Estimating in Building
Construction
Introduction to Estimating
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Grade Composition

25% Exam 1

25% Exam 1

40% Final Exam

10% Attendance and Participation
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
2
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Course Content










Presentation
Presentation
Presentation
Presentation
Presentation
Presentation
Presentation
Presentation
Presentation
Presentation
1: Introduction to Estimating
2: The Estimate
3: Overhead and Contingencies
4: Labor
5: Equipment
6: Excavation
7: Concrete
8: Masonry
9: Metals
10: Wood
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
3
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Estimating in Building
Construction


The determination of probable
construction costs for a project
Prepared from the contract documents:


Plans
Project manual
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
4
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Estimating in Building
Construction

Used to:


Establish project budget
Order materials
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
5
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Profit Margin

Provides the general contractor an
acceptable rate of return and
compensation for the risk associated
with the project
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
6
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Types of Estimates

Detailed estimate

Determines the quantity and cost of
everything required for the project, including:







Materials
Labor
Equipment
Insurance
Bonds
Overhead
Etc.
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
7
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Types of Estimates

Assembly estimating


Bid by groups of components (assemblies)
For example, a light switch would include:





Single-gang box
Single-pole switch
Cover plate
Two wire nuts
20 feet of wire
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
8
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Types of Estimates

Square-foot estimates


Bid based on an average cost per square
foot
May be adjusted for:



Building height
Building perimeter
Etc.
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
9
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Types of Estimates

Project comparison


Prepared by comparing the costs of a
proposed project to a similar project
Adjusted for differenced between the
comparison project and the project being
estimated
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
10
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Estimating Opportunities






Architectural offices
Engineering offices
Subcontractors
Material suppliers
Manufacturers’
representatives
Project management
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
11



Government
Residential
construction
Computer Software
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Quantity Takeoff Skills





Read and quantify plans
Knowledge of math and geometry
Patience
Does careful, thorough work
Computer literate with takeoff software


On-Screen Takeoff
Paydirt
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
12
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Additional Estimating Skills



Visualize building from plans
Foresee problems
Experienced in the construction process




Methods of handling materials
Labor productivity
Convert labor productivity to costs
Maintain a cost database
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
13
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Additional Estimating Skills

Computer literate with:




Spreadsheets
Estimating software such as WinEst
Meets bid deadlines
Strong writing and presentation skills
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
14
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Types of Bids

Competitive

Awarded based upon:



Price
Best value
Negotiated bids

Owner and contractor agree upon a price
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
15
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Bid Contract Documents/(Paperwork)






Invitation to Bid
Instructions to Bidders
Bid Form
Owner-Contractor Agreement
General Conditions of the Contract
Supplementary General Conditions
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
16
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Contract Documents



Technical Specifications
Working Drawings
Addenda
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
17
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved
Bid Information

Publicly advertized in:


Newspapers
Trade journals



Dodge Reports
Engineering New Record (ENR)
Internet
Estimating in Building Construction, 8th edition
Frank R. Dagostino | Steven J. Peterson
18
Copyright © 2015 by Pearson Education, Inc.
All Rights Reserved