Uploaded by kcakyo

NandGI

advertisement
RULES FOR BUILDING AND CLASSING
MOBILE OFFSHORE DRILLING UNITS
2001
NOTICES AND
GENERAL INFORMATION
American Bureau of Shipping
Incorporated by Act of Legislature of
the State of New York 1862
Copyright  2001
American Bureau of Shipping
ABS Plaza
16855 Northchase Drive
Houston, TX 77060 USA
Notices and General Information
CONTENTS
Introduction.................................................................................................. 1
TABLE 1
Applicable Editions of Booklets Comprising 2001 Rules ............. 3
TABLE 2
Division and Numbering of Rules ................................................ 3
Rule Change Notice No. 3 (2001) ................................................................ 4
TABLE 3
Summary of Changes for the 2001 Rules ................................... 4
TABLE 4
Summary of Changes from the 1997 Rules ................................ 4
TABLE 5
Comparison of Numbering System of the 1997 Rules vs. 2001
Rules............................................................................................ 7
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
i
Notices and General Information
Introduction
For the year 2001 edition of the Mobile Offshore Drilling Unit Rules, the Rules have been reorganized and re-formatted for the purpose of improving their ease of use. In this regard, we advise
the users of these Rules of the following primary changes.
1.
The year 2001 edition is a complete re-print of the MODU Rules in a new six (6) booklet
format as shown in Table 1.
2.
A new numbering system was incorporated into the Rules, in accordance with Table 2, which
introduces the “Chapter” as a new sub-division within each “Part”. A comparison of the old
“1997” numbering system versus the new “2001” numbering system is shown in Table 5 as a
guide map for users who are familiar with the existing Rules.
3.
The 2001 edition of the Rules becomes effective on 1 January 2001. This more desirable
effective date was made possible by appropriately revising the schedule of meetings of the
ABS technical Committees in 1999, and with The Technical Committee meeting during the
month of June, rather than during the previously traditional month of November. It is
intended to continue this practice in order for all future editions of the MODU Rules to
continue to have an effective date of 1 January.
4.
The effective date of each technical change since 1993 is shown in parenthesis at the end of
the subsection/paragraph titles within the text of each Part. Unless a particular date and
month are shown, (2001) refers to 1 January 2001, (1999) refers to 12 May 1999, (1998)
refers to 13 May 1998, (1997) refers to 19 May 1997, (1996) refers to 9 May 1996, (1995)
refers to 15 May 1995, (1994) refers to 9 May 1994 and (1993) refers to 11 May 1993
effective dates.
Note: There was no Rule Change Notice for the year 2000.
5.
Rule Change Notice No. 3, as per Table 3, with an effective date of 1 January 2001 has been
incorporated into the 2001 MODU Rules. In addition, the Rule Changes contained in the
previously published Notices 1 and 2 to the 1997 MODU Rules (together with Corrigenda 1
and 2) have also been incorporated into the text of the reformatted 2001 MODU Rules. These
Rule Changes, together with their effective dates, are listed for ready reference in Table 4.
6.
Until the next edition of the MODU Rules is published, Rule Change Notices and/or
Corrigenda, as necessary, will be published on the ABS website – www.eagle.org – and will
be available free for downloading. It is not intended at this time to publish hard copies of
future Rule Change Notices and/or Corrigenda.
7.
In Part 1 “Conditions of Classification” of the subject Rules, there is introduced an Appendix
1 for the user’s ready reference, which provides a listing of CLASSIFICATION SYMBOLS
AND NOTATIONS available to the Owners of vessels, offshore drilling and production units
and other marine structures and systems.
