Uploaded by Hải Nguyễn

NT34-L-00ZEN00-H10-0028 REV B HVAC SYSTEM LAYOUT DRAWING FOR ADMINISTRATION BUILDING

advertisement
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
9.5/15.9
DN 25, i=1%
B
B
B
00SAC-SAU12AH017
9.0 KW
00SAC-SAU12AH018
9.0 KW
00SAC-SAU12AH019
9.0 KW
DN 25, i=1%
00SAC-SAU12AH013
8.0 KW
B
00SAC-SAU12AH014
8.0 KW
B
B
00SAC-SAU12AH015
7.1 KW
B
00SAC-SAU12AH020
7.1 KW
DN 25, i=1%
DN 25, i=1%
00SAC-SAU12AH012
9.0 KW
B
6.4/12.7
9.5/22.2
9.5/15.9
9.5/15.9
DN 25, i=1%
B
9.5/15.9
DN 25, i=1%
DN 25, i=1%
DN 25, i=1%
00SAC-SAU12AH016
2.2 KW
9.5/15.9
DN 25, i=1%
9.5/15.9
9.5/15.9
DN 25, i=1%
9.5/15.9
9.5/22.2
DN 25, i=1%
9.5/19.1
B
DN 25, i=1%
9.5/19.1
DN 32, i=1%
12.7/28.6
9.5/15.9
9.5/22.2
DN 32, i=1%
15.9/28.6
00SAC-SAU12AH011
9.0 KW
DN 32, i=1%
15.9/28.6
DN 32, i=1%
9.5/15.9
9.5/15.9
B
9.5/15.9
B
00SAC-SAU12AH009
2.2 KW
B
00SAC-SAU12AH010
7.1 KW
DN 32, i=1%
19.1/31.8
9.5/22.2
DN 32, i=1%
DN 25, i=1%
9.5/15.9
DN 25, i=1%
1
DN 25, i=1%
DN 25, i=1%
6.4/12.7
2
DN 25, i=1%
DN 25, i=1%
DN 25, i=1%
DN 32, i=1%
9.5/22.2
9.5/22.2
9.5/15.9
(1)
00SAC-SAU12AC002
5.28 KW
9.5/19.1
9.5/15.9 DN 25, i=1%
9.5/15.9
DN 25, i=1%
9.5/15.9
00SAC-SAU12AH008
5.28 KW(STAND BY)
DN 32, i=1%
DN 32, i=1%
(1)
DN 32, i=1%
DN 50, T/B
CONNECT TO WASTE WATER SYSTEM
B
00SAC-SAU12AH001
8.0 KW
9.5/15.9
DN 25, i=1%
B
00SAC-SAU12AH002
7.1 KW
B
00SAC-SAU12AH003
7.1 KW
Ø6.35/Ø12.7
DN 50, T/B
CONNECT TO WASTE WATER SYSTEM
B
B
00SAC-SAU12AH004
9.0 KW
00SAC-SAU12AH005
9.0 KW
00SAC-SAU12AC001
5.28 KW
B
00SAC-SAU12AH006
9.0 KW
00SAC-SAU12AH007
5.28 KW
Ø6.35/Ø12.7
9.5/15.9
DN 25, i=1%
1
2
3
4
5
6
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC005
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC006
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC004
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC007
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC003
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC008
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
AIR CONDITIONING
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
1/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
B
00SAC-SAU12AH038
9.0 KW
B
00SAC-SAU12AH037
7.1 KW
DN 25, i=1%
DN 25, i=1%
9.5/15.9
9.5/15.9
B
B
00SAC-SAU12AH030
10.0 KW
00SAC-SAU12AH031
10.0 KW
B
6.4/12.7
9.5/19.1
B
9.5/15.9
9.5/19.1
9.5/22.2
12.7/28.6
DN 25, i=1%
DN 32, i=1%
DN 25, i=1%
9.5/22.2
DN 25, i=1%
9.5/19.1
DN 32, i=1%
15.9/28.6
DN 32, i=1%
B
00SAC-SAU12AH028
7.1 KW
12.7/28.6
15.9/28.6
9.5/22.2
15.9/28.6
9.5/15.9
DN 25, i=1% 9.5/15.9
DN 25, i=1%
9.5/15.9
9.5/15.9
00SAC-SAU12AH029
4.5 KW
00SAC-SAU12AH036
9.0 KW
DN 25, i=1%
DN 32, i=1%
6.4/12.7
00SAC-SAU12AH035
9.0 KW
00SAC-SAU12AH033
2.2 KW
9.5/15.9
DN 25, i=1%
DN 25, i=1%
