daily
Hr.
$49.25
47.25
63.05
$394.00
1134.00
504.40
90.64
529.68
1382.36
$73.30
70.35
93.80
$4035.08
Hr.
1 Labor Foreman (outside)
$49.25
3 Laborers
47.25
1 Cement Finisher
55.00
1 Equip. Oper. (medium)
63.05
1 Shotcrete Pump Rig, 12 C.Y./hr
1 Air Compressor, 160 cfm
4 -50’ Air Hoses, 1⬙
4 -50’ Air Hoses, 2⬙
48 L.H., Daily Totals
Crew C-8D
1 Labor Foreman (outside)
1 Laborer
1 Cement Finisher
1 Equipment Oper. (light)
1 Air Compressor, 250 cfm
2 -50’ Air Hoses, 1⬙
1 Labor Foreman (outside)
3 Laborers
1 Cement Finisher
1 Equipment Oper. (light)
1 Shotcrete Rig, 35 C.Y./hr
1 Air Compressor, 250 cfm
4 -50’ Air Hoses, 1⬙
4 -50’ Air Hoses, 2⬙
1 Cement Finisher
2 Laborers
1 Equipment Oper. (light)
1 Grout Pump, 50 C.F./hr.
1 Air Compressor, 160 cfm
2 -50’ Air Hoses, 1⬙
2 -50’ Air Hoses, 2⬙
1 Laborer
2 Cement Finishers
3 Laborers
2 Cement Finishers
1 Concrete Mixer, 10 C.F.
2 Trowels, 48⬙ Walk-Behind
$73.30
70.35
80.45
93.80
Hr.
$49.25
47.25
55.00
59.70
$394.00
378.00
440.00
477.60
196.28
18.62
$73.30
70.35
80.45
88.85
$1904.50
Hr.
Daily
Hr.
$49.25
47.25
55.00
59.70
$394.00
1134.00
440.00
477.60
797.28
196.28
37.24
129.40
$73.30
70.35
80.45
88.85
$3605.80
Hr.
Daily
Hr.
$55.00
47.25
59.70
$440.00
756.00
477.60
158.45
244.12
18.62
64.70
$80.45
70.35
88.85
$2159.49
Hr.
Daily
Hr.
$47.25
55.00
$378.00
880.00
$70.35
80.45
24 L.H., Daily Totals
Crew C-10B
$394.00
1134.00
440.00
504.40
651.19
244.12
37.24
129.40
Daily
32 L.H., Daily Totals
Crew C-10
Hr.
Hr.
48 L.H., Daily Totals
Crew C-9
Daily
$3534.35
32 L.H., Daily Totals
Crew C-8E
Incl.
Subs O&P
Hr.
40 L.H., Daily Totals
40 L.H., Daily Totals
774
Bare Costs
$1258.00
Hr.
Daily
Hr.
$47.25
55.00
$1134.00
880.00
149.77
171.24
$70.35
80.45
$2335.01
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$586.40
1688.40
750.40
99.70
582.65
1520.60
$50.81
$75.63
50.07
55.07
$5228.15
$100.88
$130.70
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
643.60
750.40
716.31
268.53
40.96
142.34
$51.51
$76.43
22.12
24.34
$4836.94
$73.63
$100.77
Daily
Bare
Costs
Incl.
O&P
$586.40
562.80
643.60
710.80
215.91
20.48
$52.80
$78.24
6.72
7.39
$2739.99
$59.52
$85.62
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
643.60
710.80
877.01
215.91
40.96
142.34
$50.95
$75.61
24.17
26.59
$4905.42
$75.12
$102.20
Daily
Bare
Costs
Incl.
O&P
$643.60
1125.60
710.80
174.29
268.53
20.48
71.17
$52.30
$77.50
15.18
16.70
$3014.48
$67.48
$94.20
Daily
Bare
Costs
Incl.
O&P
$562.80
1287.20
$52.42
$77.08
$1850.00
$52.42
$77.08
Daily
Bare
Costs
Incl.
O&P
$1688.40
1287.20
164.75
188.36
$50.35
$74.39
8.03
8.83
$3328.71
$58.38
$83.22
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew C-10C
1 Laborer
2 Cement Finishers
1 Trowel, 48⬙ Walk-Behind
Bare Costs
Hr.
Daily
Hr.
$47.25
55.00
$378.00
880.00
85.62
$70.35
80.45
24 L.H., Daily Totals
Crew C-10D
1 Laborer
2 Cement Finishers
1 Vibrating Power Screed
1 Trowel, 48⬙ Walk-Behind
$1343.62
Hr.
Daily
Hr.
$47.25
55.00
$378.00
880.00
90.64
85.62
$70.35
80.45
24 L.H., Daily Totals
Crew C-10E
1 Laborer
2 Cement Finishers
1 Vibrating Power Screed
1 Cement Trowel, 96⬙ Ride-On
Incl.
Subs O&P
$1434.26
Hr.
Daily
Hr.
$47.25
55.00
$378.00
880.00
90.64
225.34
$70.35
80.45
24 L.H., Daily Totals
$1573.98
Crew C-10F
Hr.
Daily
Hr.
1 Laborer
2 Cement Finishers
1 Telescoping Boom Lift, to 60’
$47.25
55.00
$378.00
880.00
385.68
$70.35
80.45
24 L.H., Daily Totals
$1643.68
Crew C-11
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
6 Struc. Steel Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Lattice Boom Crane, 150 Ton
$66.55
64.55
66.30
56.40
$532.40
3098.40
530.40
451.20
2585.11
$102.50
99.40
98.65
83.90
72 L.H., Daily Totals
Crew C-12
1 Carpenter Foreman (outside)
3 Carpenters
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton
$7197.51
Hr.
Daily
Hr.
$60.60
58.60
47.25
66.30
$484.80
1406.40
378.00
530.40
2150.65
$90.20
87.25
70.35
98.65
48 L.H., Daily Totals
$4950.25
Crew C-13
Hr.
Daily
Hr.
1 Struc. Steel Worker
1 Welder
1 Carpenter
1 Welder, Gas Engine, 300 amp
$64.55
64.55
58.60
$516.40
516.40
468.80
147.09
$99.40
99.40
87.25
24 L.H., Daily Totals
Crew C-14
1 Carpenter Foreman (outside)
5 Carpenters
4 Laborers
4 Rodmen (reinf.)
2 Cement Finishers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 80 Ton
144 L.H., Daily Totals
$1648.69
Hr.
Daily
Hr.
$60.60
58.60
47.25
64.55
55.00
66.30
56.40
$484.80
2344.00
1512.00
2065.60
880.00
530.40
451.20
2641.70
$90.20
87.25
70.35
96.40
80.45
98.65
83.90
$10909.70
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$562.80
1287.20
94.18
$52.42
$77.08
3.57
3.92
$1944.18
$55.98
$81.01
Daily
Bare
Costs
Incl.
O&P
$562.80
1287.20
99.70
94.18
$52.42
$77.08
7.34
8.08
$2043.89
$59.76
$85.16
Daily
Bare
Costs
Incl.
O&P
$562.80
1287.20
99.70
247.87
$52.42
$77.08
13.17
14.48
$2197.58
$65.58
$91.57
Daily
Bare
Costs
Incl.
O&P
$562.80
1287.20
424.25
$52.42
$77.08
16.07
17.68
$2274.25
$68.49
$94.76
Daily
Bare
Costs
Incl.
O&P
$820.00
4771.20
789.20
671.20
2843.62
$64.06
$97.94
35.90
39.49
$9895.22
$99.97
$137.43
Daily
Bare
Costs
Incl.
O&P
$721.60
2094.00
562.80
789.20
2365.72
$58.33
$86.83
44.81
49.29
$6533.31
$103.13
$136.11
Daily
Bare
Costs
Incl.
O&P
$795.20
795.20
698.00
161.80
$62.57
$95.35
6.13
6.74
$2450.20
$68.70
$102.09
Daily
Crew C-14A
1 Carpenter Foreman (outside)
16 Carpenters
4 Rodmen (reinf.)
2 Laborers
1 Cement Finisher
1 Equip. Oper. (medium)
1 Gas Engine Vibrator
1 Concrete Pump (Small)
Bare Costs
Crew C-14B
1 Carpenter Foreman (outside)
16 Carpenters
4 Rodmen (reinf.)
2 Laborers
2 Cement Finishers
1 Equip. Oper. (medium)
1 Gas Engine Vibrator
1 Concrete Pump (Small)
Daily
Hr.
$60.60
58.60
64.55
47.25
55.00
63.05
$484.80
7500.80
2065.60
756.00
440.00
504.40
29.68
827.49
$90.20
87.25
96.40
70.35
80.45
93.80
$12608.77
Hr.
Daily
Hr.
$60.60
58.60
64.55
47.25
55.00
63.05
$484.80
7500.80
2065.60
756.00
880.00
504.40
29.68
827.49
$90.20
87.25
96.40
70.35
80.45
93.80
208 L.H., Daily Totals
Crew C-14C
1 Carpenter Foreman (outside)
6 Carpenters
2 Rodmen (reinf.)
4 Laborers
1 Cement Finisher
1 Gas Engine Vibrator
$13048.77
Hr.
Daily
Hr.
$60.60
58.60
64.55
47.25
55.00
$484.80
2812.80
1032.80
1512.00
440.00
29.68
$90.20
87.25
96.40
70.35
80.45
112 L.H., Daily Totals
Crew C-14D
Incl.
O&P
$721.60
3490.00
2251.20
3084.80
1287.20
789.20
671.20
2905.87
$57.42
$85.38
18.35
20.18
$15201.07
$75.76
$105.56
1 Carpenter Foreman (outside)
18 Carpenters
2 Rodmen (reinf.)
2 Laborers
1 Cement Finisher
1 Equip. Oper. (medium)
1 Gas Engine Vibrator
1 Concrete Pump (Small)
$6312.08
Hr.
Daily
Hr.
$60.60
58.60
64.55
47.25
55.00
63.05
$484.80
8438.40
1032.80
756.00
440.00
504.40
29.68
827.49
$90.20
87.25
96.40
70.35
80.45
93.80
200 L.H., Daily Totals
Crew C-14E
1 Carpenter Foreman (outside)
2 Carpenters
4 Rodmen (reinf.)
3 Laborers
1 Cement Finisher
1 Gas Engine Vibrator
$12513.57
Hr.
Daily
Hr.
$60.60
58.60
64.55
47.25
55.00
$484.80
937.60
2065.60
1134.00
440.00
29.68
$90.20
87.25
96.40
70.35
80.45
88 L.H., Daily Totals
Crew C-14F
1 Labor Foreman (outside)
2 Laborers
6 Cement Finishers
1 Gas Engine Vibrator
72 L.H., Daily Totals
Incl.
Subs O&P
Hr.
200 L.H., Daily Totals
Bare
Costs
Daily
Crew No.
$5091.68
Hr.
Daily
Hr.
$49.25
47.25
55.00
$394.00
756.00
2640.00
29.68
$73.30
70.35
80.45
$3819.68
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$721.60
11168.00
3084.80
1125.60
643.60
750.40
32.65
910.24
$58.76
$87.47
4.29
4.71
$18436.89
$63.04
$92.18
Daily
Bare
Costs
Incl.
O&P
$721.60
11168.00
3084.80
1125.60
1287.20
750.40
32.65
910.24
$58.61
$87.20
4.12
4.53
$19080.49
$62.73
$91.73
Daily
Bare
Costs
Incl.
O&P
$721.60
4188.00
1542.40
2251.20
643.60
32.65
$56.09
$83.45
.27
.29
$9379.45
$56.36
$83.75
Daily
Bare
Costs
Incl.