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
1
Notices and General Information
TABLE 1
Applicable Editions of Booklets Comprising 2001 Rules
Notices and General Information
Part 1:
Conditions of Classification
Part 2:
Materials and Welding
Part 3:
Hull Construction and Equipment
Part 4:
Machinery and Systems
Part 5:
Surveys After Construction
2001
2001
2001
2001
2001
2001
TABLE 2
Division and Numbering of Rules (1)
Division
Part
Chapter
Section
Subsection
Paragraph
Subparagraph
Item
Subitem
Appendix
Number
Part 1
Part 1, Chapter 1
Section 1-1-1
1-1-1/1
1-1-1/1.1
1-1-1/1.1.1
1-1-1/1.1.1(a)
1-1-1/1.1.1(a)i)
Appendix 1-1-A1
or
Appendix 1-A1-1
Note:
1
An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future
insertions of even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber
the existing text and associated cross-references, as applicable, within the Rules and associated process
instructions, check sheets, etc.
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
3
Notices and General Information
Rule Change Notice No. 3 (2001)
TABLE 3
Summary of Changes for the 2001 Rules
EFFECTIVE DATE 1 January 2001
(based on the contract date for construction)
Part/Paragraph No.
PART 4
4-4-1/41
Title/Subject
Vessel Systems and Machinery
Paint and Flammable Liquid Lockers
Status/Remarks
Revised
TABLE 4
Summary of Changes from the 1997 Rules
EFFECTIVE DATE as specified
(based on the contract date for construction)
Part/Paragraph No.
PART 1
Section 1-1-2
1-1-7/1
PART 2
2-1-1/1
2-1-1/11
2-1-5/9
2-1-6/9
Section 2-3-5
2-3-5/Table 1
2-3-5/Table 2
2-3-5/Table 3
2-3-5/Table 4
Section 2-3-9
Section 2-3-12
2-3-12/Table 1
2-3-12/Table 2
2-3-12/Table 3
2-3-12/Table 4
2-3-12/Table 6
Section 2-3-14
Section 2-3-16
4
Title/Subject
Conditions of Classification
Suspension and Cancellation of Class
Hull and Design Data
Rule Requirements for Materials and
Welding
Testing and Inspection
Standard Test Specimens
Test Specimens
Test Specimens
Boiler and Superheater Tubes
Chemical Composition for Tubes
Mechanical Tests
Tensile Properties of Tubes
Permissible Variations in Outside Diameter
for Tubes
Steel Castings for Machinery, Boilers and
Pressure Vessels
Steel Piping
Maxima or Permissible Range of Chemical
Composition in Percent for Pipe
Lot Sizes for Pipe Grades 6, 7, 11, 12, 13
and 14
Mechanical Tests for Pipe
Tensile Requirements for Pipe
Out-of-roundiness Variation
Bronze Castings
Seamless Copper Piping
Status/Remarks
Effect.
Date*
Revised
Revised
(1)
(2)
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
Revised
(1)
Revised
Revised
(1)
(1)
Revised
(1)
Revised
Revised
Revised
Revised
Revised
(1)
(1)
(1)
(1)
(1)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
Part/Paragraph No.
2-3-16/Table 1
Title/Subject
Section 2-3-20
PART 3
3-4-1/3.5
Chemical Composition for Copper Pipe and
Tube
Tensile Properties for Copper Pipe and
Tube
Seamless Copper Tube
Condenser and Heat Exchanger Tube
Chemical Composition for Copper-Nickel
Pipe and Tube
Tensile Properties for Seamless CopperNickel Pipe and Tube
Copper-Nickel Tube and Pipe
Hull Construction and Equipment
Fire Integrity of Bulkheads and Decks
3-4-1/3.7
Application of Tables
3-4-1/3.17
3-4-1/3.19
3-4-1/5.37iv)
PART 4
4-1-1/11
4-2-2/21.9
4-2-3/15.9
4-2-3/15.11
4-2-4/1.1.3
4-2-4/11.1
4-2-4/11.7.2
4-3-1/Table 1
4-3-2/3.1.4
4-3-2/3.1.6
4-3-2/5.3i)
4-3-2/5.3ii)
(No title)
(No title)
(No title)
Vessel Systems and Machinery
Dead Ship Start
Sea-water Inlet and Discharge Valves
Termination of Vent Pipes
Overflow Pipes
Service and Settling Tanks
General
Filters
Voltage and Frequency Variations
Starting from “Dead Ship” Condition
Propulsion and Steering Related Equipment
(No title)
(No title)
4-3-2/5.3iv)
4-3-2/5.3xiv)
4-3-2/9.1.1
4-3-2/13.3.3
4-3-2/15.9
4-3-2/17.1
4-3-2/17.3
4-3-3/3.7.2(d)
(No title)
(No title)
General
Protection
Public Address System
General
Engineers’ Alarm
Low-hydrogen-emission Battery Installation
4-3-3/3.11.3
Safety-type Panels
2-3-16/Table 2
Section 2-3-18
Section 2-3-19
2-3-19/Table 1
2-3-19/Table 2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Status/Remarks
Effect.
