RNM & IPC Report Joevert Morilla Luna JB Lotus Mall October 10, 2019 Actual Target Met/ Not Met 1.14% 1.09% .05% 618,000 607,000 11,000 October 69,000 November 74,800 December 96,800 RNM History Logbook Objective: • To ensure all Equipments and Parts of the Equipment is monitored. – Life span of equipment. – Life span of replaced parts. – To monitor all parts to be replace. Mechanics: • MOD on the date and time of repair must be log the following: Issue, Action Taken, Recommendation, Parts replacement, (Price of replaced parts) Time Line: October 14, 2019 In Charge: JML / MOD Proj. Warrior / Guerrero Objective: • • To train our crew on Detection skills and simple DIY skills. To create pest warrior team. Mechanics: • • • Attend PCO Cascades. Selection of potential crews. Monthly Meetings and trainings. Time Line: October 20, 2019 In Charge: JML THANK YOU ! Slide Title Product A • Feature 1 • Feature 2 • Feature 3 Product B • Feature 1 • Feature 2 • Feature 3