1. ALL SANITARY WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE PROVISIONS OF THE NATIONAL BUILDING CODE OF AND ITS IMPLEMENTING RULES AND REGULATIONS. 2. COORDINATE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS. THE ARCHITECT OR ENGINEER BE NOTIFIED IMMEDIATELY OR ANY DISCREPANCIES FOUND THEREIN HIS/HER DECISIONS SHALL BE FINAL. 3. ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR PROPER RE-EXECUTION OF THEIR TRADES. SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER. 4. PROPOSE SANITARY UTILITIES SHALL CONFORM THE ACTUAL LOCATION, DEPTH, AND IN EVERY ELEVATION VERIFIED BY THE CONTRACTOR. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REQUIRED WALL OPENINGS AND FLOORS. 6. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 2% MINIMUM SLOPE UNLESS OTHERWISE NOTIFIED. 7. THE SIZE OF WATER SUPPLY LINES PIPE TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. 8. ALL FIXTURES SHALL BE VENTED UNLESS OTHERWISE NOTED 9. THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST THROUGH MANNER KNOWN TO THE TRADE AND TO THE SATISFACTION OF ARCHITECT OR ENGINEER. 10. REFER TO TECHNICAL SPECIFICATIONS FOR DETAILED MATERIAL SPECIFICATIONS. 1. THE CONTRACTOR SHALL FURNISH AND INSTALL THE PLUMBING SYSTEM COMPLETE WITH ALL EQUIPMENT, PIPING, VALVES, INSULATIONS, CONTROLS, HANGER, TRIM, ACCESSORIES, AND ASSOCIATED WORK. IN ACCORDANCE WITH BUILDING CODE ALL AUTHORITIES HAVING JURISDICTION, AND THIS SPECIFICATION. 2. ALL WORK SHALL COMPLY WITH THE PHILIPPINE BUILDING CODE AND PHILIPPINE PLUMBING CODE. 3. PLUMBING CODE CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER CONTRACTOR INVOLVED IN THE PROJECT. 4. THE WORK SHALL INCLUDE ALL LABORS EQUIPMENT, HOSTING AND RAGGING, SCAFFOLDING LOADING AND UNLOADING CLEAN-UP OF DEBRIS AND OTHER SERVICES, TO PROVIDE THE OWNER WITH FULLY OPERATIONAL SYSTEM. 5. ALL WORKS SHALL BE PROPERLY COORDINATED IS WITH WORK OF OTHER TRADES TO AVOID CONFLICT REFER TO THE ARCHITECTURAL AND STRUCTURAL DRAWING ONLY FOR INFORMATION USED ONLY TO PREPARE COORDINATED DRAWINGS. 6. BIDDERS PRIOR TO SUBMITTING PROPOSAL, SHALL VISIT THE SITE AND FULLY EXAMINE THE AREAS INVOLVED WITH THIS WORK, TO FAMILIARIZES THEMSELVES WITH THE EXACT CONDITIONS AND DIFFICULTIES THAT MAY ATTEND THE EXECUTION OF THIS WORK. 7. WATER DISTRIBUTION PIPE THAT HAS BEEN A TERMINATED OR IS UNUSED SEGMENT SHALL HAVE NO DEAD-ENDS. 8. EACH PLUMBING FIXTURE, SHALL BE PROVIDED WITH AN ADEQUATE SUPPLY OF PORTABLE A RUNNING WATER, SO ARRANGED AS TO FLUSH AND KEEP SAFE, CLEAN AND HEALTHFUL CONDITIONS WITHOUT BACKFLOW OR CROSS-SECTION. 9. VERIFY AND DETERMINED SUBJECT TO THE ARCHITECTS APPROVAL, THE BEST SOURCE OF WATER THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAPPING THE WATER SYSTEM TO THE MAIN SOURCE: a. THE MAIN LOCAL SOURCE; b. ANY ADDITIONAL SOURCE PROVIDED BY THE OWNER. PLUMBING SPECIFICATIONS SCALE FITTINGS SYMBOLS LEGENDS CONTINUED CLEANOUT CO STORM DRAIN PIPE P-TRAP NTS SYMBOLS LEGENDS SYMBOLS LEGENDS SDP LAVATORY LAV WATER CLOSET WC P-T DRAINAGE DIRECTION SANITARY LINE SL SOIL PIPE VENT LINE VL SOIL STACK PIPE SSP WL SOIL STACK SS GATE VALVE GV CHECK VALVE CV WASTE LINE (BELOW GRADE) SP SHOWER BATH SB KITCHEN SINK KS JOINT LINE JL VENT THROUGH ROOF VTR ELBOW 90 DEGREE EL.90° VENT STACK THRU ROOF VSTR HOSE BIBB HB ELBOW 45 DEGREE EL. 45° VENT STACK VS WATER METER WM SANITARY TEE SP EL.90° CP PLUMBING ELBOW 90 DEGREE CROSS PIPE ELBOW TURNED UP EL. TU FLOOR DRAIN FD JOINT CONNECTION PIPE ELBOW TURNED DOWN EL. TD KITCHEN SINK KS COLD WATER SUPPLY PIPE FD LAVATORY FLOOR DRAIN CATCH BASIN CB DOWNSPOUT DS CB SYMBOLS LEGENDS TEE ELBOW TURNED DOWN/ PIPE GOING UP LAV SHOWER BATH SB WATER CLOSET WC M RISER PLUMBING SYMBOLS AND LEGENDS SCALE NTS PROJECT TITLE: INSTRUCTOR: RATING: REMARKS: SHEET NO: REGINA D. GATCHALIAN PTR No: PCR No: Place Issued: Validity: Date Issued: TIN: PROPOSED TWO STORY RESIDENTIAL BUILDING LOCATION: P1 ENGR. RUTH ANN D. MANINGDING SUBJECT: ENGINEERING UTILITIES 2 SECTION: BSCE-2A DATE SUBMITTED: JUNE 14, 2023