O&P
$721.60
12564.00
1542.40
1125.60
643.60
750.40
32.65
910.24
$58.28
$86.74
4.29
4.71
$18290.49
$62.57
$91.45
Daily
Bare
Costs
Incl.
O&P
$721.60
1396.00
3084.80
1688.40
643.60
32.65
$57.52
$85.62
.34
.37
$7567.05
$57.86
$85.99
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
3861.60
32.65
$52.64
$77.41
.41
.45
$5606.25
$53.05
$77.86
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
775
Crews - Standard
Crew No.
Crew C-14G
1 Labor Foreman (outside)
2 Laborers
4 Cement Finishers
1 Gas Engine Vibrator
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
55.00
$394.00
756.00
1760.00
29.68
$73.30
70.35
80.45
56 L.H., Daily Totals
Crew C-14H
1 Carpenter Foreman (outside)
2 Carpenters
1 Rodman (reinf.)
1 Laborer
1 Cement Finisher
1 Gas Engine Vibrator
$2939.68
Hr.
Daily
Hr.
$60.60
58.60
64.55
47.25
55.00
$484.80
937.60
516.40
378.00
440.00
29.68
$90.20
87.25
96.40
70.35
80.45
48 L.H., Daily Totals
Crew C-14L
1 Carpenter Foreman (outside)
6 Carpenters
4 Laborers
1 Cement Finisher
1 Gas Engine Vibrator
$2786.48
Hr.
Daily
Hr.
$60.60
58.60
47.25
55.00
$484.80
2812.80
1512.00
440.00
29.68
$90.20
87.25
70.35
80.45
96 L.H., Daily Totals
Crew C-14M
1 Carpenter Foreman (outside)
2 Carpenters
1 Rodman (reinf.)
2 Laborers
1 Cement Finisher
1 Equip. Oper. (medium)
1 Gas Engine Vibrator
1 Concrete Pump (Small)
$5279.28
Hr.
Daily
Hr.
$60.60
58.60
64.55
47.25
55.00
63.05
$484.80
937.60
516.40
756.00
440.00
504.40
29.68
827.49
$90.20
87.25
96.40
70.35
80.45
93.80
64 L.H., Daily Totals
Crew C-15
1 Carpenter Foreman (outside)
2 Carpenters
3 Laborers
2 Cement Finishers
1 Rodman (reinf.)
$4496.37
Hr.
Daily
Hr.
$60.60
58.60
47.25
55.00
64.55
$484.80
937.60
1134.00
880.00
516.40
$90.20
87.25
70.35
80.45
96.40
72 L.H., Daily Totals
Crew C-16
1 Labor Foreman (outside)
3 Laborers
2 Cement Finishers
1 Equip. Oper. (medium)
1 Gunite Pump Rig
2 -50’ Air Hoses, 3/4⬙
2 -50’ Air Hoses, 2⬙
Incl.
Subs O&P
$3952.80
Hr.
Daily
Hr.
$49.25
47.25
55.00
63.05
$394.00
1134.00
880.00
504.40
352.58
16.32
64.70
$73.30
70.35
80.45
93.80
56 L.H., Daily Totals
$3346.00
Crew C-16A
Hr.
Daily
Hr.
1 Laborer
2 Cement Finishers
1 Equip. Oper. (medium)
1 Gunite Pump Rig
2 -50’ Air Hoses, 3/4⬙
2 -50’ Air Hoses, 2⬙
1 Telescoping Boom Lift, to 60’
$47.25
55.00
63.05
$378.00
880.00
504.40
352.58
16.32
64.70
385.68
$70.35
80.45
93.80
32 L.H., Daily Totals
776
$2581.68
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$586.40
1125.60
2574.40
32.65
$51.96
$76.54
.53
.58
$4319.05
$52.49
$77.13
Crew C-17A
Hr.
Daily
Hr.
Daily
Bare
Costs
Incl.
O&P
$721.60
1396.00
771.20
562.80
643.60
32.65
$57.43
$85.32
2 Skilled Worker Foremen (out)
8 Skilled Workers
.13 Equip. Oper. (crane)
.13 Hyd. Crane, 80 Ton
$63.25
61.25
66.30
$1012.00
3920.00
68.95
343.42
$95.00
92.00
98.65
.62
.68
$4127.85
$58.05
$86.00
Daily
Bare
Costs
Incl.
O&P
$721.60
4188.00
2251.20
643.60
32.65
$54.68
$81.30
.31
.34
$7837.05
$54.99
$81.64
Daily
Bare
Costs
Incl.
O&P
$721.60
1396.00
771.20
1125.60
643.60
750.40
32.65
910.24
$56.86
$84.51
13.39
14.73
$6351.29
$70.26
$99.24
Daily
Bare
Costs
Incl.
O&P
$721.60
1396.00
1688.40
1287.20
771.20
$54.90
$81.45
$5864.40
$54.90
$81.45
Daily
Bare
Costs
Incl.
O&P
$586.40
1688.40
1287.20
750.40
387.84
17.95
71.17
$52.01
$77.01
7.74
8.52
$4789.36
$59.75
$85.52
9.04 L.H., Daily Totals
Daily
Bare
Costs
Incl.
O&P
Crew C-20
$562.80
1287.20
750.40
387.84
17.95
71.17
424.25
$55.08
$81.26
25.60
28.16
$3501.61
$80.68
$109.43
Daily
Crew C-17
Hr.
Daily
Hr.
2 Skilled Worker Foremen (out)
8 Skilled Workers
$63.25
61.25
$1012.00
3920.00
$95.00
92.00
80 L.H., Daily Totals
$4932.00
81.04 L.H., Daily Totals
$5344.37
Crew C-17B
Hr.
Daily
Hr.
2 Skilled Worker Foremen (out)
8 Skilled Workers
.25 Equip. Oper. (crane)
.25 Hyd. Crane, 80 Ton
.25 Trowel, 48⬙ Walk-Behind
$63.25
61.25
66.30
$1012.00
3920.00
132.60
660.42
21.41
$95.00
92.00
98.65
82 L.H., Daily Totals
$5746.43
Crew C-17C
Hr.
Daily
Hr.
2 Skilled Worker Foremen (out)
8 Skilled Workers
.38 Equip. Oper. (crane)
.38 Hyd. Crane, 80 Ton
$63.25
61.25
66.30
$1012.00
3920.00
201.55
1003.85
$95.00
92.00
98.65
83.04 L.H., Daily Totals
$6137.40
Crew C-17D
Hr.
Daily
Hr.
2 Skilled Worker Foremen (out)
8 Skilled Workers
.5 Equip. Oper. (crane)
.5 Hyd. Crane, 80 Ton
$63.25
61.25
66.30
$1012.00
3920.00
265.20
1320.85
$95.00
92.00
98.65
84 L.H., Daily Totals
$6518.05
Crew C-17E
Hr.
Daily
Hr.
2 Skilled Worker Foremen (out)
8 Skilled Workers
1 Hyd. Jack with Rods
$63.25
61.25
$1012.00
3920.00
40.57
$95.00
92.00
80 L.H., Daily Totals
Crew C-18
.13 Labor Foreman (outside)
1 Laborer
1 Concrete Cart, 10 C.F.
$4972.57
Hr.
Daily
Hr.
$49.25
47.25
$51.22
378.00
149.92
$73.30
70.35
9.04 L.H., Daily Totals
Crew C-19
.13 Labor Foreman (outside)
1 Laborer
1 Concrete Cart, 18 C.F.
1 Labor Foreman (outside)
5 Laborers
1 Cement Finisher
1 Equip. Oper. (medium)
2 Gas Engine Vibrators
1 Concrete Pump (Small)
64 L.H., Daily Totals
Bare
Costs
Incl.
O&P
$1520.00
5888.00
$61.65
$92.60
$7408.00
$61.65
$92.60
Daily
Bare
Costs
Incl.
O&P
$1520.00
5888.00
102.60
377.76
$61.71
$92.68
4.24
4.66
$7888.36
$65.95
$97.34
Daily
Bare
Costs
Incl.
O&P
$1520.00
5888.00
197.30
726.47
23.55
$61.76
$92.75
8.31
9.15
$8355.31
$70.08
$101.89
Daily
Bare
Costs
Incl.
O&P
$1520.00
5888.00
299.90
1104.23
$61.82
$92.82
12.09
13.30
$8812.13
$73.91
$106.12
Daily
Bare
Costs
Incl.
O&P
$1520.00
5888.00
394.60
1452.93
$61.87
$92.89
15.72
17.30
$9255.53
$77.60
$110.18
Daily
Bare
Costs
Incl.
O&P
$1520.00
5888.00
44.63
$61.65
$92.60
.51
.56
$7452.63
$62.16
$93.16
Daily
Bare
Costs
Incl.
O&P
$76.23
562.80
164.91
$47.48
$70.69
16.58
18.24
$803.94
$64.06
$88.93
Daily
Bare
Costs
Incl.
O&P
$76.23
562.80
135.00
$47.48
$70.69
13.58
14.93
$774.03
$61.06
$85.62
Daily
Bare
Costs
Incl.
O&P
$586.40
2814.00
643.60
750.40
65.30
910.24
$50.44
$74.91
13.86
15.24
$5769.94
$64.30
$90.16
Daily
$579.14
Hr.
Daily
Hr.
$49.25
47.25
$51.22
378.00
122.73
$73.30
70.35
$551.95
Hr.
Daily
Hr.
$49.25
47.25
55.00
63.05
$394.00
1890.00
440.00
504.40
59.36
827.49
$73.30
70.35
80.45
93.80
$4115.25
Cost
Per Labor-Hour
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew C-21
1 Labor Foreman (outside)
5 Laborers
1 Cement Finisher
1 Equip. Oper. (medium)
2 Gas Engine Vibrators
1 Concrete Conveyer
Bare Costs
Hr.
Daily
Hr.
$49.25
47.25
55.00
63.05
$394.00
1890.00
440.00
504.40
59.36
194.76
$73.30
70.35
80.45
93.80
64 L.H., Daily Totals
Crew C-22
1 Rodman Foreman (outside)
4 Rodmen (reinf.)
.13 Equip. Oper. (crane)
.13 Equip. Oper. (oiler)
.13 Hyd. Crane, 25 Ton
Incl.
Subs O&P
$3482.52
Hr.
Daily
Hr.
$66.55
64.55
66.30
56.40
$532.40
2065.60
68.95
58.66
295.53
$99.40
96.40
98.65
83.90
42.08 L.H., Daily Totals
$3021.14
Crew C-23
Hr.
Daily
Hr.
2 Skilled Worker Foremen (out)
6 Skilled Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Lattice Boom Crane, 90 Ton
$63.25
61.25
66.30
56.40
$1012.00
2940.00
530.40
451.20
2689.54
$95.00
92.00
98.65
83.90
80 L.H., Daily Totals
Crew C-23A
1 Labor Foreman (outside)
2 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Crawler Crane, 100 Ton
3 Conc. Buckets, 8 C.Y.
$7623.14
Hr.
Daily
Hr.
$49.25
47.25
66.30
56.40
$394.00
756.00
530.40
451.20
1552.12
425.58
$73.30
70.35
98.65
83.90
40 L.H., Daily Totals
$4109.30
Crew C-24
Hr.
Daily
Hr.
2 Skilled Worker Foremen (out)
6 Skilled Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Lattice Boom Crane, 150 Ton
$63.25
61.25
66.30
56.40
$1012.00
2940.00
530.40
451.20
2585.11
$95.00
92.00
98.65
83.90
80 L.H., Daily Totals
Crew C-25
2 Rodmen (reinf.)
2 Rodmen Helpers
$7518.71
Hr.