Date*
New
(1)
New
(1)
New
New
New
(1)
(1)
(1)
New
(1)
New
(1)
Revised and new Note
added
Existing Items 5 and 7
revised
New
New
Revised
(2)
Replaced in entirety
Revised
Revised
Revised
New
Revised
Revised
Revised
Revised
New
Revised
New Item “h” (eighth
dash) added
Revised
New
Revised
Revised
New
Replaced in entirety
Revised
New; Exisiting Items “d”
and “e” renumbered
Revised
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(1)
(1)
(2)
(2)
(1)
(2)
(1)
5
Notices and General Information
Part/Paragraph No.
Title/Subject
4-3-3/3.13.2(b)
4-3-3/3.13.2(c)
4-3-3/5.5.2
4-3-3/5.9.1
4-3-3/5.33
Location
Locking Means
Single Conductor Cables
Support and Fixing
Cable Junction Box
4-3-3/7.1
4-3-3/7.7
4-3-3/Table 1
General
Portable Cords
Minimum Degree of Protection
4-3-3/Table 2
4-3-4/3.17.1 –
4-3-4/3.17.5
4-3-4/3.17.1(c)
4-3-4/3.19.1(a)
4-3-4/3.19.1(c)
4-3-4/7.15.2
4-3-4/7.17.2
4-3-4/7.19.2(g)
4-3-4/9.7
4-3-4/13.1.2(a)
4-3-4/Table 2
Minimum Bending Radii of Cables
Turbines for Governors
4-3-4/Table 5
4-3-5/1.1.3
4-3-5/3.5.3
4-3-5/3.15.3
4-3-5/3.17.12(c)
Emergency Generator Prime Movers
Momentary Speed Variation
Emergency Generator Prime Movers
Main Bus Bar Sub-division
Disconnect Switches and Circuit Breakers
Current Limiting Constant Voltage
Testing
Standards
Dielectric Strength Test for Rotating
Machines
Factory Testing Schedule for Switchboards,
Chargers, Motor Control Centers and
Controllers
Distribution Systems
Semiconductor Convertors
4-4-1/1
4-4-1/17.1
4-4-1/17.3.2
PART 5
Semiconductor Convertors
Braided Metallic Armor and Impervious
Metallic Sheaths
Governmental Authority
Fixed High Expansion Foam Systems
Design
Surveys After Construction
5-1-1/5
Annual Surveys
Status/Remarks
Effect.
Date*
Revised
Revised
Revised
Replaced in entirety
Existing Items 3-6 revised.
Existing Item 5 deleted
Exisitng Item 1 revised
Revised
Revised; New Note 3
added
Revised
Revised
(1)
(1)
(2)
(2)
(1)
(1)
(1)
(2)
(2)
(1)
New
Revised
New
Revised
Replaced in entirety
New
New
Revised
Item 3 revised
(1)
(1)
(1)
(1)
(2)
(2)
(2)
(2)
(2)
Revised
(1)
Revised
Broke into separate
paragraphs
Revised
Revised
(2)
(2)
Revised
Revised
Revised
Relocated from the
previous Part 1
Revised
(2)
(1)
(1)
(2)
(1)
(1)
* Note:
(1) = (13 May 1998)
(2) = (12 May 1999)
There were no changes to the MODU Rules for the year 2000.