B
B
00SAC-SAU12AH034
9.0 KW
DN 25, i=1%
DN 25, i=1%
9.5/15.9
B
00SAC-SAU12AH032
7.1 KW
9.5/15.9
DN 25, i=1%
9.5/15.9
DN 25, i=1%
B
9.5/15.9
B
00SAC-SAU12AH027
2.8 KW
DN 32, i=1%
DN 25, i=1%
19.1/31.8
1 3
6.4/12.7
DN 25, i=1%
9.5/15.9
DN 25, i=1%
2 4
DN 25, i=1%
DN 25, i=1%
DN 25, i=1%
9.5/15.9
DN 25, i=1%
DN 32, i=1%
B
00SAC-SAU12AH021
4.5 KW
DN 32, i=1%
B
00SAC-SAU12AH022
8.0 KW
B
00SAC-SAU12AH023
14.0 KW
DN 32, i=1%
DN 32, i=1%
DN 40, F/A & T/B
DN 40, F/A & T/B
DN 32, i=1%
9.5/15.9
9.5/15.9
9.5/19.1
B
00SAC-SAU12AH024
9.0 KW
9.5/15.9
B
00SAC-SAU12AH025
9.0 KW
B
00SAC-SAU12AH026
9.0 KW
6.4/12.7
DN 25, i=1%
DN 25, i=1%
DN 25, i=1%
1
2
3
4
5
6
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC005
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC006
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC004
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC007
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC003
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC008
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
AIR CONDITIONING
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
2/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
00SAC-SAU12AH050
11.2 KW
B
00SAC-SAU12AH051
11.2 KW
B
B
00SAC-SAU12AH052
14.0 KW
9.5/15.9
00SAC-SAU12AH049
19.1/31.8
10.0 KW
B
B
00SAC-SAU12AH043
11.2 KW
B
19.1/31.8
DN 25, i=1%
DN 25, i=1%
00SAC-SAU12AH044
11.2 KW
9.5/15.9
DN 25, i=1%
9.5/15.9
DN 32, i=1%
9.5/22.2
9.5/15.9
DN 25, i=1%
9.5/15.9
DN 25, i=1%
12.7/28.6
DN 32, i=1%
9.5/15.9
DN 25, i=1%
15.9/28.6
12.7/28.6
15.9/28.6
12.7/28.6
9.5/22.2
B
00SAC-SAU12AH041
11.2 KW
9.5/15.9
DN 25, i=1%
DN 32, i=1%
DN 32, i=1%
9.5/22.2
00SAC-SAU12AH042
11.2 KW
B
B
00SAC-SAU12AH048
9.0 KW
9.5/15.9
9.5/15.9
DN 25, i=1%
DN 32, i=1%
9.5/22.2
DN 25, i=1%
19.1/31.8
9.5/15.9
DN 32, i=1%
1 3 5
2 4 6
DN 32, i=1%
DN 32, i=1%
B
00SAC-SAU12AH039
11.2 KW
B
DN 25, i=1%
9.5/15.9
00SAC-SAU12AH040
11.2 KW
DN 32, i=1% DN 32, T/B
DN 32, i=1%
DN 32,T/B
DN 32, i=1%
00SAC-SAU12AH047
16.0 KW
DN 25, i=1%
B
9.5/15.9
DN 25, i=1%
DN 25, i=1%
9.5/15.9
DN 25, i=1%
9.5/15.9
B
00SAC-SAU12AH045
10.0 KW
B
1
2
3
4
5
6
00SAC-SAU12AH046
16.0 KW
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC005
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC006
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC004
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC007
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC003
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC008
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
AIR CONDITIONING
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
3/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
B
00SAC-SAU12AC006 00SAC-SAU12AC007 00SAC-SAU12AC008