Daily
Hr.
$64.55
38.85
$1032.80
621.60
$96.40
62.95
32 L.H., Daily Totals
Crew C-27
2 Cement Finishers
1 Concrete Saw
$1654.40
Hr.
Daily
Hr.
$55.00
$880.00
176.00
$80.45
16 L.H., Daily Totals
$1056.00
Crew C-28
Hr.
Daily
Hr.
1 Cement Finisher
1 Portable Air Compressor, Gas
$55.00
$440.00
34.53
$80.45
8 L.H., Daily Totals
Crew C-29
1 Laborer
1 Pressure Washer
8 L.H., Daily Totals
$474.53
Hr.
Daily
Hr.
$47.25
$378.00
104.23
$70.35
$482.23
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$586.40
2814.00
643.60
750.40
65.30
214.24
$50.44
$74.91
3.97
4.37
$5073.93
$54.41
$79.28
1 Cement Finisher
1 Grout Pump
Bare
Costs
Incl.
O&P
8 L.H., Daily Totals
Daily
$795.20
3084.80
102.60
87.26
325.08
$64.77
$96.72
7.02
7.73
$4394.94
$71.80
$104.44
Daily
Bare
Costs
Incl.
O&P
$1520.00
4416.00
789.20
671.20
2958.49
$61.67
$92.45
33.62
36.98
$10354.89
$95.29
$129.44
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
789.20
671.20
1707.33
468.14
$53.29
$79.31
49.44
54.39
$5347.87
$102.73
$133.70
Daily
Bare
Costs
Incl.
O&P
$1520.00
4416.00
789.20
671.20
2843.62
$61.67
$92.45
32.31
35.55
$10240.02
$93.98
$128.00
Daily
Bare
Costs
Incl.
O&P
$1542.40
1007.20
$51.70
$79.67
$2549.60
$51.70
$79.67
Daily
Bare
Costs
Incl.
O&P
$1287.20
193.60
$55.00
11.00
$80.45
12.10
3 Bricklayers
3 Bricklayer Helpers
.25 Carpenter
$1480.80
$66.00
$92.55
50 L.H., Daily Totals
Daily
Bare
Costs
Incl.
O&P
$643.60
37.98
$55.00
4.32
$80.45
4.75
1 Tile Layer
1 Tile Layer Helper
$681.58
$59.32
$85.20
16 L.H., Daily Totals
Daily
Bare
Costs
Incl.
O&P
$562.80
114.65
$47.25
13.03
$70.35
14.33
3 Bricklayers
2 Bricklayer Helpers
$677.45
$60.28
$84.68
40 L.H., Daily Totals
Daily
Crew C-30
1 Laborer
1 Concrete Mixer, 10 C.F.
Bare Costs
Hr.
Daily
Hr.
$47.25
$378.00
149.77
$70.35
8 L.H., Daily Totals
Crew C-31
Incl.
Subs O&P
Daily
Hr.
$55.00
$440.00
352.58
$80.45
$792.58
Crew C-32
Hr.
Daily
Hr.
1 Cement Finisher
1 Laborer
1 Crack Chaser Saw, Gas, 6 H.P.
1 Vacuum Pick-Up System
$55.00
47.25
$440.00
378.00
86.61
73.53
$80.45
70.35
16 L.H., Daily Totals
Crew D-1
1 Bricklayer
1 Bricklayer Helper
$978.14
Hr.
Daily
Hr.
$57.50
46.65
$460.00
373.20
$86.35
70.05
16 L.H., Daily Totals
Crew D-2
3 Bricklayers
2 Bricklayer Helpers
.5 Carpenter
$833.20
Hr.
Daily
Hr.
$57.50
46.65
58.60
$1380.00
746.40
234.40
$86.35
70.05
87.25
44 L.H., Daily Totals
Crew D-3
3 Bricklayers
2 Bricklayer Helpers
.25 Carpenter
$2360.80
Hr.
Daily
Hr.
$57.50
46.65
58.60
$1380.00
746.40
117.20
$86.35
70.05
87.25
42 L.H., Daily Totals
Crew D-4
1 Bricklayer
2 Bricklayer Helpers
1 Equip. Oper. (light)
1 Grout Pump, 50 C.F./hr.
$2243.60
Hr.
Daily
Hr.
$57.50
46.65
59.70
$460.00
746.40
477.60
158.45
$86.35
70.05
88.85
32 L.H., Daily Totals
Crew D-5
1 Bricklayer
$1842.45
Hr.
57.50
8 L.H., Daily Totals
Crew D-6
Crew D-7
Crew D-8
Daily
Bare
Costs
Incl.
O&P
$562.80
164.75
$47.25
18.72
$70.35
20.59
$727.55
$65.97
$90.94
Daily
Bare
Costs
Incl.
O&P
$643.60
387.84
$55.00
44.07
$80.45
48.48
$1031.44
$99.07
$128.93
Daily
Bare
Costs
Incl.
O&P
$643.60
562.80
95.27
80.88
$51.13
$75.40
10.01
11.01
$1382.55
$61.13
$86.41
Daily
Bare
Costs
Incl.
O&P
$690.80
560.40
$52.08
$78.20
$1251.20
$52.08
$78.20
Daily
Bare
Costs
Incl.
O&P
$2072.40
1120.80
349.00
$53.65
$80.50
$3542.20
$53.65
$80.50
Daily
Bare
Costs
Incl.
O&P
$2072.40
1120.80
174.50
$53.42
$80.18
$3367.70
$53.42
$80.18
Daily
Bare
Costs
Incl.
O&P
$690.80
1120.80
710.80
174.29
$52.63
$78.83
4.95
5.45
$2696.70
$57.58
$84.27
Daily
Bare
Costs
Incl.
O&P
$527.77
Hr.
Daily
Hr.
460.00
86.35
690.80
57.50
86.35
$690.80
$57.50
$86.35
Daily
Bare
Costs
Incl.
O&P
$2072.40
1681.20
174.50
$52.34
$78.56
$3928.10
$52.34
$78.56
Daily
Bare
Costs
Incl.
O&P
$646.40
520.00
$49.90
$72.90
$1166.40
$49.90
$72.90
Daily
Bare
Costs
Incl.
O&P
$2072.40
1120.80
$53.16
$79.83
$3193.20
$53.16
$79.83
$460.00
Hr.
Daily
Hr.
$57.50
46.65
58.60
$1380.00
1119.60
117.20
$86.35
70.05
87.25
$2616.80
Hr.
Daily
Hr.
$55.30
44.50
$442.40
356.00
$80.80
65.00
$798.40
Hr.
Daily
Hr.
$57.50
46.65
$1380.00
746.40
$86.35
70.05
$2126.40
Cost
Per Labor-Hour
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
777
Crews - Standard
Crew No.
Crew D-9
3 Bricklayers
3 Bricklayer Helpers
Bare Costs
Hr.
Daily
Hr.
$57.50
46.65
$1380.00
1119.60
$86.35
70.05
48 L.H., Daily Totals
Crew D-10
1 Bricklayer Foreman (outside)
1 Bricklayer
1 Bricklayer Helper
1 Equip. Oper. (crane)
1 S.P. Crane, 4x4, 12 Ton
$2499.60
Hr.
$59.50
57.50
46.65
66.30
32 L.H., Daily Totals
Crew D-11
1 Bricklayer Foreman (outside)
1 Bricklayer
1 Bricklayer Helper
1 Bricklayer Foreman (outside)
1 Bricklayer
2 Bricklayer Helpers
1 Bricklayer Foreman (outside)
1 Bricklayer
2 Bricklayer Helpers
1 Carpenter
1 Equip. Oper. (crane)
1 S.P. Crane, 4x4, 12 Ton
3 Bricklayers
1 Bricklayer Helper
$89.35
86.35
70.05
98.65
Daily
Hr.
$59.50
57.50
46.65
$476.00
460.00
373.20
$89.35
86.35
70.05
$1309.20
Hr.
Daily
Hr.
$59.50
57.50
46.65
$476.00
460.00
746.40
$89.35
86.35
70.05
$1682.40
Hr.
Daily
Hr.
$59.50
57.50
46.65
58.60
66.30
$476.00
460.00
746.40
468.80
530.40
637.99
$89.35
86.35
70.05
87.25
98.65
48 L.H., Daily Totals
Crew D-14
$476.00
460.00
373.20
530.40
637.99
Hr.
Hr.
32 L.H., Daily Totals
Crew D-13
Daily
$2477.59
24 L.H., Daily Totals
Crew D-12
Incl.
Subs O&P
$3319.59
Hr.
Daily
Hr.
$57.50
46.65
$1380.00
373.20
$86.35
70.05
32 L.H., Daily Totals
$1753.20
Crew E-1
Hr.
Daily
Hr.
1 Welder Foreman (outside)
1 Welder
1 Equip. Oper. (light)
1 Welder, Gas Engine, 300 amp
$66.55
64.55
59.70
$532.40
516.40
477.60
147.09
$102.50
99.40
88.85
24 L.H., Daily Totals
$1673.49
Crew E-2
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
4 Struc. Steel Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Lattice Boom Crane, 90 Ton
$66.55
64.55
66.30
56.40
$532.40
2065.60
530.40
451.20
2689.54
$102.50
99.40
98.65
83.90
56 L.H., Daily Totals
$6269.14
Crew E-3
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
1 Struc. Steel Worker
1 Welder
1 Welder, Gas Engine, 300 amp
$66.55
64.55
64.55
$532.40
516.40
516.40
147.09
$102.50
99.40
99.40
24 L.H., Daily Totals
778
$1712.29
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$2072.40
1681.20
$52.08
$78.20
$3753.60
$52.08
$78.20
Daily
Bare
Costs
Incl.
O&P
Daily
$714.80
690.80
560.40
789.20
701.79
$57.49
$86.10
19.94
21.93
$3456.99
$77.42
$108.03
Bare
Costs
Incl.
O&P
$714.80
690.80
560.40
$54.55
$81.92
$1966.00
$54.55
$81.92
Daily
Bare
Costs
Incl.
O&P
$714.80
690.80
1120.80
$52.58
$78.95
$2526.40
$52.58
Daily
Bare Costs
Incl.
Subs O&P
Crew E-3A
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
1 Struc. Steel Worker
1 Welder
1 Welder, Gas Engine, 300 amp
1 Telescoping Boom Lift, to 40’
$66.55
64.55
64.55
$532.40
516.40
516.40
147.09
345.57
$102.50
99.40
99.40
24 L.H., Daily Totals
$2057.86
Crew E-4
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
3 Struc. Steel Workers
1 Welder, Gas Engine, 300 amp
$66.55
64.55
$532.40
1549.20
147.09
$102.50
99.40
32 L.H., Daily Totals
$2228.69
Crew E-5
Hr.
Daily
Hr.
2 Struc. Steel Foremen (outside)
5 Struc. Steel Workers
1 Equip. Oper. (crane)
1 Welder
1 Equip. Oper. (oiler)
1 Lattice Boom Crane, 90 Ton
1 Welder, Gas Engine, 300 amp
$66.55
64.55
66.30
64.55
56.40
$1064.80
2582.00
530.40
516.40
451.20
2689.54
147.09
$102.50
99.40
98.65
99.40
83.90
80 L.H., Daily Totals
$7981.43
Incl.
O&P
$714.80
690.80
1120.80
698.00
789.20
701.79
$55.87
$83.62
13.29
14.62
$4715.39
$69.16
$98.24
Daily
Bare
Costs
Incl.