6
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
TABLE 5
Comparison of Numbering System of the 1997 Rules vs. 2001 Rules
MODU 1997
Part
1
Section
1
1/1.1
1/1.1.1
1/1.1.2
1/1.1.2a
1/1.1.2b
1/1.1.2c
1/1.1.3
1/1.1.4
1/1.2
1/1.2.1
1/1.2.2
1/1.2.3
1/1.2.4
1/1.2.4a
1/1.2.4b
1/1.2.4c
1/1.2.4d
1/1.2.5
1/1.2.5a
1/1.2.5b
1/1.3
1/1.3.1
1/1.3.1a
1/1.3.1b
1/1.3.1c
1/1.3.1c1
1/1.3.1c2
1/1.3.2
1/1.3.3
1/1.3.4
1/1.3.5
1/1.3.6
1/1.3.6a
1/1.3.6b
1/1.3.7
1/1.3.8
1/1.3.9
1/1.3.10
1/1.3.11
1/1.5
1/1.5.1
Title
Classification, Testing and Surveys
Scope and Conditions of Classification
Classification
Process
Certificates and Reports
------Representation as to Classification
Scope of Classification
Suspension and Cancellation of Class
Termination of Classification
Notice of Surveys
Special Notations
Suspension of Class
--------Cancellation of Class
----Classification Symbols
Drilling Units Built Under Survey
Self Elevating Drilling Units
Column-Stabilized Units
Surface Type Drilling Units
Ship-type Drilling Units
Barge-type Drilling Units
Special Purpose Units
Service Limitations
Units not Built under Survey
Temporary Mooring Equipment Symbol
Position Mooring Equipment and Systems
Symbol Â
Symbol Ã
Propulsion Machinery
Thrusters
Dynamic Positioning Systems
Drilling Systems
Ice Strengthening
Rules for Classification
Application of Rules
1/1.5.2
Alternatives
1/1.5.3
1/1.5.4
1/1.5.4a
1/1.5.4b
1/1.5.5
1/1.5.6
1/1.7
1/1.7.1
1/1.7.2
1/1.7.3
1/1.8
1/1.9
1/1.9.1
Novel Features
Effective Date of Rule Change
Six Month Rule
Implementation of Rule Changes
Other Conditions
Installations not Covered by the Rules
Other Regulations
Governmental and Other Regulations
Other International Conventions or Codes
Governmental Regulations
IACS Audit
Plans and Design Data to be Submitted
Hull and Design Data
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
1-1-1
1-1-1/1
1-1-1/3
1-1-1/3.1
1-1-1/3.3
1-1-1/3.5
1-1-1/5
1-1-1/7
1-1-2
1-1-2/1
1-1-2/3
1-1-2/5
1-1-2/7
1-1-2/7.1
1-1-2/7.3
1-1-2/7.5
1-1-2/7.7
1-1-2/11
1-1-2/11.1
1-1-2/11.3
1-1-3
1-1-3/1
1-1-3/1.1
1-1-3/1.3
1-1-3/1.5
1-1-3/1.5.1
1-1-3/1.5.2
1-1-3/3
1-1-3/5
1-1-3/7
1-1-3/9
1-1-3/11
1-1-3/11.1
1-1-3/11.3
1-1-3/13
1-1-3/15
1-1-3/17
1-1-3/19
1-1-3/21
1-1-4
1-1-4/1
1-1-4/3
1-1-4/3.1
1-1-4/3.3
1-1-4/5
1-1-4/7
1-1-4/7.1
1-1-4/7.3
1-1-4/9
1-1-4/11
1-1-5
1-1-5/1
1-1-5/3
1-1-5/5
1-1-6
1-1-7
1-1-7/1
7
Notices and General Information
MODU 1997
1/1.9.2
1/1.9.3
1/1.9.4
1/1.9.5
Machinery Plans
