EOC SITUATION REPORT Community / Local Authority: Date and Time: PEP Task Number: Prepared By: Community / Local Authority PREOC Operational Area Coordinator Approved By: (Name and Position) EOC Contact: Name: Position: Report Type: Initial Update # Final Phone #: Fax #: E-mail: Situation Forecast: Improving Unchanged Deteriorating Highlights (Situational Overview – Key Points): Current Priority Needs: (Resources / Information / Support): Resource Request Attached: Yes No People Impacted (Estimated / Confirmed): # # # Evacuated Injured Homeless* # Missing # Dead # Hospitalized * As a result of the emergency event page 1 of 4 EOC 501 Livestock Impacted (Estimated / Confirmed): # Animal Type Dead # Evacuated # Disposed General Situations: Transportation Routes Closed Partial Blockages Reopened Times Municipal Roads Provincial Roads DRR (Disaster Response Routes) Bridges Transit System Rail Critical Transportation Issues: Customers Without Service # % Utilities Comments Water Sewer Hydro Gas Telephone Cable Critical Utilities Issues: Communication Methods Still Functioning Telephone Cellular Radio Satellite E-mail Fax Amateur Radio Other Call Centre # of calls received / hr. Anticipated Communication Problems: page 2 of 4 EOC 501 Damage Assessment Report: Attached Not Attached Current Resource Information: Assigned 1 Available Critical Need RCMP: RCMP Staff RCMP Vehicles 2 3 Search and Rescue: SAR members Fire & Rescue: Structural Firefighters Structural Fire Apparatus Wildland Firefighters Wildland Fire Apparatus Aircraft 4 Engineering / Public Works: Staff Vehicles Equipment 5 BCAS: Paramedics Ambulances 6 ESS: Local Authority Staff Volunteers 7 Public Information: Information Officers Call Takers 8 Other: (e.g., Inspectors, Park Staff) Current ESS Reception Centre / Group Lodging Information: Name of RC / GL Address / Facility Total # Total # Still Activated Location Capacity Reg. Requires Help page 3 of 4 Comments EOC 501 Current Health Information: Hospital Status Facilities / Location Operational Status: Yes / No Communication Power Water # Hospitalized # Beds Available Comments Community Health Status: Public Health Mental Health Continuing Care Request for National Emergency Services Stock Pile (CCU and / or 200 bed hospital): Yes or No Details: Weather Conditions: Temperature Precipitation Wind: (Speed and Direction) Air Quality Forecast (24 Hr) Future Outlook / Planned Actions: Other Comments: page 4 of 4 EOC 501 EOC ACTION PLAN Event: Date: Operational Period: PEP Task #: Time: Prepared By: Objectives: (In priority order, for the designated operational period) Function Assigned Tasks/Action Items: Attachments: (Check if attached) Organization Chart EOC Floor Plan Situation Map Recommended By (Planning Section Chief): Distribution: Public Information Plan Transportation Plan Evacuation Plan Estimated Completion Time Communication Plan Approved By (EOC Director): EOC Director Risk Management Officer Liaison Officer Information Officer Posted for ALL EOC Personnel Operation Section Chief Planning Section Chief Logistics Section Chief Finance/Administration Section Chief Other _ EOC 502 August 2006 EOC SHIFT SCHEDULE Event: Date: Operational Period: Name Signature: PEP Task #: EOC Section / Position Prepared By: 0800 – 1600 1600 – 2400 0000 - 0800 Title: EOC 503