Project proposal
Project description
Ablekuma Central Municipal Assembly was created by a legislative instrument 2376 on 19th
February 2019. Previously it was part of the Accra Metropolitan Assembly as one of the 8 Sub
metros. The Municipal capital is Laterbiokorshie which is a highly urbanized mixed community
with residential and commercial functions. The capital has close proximity to Accra, the national
capital and has functional relationship with other key urban centers of Accra. The Municipality is
an urban environment dominated by build environment and human ecology with very minimal
natural ecology. The Municipality is highly urbanized. Municipality is constituted by Seven (7)
Electoral Areas namely; Laterbiokorshie, Nmemeete, Mataheko, Gbortsui, Mambrouk, Adwenbu
and Abossey Okai. As an urban municipality, it has contiguous settlements with no boundaries
between localities.
The Municipal economy is dominated by three sectors and subsectors comprising of
commerce/retail trade, services and industrial sectors. The scale of economic activities is
dominated by Micro Small and Medium Enterprises (MSMEs) in all the sectors and subsectors.
As an urban commercial hub, there are key centers of commercial activities with petty trading and
medium scale trading dominating economic activities. Trading is the main economic activity in
the municipality with the Abossey Okai Spare parts market as the main hub for trading. As one of
the large markets in Accra, the Abossey Okai Spare parts market has become a busy centre of
commercial activity, attracting patrons and traders from all over the region and beyond and
generating over 50,000 trips daily. The trading sector is the biggest sector in the Municipality, and
generates the highest employment and revenues to the citizens as the Abossey Okai Spare parts
market alone is a source of livelihood to over 25,000 people. There are several stores ranging from
‘table top’ to kiosks and walk in shops dealing in retail of diverse goods and offering variety of
services. Also present are Fashion and design enterprises dealing exclusively in clothes as well as
barber and hairdressing saloons.
Currently, there are three substandard Markets in the Municipality which comprise the Zongo
market, Shukura Market and Mataheko market. These markets have a very small land area
comprising tables and a few stalls which is very insufficient for the community they are located
in. Consequently, people within the Municipality are forced to patronize the Kaneshie Market
which borders the Municipality. the Municipal Assembly has lost a lot of revenue as a result of the
relocation, and people within the Municipality who took advantage of this market to trade have
been left stranded and some many now doing their trades at illegal locations (pavements and
pedestrian walkways).
Nonetheless, there is a pressing need for an Ultra-modern Market in the Municipality given the
high economic potential of the Municipality and the fact that it is a trading hub and situated at the
heart of the Accra. This project will serve all persons within and around the Municipality and will
also help give a lot of unemployed youth and women in the Municipality a viable source of income.
It will also go a long way to take of all trading activities off the street and centralize it at a particular
point.
The Construction of a Three-storey ultra-modern market facility will be situated at the economic
heart of the municipality which is the site where the Takoradi station and other taxi stations operate
currently. This project will be aimed at providing a huge economic avenue for all persons within
the Municipality and it will serve as a Municipal market as those existents currently are very small
in size and area and cannot meet the demands of communities they exist at.
The project is therefore necessary, especially after the relocation of the onion market which was a
primary economic means for a lot of individuals in the Municipality within the value chain. The
project will comprise of a variety of spaces comprising stores, Officers, Conference rooms,
Pharmacies, Training Centers, Bus Terminals, Taxi and Trotro Station, Drains, Pavements, Bath
houses and Toilet facilities. The dynamism of this market facility is aimed at meeting not only the
economic needs but also a place of convenience for meetings of market unions and groups as well
as pharmacies to serve as health facilities to give first aid attention and advice to all who visit the
facility or operate nearby.
Since market places are avenues for the spread of airborne and communicable diseases, the
pharmacies are essential in combating and providing treating to these conveniently before proper
medical care is sought. The project will have more than 200 stores for use by traders, 7 pharmacies
at various points for convenience and to prevent overcrowding there, as well as 27-bathroom units
and 30 toilet units in total on both floors.
Scope of the Project
Project Goal and Objective
The main Goal of the Project is to Provide an Ultra-Modern Market Facility that meets the
economic needs and service of individuals within the Municipality.
The project goal is guided by specific objectives aimed at achieving project success which are as
follows;
 To add a strong Internally Generated Revenue source to the Assembly.
 To provide job avenues for individuals and reduce the unemployment incidence in the
Municipality.