Calculations
Additional Plans
Submissions
1/1.11
Operating Manual
1/1.11a
1/1.11b
1/1.11c
1/1.11d
1/1.11e
1/1.11f
1/1.11g
1/1.11h
1/1.13
1/1.15
1/1.15.1
1/1.15.1a
1/1.15.1b
1/1.15.1c
1/1.15.2
1/1.15.3
1/1.17
1/1.19
1/1.19.1
1/1.19.2
1/1.21
Part
Section
1/2.1
1/2.1.1
1/2.1.1a
1/2.1.1b
1/2.1.1c
1/2.1.2
1/2.1.3
1/2.1.4
1/2.1.5
1/2.1.5
1/2.1.5
1/2.1.6
1/2.1.7
1/2.1.8
1/2.1.9
1/2.1.9a
1/2.1.9b
1/2.1.10
1/2.1.10a
1/2.1.10b
1/2.1.10c
1/2.1.10c1
1/2.1.10c2
1/2.1.10c3
1/2.1.10c4
1/2.1.10c4a
1/2.1.10c4b
1/2.1.10c4c
1/2.1.10c5
1/2.1.10c5a
1/2.1.10c5b
1/2.2
1/2.3
1/2.3.1
----------------Construction Booklet
Conditions for Surveys After Construction
Damage, Failure and Repair
Examination and Repair
Repairs
Representation
Notification and Availability for Survey
Attendance at Port State Request
Fees
Disagreement
Rules
Surveyors
Limitation of Liability
Classification, Testing and Surveys
Surveys After Construction
Conditions for Surveys After Construction
Damage, Failure and Repair
Examination and Repair
Repairs
Representation
Notification and Availability for Survey
Annual Survey
Special Periodical Survey
Continuous Surveys
----Reactivation Surveys
Partially Complete Surveys
Alterations
Welding and Replacement of Materials
Ordinary and Higher Strength Structural Steels
Speical Materials
Drydocking Survey or Equivalent
Interval
Underwater Inspection in Lieu of Drydocking
Parts to be Examined
Surface-type Units
Self-elevating Units
Column-stabilized Units
Ballast and Preload Spaces
For Surface-type Units
Self-elevating Units
For Column-stabilized Units
All Units
Internal Examinations of Tanks and Voids
Sea Valves
Corrosion Control Systems
Annual Surveys
Parts to be Examined – Hull
8
1
2
Title
MODU 2001
1-1-7/3
1-1-7/5
1-1-7/7
1-1-7/9
1-1-8
1-1-8/1
1-1-8/1.1
1-1-8/1.3
1-1-8/1.5
1-1-8/1.7
1-1-8/1.9
1-1-8/1.11
1-1-8/1.13
1-1-8/1.15
1-1-9
1-1-10
1-1-10/1
1-1-10/1.1
1-1-10/1.3
1-1-10/1.5
1-1-10/3
1-1-10/5
1-1-11
1-1-12
1-1-12/15.1
1-1-12/15.3
1-1-13
5-1-1
5-1-1/1
5-1-1/1.1
5-1-1/1.3
5-1-1/1.5
5-1-1/3
5-1-1/5
5-1-1/7
5-1-1/9
5-1-1/9.1
5-1-1/9.3
5-1-1/11
5-1-1/13
5-1-1/15
5-1-1/17
5-1-1/17.1
5-1-1/17.3
5-1-1/19
5-1-1/19.1
5-1-1/19.3
5-1-1/19.5
5-1-1/19.5.1
5-1-1/19.5.2
5-1-1/19.5.3
5-1-1/19.5.4
5-1-1/19.5.4(a)
5-1-1/19.5.4(b)
5-1-1/19.5.4(c)
5-1-1/19.5.5
5-1-1/19.5.5(a)
5-1-1/19.5.5(b)
5-1-2
5-1-3
5-1-3/1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
1/2.3.1a
1/2.3.1a1
1/2.3.1a2
1/2.3.1a3
1/2.3.1a4
1/2.3.1a5
1/2.3.1a6
1/2.3.1a7