67.0 KW
67.0 KW
73.0 KW
CONCRETE PLINTH
1390x250xH250 (5 NOS)
TRUNKING 700x300
BTM. FFL+200
CONCRETE PLINTH
2360x250xH250 (1 NOS)
19.1/31.8
15.9/28.6
19.1/31.8
15.9/28.6
15.9/28.6
19.1/31.8
1 3 5
2 4 6
00SAC-SAU12AC003 00SAC-SAU12AC004 00SAC-SAU12AC005
101.0 KW
78.5 KW
73.0 KW
B
1
2
3
4
5
6
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC005
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC006
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC004
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC007
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC003
GAS PIPE GO TO ROOF
CONNECT TO OUTDOOR UNIT 00SAC-SAU12AC008
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
AIR CONDITIONING
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
4/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
B
B
00SAC-SAU12AH012
9.0 KW
B
00SAC-SAU12AH013
8.0 KW
B
00SAC-SAU12AH014
8.0 KW
B
00SAC-SAU12AH015
7.1 KW
B
00SAC-SAU12AH020
7.1 KW
00SAC-SAU12AH017
9.0 KW
OAG-150x150
C/W OBD
B
00SAC-SAU12AH016
2.2 KW
OA:9 L/S
EAG-150x150
C/W OBD-24.5L/S
Ø200
OA:56 L/S
Ø150
OAG-150x150
C/W OBD
Ø250
00SAC-SAU12AN003
193CMH-30Pa
VENT CAP
OA:112 L/S
OAD-200x100
FAL-1200x900 ( BY OTHER)
C/W IS
FREE AIR 45%
B
Ø150
OAG-250x250
C/W OBD
B
OAD-500x350
B
OA:161 L/S
OA:14 L/S
OAD-150x100
FAN PLACE IN ACOUSTIC BOX
OAD-250x150
OAD-300x150
OAD-200x100
OAG-150x150
C/W OBD
00SAC-SAU12AN002
3438CMH-300Pa
Ø300
OAG-300x300
C/W OBD
OAG-150x150
C/W OBD
Ø150
OA:38 L/S
OAD-150x100
OAD-150x100
OAD-400x300
OAD-150x100
Ø150
OA:38 L/S
SAG-200x200
C/W OBD
OA:69 L/S
B
00SAC-SAU12AH011
9.0 KW
OAG-150x150
C/W OBD
EAD-300x300, T/A
EAD-150x100
EAG-150x150
C/W OBD-30L/S
2 NOS OAG 200x200
C/W OBD-98L/S
Ø200
OA:196 L/S
OAD-300x300
OAD-200x150
OAD-200x150
OAD-200x150
OAD-200x150
B
Ø200
OA:196 L/S
2 NOS OAG 200x200
C/W OBD-98L/S
EAD-200x100
(1)
00SAC-SAU12AC002
5.28 KW
EAD-300x300
00SAC-SAU12AH009
2.2 KW
Ø150
B
00SAC-SAU12AH019
9.0 KW
Ø150
OA:28 L/S
OAG-200x200
C/W OBD
B
00SAC-SAU12AH018
9.0 KW
OA:38 L/S
B
00SAC-SAU12AH008
5.28 KW(STAND BY)
00SAC-SAU12AH010
7.1 KW
EAD-250x200
EAD-250x150
OAG-150x150
C/W OBD
B
EAD-200x150
B
00SAC-SAU12AH001
8.0 KW
B
B
00SAC-SAU12AN001
405CMH-30Pa
00SAC-SAU12AH002
7.1 KW
00SAC-SAU12AH003
7.1 KW
EAD-150x100
(1)
B
00SAC-SAU12AH004
9.0 KW
B
00SAC-SAU12AH005
9.0 KW
00SAC-SAU12AC001
5.28 KW
B
00SAC-SAU12AH006
9.0 KW
00SAC-SAU12AH007
5.28 KW
9NOS EAG-150x150
C/W OBD-36L/S
Ø150
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
VENTILATION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
5/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
B
B
00SAC-SAU12AH038
9.0 KW
B
00SAC-SAU12AH037
7.1 KW
B
B
B
00SAC-SAU12AH030
10.0 KW
00SAC-SAU12AH031
10.0 KW