O&P
$2072.40
560.40
$54.79
$82.28
$2632.80
$54.79
$82.28
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
710.80
161.80
$63.60
$96.92
6.13
6.74
$2487.80
$69.73
$103.66
Daily
Bare
Costs
Incl.
O&P
$820.00
3180.80
789.20
671.20
2958.49
$63.92
$97.52
48.03
52.83
$8419.69
$111.95
$150.35
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
795.20
161.80
$65.22
$100.43
6.13
6.74
$2572.20
$71.35
$107.17
Crew E-6
Hr.
Daily
Hr.
3 Struc. Steel Foremen (outside)
9 Struc. Steel Workers
1 Equip. Oper. (crane)
1 Welder
1 Equip. Oper. (oiler)
1 Equip. Oper. (light)
1 Lattice Boom Crane, 90 Ton
1 Welder, Gas Engine, 300 amp
1 Air Compressor, 160 cfm
2 Impact Wrenches
$66.55
64.55
66.30
64.55
56.40
59.70
$1597.20
4647.60
530.40
516.40
451.20
477.60
2689.54
147.09
244.12
92.56
$102.50
99.40
98.65
99.40
83.90
88.85
128 L.H., Daily Totals
$11393.71
Crew E-7
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
4 Struc. Steel Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Welder Foreman (outside)
2 Welders
1 Lattice Boom Crane, 90 Ton
2 Welder, Gas Engine, 300 amp
$66.55
64.55
66.30
56.40
66.55
64.55
$532.40
2065.60
530.40
451.20
532.40
1032.80
2689.54
294.18
$102.50
99.40
98.65
83.90
102.50
99.40
80 L.H., Daily Totals
$8128.52
Crew E-8
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
4 Struc. Steel Workers
1 Welder Foreman (outside)
4 Welders
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Equip. Oper. (light)
1 Lattice Boom Crane, 90 Ton
4 Welder, Gas Engine, 300 amp
$66.55
64.55
66.55
64.55
66.30
56.40
59.70
$532.40
2065.60
532.40
2065.60
530.40
451.20
477.60
2689.54
588.36
$102.50
99.40
102.50
99.40
98.65
83.90
88.85
104 L.H., Daily Totals
$9933.10
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$820.00
795.20
795.20
161.80
380.13
$65.22
$100.43
20.53
22.58
$2952.33
$85.74
$123.01
Daily
Bare
Costs
Incl.
O&P
$820.00
2385.60
161.80
$65.05
$100.18
4.60
5.06
$3367.40
$69.65
$105.23
Daily
Bare
Costs
Incl.
O&P
$1640.00
3976.00
789.20
795.20
671.20
2958.49
161.80
$64.31
$98.39
35.46
39.00
$10991.89
$99.77
$137.40
Daily
Bare
Costs
Incl.
O&P
$2460.00
7156.80
789.20
795.20
671.20
710.80
2958.49
161.80
268.53
101.82
$64.22
$98.31
24.79
27.27
$16073.84
$89.01
$125.58
Daily
Bare
Costs
Incl.
O&P
$820.00
3180.80
789.20
671.20
820.00
1590.40
2958.49
323.60
$64.31
$98.39
37.30
41.03
$11153.69
$101.61
$139.42
Daily
Bare
Costs
Incl.
O&P
$820.00
3180.80
820.00
3180.80
789.20
671.20
710.80
2958.49
647.20
$63.99
$97.82
31.52
34.67
$13778.49
$95.51
$132.49
Daily
$78.95
Bare
Costs
Daily
Crew No.
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew E-9
Hr.
Daily
Hr.
2 Struc. Steel Foremen (outside)
5 Struc. Steel Workers
1 Welder Foreman (outside)
5 Welders
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Equip. Oper. (light)
1 Lattice Boom Crane, 90 Ton
5 Welder, Gas Engine, 300 amp
$66.55
64.55
66.55
64.55
66.30
56.40
59.70
$1064.80
2582.00
532.40
2582.00
530.40
451.20
477.60
2689.54
735.45
$102.50
99.40
102.50
99.40
98.65
83.90
88.85
128 L.H., Daily Totals
$11645.39
Crew E-10
Hr.
Daily
Hr.
1 Welder Foreman (outside)
1 Welder
1 Welder, Gas Engine, 300 amp
1 Flatbed Truck, Gas, 3 Ton
$66.55
64.55
$532.40
516.40
147.09
391.02
$102.50
99.40
16 L.H., Daily Totals
$1586.91
Crew E-11
Hr.
Daily
Hr.
2 Painters, Struc. Steel
1 Building Laborer
1 Equip. Oper. (light)
1 Air Compressor, 250 cfm
1 Sandblaster, Portable, 3 C.F.
1 Set Sand Blasting Accessories
$51.20
47.25
59.70
$819.20
378.00
477.60
196.28
84.26
17.14
$81.75
70.35
88.85
32 L.H., Daily Totals
$1972.48
Crew E-11A
Hr.
Daily
Hr.
2 Painters, Struc. Steel
1 Building Laborer
1 Equip. Oper. (light)
1 Air Compressor, 250 cfm
1 Sandblaster, Portable, 3 C.F.
1 Set Sand Blasting Accessories
1 Telescoping Boom Lift, to 60’
$51.20
47.25
59.70
$819.20
378.00
477.60
196.28
84.26
17.14
385.68
$81.75
70.35
88.85
32 L.H., Daily Totals
$2358.16
Crew E-11B
Hr.
Daily
Hr.
2 Painters, Struc. Steel
1 Building Laborer
2 Paint Sprayer, 8 C.F.M.
1 Telescoping Boom Lift, to 60’
$51.20
47.25
$819.20
378.00
104.28
385.68
$81.75
70.35
24 L.H., Daily Totals
$1687.16
Crew E-12
Hr.
Daily
Hr.
1 Welder Foreman (outside)
1 Equip. Oper. (light)
1 Welder, Gas Engine, 300 amp
$66.55
59.70
$532.40
477.60
147.09
$102.50
88.85
16 L.H., Daily Totals
$1157.09
Crew E-13
Hr.
Daily
Hr.
1 Welder Foreman (outside)
.5 Equip. Oper. (light)
1 Welder, Gas Engine, 300 amp
$66.55
59.70
$532.40
238.80
147.09
$102.50
88.85
12 L.H., Daily Totals
$918.29
Crew E-14
Hr.
Daily
Hr.
1 Welder Foreman (outside)
1 Welder, Gas Engine, 300 amp
$66.55
$532.40
147.09
$102.50
8 L.H., Daily Totals
$679.49
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1640.00
3976.00
820.00
3976.00
789.20
671.20
710.80
2958.49
809.00
$64.22
$98.31
26.76
29.43
$16350.69
$90.98
$127.74
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
161.80
430.12
$65.55
$100.95
33.63
37.00
$2207.12
$99.18
$137.95
Daily
Bare
Costs
Incl.
O&P
$1308.00
562.80
710.80
215.91
92.69
18.85
$52.34
$80.67
9.30
10.23
$2909.05
$61.64
$90.91
Daily
Bare
Costs
Incl.
O&P
$1308.00
562.80
710.80
215.91
92.69
18.85
424.25
$52.34
$80.67
21.36
23.49
$3333.30
$73.69
$104.17
Daily
Bare
Costs
Incl.
O&P
$1308.00
562.80
114.71
424.25
$49.88
$77.95
20.41
22.46
$2409.76
$70.30
$100.41
Daily
Bare
Costs
Incl.
O&P
$820.00
710.80
161.80
$63.13
$95.67
9.19
10.11
$1692.60
$72.32
$105.79
Daily
Bare
Costs
Incl.
O&P
$820.00
355.40
161.80
$64.27
$97.95
12.26
13.48
$1337.20
$76.52
$111.43
Daily
Bare
Costs
Incl.
O&P
$820.00
161.80
$66.55
18.39
$102.50
20.22
$981.80
$84.94
$122.72
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew E-16
Hr.
Daily
Hr.
1 Welder Foreman (outside)
1 Welder
1 Welder, Gas Engine, 300 amp
$66.55
64.55
$532.40
516.40
147.09
$102.50
99.40
16 L.H., Daily Totals
$1195.89
Crew E-17
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
1 Structural Steel Worker
$66.55
64.55
$532.40
516.40
$102.50
99.40
16 L.H., Daily Totals
$1048.80
Crew E-18
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
3 Structural Steel Workers
1 Equipment Operator (med.)
1 Lattice Boom Crane, 20 Ton
$66.55
64.55
63.05
$532.40
1549.20
504.40
868.10
$102.50
99.40
93.80
40 L.H., Daily Totals
$3454.10
Crew E-19
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
1 Structural Steel Worker
1 Equip. Oper. (light)
1 Lattice Boom Crane, 20 Ton
$66.55
64.55
59.70
$532.40
516.40
477.60
868.10
$102.50
99.40
88.85
24 L.H., Daily Totals
$2394.50
Crew E-20
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
5 Structural Steel Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Lattice Boom Crane, 40 Ton
$66.55
64.55
66.30
56.40
$532.40
2582.00
530.40
451.20
2371.83
$102.50
99.40
98.65
83.90
64 L.H., Daily Totals
$6467.83
Crew E-22
Hr.
Daily
Hr.
1 Skilled Worker Foreman (out)
2 Skilled Workers
$63.25
61.25
$506.00
980.00
$95.00
92.00
24 L.H., Daily Totals
Crew E-24
3 Structural Steel Workers
1 Equipment Operator (med.)
1 Hyd. Crane, 25 Ton
$1486.00
Hr.
Daily
Hr.
$64.55
63.05
$1549.20
504.40
2273.31
$99.40
93.80
32 L.H., Daily Totals
Crew E-25
1 Welder Foreman (outside)
1 Cutting Torch
$4326.91
Hr.
Daily
Hr.
$66.55
$532.40
14.24
$102.50
8 L.H., Daily Totals
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
1 Struc. Steel Worker
1 Welder
.25 Electrician
.25 Plumber
1 Welder, Gas Engine, 300 amp
$66.55
64.55
64.55
67.35
72.05
$532.40
516.40
516.40
134.70
144.10
147.09
$102.50
99.40
99.40
100.10
107.45
28 L.H., Daily Totals
Bare
Costs
Incl.
O&P
$820.00
795.20
161.80
$65.55
$100.95
9.19
10.11
$1777.00
$74.74
$111.06
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
$65.55
$100.95
$1615.20
$65.55
$100.95
Daily
Bare
Costs
Incl.
O&P
$820.00
2385.60
750.40
954.91
$64.65
$98.90
21.70
23.87
$4910.91
$86.35
$122.77
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
710.80
954.91
$63.60
$96.92
36.17
39.79
$3280.91
$99.77
$136.70
Daily
Bare
Costs
Incl.
O&P
$820.00
3976.00
789.20
671.20
2609.01
$64.00
$97.76
37.06
40.77
$8865.41
$101.06
$138.52
Daily
Bare
Costs
Incl.
O&P
$760.00
1472.00
$61.92
$93.00
$2232.00
$61.92
$93.00
Daily
Bare
Costs
Incl.
O&P
$2385.60
750.40
2500.64
$64.17
$98.00
71.04
78.14
$5636.64
$135.22
$176.15
Daily
Bare
Costs
Incl.