1/2.3.1a8
1/2.3.1b
1/2.3.1c
1/2.3.1d
1/2.3.2
1/2.5
1/2.5.1
1/2.5.2
1/2.7
1/2.7.1
1/2.7.1a
1/2.7.1a1
1/2.7.1a2
1/2.7.1a3
1/2.7.1a4
1/2.7.1a5
1/2.7.1a6
1/2.7.1a7
1/2.7.1a8
1/2.7.1b
1/2.7.1b1
1/2.7.1c
1/2.7.1c1
1/2.7.1c2
1/2.7.1c3
1/2.7.1c4
1/2.7.1c5
1/2.7.1c6
1/2.7.1d
1/2.7.2
1/2.8
1/2.9
1/2.9.1
1/2.9.2
1/2.11
1/2.11.1
1/2.11.2
1/2.11.2a
1/2.11.2b
1/2.11.2c
1/2.11.2d
1/2.11.3
1/2.11.4
1/2.11.4a
1/2.11.4b
1/2.11.4c
1/2.11.4d
1/2.11.4e
1/2.11.4f
1/2.11.5
1/2.12
1/2.13
1/2.13.1
1/2.13.2
1/2.13.2a
Title
All Types of Mobile Offshore Drilling Units
----------------Surface-type Units
Self-elevating Units
Column-stabilized Units
Alterations and Position of Load Lines
Survey Pre-planning
Special Surveys
Underwater Insepction in Lieu of Drydocking
Speical Surveys – Hull
Special Survey No. 1 – Hull
General – All Drilling Units
----------------Surface-type Units
--Self-elevating Units
------------Column-stabilized Units
Special Survey No. 2 and Subsequent
Specific Survey on Self-elevating Units After Ocean Transit Tow
Annual Surveys – Machinery
Self-propelled Units
Non-self-propelled Units
Special Periodical Surveys – Machinery
Correlation with Hull Special Surveys
Parts to be Examined
--------Units with Propulsion-assist or Dynamic Position Certification
Special Features (All Types)
Hazardous Areas
Remore Shutdown Arrangements
Fire Fighting Apparatus
Column Jakcing Systems
Piping Systems
Miscellaneous
Retractable Propulsion Thrusters
Tail Shaft Surveys
Boiler Surveys
Survey Interval
Parts to be Examined
---
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
5-1-3/1.1
5-1-3/1.1.1
5-1-3/1.1.2
5-1-3/1.1.3
5-1-3/1.1.4
5-1-3/1.1.5
5-1-3/1.1.6
5-1-3/1.1.7
5-1-3/1.1.8
5-1-3/1.3
5-1-3/1.5
5-1-3/1.7
5-1-3/3
5-1-4
5-1-4/1
5-1-4/3
5-1-5
5-1-5/1
5-1-5/1.1
5-1-5/1.1.1
5-1-5/1.1.2
5-1-5/1.1.3
5-1-5/1.1.4
5-1-5/1.1.5
5-1-5/1.1.6
5-1-5/1.1.7
5-1-5/1.1.8
5-1-5/1.3
5-1-5/1.3.1
5-1-5/1.5
5-1-5/1.5.1
5-1-5/1.5.2
5-1-5/1.5.3
5-1-5/1.5.4
5-1-5/1.5.5
5-1-5/1.5.6
5-1-5/1.7
5-1-5/3
5-1-6
5-1-7
5-1-7/1
5-1-7/3
5-1-8
5-1-8/1
5-1-8/3
5-1-8/3.1
5-1-8/3.3
5-1-8/3.5
5-1-8/3.7
5-1-8/5
5-1-8/7
5-1-8/7.1
5-1-8/7.3
5-1-8/7.5
5-1-8/7.7
5-1-8/7.9
5-1-8/7.11
5-1-8/9
5-1-9
5-1-10
5-1-10/1
5-1-10/3
5-1-10/3.1
9
Notices and General Information
MODU 1997
1/2.13.2b
1/2.13.2c
1/2.13.2d
1/2.15
1/2.15.1
1/2.15.2
1/2.15.2a
1/2.15.2b
1/2.15.2c
1/2.15.2d
1/2.15.2e
1/2.15.3
1/2.15.4
1/2.17
1/2.17.1
1/2.17.2
1/2.17.2a
1/2.17.2b
1/2.17.2c
1/2.17.3
Table 1/2.1
