• PROGRAM BACKGROUND
• OPERATIONAL REQUIREMENTS
• PROGRAM SCHEDULE
3
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
REQUIREMENTS
6
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Small Diameter Bomb (SDB)
Program
Public Overview Briefing
Current As of: 24 August 2001
Air Armament Center
Lethal Strike JPO
Eglin Air Force Base, FL
1
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
MINIATURIZED MUNITIONS
C ONCEPT
SDB Program Covers Phase I and Phase ED
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
7
PROGRAM SCHEDULE
12
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Requirements (con, t)
• Aircraft Integration
一
Threshold Aircraft:
- Phase I: F-15E
- Phase II: F-15E, F-16C/D and B-1B
一
Objective Aircraft:
一
一
Phase I: A-10, F-16, F-117, F-22, JSF, B-1, B-52, B・2, UCAV
Phase II: A-10, F-117, F-22, JSF, B-52, B-2, UCAV
• Aircraft Loadouts
A・10
Stations
F・15E F・16 F・22 F・117 JSF B・1 B・2 B・52 UCAV
4
3
2
Threshold*
16
12
8
Objective
48
36
24
2
8
12
2
2
24
16
12
8
8
96
64
48
24
24
288 192 144
TBD
TBD
TBD
/Threshold: 4 SDB weapons per 1760 interface
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
10
Further Questions & Inquiry
Mail to: AAC/YV
Attn: Small Diameter Bomb Program Office
Suite 300
102 West D. Ave.
Eglin AFB FL 32542-6808
DSN Prefix: 872
Voice Phone: (850) 882-7321 x2233
Data Fax 850-882-0657
15
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Disclosure & Disclaimer
Statements
• DISTRIBUTION A: This briefing has been
cleared by AAC/PA (Public Affairs) for
public release.
• This is briefing is UNCLASSIFIED.
• This presentation is for information only.
No US Government commitment to sell,
loan, lease, co-develop or co-produce
defense articles or services is implied or
intended.
2
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
J , Carriage System Requirements
唱
• Commonality across all threshold and objective
aircraft
Standard test equipment, training, containers, loading
procedures, etc.
- Compatibility with B-2 Smart BRA
一
• MIL-STD-1760 interface
一
一
Minimize aircraft OFP impact, single update
Must support individual weapon targeting, fuze
programming, weapon release initialization, weapon
status reporting and weapon software reprogramming
• Individual and ripple release against one or more targets
一
No single use devices for weapon ejection system
11
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Program Background
• MMC Mission Need Statement, ACAT Level II, Oct 97
Increase kills per sortie
一
一
一
Increase aircraft loadout
Accommodate current and future aircraft
Kill fixed, relocatable and mobiles targets
• Milestone 0 decision Feb 98
Perform concept and trade studies
Evaluate both weapons and carriage systems
• HQ ACC, AAC, and AFRL performed Analysis of
Alternatives (AoA) 1998-2000
- 22 approaches evaluated
Government and Industry proposed methods
一
一
一
一
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Program Background (con't)
一
• Air Force Research Lab Munitions Directorate (Eglin
AFB FL) demonstrated technologies 1990-2000
• Four Concept Study Contracts awarded 1999 ($250K
each)
一 Boeing, Lockheed Martin, Northrop Grumman,
Raytheon
一 Conducted trade studies, defined concepts
• Four contracts modified 2000 (adding $1.3M each)
一 Develop and tested seeker and ATR algorithms
一 Characterized seeker/ATR in operational
environment
- Continue algorithm development
5
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Requirements
• Schedule #1 Priority: field systems soonest
• Cost #2: Affordability, obtain price commitments
• Performance #3
一 Phase I: GPS/INS-like accuracy (fixed/stationary)
一 Phase II: Seeker/ATR-like accuracy
(mobile/relocatable)
• 2 KPPs:
一 Loadout
- 4 weapons per 1760 aircraft station is threshold
一
Interoperability
- Common carriage system & interface across aircraft
- Compatible with C4ISR infrastructure
8
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Requirements (con't)
• Evolutionary approach to fielding systems
一
一
Phase I: Effective in GPS Jammed Environment
Phase II: Target Recognition for Autonomous
Engagement in Limited Search Area
• ORD Will Remain DRAFT until Milestone B decision
- KPPs are only non-tradables
一
一
CAIV : performance trades between MS A and MS B
HQ ACC finalize performance “thresholds” after
seeing cost & schedule impacts to program
9
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Development & System Integration —
• 2 Contractors = 24 months
- Design and test warhead, fuze,
GPS/INS guidance, carriage
for fixed target SDB
- Develop common aircraft ICD
一 Verify system level
performance requirements are
achievable for fixed target
variant
一 Concurrent development and
maturation of seeker/ATR
algorithms
- Develop and test Seeker/ATR
- Verify costs are below
threshold amount for fixed
target SDB and delta for
mobile target variant
P R O P O S E D S D B P RO G RAM
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
SDB Program Schedule