00SAC-SAU12AH032
7.1 KW
B
B
B
00SAC-SAU12AH034
9.0 KW
00SAC-SAU12AH035
9.0 KW
00SAC-SAU12AH036
9.0 KW
OA:70 L/S
OAG-200x200
C/W OBD
B
OA:21 L/S
Ø200
Ø150
OA:8 L/S
OAD-150x100
B
OA:49 L/S
EAG-150x150
C/W OBD-24.5L/S
00SAC-SAU12AH029
4.5 KW
Ø150
2 NOS OAG 200x200
C/W OBD 84 L/S
OA:21 L/S
OAD-200x100
FAL-1200x950 (BY OTHER)
C/W IS
FREE AIR 45%
Ø200
Ø200
OAD-200x150
OAD-200x150
OAD-200x100
OAD-400x300
OAG-150x150
C/W OBD
Ø250
Ø200
OA:140 L/S
FAN PLACE IN ACOUSTIC BOX
EAD-500x300, T/A & F/B
OA:21 L/S
OAG-200x200
C/W OBD
00SAC-SAU12AH027
2.8 KW
OAD-150x100
OA:49 L/S
OAD-200x150
OAD-200x150
OAD-200x150
OAD-200x150
Ø200
OA:196 L/S
EAD-200x100
B
2 NOS OAG 200x200
C/W OBD-98L/S
EAD-300x300
OAG-250x250
C/W OBD
Ø150
00SAC-SAU12AN005
203CMH-30Pa
EAD-250x200
EAD-250x150
4 NOS OAG-150x150
C/W OBD
B
B
OA:196 L/S Ø200
B
00SAC-SAU12AH028
7.1 KW
OA:56 L/S
OA:21 L/S
2 NOS OAG 200x200
C/W OBD-98L/S
OAD-150x100
OAD-200x100
OAD-200x100
00SAC-SAU12AN004
3658CMH-300Pa
OAG-150x150
C/W OBD
OAD-200x150
OAG-150x150
C/W OBD
OA:168 L/S
EAD-150x100
EAG-150x150
C/W OBD-30L/S
Ø150
OAD-550x350
B
00SAC-SAU12AH033
2.2 KW
00SAC-SAU12AH022
8.0 KW
B
00SAC-SAU12AH023
14.0 KW
EAD-200x150
00SAC-SAU12AH021
4.5 KW
B
B
B
00SAC-SAU12AH024
9.0 KW
00SAC-SAU12AH025
9.0 KW
00SAC-SAU12AH026
9.0 KW
EAD-150x100
9NOS EAG-150x150
C/W OBD-36L/S
Ø150
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
VENTILATION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
6/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
B
00SAC-SAU12AH049
10.0 KW
00SAC-SAU12AH050
11.2 KW
B
00SAC-SAU12AH051
11.2 KW
B
B
B
2 NOS OAG-200x200
C/W OBD-84L/S
00SAC-SAU12AH043
11.2 KW
00SAC-SAU12AH044
11.2 KW
Ø200
B
00SAC-SAU12AH052
14.0 KW
4 NOS OAG-300x300
C/W OBD-184L/S
OA:49 L/S
OAD-200x150
OAG-150x150
C/W OBD
Ø300
OA:168 L/S
B
Ø150
OAD-350x150
OAD-350x150
OAD-700x400
FAL-1800x950 ( BY OTHER)
C/W IS
FREE AIR 45%
00SAC-SAU12AN007
5516CMH-300Pa
FAN PLACE IN ACOUSTIC BOX
OAG-200x200
C/W OBD
EAG-150x150
C/W OBD-30L/S
OAD-500x300
OAD-150x100
B
00SAC-SAU12AH041
11.2 KW
00SAC-SAU12AH042
11.2 KW
OAD-350x150
OA:69 L/S
OAG-200x200
C/W OBD
Ø200
EAD-500x400, T/A & F/B
OAD-350x150
OA:735 L/S
EAD-300x300
OAG-200x200
C/W OBD
B
B
B
00SAC-SAU12AH039
11.2 KW
00SAC-SAU12AH040
11.2 KW
OA:91 L/S
Ø200
OAD-250x200
00SAC-SAU12AH048
9.0 KW
OAD-200x150
B
Ø150
00SAC-SAU12AH045
10.0 KW
OAD-200x150
OAD-300x150
OAD-300x150
Ø300
Ø300
B
B
00SAC-SAU12AH047
16.0 KW
00SAC-SAU12AN008
198CMH-30Pa
EAD-150x100
2 NOS OAG-300x300
C/W OBD-161L/S
OA:322 L/S
EAD-250x200
EAD-250x150
TFL-200x200
C/W IS
FREE AIR 45%
BTM. FFL +300
B
00SAC-SAU12AN006
104CMH-30Pa
EAD-200x150
EAD-150x100
B
00SAC-SAU12AH046
16.0 KW
9NOS EAG-150x150
C/W OBD-36L/S
Ø150
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