O&P
$820.00
15.66
$66.55
1.78
$102.50
1.96
$835.66
$68.33
$104.46
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
795.20
200.20
214.90
161.80
$65.86
$100.91
5.25
5.78
$2987.30
$71.11
$106.69
Daily
$546.64
Crew E-26
$1991.09
Cost
Per Labor-Hour
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
779
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew E-27
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
5 Struc. Steel Workers
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 12 Ton
1 Hyd. Crane, 80 Ton
$66.55
64.55
66.30
56.40
$532.40
2582.00
530.40
451.20
2150.65
2641.70
$102.50
99.40
98.65
83.90
64 L.H., Daily Totals
Crew F-3
4 Carpenters
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton
$8888.35
Hr.
Daily
Hr.
$58.60
66.30
$1875.20
530.40
2150.65
$87.25
98.65
40 L.H., Daily Totals
Crew F-4
4 Carpenters
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 55 Ton
$4556.25
Hr.
Daily
Hr.
$58.60
66.30
56.40
$1875.20
530.40
451.20
2461.06
$87.25
98.65
83.90
48 L.H., Daily Totals
Crew F-5
1 Carpenter Foreman (outside)
3 Carpenters
$5317.86
Hr.
Daily
Hr.
$60.60
58.60
$484.80
1406.40
$90.20
87.25
32 L.H., Daily Totals
Crew F-6
2 Carpenters
2 Building Laborers
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton
$1891.20
Hr.
Daily
Hr.
$58.60
47.25
66.30
$937.60
756.00
530.40
2150.65
$87.25
70.35
98.65
40 L.H., Daily Totals
Crew F-7
2 Carpenters
2 Building Laborers
$4374.65
Hr.
Daily
Hr.
$58.60
47.25
$937.60
756.00
$87.25
70.35
32 L.H., Daily Totals
Crew G-1
1 Roofer Foreman (outside)
4 Roofers Composition
2 Roofer Helpers
1 Application Equipment
1 Tar Kettle/Pot
1 Crew Truck
$1693.60
Hr.
Daily
Hr.
$53.80
51.80
38.85
$430.40
1657.60
621.60
189.41
220.65
183.83
$87.20
83.95
62.95
56 L.H., Daily Totals
Crew G-2
1 Plasterer
1 Plasterer Helper
1 Building Laborer
1 Grout Pump, 50 C.F./hr.
24 L.H., Daily Totals
$3303.49
Hr.
Daily
Hr.
$53.35
47.55
47.25
$426.80
380.40
378.00
158.45
$79.30
70.65
70.35
$1343.65
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$820.00
3976.00
789.20
671.20
2365.72
2905.87
$64.00
$97.76
74.88
82.37
$11527.99
$138.88
$180.12
Daily
Bare
Costs
Incl.
O&P
$2792.00
789.20
2365.72
$60.14
$89.53
53.77
59.14
$5946.92
$113.91
$148.67
Daily
Bare
Costs
Incl.
O&P
$2792.00
789.20
671.20
2707.17
$59.52
$88.59
51.27
56.40
$6959.57
$110.79
$144.99
Daily
Bare
Costs
Incl.
O&P
$721.60
2094.00
$59.10
$87.99
$2815.60
$59.10
$87.99
Daily
Bare
Costs
Incl.
O&P
$1396.00
1125.60
789.20
2365.72
$55.60
$82.77
53.77
59.14
$5676.52
$109.37
$141.91
Daily
Bare
Costs
Incl.
O&P
$1396.00
1125.60
$52.92
$78.80
1 Carpenter
1 Small Compressor, Electric
1 Pneumatic Nailer
$2521.60
$52.92
$78.80
8 L.H., Daily Totals
Daily
Bare
Costs
Incl.
O&P
$697.60
2686.40
1007.20
208.35
242.72
202.21
$48.39
$78.41
10.61
11.67
$5044.48
$58.99
$90.08
2 Glaziers
1 Building Laborer
Bare
Costs
Incl.
O&P
24 L.H., Daily Totals
Daily
$634.40
565.20
562.80
174.29
$49.38
$73.43
6.60
7.26
$1936.69
$55.99
$80.70
Daily
Crew G-2A
1 Roofer Composition
1 Roofer Helper
1 Building Laborer
1 Foam Spray Rig, Trailer-Mtd.
1 Pickup Truck, 3/4 Ton
Crew G-3
2 Sheet Metal Workers
2 Building Laborers
Daily
Hr.
$51.80
38.85
47.25
$414.40
310.80
378.00
581.75
122.56
$83.95
62.95
70.35
$1807.51
Hr.
Daily
Hr.
$70.15
47.25
$1122.40
756.00
$105.70
70.35
32 L.H., Daily Totals
Crew G-4
1 Labor Foreman (outside)
2 Building Laborers
1 Flatbed Truck, Gas, 1.5 Ton
1 Air Compressor, 160 cfm
$1878.40
Hr.
Daily
Hr.
$49.25
47.25
$394.00
756.00
361.95
244.12
$73.30
70.35
24 L.H., Daily Totals
Crew G-5
1 Roofer Foreman (outside)
2 Roofers Composition
2 Roofer Helpers
1 Application Equipment
$1756.07
Hr.
Daily
Hr.
$53.80
51.80
38.85
$430.40
828.80
621.60
189.41
$87.20
83.95
62.95
40 L.H., Daily Totals
Crew G-6A
2 Roofers Composition
1 Small Compressor, Electric
2 Pneumatic Nailers
$2070.21
Hr.
Daily
Hr.
$51.80
$828.80
32.29
38.40
$83.95
16 L.H., Daily Totals
Crew G-7
Crew H-1
2 Glaziers
2 Struc. Steel Workers
$899.49
Hr.
Daily
Hr.
$58.60
$468.80
32.29
19.20
$87.25
Hr.
Daily
Hr.
$56.05
64.55
$896.80
1032.80
$83.30
99.40
Crew H-3
1 Glazier
1 Helper
$1929.60
Hr.
Daily
Hr.
$56.05
47.25
$896.80
378.00
$83.30
70.35
$1274.80
Hr.
Daily
Hr.
$56.05
44.95
$448.40
359.60
$83.30
67.95
16 L.H., Daily Totals
1 Carpenter
1 Carpenter Helper
.5 Electrician
20 L.H., Daily Totals
$808.00
Hr.
Daily
Hr.
$58.60
44.95
67.35
$468.80
359.60
269.40
$87.25
67.95
100.10
$1097.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$671.60
503.60
562.80
639.92
134.82
$45.97
$72.42
29.35
32.28
$2512.74
$75.31
$104.70
Daily
Bare
Costs
Incl.
O&P
$1691.20
1125.60
$58.70
$88.03
$2816.80
$58.70
$88.03
Daily
Bare
Costs
Incl.
O&P
$586.40
1125.60
398.14
268.53
$47.92
$71.33
25.25
27.78
$2378.68
$73.17
$99.11
Daily
Bare
Costs
Incl.
O&P
$697.60
1343.20
1007.20
208.35
$47.02
$76.20
4.74
5.21
$3256.35
$51.76
$81.41
Daily
Bare
Costs
Incl.
O&P
$1343.20
35.52
42.24
$51.80
$83.95
4.42
4.86
$1420.96
$56.22
$88.81
Daily
Bare
Costs
Incl.
O&P
$698.00
35.52
21.12
$58.60
$87.25
6.44
7.08
$754.64
$65.04
$94.33
Daily
Bare
Costs
Incl.
O&P
$1332.80
1590.40
$60.30
$91.35
$2923.20
$60.30
$91.35
Daily
Bare
Costs
Incl.
O&P
$1332.80
562.80
$53.12
$78.98
$1895.60
$53.12
$78.98
Daily
Bare
Costs
Incl.
O&P
$666.40
543.60
$50.50
$75.63
$1210.00
$50.50
$75.63
Daily
Bare
Costs
Incl.
O&P
$698.00
543.60
400.40
$54.89
$82.10
$1642.00
$54.89
$82.10
Daily
$520.29
32 L.H., Daily Totals
Crew H-2
Incl.
Subs O&P
Hr.
24 L.H., Daily Totals
Crew H-4
780
Bare Costs
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew J-1
3 Plasterers
2 Plasterer Helpers
1 Mixing Machine, 6 C.F.
Bare Costs
Hr.
Daily
Hr.
$53.35
47.55
$1280.40
760.80
116.18
$79.30
70.65
40 L.H., Daily Totals
Crew J-2
3 Plasterers
2 Plasterer Helpers
1 Lather
1 Mixing Machine, 6 C.F.
$2157.38
Hr.
Daily
Hr.
$53.35
47.55
58.45
$1280.40
760.80
467.60
116.18
$79.30
70.65
85.30
48 L.H., Daily Totals
Crew J-3
1 Terrazzo Worker
1 Terrazzo Helper
1 Floor Grinder, 22⬙ Path
1 Terrazzo Mixer
$2624.98
Hr.
Daily
Hr.
$55.25
46.80
$442.00
374.40
109.91
144.05
$80.70
68.35
16 L.H., Daily Totals
Crew J-4
2 Cement Finishers
1 Laborer
1 Floor Grinder, 22⬙ Path
1 Floor Edger, 7⬙ Path
1 Vacuum Pick-Up System
$1070.36
Hr.
Daily
Hr.
$55.00
47.25
$880.00
378.00
109.91
52.63
73.53
$80.45
70.35
24 L.H., Daily Totals
Crew J-4A
2 Cement Finishers
2 Laborers
1 Floor Grinder, 22⬙ Path
1 Floor Edger, 7⬙ Path
1 Vacuum Pick-Up System
1 Floor Auto Scrubber
$1494.07
Hr.
Daily
Hr.
$55.00
47.25
$880.00
756.00
109.91
52.63
73.53
195.20
$80.45
70.35
32 L.H., Daily Totals
Crew J-4B
1 Laborer
1 Floor Auto Scrubber
Incl.
Subs O&P
$2067.27
Hr.
Daily
Hr.
$47.25
$378.00
195.20
$70.35
8 L.H., Daily Totals
$573.20
Crew J-6
Hr.
Daily
Hr.
2 Painters
1 Building Laborer
1 Equip. Oper. (light)
1 Air Compressor, 250 cfm
1 Sandblaster, Portable, 3 C.F.
1 Set Sand Blasting Accessories
$49.65
47.25
59.70
$794.40
378.00
477.60
196.28
84.26
17.14
$73.55
70.35
88.85
32 L.H., Daily Totals
Crew J-7
2 Painters
1 Floor Belt Sander
1 Floor Sanding Edger
16 L.H., Daily Totals
$1947.68
Hr.
$49.65
Daily
$794.40
49.75
26.35
$870.50
Hr.
$73.55
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$1903.20
1130.40
127.80
$51.03
$75.84
2.90
3.19
$3161.40
$53.93
$79.03
Daily
Bare
Costs
Incl.
O&P
$1903.20
1130.40
682.40
127.80
$52.27
$77.42
2.42
2.66
$3843.80
$54.69
$80.08
Daily
Bare
Costs
Incl.
O&P
$645.60
546.80
120.90
158.46
$51.02
$74.53
15.87
17.46
$1471.76
$66.90
$91.98
Daily
Bare
Costs
Incl.
O&P
1 Carpenter
1 Carpenter Helper
$1287.20
562.80
120.90
57.89
80.88
$52.42
$77.08
16 L.H., Daily Totals
9.84
10.82
$2109.68
$62.25
$87.90
Daily
Bare
Costs
Incl.
O&P
$1287.20
1125.60
120.90
57.89
80.88
214.72
$51.13
$75.40
13.48
14.82
$2887.20
$64.60
$90.22
Daily
Bare
Costs
Incl.
O&P
$562.80
214.72
$47.25
24.40
$70.35
26.84
$777.52
$71.65
$97.19
Daily
Bare
Costs
Incl.