 To meet the economic needs of people and provide alternative economic avenues.
 To provide a common market place for all traders within the municipality to market
products.
 To provide a common market facility to all who live within the municipality.
Geographical location
The proposed ultra-modern market facility will be located at Mataheko in the Ablekuma Central
Municipal Assembly. The land area to be allotted for the project is … square km. landmarks at the
area include the Kaneshie overhead and the Takoradi bus terminal. It will be situated opposite the
Kaneshie market with the main Busia highway being the boundary.
Project Stakeholders & Target Beneficiaries
The proposed project will have a capacity of more than 200 stores to be occupied for trading
activities. The project will be implemented by Debagio Trading Enterprise, box Km 176, Kumasi
with close coordination with the Municipal Works Engineer of the Municipal Assembly. The
Municipal Participatory Project Monitoring team would as well be deeply involved in this project
as a stakeholder Monitoring team to check the activities and progress of works quarterly.
Due to the widely concentrated nature of this team, it would make up a clear representation of
major community and institutional stakeholders and partners. This will in turn ensure success and
community support for the progress of this project.
Target beneficiaries majorly will be composed of women and unemployed youth in the
Municipality who can explore this big opportunity to showcase and probe into economic activities
for a sustained livelihood after the Onion market was relocated outside the municipality. Other
beneficiaries will include traders operating on pedestrian walkways and pavements as they will be
removed and given an alternative place to ply their trades to free the roads and walkways and
prevent overcrowding in the environs around the site.
Project implementation
Some components of the projects need to be addressed before the Project will be implemented.
Local Authorities such as the Municipal Chief executive and the Honorable Assembly members
will be engaged intensively to adopt and form a part of the project as major stakeholders.
Traditional and Religious leaders, Market queens, Youth groups and other economic groups in the
Municipality will also be engaged to foster community ownership of the project given the
enormous gain that will be benefited after the project is complete.
Project timeline for stakeholder consultations, procurement and contract awarding will be pegged
in 2023 with the whole month dedicated to intensive stakeholder deliberations. Stakeholders will
be taken through the opportunities and benefits of the project and the need to play an active role
in ensuring the project’s success. Construction of the project will begin in the third quarter of 2024
with the rest of the year dedicated to completing various processes and due diligences in
accordance with the National Building Regulations 1996 (LI 1630) and the Ghana Building Code
20
Project work schedule
Activity
Stakeholders’ consultation
Procurement
and
contract
awarding
Labor mobilization & materials
procurement
Site preparation
Structure construction
External works
Completing various process and
due diligence
Jan.- June July -December 1st - 2nd quarter
3rd - 4th
2023
2024
2023
2024
quarter 1st - 2nd quarter
2025
3rd - 4th
2025
quarter
Project Architectural design & layout (Structural design, technical specification and
infrastructure requirement)
The proposed three storey market design can be described as grid pattern. Grid pattern design can
be expressed as a rectangular arrangement of shops that generally run parallel to one another with
a circulation access in front of the shops. such a design provides consumers with flexibility and
speed in finding out required product in a given store. Each block of shop will be designed to
accommodate a row of shops both on its back and front oriented North and south with the two
extreme ends of the block East and West left blank.
The facility will maintain higher standards of hygiene, improved handling, more economical use
of space and lower costs for heating or air conditioning with all operations confined to one
building.
In terms of structural design summary, there is a simplistic blend of glazing, steel and a concrete
material giving the design a touch of modernism. Also, the choice of steel trusses and huge
concrete columns gives a feel of structural integrity.
The walls will be smooth and waterproof, clockwork of dense concrete blocks preferable for the
main walls to provide a good base for smooth washable finish; exposed steelwork will be protected
against corrosion and coating will be applied to prevent condensation. Steel reinforcement will be
40mm of concrete.
Floors will be hard-wearing, non-porous and well drained. Ideally, a suspended ceiling is desirable
for this kind of project due to its smoothness and unbroken Surface that can be cleaned easily. The
design of the mall employs a combination of both passive and active ventilation systems. Thus,
few open spaces in the food court zone employ passive system to aid natural ventilation, hence
reducing energy consumed and also giving a sense of relaxation in this particular area. The markets
also employ the barrel roof system to aid the escape of hot air from the interior spaces. Artificial
lighting has been employed to the maximum in most spaces including the anchor shops, retail
shops and mini mall. The consideration given to natural lighting is approximately 15%
In terms of active ventilation system, the facility will use a central air-conditioning system with its
high energy requirements provided by six high wattage generators of capacity 1000kva each to
power the building due to electric power fluctuations. The facility will also have outdoor systems,
such as the cooling towers, concealed in the large roof attics and gutters. Air-conditioning
distribution ducts and other service ducts are well hidden in the ceiling spaces except at the subbasement level and service corridors where they are exposed rendering such spaces untidy.
