MUMBAI PUNE SOLAPUR PIPELINE
Non Comprehensive AMC for Fire Engine &DG Set
ANNEXURE 2
CHECKLIST:
1) CHECKLIST OF AIR SYSTEM
S.NO
1
2
3
4
DESCRIPTION
Check AC element for Tightness.
Check Vaccum Indicator
Clean Pre cleaner Dust pan
Correct Loose Hose/Clamps
OBSERVATION
REMARKS
2) CHECKLIST FOR LUB SYSTEM
S.NO
1
2
DESCRIPTION
Check lube oil level
Check lube oil leakage
OBSERVATION
REMARKS
3) CHECKLIST OF ALTERNATOR
S.NO
1
2
3
4
DESCRIPTION
Check Tightness of Load Cable
Check Earthling connections
Check for Damages in wiring
Check Alternator Output Voltage
OBSERVATION REMARKS
4) CHECKLIST OF CONTROL PANEL
S.NO
1
2
3
4
5
8
9
10
11
12
13
DESCRIPTION
Check for damages in wiring
Check control supply Voltage
Check 415 or 240 Volts AC supply for battery
charger
Check Engine starting from panel (Manual)
Check Engine stopping from panel ( Manual
Check Fuel Level Meter reading
Check meter reading
Check Battery charger output voltage
Check High water temperature safety
Check Low lube oil level safety
Check Emergency stop
OBSERVATION REMARKS
Page 1 of 2
Vendor Seal & Signature
MUMBAI PUNE SOLAPUR PIPELINE
Non Comprehensive AMC for Fire Engine &DG Set
5) CHECKLIST COOLING SYSTEM
S.NO
1
2
3
4
5
DESCRIPTION
Check Coolant Level
Check Coolant hoses for leakages.
Check belt Connections & Tension
Check Pressure Cap.
Check for Radiator External Cleanliness.
OBSERVATION
REMARK
OBSERVATION
REMARK
OBSERVATION
REMARK
OBSERVATION
REMARK
6) CHEKLIST FOR FUEL SYSTEM
S.NO
1
2
3
DESCRIPTION
Check fuel Supply & Return
Check fuel leakage
Record Last Filter Changed
7) CHECKLIST FOR ENGINE PARAMETERS
S.NO
1
2
3
4
DESCRIPTION
Engine RPM
Engine Oil Pressure
Coolant Temp.
Lube Oil Temp.
8) CHEKLIST FOR BATTERIES
S.NO
1
2
3
4
5
DESCRITION
Check Battery Voltage
Check Specific Gravity
Check for sulphasation
Check for any bulging out effect.
Refill Distil Water as per Requirement
Page 2 of 2
Vendor Seal & Signature
Download