Table 1/2.2
Table 1/2.3
Part
1
Appendix A
1/A
1/A.1
1/A.2
1/A.2.1
1/A.2.2
1/A.2.3
1/A.2.4
1/A.3
1/A.3.1
1/A.3.2
1/A.3.3
1/A.3.4
1/A.4
1/A.4.1
1/A.4.2
1/A.4.3
1/A.5
10
Title
------Electrical Equipment
Timing of Survey
Parts to be Examined
----------Main Proulsion Apparatus
Major Repairs
Automatic and Remote-control Systems
Annual Survey
Special Periodical Surveys
Control Actuators
Electrical
Unattended Plants
Repairs or Alternatives
Thickness Gauging Requirements for Surface-type Units
Thickness Gauging Requirements for Self-elevating Units
Thickness Gauging Requirements for Column-stabilized Units
Classification, Testing and Surveys
Load Line Marks
Underwater Inspection in Lieu of Drydocking
General
Conditions
Limitations
Thickness Gauging and Non-destructive Testing
Plans and Data
Underwater Conditions
Physical Features
Stern Bearing
Rudder Bearings
Sea Suctions
Sea Valves
Procedures
Exposed Areas
Underwater Areas
Damage Areas
Alternatives
MODU 2001
5-1-10/3.3
5-1-10/3.5
5-1-10/3.7
5-1-11
5-1-11/1
5-1-11/3
5-1-11/3.1
5-1-11/3.3
5-1-11/3.5
5-1-11/3.7
5-1-11/3.9
5-1-11/5
5-1-11/7
5-1-12
5-1-12/1
5-1-12/3
5-1-12/3.1
5-1-12/3.3
5-1-12/3.5
5-1-12/5
5-1-5/Table 1
5-1-5/Table 2
5-1-5/Table 3
5-1-A1
5-1-A1/1
5-1-A1/3
5-1-A1/3.1
5-1-A1/3.3
5-1-A1/3.5
5-1-A1/3.7
5-1-A1/5
5-1-A1/5.1
5-1-A1/5.3
5-1-A1/5.5
5-1-A1/5.7
5-1-A1/7
5-1-A1/7.1
5-1-A1/7.3
5-1-A1/7.5
5-1-A1/9
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Part
2
Section
1
2/1.1
2/1.1.1
2/1.1.1a
2/1.1.1b
2/1.1.1b1
2/1.1.1b2
2/1.1.1b3
2/1.1.1d
2/1.1.1e
2/1.1.1f
2/1.1.1g
2/1.1.2
2/1.1.3
2/1.1.4
2/1.1.4a
2/1.1.4b
2/1.1.5
2/1.1.5a
2/1.1.5b
2/1.1.5c
2/1.1.5d
2/1.1.6
2/1.1.6a
2/1.1.6b
2/1.1.6c
2/1.1.6c1
2/1.1.6c2
2/1.1.6d
2/1.1.6e
2/1.1.6f
2/1.1.6g
2/1.1.7
2/1.1.7a
2/1.1.7b
2/1.1.8
2/1.1.8a
2/1.1.8b
2/1.1.8c
2/1.1.9
2/1.1.9a
2/1.1.9a1
2/1.1.9a2
2/1.1.9b
2/1.1.9c
2/1.1.9d
2/1.1.9e
2/1.1.9f
2/1.1.10
2/1.1.11
2/1.1.12
Title
Rules and Regulations for Materials and Welding
Materials for Hull Construction and Equipment
General
Testing and Inspection
General
Test and Test Data
Witnessed Tests
Manufacturer's Data
Other Tests
Certification on the Basis of the ABS Quality Assurance Program for Rolled
Products
Rejection of Previously Accepted Material
Calibrated Testing Machines
Structural Pipe
ASTM References
Defects
Identification of Materials
Manufacturer’s Certificates
Form of Certificate
Other Certificates
Marking and Retests
Identification of Specimens
