WORK BREAKDOWN STRUCTURE:
SR.
NO
1
RESEARCH PHASE
DESIGN PHASE
CONSTRUCTION PHASE
-Defining scope and
milestones
-Finalize masterplan
-Secure site permits and
licenses
-Defining budget
-Floor plan's initial drafts
-Safely demolish or remove
existing structures or materials.
- Working on drawings
 Architectural
 Structural
 Mechanical
 Plumbing
-Address any structural
modifications or repairs
-Define schedule
2
-Case study analysis
-Site selection criteria
-Site analysis
-Working on hidden
potentials and
completing research
3
-Working on final
reports
-Renovate interior
spaces
-Repair HVAC, plumbing, and
electrical systems
-Revisions
-Test systems
-Final approvals
-Arrange for final inspections
and obtain required certificates