O&P
$1176.80
562.80
710.80
215.91
92.69
18.85
$51.56
$76.58
9.30
10.23
$2777.85
$60.87
$86.81
Daily
Bare
Costs
Incl.
O&P
Daily
Crew K-1
1 Carpenter
1 Truck Driver (light)
1 Flatbed Truck, Gas, 3 Ton
Bare Costs
Hr.
Daily
Hr.
$58.60
52.90
$468.80
423.20
391.02
$87.25
79.00
16 L.H., Daily Totals
$1283.02
Crew K-2
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
1 Struc. Steel Worker
1 Truck Driver (light)
1 Flatbed Truck, Gas, 3 Ton
$66.55
64.55
52.90
$532.40
516.40
423.20
391.02
$102.50
99.40
79.00
24 L.H., Daily Totals
Crew L-1
1 Electrician
1 Plumber
$1863.02
Hr.
Daily
Hr.
$67.35
72.05
$538.80
576.40
$100.10
107.45
16 L.H., Daily Totals
Crew L-2
Crew L-3
1 Carpenter
.5 Electrician
.5 Sheet Metal Worker
$1115.20
Hr.
Daily
Hr.
$58.60
44.95
$468.80
359.60
$87.25
67.95
$828.40
Hr.
Daily
Hr.
$58.60
67.35
70.15
$468.80
269.40
280.60
$87.25
100.10
105.70
16 L.H., Daily Totals
Crew L-3A
1 Carpenter Foreman (outside)
.5 Sheet Metal Worker
$1018.80
Hr.
Daily
Hr.
$60.60
70.15
$484.80
280.60
$90.20
105.70
12 L.H., Daily Totals
Crew L-4
2 Skilled Workers
1 Helper
$765.40
Hr.
Daily
Hr.
$61.25
44.95
$980.00
359.60
$92.00
67.95
24 L.H., Daily Totals
$1339.60
Crew L-5
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
5 Struc. Steel Workers
1 Equip. Oper. (crane)
1 Hyd. Crane, 25 Ton
$66.55
64.55
66.30
$532.40
2582.00
530.40
2273.31
$102.50
99.40
98.65
56 L.H., Daily Totals
$1176.80
54.73
28.98
$49.65
$73.55
4.76
5.23
$1260.51
$54.41
$78.78
Incl.
Subs O&P
$5918.11
Crew L-5A
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
2 Structural Steel Workers
1 Equip. Oper. (crane)
1 S.P. Crane, 4x4, 25 Ton
$66.55
64.55
66.30
$532.40
1032.80
530.40
927.07
$102.50
99.40
98.65
32 L.H., Daily Totals
$3022.67
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$698.00
632.00
430.12
$55.75
$83.13
24.44
26.88
$1760.12
$80.19
$110.01
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
632.00
430.12
$61.33
$93.63
16.29
17.92
$2677.32
$77.63
$111.56
Daily
Bare
Costs
Incl.
O&P
$800.80
859.60
$69.70
$103.78
$1660.40
$69.70
$103.78
Daily
Bare
Costs
Incl.
O&P
$698.00
543.60
$51.77
$77.60
$1241.60
$51.77
$77.60
Daily
Bare
Costs
Incl.
O&P
$698.00
400.40
422.80
$63.67
$95.08
$1521.20
$63.67
$95.08
Daily
Bare
Costs
Incl.
O&P
$721.60
422.80
$63.78
$95.37
$1144.40
$63.78
$95.37
Daily
Bare
Costs
Incl.
O&P
$1472.00
543.60
$55.82
$83.98
$2015.60
$55.82
$83.98
Daily
Bare
Costs
Incl.
O&P
$820.00
3976.00
789.20
2500.64
$65.09
$99.74
40.59
44.65
$8085.84
$105.68
$144.39
Daily
Bare
Costs
Incl.
O&P
$820.00
1590.40
789.20
1019.78
$65.49
$99.99
28.97
31.87
$4219.38
$94.46
$131.86
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
781
Crews - Standard
Crew No.
Bare Costs
Incl.
Subs O&P
Crew L-5B
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
2 Structural Steel Workers
2 Electricians
2 Steamfitters/Pipefitters
1 Equip. Oper. (crane)
1 Equip. Oper. (oiler)
1 Hyd. Crane, 80 Ton
$66.55
64.55
67.35
72.55
66.30
56.40
$532.40
1032.80
1077.60
1160.80
530.40
451.20
2641.70
$102.50
99.40
100.10
108.20
98.65
83.90
72 L.H., Daily Totals
Crew L-6
1 Plumber
.5 Electrician
$7426.90
Hr.
Daily
Hr.
$72.05
67.35
$576.40
269.40
$107.45
100.10
12 L.H., Daily Totals
Crew L-7
2 Carpenters
1 Building Laborer
.5 Electrician
$845.80
Hr.
Daily
Hr.
$58.60
47.25
67.35
$937.60
378.00
269.40
$87.25
70.35
100.10
28 L.H., Daily Totals
Crew L-8
2 Carpenters
.5 Plumber
$1585.00
Hr.
Daily
Hr.
$58.60
72.05
$937.60
288.20
$87.25
107.45
20 L.H., Daily Totals
Crew L-9
1 Labor Foreman (inside)
2 Building Laborers
1 Struc. Steel Worker
.5 Electrician
$1225.80
Hr.
Daily
Hr.
$47.75
47.25
64.55
67.35
$382.00
756.00
516.40
269.40
$71.10
70.35
99.40
100.10
36 L.H., Daily Totals
$1923.80
Crew L-10
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
1 Structural Steel Worker
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton
$66.55
64.55
66.30
$532.40
516.40
530.40
2150.65
$102.50
99.40
98.65
24 L.H., Daily Totals
Crew L-11
2 Wreckers
1 Equip. Oper. (crane)
1 Equip. Oper. (light)
1 Hyd. Excavator, 2.5 C.Y.
1 Loader, Skid Steer, 78 H.P.
$3729.85
Hr.
Daily
Hr.
$47.25
66.30
59.70
$756.00
530.40
477.60
1683.69
429.91
$71.35
98.65
88.85
32 L.H., Daily Totals
Crew M-1
3 Elevator Constructors
1 Elevator Apprentice
5 Hand Tools
32 L.H., Daily Totals
$3877.60
Hr.
Daily
Hr.
$96.60
77.30
$2318.40
618.40
344.60
$143.00
114.45
$3281.40
Cost
Per Labor-Hour
Crew No.
Bare Costs
Bare
Costs
Incl.
O&P
$820.00
1590.40
1601.60
1731.20
789.20
671.20
2905.87
$66.46
$100.05
36.69
40.36
$10109.47
$103.15
$140.41
Daily
Bare
Costs
Incl.
O&P
$859.60
400.40
$70.48
$105.00
$1260.00
$70.48
$105.00
Daily
Bare
Costs
Incl.
O&P
$1396.00
562.80
400.40
$56.61
$84.26
$2359.20
$56.61
$84.26
Crew Q-1
Daily
Bare
Costs
Incl.
O&P
1 Plumber
1 Plumber Apprentice
$1396.00
429.80
$61.29
$91.29
$1825.80
$61.29
$91.29
Crew Q-1A
Hr.
Daily
Hr.
Daily
Bare
Costs
Incl.
O&P
.25 Plumber Foreman (outside)
1 Plumber
$74.05
72.05
$148.10
576.40
$110.40
107.45
$568.80
1125.60
795.20
400.40
$53.44
$80.28
$2890.00
$53.44
$80.28
Daily
Bare
Costs
Incl.
O&P
$820.00
795.20
789.20
2365.72
$65.80
$100.18
89.61
98.57
$4770.11
$155.41
$198.75
Daily
Bare
Costs
Incl.
O&P
$1141.60
789.20
710.80
1852.06
472.90
$55.13
$82.55
66.05
72.66
$4966.56
$121.18
$155.21
Daily
Bare
Costs
Incl.
O&P
$3432.00
915.60
379.06
$91.78
$135.86
10.77
11.85
$4726.66
$102.54
$147.71
Daily
Crew M-3
Hr.
Daily
Hr.
1 Electrician Foreman (outside)
1 Common Laborer
.25 Equipment Operator (med.)
1 Elevator Constructor
1 Elevator Apprentice
.25 S.P. Crane, 4x4, 20 Ton
$69.35
47.25
63.05
96.60
77.30
$554.80
378.00
126.10
772.80
618.40
190.24
$103.05
70.35
93.80
143.00
114.45
34 L.H., Daily Totals
$2640.34
Crew M-4
Hr.
Daily
Hr.
1 Electrician Foreman (outside)
1 Common Laborer
.25 Equipment Operator, Crane
.25 Equip. Oper. (oiler)
1 Elevator Constructor
1 Elevator Apprentice
.25 S.P. Crane, 4x4, 40 Ton
$69.35
47.25
66.30
56.40
96.60
77.30
$554.80
378.00
132.60
112.80
772.80
618.40
284.79
$103.05
70.35
98.65
83.90
143.00
114.45
36 L.H., Daily Totals
$2854.18
Hr.
Daily
Hr.
$72.05
57.65
$576.40
461.20
$107.45
85.95
16 L.H., Daily Totals
$1037.60
10 L.H., Daily Totals
Crew Q-1C
1 Plumber
1 Plumber Apprentice
1 Equip. Oper. (medium)
1 Trencher, Chain Type, 8’ D
$724.50
Hr.
Daily
Hr.
$72.05
57.65
63.05
$576.40
461.20
504.40
2079.03
$107.45
85.95
93.80
24 L.H., Daily Totals
Crew Q-2
2 Plumbers
1 Plumber Apprentice
$3621.03
Hr.
Daily
Hr.
$72.05
57.65
$1152.80
461.20
$107.45
85.95
24 L.H., Daily Totals
Crew Q-3
1 Plumber Foreman (inside)
2 Plumbers
1 Plumber Apprentice
$1614.00
Hr.
Daily
Hr.
$72.55
72.05
57.65
$580.40
1152.80
461.20
$108.20
107.45
85.95
32 L.H., Daily Totals
Crew Q-4
1 Plumber Foreman (inside)
1 Plumber
1 Welder (plumber)
1 Plumber Apprentice
1 Welder, Electric, 300 amp
$2194.40
Hr.
Daily
Hr.
$72.55
72.05
72.05
57.65
$580.40
576.40
576.40
461.20
64.17
$108.20
107.45
107.45
85.95
32 L.H., Daily Totals
Crew Q-5
1 Steamfitter
1 Steamfitter Apprentice
16 L.H., Daily Totals
782
Incl.
Subs O&P
$2258.57
Hr.
Daily
Hr.
$72.55
58.05
$580.40
464.40
$108.20
86.55
$1044.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$824.40
562.80
187.60
1144.00
915.60
209.27
$72.06
$106.89
5.60
6.15
$3843.67
$77.66
$113.05
Daily
Bare
Costs
Incl.
O&P
$824.40
562.80
197.30
167.80
1144.00
915.60
313.26
$71.37
$105.89
7.91
8.70
$4125.16
$79.28
$114.59
Daily
Bare
Costs
Incl.
O&P
$859.60
687.60
$64.85
$96.70
$1547.20
$64.85
$96.70
Daily
Bare
Costs
Incl.
O&P
$220.80
859.60
$72.45
$108.04
$1080.40
$72.45
$108.04
Daily
Bare
Costs
Incl.
O&P
$859.60
687.60
750.40
2286.93
$64.25
$95.73
86.63
95.29
$4584.53
$150.88
$191.02
Daily
Bare
Costs
Incl.