VENTILATION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
7/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
1145
EAL-1200x1000
C/W IS
FREE AIR 45%
CONCRETE PLINTH 1105x1145xH200
00SAC-SAU12AN009
4021CMH-600Pa
B
1105
EAD-500x400, F/B
C/W IS
EAD-400x500
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
VENTILATION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
8/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
TỦ ĐIỀU KHIỂN HỆ THỐNG HÚT KHÓI
SMOKE CONTROL PANEL
ĐI LÊN MÁI
2NOSXSEAG:1200X600+OBD
SEAD-1400x400, El45
SEAD-700x400, El30
SEAD-1000x400, El30
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
SMOKE EXTRACTION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
9/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
SEAD-1400x400, El45
ĐI LÊN MÁI
2NOSXSEAG:1200X600+OBD
SEAD-700x400, El30
SEAD-1000x400, El30
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
SMOKE EXTRACTION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
10/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
SEAD-1400x400, El45
ĐI LÊN MÁI
1NOSXSEAG:1200X600+OBD
2NOSXSEAG:1200X600+OBD
SEAD-700x400, El30
SEAD-1000x400, El30
SEAD-1000x400, El45
ĐI LÊN MÁI
SEAD-7000x400, El30
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
SMOKE EXTRACTION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
11/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)
REFERENCE DRAWING
NT34-L-00UYC01-A05-0001~0005-R0
FLOOR PLANS
NT34-L-00UYC01-A05-0006~0008-R0
ELEVATIONS AND SECTIONS
NT34-L-00UYC01-A05-0009~0014-R0
FLOOR FINISH PLAN
NOTE:
1. REFER TO THE APPROVED DRAWINGS FOR FIRE PROTECTION PERMITS
2140
2255
CONCRETE PLINTH 2140x2255xH200
SEAD-1400x400, El120
ĐI XUỐNG TẦNG TRỆT
2055
B
00SAC-SAU12AN011
30000CMH-300Pa
2340
CONCRETE PLINTH 2055x2340xH200
ĐI XUỐNG TẦNG 2
SEAD-1000x400, El120
B
00SAC-SAU12AN010
20000CMH-200Pa
B
FOR APPROVAL
9/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
A
FOR APPROVAL
7/2023
M.T.TRIỀU
T.Q.TUỆ
T.Q.TUỆ
Reviewed
Approved
Rev
Description
Date
Prepared
Project
NHON TRACH 3 AND NHON TRACH 4
POWER PLANT PROJECT
Owner
Project Technical Consultant
PETROVIETNAM POWER CORPORATION (PV POWER)
POWER PROJECT MANAGEMENT BOARD (PVPP)
EPC Contractor
VIETNAM MACHINERY
INSTALLATION CORPORATION-JSC
SAMSUNG C&T
Engineering & Construction Group
Sub-Contractor
CÔNG TY CỔ PHẦN DỊCH VỤ & KỸ THUẬT
CƠ ĐIỆN LẠNH R.E.E
Drawing Title
HVAC SYSTEM LAYOUT DRAWING
FOR ADMINISTRATION BUILDING
Designer
SMOKE EXTRACTION
Design Leader
ENG. Manager
Name:
Name:
Name:
M.T.TRIỀU
M.T.TRIỀU
Signature:
Signature:
T.Q.TUỆ
Signature:
Scale
1/100
Sheet No.
12/12
Owner's Drawing number
NT34-L-00ZEN00-H10-0028
Contractor's number
Rev. No.
19HM-00ZEN00-H10-0028
A3 (420x297)