Generally, service rooms, pipes and other service gadgets will be well integrated into the structural
and aesthetic components of the facility. Most service ducts will be concealed in the ceiling space,
sub-basement level and cavities at the rear of the edifice.
customer parking will employ a parking relation of 4-6 car/100m2 of retail space which produces
the requisite area for a number of parking lots in a commercial complex. The staff parking will be
located at north-western end of the sub-basement level of the edifice, whereas the service parking
will be situated at the north-west end of the ground floor level and is closer to the anchor stores.
The proposed total area for service floor parking is average 1125m2 with adequate circulation
space of average 570m2 facilitating entry, exiting and turning.
Other service facilities of the facility are service corridors of proposed width 2200mm which start
from the service yard and branches to the various retail shops. These service corridors will house
sanitary facilities and service cables in the wall recesses and cavities as well as the ceiling space
respectively. Ramps will design to a gentle gradient of 0.8 % at the entrance and service yard.
Also, a panoramic lift has been provided making the commercial complex very user accessible.
waste generated will be dominantly cardboard used for packaging goods and sewage. The pieces
of cardboard will be kept in wire mesh cages for disposal whereas sewage is channeled to the water
treatment plant for recycling. The sewage treatment plant is planned to be located on the outskirts
of the facility with the control panel pin-pointing at the frontage of the building.
Metallic vent slits will be installed into the walls that enclose the generator rooms in order to aid
convective cooling of the generators. Located at the top of the slit vents are the generator smoke
spouts to direct smoke from the generators to the exterior space.
Fire extinguishers, water hoses (spaced out at intervals of 5m) and smoke detectors will be located
on the walls and ceiling material, respectively, to combat fire promptly. Fire escape staircases are
planned to be positioned at fire prone areas such as the service yard and kitchen areas of the anchor
shops. Proposed Installed sprinklers to cover a standard area of 30m2 /sprinkler to quench fire
effectively. These will be mostly located at the sub-basement parking level. Also on this level are
extractor fans to suck out smoke from any outburst of fire.
Utilities
The market will be divided centrally north and south by Busia highway with two main entrances,
a parking lot near each of its two gates, with utilities that comprised of public convenience,
restaurants, mini shopping mall, banks and disability friendly stairs. There are two main parking
allotments mainly for customers, staff and service vehicles. The customer parking space is located
at close proximity to the main entrance, enabling easier access to the facility. Below is the
breakdown of the utilities within the premises;
Ground floor
Number
First floor
Number
Second floor
Number
Stores
147
Stores
302
Stores
303
Pharmacy
2
Washroom
16
Auditorium
1
Restaurant
5
Stairs
7
Vocational
1
training center
washroom
16
Conference
1
Washroom
16
Bar
2
Stairs
7
hall
Mini
shopping 1
mall
Office
2
Stairs
7
Environmental And Social Safeguards
In terms of sustainability, Since the Market Facility is going to be allotted to traders for economic
activities, damages made and repairs needed which are not a setback after construction will strictly
have costs settled by tenants in affected stores. This will be strictly enforced by the manager of the
facility with those who do not adhere evicted from the stores.
With the broad stakeholder engagements throughout the construction of the project and after,
community ownership of the project will be prime and this will in turn ensure the continuity and
sustainability of the project as major stakeholders will assume responsibility of issues as they arise
and find proper ways to come to terms and settle them for the success of the continued project.
Periodic multi-stakeholder monitoring of the will be encouraged so as to ensure that project
environment is sound and safe and businesses assessed to ensure best conditions are made
available for them to thrive.
The success of implementing the project can be attributed to good management and collaboration
with partner stakeholders. Risk management will occur if the Government will not hear and give
priority on the clamor of current occupiers of that site that are to be relocated and the general public
as a whole but take action for the greater good. Ethical due diligence will also be done in the form
of evaluating the project to avoid mismanagement in the implementation report.