O&P
$1719.20
687.60
$67.25
$100.28
$2406.80
$67.25
$100.28
Daily
Bare
Costs
Incl.
O&P
$865.60
1719.20
687.60
$68.58
$102.26
$3272.40
$68.58
$102.26
Daily
Bare
Costs
Incl.
O&P
$865.60
859.60
859.60
687.60
70.59
$68.58
$102.26
2.01
2.21
$3342.99
$70.58
$104.47
Daily
Bare
Costs
Incl.
O&P
$865.60
692.40
$65.30
$97.38
$1558.00
$65.30
$97.38
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew Q-6
2 Steamfitters
1 Steamfitter Apprentice
Bare Costs
Hr.
Daily
Hr.
$72.55
58.05
$1160.80
464.40
$108.20
86.55
24 L.H., Daily Totals
Crew Q-7
1 Steamfitter Foreman (inside)
2 Steamfitters
1 Steamfitter Apprentice
$1625.20
Hr.
Daily
Hr.
$73.05
72.55
58.05
$584.40
1160.80
464.40
$108.95
108.20
86.55
32 L.H., Daily Totals
Crew Q-8
1 Steamfitter Foreman (inside)
1 Steamfitter
1 Welder (steamfitter)
1 Steamfitter Apprentice
1 Welder, Electric, 300 amp
$2209.60
Hr.
Daily
Hr.
$73.05
72.55
72.55
58.05
$584.40
580.40
580.40
464.40
64.17
$108.95
108.20
108.20
86.55
32 L.H., Daily Totals
Crew Q-9
1 Sheet Metal Worker
1 Sheet Metal Apprentice
$2273.77
Hr.
Daily
Hr.
$70.15
56.10
$561.20
448.80
$105.70
84.50
16 L.H., Daily Totals
Crew Q-10
2 Sheet Metal Workers
1 Sheet Metal Apprentice
Incl.
Subs O&P
$1010.00
Hr.
Daily
Hr.
$70.15
56.10
$1122.40
448.80
$105.70
84.50
24 L.H., Daily Totals
$1571.20
Crew Q-11
Hr.
Daily
Hr.
1 Sheet Metal Foreman (inside)
2 Sheet Metal Workers
1 Sheet Metal Apprentice
$70.65
70.15
56.10
$565.20
1122.40
448.80
$106.45
105.70
84.50
32 L.H., Daily Totals
Crew Q-12
1 Sprinkler Installer
1 Sprinkler Apprentice
$2136.40
Hr.
Daily
Hr.
$70.80
56.65
$566.40
453.20
$105.70
84.55
16 L.H., Daily Totals
Crew Q-13
1 Sprinkler Foreman (inside)
2 Sprinkler Installers
1 Sprinkler Apprentice
$1019.60
Hr.
Daily
Hr.
$71.30
70.80
56.65
$570.40
1132.80
453.20
$106.45
105.70
84.55
32 L.H., Daily Totals
Crew Q-14
1 Asbestos Worker
1 Asbestos Apprentice
$2156.40
Hr.
Daily
Hr.
$65.25
52.20
$522.00
417.60
$99.80
79.85
16 L.H., Daily Totals
Crew Q-15
1 Plumber
1 Plumber Apprentice
1 Welder, Electric, 300 amp
16 L.H., Daily Totals
$939.60
Hr.
Daily
Hr.
$72.05
57.65
$576.40
461.20
64.17
$107.45
85.95
$1101.77
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1731.20
692.40
$67.72
$100.98
$2423.60
$67.72
$100.98
Daily
Bare
Costs
Incl.
O&P
$871.60
1731.20
692.40
$69.05
$102.97
$3295.20
$69.05
Daily
$102.97
Bare
Costs
Incl.
O&P
$871.60
865.60
865.60
692.40
70.59
$69.05
$102.97
2.01
2.21
$3365.79
$71.06
$105.18
Daily
Bare
Costs
Incl.
O&P
$845.60
676.00
$63.13
$95.10
$1521.60
$63.13
$95.10
Daily
Bare
Costs
Incl.
O&P
$1691.20
676.00
$65.47
$98.63
$2367.20
$65.47
$98.63
Daily
Bare
Costs
Incl.
O&P
$851.60
1691.20
676.00
$66.76
$100.59
$3218.80
$66.76
$100.59
Daily
Bare
Costs
Incl.
O&P
$845.60
676.40
$63.73
$95.13
$1522.00
$63.73
$95.13
Daily
Bare
Costs
Incl.
O&P
$851.60
1691.20
676.40
$67.39
$100.60
$3219.20
$67.39
$100.60
Daily
Bare
Costs
Incl.
O&P
$798.40
638.80
$58.73
$89.83
$1437.20
$58.73
$89.83
Daily
Crew Q-16
2 Plumbers
1 Plumber Apprentice
1 Welder, Electric, 300 amp
Crew Q-17
1 Steamfitter
1 Steamfitter Apprentice
1 Welder, Electric, 300 amp
Crew Q-17A
1 Steamfitter
1 Steamfitter Apprentice
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton
1 Welder, Electric, 300 amp
$859.60
687.60
70.59
$64.85
$96.70
4.01
4.41
$1617.79
$68.86
$101.11
Daily
Hr.
$72.05
57.65
$1152.80
461.20
64.17
$107.45
85.95
$1678.17
Hr.
Daily
Hr.
$72.55
58.05
$580.40
464.40
64.17
$108.20
86.55
$1108.97
Hr.
Daily
Hr.
$72.55
58.05
66.30
$580.40
464.40
530.40
2150.65
64.17
$108.20
86.55
98.65
24 L.H., Daily Totals
Crew Q-18
2 Steamfitters
1 Steamfitter Apprentice
1 Welder, Electric, 300 amp
$3790.02
Hr.
Daily
Hr.
$72.55
58.05
$1160.80
464.40
64.17
$108.20
86.55
24 L.H., Daily Totals
1 Steamfitter
1 Steamfitter Apprentice
1 Electrician
$1689.37
Hr.
Daily
Hr.
$72.55
58.05
67.35
$580.40
464.40
538.80
$108.20
86.55
100.10
24 L.H., Daily Totals
1 Sheet Metal Worker
1 Sheet Metal Apprentice
.5 Electrician
$1583.60
Hr.
Daily
Hr.
$70.15
56.10
67.35
$561.20
448.80
269.40
$105.70
84.50
100.10
20 L.H., Daily Totals
Crew Q-21
2 Steamfitters
1 Steamfitter Apprentice
1 Electrician
$1279.40
Hr.
Daily
Hr.
$72.55
58.05
67.35
$1160.80
464.40
538.80
$108.20
86.55
100.10
32 L.H., Daily Totals
Crew Q-22
1 Plumber
1 Plumber Apprentice
1 Hyd. Crane, 12 Ton
$2164.00
Hr.
Daily
Hr.
$72.05
57.65
$576.40
461.20
2150.65
$107.45
85.95
16 L.H., Daily Totals
Crew Q-22A
1 Plumber
1 Plumber Apprentice
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Crane, 12 Ton
32 L.H., Daily Totals
Incl.
Subs O&P
Hr.
16 L.H., Daily Totals
Crew Q-20
Incl.
O&P
Bare Costs
24 L.H., Daily Totals
Crew Q-19
Bare
Costs
Daily
Crew No.
$3188.25
Hr.
Daily
Hr.
$72.05
57.65
47.25
66.30
$576.40
461.20
378.00
530.40
2150.65
$107.45
85.95
70.35
98.65
$4096.65
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1719.20
687.60
70.59
$67.25
$100.28
2.67
2.94
$2477.39
$69.92
$103.22
Daily
Bare
Costs
Incl.
O&P
$865.60
692.40
70.59
$65.30
$97.38
4.01
4.41
$1628.59
$69.31
$101.79
Daily
Bare
Costs
Incl.
O&P
$865.60
692.40
789.20
2365.72
70.59
$65.63
$97.80
92.28
101.51
$4783.50
$157.92
$199.31
Daily
Bare
Costs
Incl.
O&P
$1731.20
692.40
70.59
$67.72
$100.98
2.67
2.94
$2494.19
$70.39
$103.92
Daily
Bare
Costs
Incl.
O&P
$865.60
692.40
800.80
$65.98
$98.28
$2358.80
$65.98
$98.28
Daily
Bare
Costs
Incl.
O&P
$845.60
676.00
400.40
$63.97
$96.10
$1922.00
$63.97
$96.10
Daily
Bare
Costs
Incl.
O&P
$1731.20
692.40
800.80
$67.63
$100.76
$3224.40
$67.63
$100.76
Daily
Bare
Costs
Incl.
O&P
$859.60
687.60
2365.72
$64.85
$96.70
134.42
147.86
$3912.92
$199.27
$244.56
Daily
Bare
Costs
Incl.
O&P
$859.60
687.60
562.80
789.20
2365.72
$60.81
$90.60
67.21
73.93
$5264.92
$128.02
$164.53
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
783
Crews - Standard
Crew No.
Crew Q-23
1 Plumber Foreman (outside)
1 Plumber
1 Equip. Oper. (medium)
1 Lattice Boom Crane, 20 Ton
Bare Costs
Hr.
Daily
Hr.
$74.05
72.05
63.05
$592.40
576.40
504.40
868.10
$110.40
107.45
93.80
24 L.H., Daily Totals
Crew R-1
1 Electrician Foreman
3 Electricians
2 Electrician Apprentices
$2541.30
Hr.
Daily
Hr.
$67.85
67.35
53.90
$542.80
1616.40
862.40
$100.85
100.10
80.10
48 L.H., Daily Totals
Crew R-1A
1 Electrician
1 Electrician Apprentice
$3021.60
Hr.
Daily
Hr.
$67.35
53.90
$538.80
431.20
$100.10
80.10
16 L.H., Daily Totals
Crew R-1B
1 Electrician
2 Electrician Apprentices
Incl.
Subs O&P
$970.00
Hr.
Daily
Hr.
$67.35
53.90
$538.80
862.40
$100.10
80.10
24 L.H., Daily Totals
$1401.20
Crew R-1C
Hr.
Daily
Hr.
2 Electricians
2 Electrician Apprentices
1 Portable cable puller, 8000 lb.
$67.35
53.90
$1077.60
862.40
118.26
$100.10
80.10
32 L.H., Daily Totals
Crew R-2
1 Electrician Foreman
3 Electricians
2 Electrician Apprentices
1 Equip. Oper. (crane)
1 S.P. Crane, 4x4, 5 Ton
$2058.26
Hr.
Daily
Hr.
$67.85
67.35
53.90
66.30
$542.80
1616.40
862.40
530.40
385.89
$100.85
100.10
80.10
98.65
56 L.H., Daily Totals
Crew R-3
1 Electrician Foreman
1 Electrician
.5 Equip. Oper. (crane)
.5 S.P. Crane, 4x4, 5 Ton
$3937.89
Hr.
Daily
Hr.
$67.85
67.35
66.30
$542.80
538.80
265.20
192.94
$100.85
100.10
98.65
20 L.H., Daily Totals
$1539.74
Crew R-4
Hr.
Daily
Hr.
1 Struc. Steel Foreman (outside)
3 Struc. Steel Workers
1 Electrician
1 Welder, Gas Engine, 300 amp
$66.55
64.55
67.35
$532.40
1549.20
538.80
147.09
$102.50
99.40
100.10
40 L.H., Daily Totals
$2767.49
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$883.20
859.60
750.40
954.91
$69.72
$103.88
36.17
39.79
$3448.11
$105.89
$143.67
Daily
Bare
Costs
Incl.
O&P
$806.80
2402.40
1281.60
$62.95
$93.56
$4490.80
$62.95
$93.56
Daily
Bare
Costs
Incl.
O&P
$800.80
640.80
$60.63
$90.10
$1441.60
$60.63
$90.10
Daily
Bare
Costs
Incl.
O&P
$800.80
1281.60
$58.38
$86.77
$2082.40
$58.38
$86.77
Daily
Bare
Costs
Incl.
O&P
$1601.60
1281.60
130.09
$60.63
$90.10
3.70
4.07
$3013.29
$64.32
$94.17
Daily
Bare
Costs
Incl.
O&P
$806.80
2402.40
1281.60
789.20
424.48
$63.43
$94.29
6.89
7.58
$5704.48
$70.32
$101.87
Daily
Bare
Costs
Incl.
O&P
$806.80
800.80
394.60
212.24
$67.34
$100.11
9.65
10.61
$2214.44
$76.99
$110.72
Daily
Bare
Costs
Incl.
O&P
$820.00
2385.60
800.80
161.80
$65.51
$100.16
3.68
4.04
$4168.20
$69.19
$104.21
Daily
Crew No.
Crew R-5
1 Electrician Foreman
4 Electrician Linemen
2 Electrician Operators
4 Electrician Groundmen
1 Crew Truck
1 Flatbed Truck, 20,000 GVW
1 Pickup Truck, 3/4 Ton
.2 Hyd. Crane, 55 Ton
.2 Hyd. Crane, 12 Ton
.2 Earth Auger, Truck-Mtd.
1 Tractor w/Winch
Bare Costs
Hr.
Daily
Hr.
$67.85
67.35
67.35
44.95
$542.80
2155.20
1077.60
1438.40
183.83
223.10
122.56
492.21
430.13
30.79
413.43
$100.85
100.10
100.10
67.95
88 L.H., Daily Totals
Crew R-6
1 Electrician Foreman
4 Electrician Linemen
2 Electrician Operators
4 Electrician Groundmen
1 Crew Truck
1 Flatbed Truck, 20,000 GVW
1 Pickup Truck, 3/4 Ton
.2 Hyd. Crane, 55 Ton
.2 Hyd. Crane, 12 Ton
.2 Earth Auger, Truck-Mtd.
1 Tractor w/Winch
3 Cable Trailers
.5 Tensioning Rig
.5 Cable Pulling Rig
$7110.06
Hr.
Daily
Hr.
$67.85
67.35
67.35
44.95
$542.80
2155.20
1077.60
1438.40
183.83
223.10
122.56
492.21
430.13
30.79
413.43
609.78
76.23
370.78
$100.85
100.10
100.10
67.95
88 L.H., Daily Totals
Crew R-7
1 Electrician Foreman
5 Electrician Groundmen
1 Crew Truck
$8166.85
Hr.
Daily
Hr.
$67.85
44.95
$542.80
1798.00
183.83
$100.85
67.95
48 L.H., Daily Totals
Crew R-8
1 Electrician Foreman
3 Electrician Linemen
2 Electrician Groundmen
1 Pickup Truck, 3/4 Ton
1 Crew Truck
$2524.63
Hr.
Daily
Hr.
$67.85
67.35
44.95
$542.80
1616.40
719.20
122.56
183.83
$100.85
100.10
67.95
48 L.H., Daily Totals
Crew R-9
1 Electrician Foreman
1 Electrician Lineman
2 Electrician Operators
4 Electrician Groundmen
1 Pickup Truck, 3/4 Ton
1 Crew Truck
$3184.79
Hr.
Daily
Hr.
$67.85
67.35
67.35
44.95
$542.80
538.80
1077.60
1438.40
122.56
183.83
$100.85
100.10
100.10
67.95
64 L.H., Daily Totals
Crew R-10
1 Electrician Foreman
4 Electrician Linemen
1 Electrician Groundman
1 Crew Truck
3 Tram Cars
48 L.H., Daily Totals
784
Incl.
Subs O&P
$3903.99
Hr.
Daily
Hr.
$67.85
67.35
44.95
$542.80
2155.20
359.60
183.83
237.63
$100.85
100.10
67.95
$3479.06
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$806.80
3203.20
1601.60
2174.40
202.21
245.41
134.82
541.43
473.14
33.87
454.77
$59.25
$88.48
21.55
23.70
$9871.66
$80.80
$112.18
Daily
Bare
Costs
Incl.
O&P
$806.80
3203.20
1601.60
2174.40
202.21
245.41
134.82
541.43
473.14
33.87
454.77
670.76
83.86
407.86
$59.25
$88.48
33.56
36.91
$11034.14
$92.81
$125.39
Daily
Bare
Costs
Incl.
O&P
$806.80
2718.00
202.21
$48.77
$73.43
3.83
4.21
$3727.01
$52.60
$77.65
Daily
Bare
Costs
Incl.
O&P
$806.80
2402.40
1087.20
134.82
202.21
$59.97
$89.51
6.38
7.02
$4633.43
$66.35
$96.53
Daily
Bare
Costs
Incl.
O&P
$806.80
800.80
1601.60
2174.40
134.82
202.21
$56.21
$84.12
4.79
5.27
$5720.63
$61.00
$89.38
Daily
Bare
Costs
Incl.
O&P
$806.80
3203.20
543.60
202.21
261.39
$63.70
$94.87
8.78
9.66
$5017.21
$72.48
$104.53
Daily
Copyright The Gordian Group, Inc. 2023
For customer support on your Building Construction Costs with RSMeans data, call 800.448.8182.
Crews - Standard
Crew No.
Crew R-11
1 Electrician Foreman
4 Electricians
1 Equip. Oper. (crane)
1 Common Laborer
1 Crew Truck
1 Hyd. Crane, 12 Ton
Bare Costs
Hr.
Daily
Hr.
$67.85
67.35
66.30
47.25
$542.80
2155.20
530.40
378.00
183.83
2150.65
$100.85
100.10
98.65
70.35
56 L.H., Daily Totals
Crew R-12
1 Carpenter Foreman (inside)
4 Carpenters
4 Common Laborers
1 Equip. Oper. (medium)
1 Steel Worker
1 Dozer, 200 H.P.
1 Pickup Truck, 3/4 Ton
$5940.88
Hr.
Daily
Hr.
$59.10
58.60
47.25
63.05
64.55
$472.80
1875.20
1512.00
504.40
516.40
1382.36
122.56
$88.00
87.25
70.35
93.80
99.40
88 L.H., Daily Totals
Crew R-13
1 Electrician Foreman
3 Electricians
.25 Equip. Oper. (crane)
1 Equipment Oiler
.25 Hydraulic Crane, 33 Ton
Incl.
Subs O&P
$6385.72
Hr.
Daily
Hr.
$67.85
67.35
66.30
56.40
$542.80
1616.40
132.60
451.20
607.40
$100.85
100.10
98.65
83.90
42 L.H., Daily Totals
$3350.41
Crew R-15
Hr.
Daily
Hr.
1 Electrician Foreman
4 Electricians
1 Equipment Oper. (light)
1 Telescoping Boom Lift, to 40’
$67.85
67.35
59.70
$542.80
2155.20
477.60
345.57
$100.85
100.10
88.85
48 L.H., Daily Totals
$3521.17
Crew R-15A
Hr.
Daily
Hr.
1 Electrician Foreman
2 Electricians
2 Common Laborers
1 Equip. Oper. (light)
1 Telescoping Boom Lift, to 40’
$67.85
67.35
47.25
59.70
$542.80
1077.60
756.00
477.60
345.57
$100.85
100.10
70.35
88.85
48 L.H., Daily Totals
Crew R-18
.25 Electrician Foreman
1 Electrician
2 Electrician Apprentices
$3199.57
Hr.
Daily
Hr.
$67.85
67.35
53.90
$135.70
538.80
862.40
$100.85
100.10
80.10
26 L.H., Daily Totals
Crew R-19
.5 Electrician Foreman
2 Electricians
$1536.90
Hr.
Daily
Hr.
$67.85
67.35
$271.40
1077.60
$100.85
100.10
20 L.H., Daily Totals
Crew R-21
1 Electrician Foreman
3 Electricians
.1 Equip. Oper. (medium)
.1 S.P. Crane, 4x4, 25 Ton
32.8 L.H., Daily Totals
$1349.00
Hr.
Daily
Hr.
$67.85
67.35
63.05
$542.80
1616.40
50.44
92.71
$100.85
100.10
93.80
$2302.35
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$806.80
3203.20
789.20
562.80
202.21
2365.72
$64.40
$95.75
41.69
45.86
$7929.93
$106.09
$141.61
Daily
Bare
Costs
Incl.
O&P
$704.00
2792.00
2251.20
750.40
795.20
1520.60
134.82
$55.46
$82.87
17.10
18.81
$8948.21
$72.56
$101.68
Daily
Crew R-22
.66 Electrician Foreman
2 Electricians
2 Electrician Apprentices
Bare Costs
Daily
Hr.
$67.85
67.35
53.90
$358.25
1077.60
862.40
$100.85
100.10
80.10
Hr.
Daily
Hr.
.25 Electrician Foreman (outside)
1 Electrician
2 Laborers (Semi-Skilled)
$69.35
67.35
47.25
$138.70
538.80
756.00
$103.05
100.10
70.35
26 L.H., Daily Totals
1 Electrician
1 Core Drill, Electric, 2.5 H.P.
$806.80
2402.40
197.30
671.20
668.15
$65.31
$97.09
14.46
15.91
$4745.85
$79.77
$113.00
Daily
Bare
Costs
Incl.
O&P
$806.80
3203.20
710.80
380.13
$66.16
$98.35
7.20
7.92
$5100.93
$73.36
$106.27
Daily
Bare
Costs
Incl.
O&P
$806.80
1601.60
1125.60
710.80
380.13
$59.46
$88.43
7.20
7.92
$4624.93
$66.66
$96.35
Daily
Bare
Costs
Incl.
O&P
$201.70
800.80
1281.60
$59.11
$87.85
$2284.10
$59.11
$87.85
Daily
Bare
Costs
Incl.
O&P
$403.40
1601.60
$67.45
$100.25
$2005.00
$67.45
$100.25
Daily
Bare
Costs
Incl.
O&P
$806.80
2402.40
75.04
101.98
$67.37
$100.13
2.83
3.11
$3386.22
$70.19
$103.24
$2298.25
Crew R-30
Crew R-31
Incl.
O&P
Incl.
Subs O&P
Hr.
37.28 L.H., Daily Totals
Bare
Costs
Daily
Crew No.
$1433.50
Hr.
Daily
Hr.
$67.35
$538.80
61.41
$100.10
8 L.H., Daily Totals
Crew W-41E
.5 Plumber Foreman (outside)
1 Plumber
1 Laborer
20 L.H., Daily Totals
Bare
Costs
Incl.
O&P
$532.49
1601.60
1281.60
$61.65
$91.62
$3415.69
$61.65
$91.62
Daily
Bare
Costs
Incl.
O&P
$206.10
800.80
1125.60
$55.13
$82.02
$2132.50
$55.13
$82.02
Daily
Bare
Costs
Incl.
O&P
$800.80
67.55
$67.35
7.68
$100.10
8.44
$868.35
$75.03
$108.54
Daily
Bare
Costs
Incl.
O&P
$441.60
859.60
562.80
$62.53
$93.20
$1864.00
$62.53
$93.20
Daily
$600.21
Hr.
Daily
Hr.
$74.05
72.05
47.25
$296.20
576.40
378.00
$110.40
107.45
70.35
$1250.60
Cost
Per Labor-Hour
Copyright The Gordian Group, Inc. 2023