Defects in Specimens
Retests
Rejected Material
Standard Test Specimens
General
Test Specimens Orientation
Tension Test Specimens, Plates and Shapes
Flat Specimens
Round Specimens
Tension Test Specimens, Castings and Forgings
Bend Test Specimens, Casting and Forgings
Impact Test Specimens
Tolerances
Definition and Determination of Yield Point and Yield Strength
Yield Point
Yield Strength
Permissible Variations in Dimensions
Scope
Plates
Shapes and Bars
Through Thickness Properties
Sampling
Plates
Wide Flats
Test Specimens
Test Results
Retest
Ultrasonic Inspection
Marking
Formed Materials
Ultrasonic Examination of Plate Material
Supplementary Requirements
2/1.3
Ordinary-strength Hull Structural Steel
2/1.3.1
2/1.3.1a
2/1.3.2
2/1.3.2a
2/1.3.2b
2/1.3.2c
2/1.3.2d
Process of Manufacture
Plates Produced from Coils
Chemical Composition
Ladle Analysis
Product Analysis
Special Compositions
Fine Grain Practice
2/1.1.1c
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-1-1
2-1-1/1
2-1-1/1.1
2-1-1/1.3
2-1-1/1.3.1
2-1-1/1.3.2
2-1-1/1.3
2-1-1/1.5
2-1-1/1.7
2-1-1/1.9
2-1-1/1.11
2-1-1/1.13
2-1-1/3
2-1-1/5
2-1-1/7
2-1-1/7.1
2-1-1/7.3
2-1-1/9
2-1-1/9.1
2-1-1/9.3
2-1-1/9.5
2-1-1/9.7
2-1-1/11
2-1-1/11.1
2-1-1/11.3
2-1-1/11.5
2-1-1/11.5.1
2-1-1/11.5.2
2-1-1/11.7
2-1-1/11.9
2-1-1/11.11
2-1-1/11.13
2-1-1/13
2-1-1/13.1
2-1-1/13.3
2-1-1/15
2-1-1/15.1
2-1-1/15.3
2-1-1/15.5
2-1-1/17
2-1-1/17.1
2-1-1/17.1.1
2-1-1/17.1.2
2-1-1/17.3
2-1-1/17.5
2-1-1/17.7
2-1-1/17.9
2-1-1/17.11
2-1-1/19
2-1-1/21
2-1-1/23
2-1-2
2-1-2/1
2-1-2/3
2-1-2/3.1
2-1-2/5
2-1-2/5.1
2-1-2/5.3
2-1-2/5.5
2-1-2/5.7
11
Notices and General Information
MODU 1997
2/1.3.2d1
2/1.3.2d2
2/1.3.3
2/1.3.3a
2/1.3.3a1
2/1.3.3a2
2/1.3.3b
2/1.3.3b1
2/1.3.3b2
2/1.3.4
2/1.3.4a
2/1.3.4b
2/1.3.4c
2/1.3.4d
2/1.3.4e
2/1.3.4f
2/1.3.4g
2/1.3.5
2/1.3.5a
2/1.3.5b
2/1.3.5c
2/1.3.5d
2/1.3.5e
2/1.3.5f
2/1.3.6
2/1.3.6a
2/1.3.6b
2/1.3.6c
2/1.3.6d
2/1.3.6e
2/1.3.6f
2/1.3.6g
2/1.3.6h
2/1.3.6i
2/1.3.7
2/1.3.7a
2/1.3.7b
2/1.3.7b1
2/1.3.7b2
2/1.3.7b3
2/1.3.7b4
2/1.3.7c
2/1.3.7c1
2/1.3.7c2
2/1.3.7c3
2/1.3.7c3a
2/1.3.7c3b
2/1.3.7c3c
2/1.3.7c3d
2/1.3.7d
2/1.3.8
Title
----Condition of Supply
Heat Treatment
Normalizing Heat Treatment
Special Heat Treatment
Controlled Manufacturing Process
Controlled Rolling
Thermo-mechanical Controlled Processing
Tensile Properties
Required Tensile Properties
Tension Test Specimens
Exceptions
Elongation Deduction for Material Under 7.9 mm (0.313 in.) Thick
Omission of Elongation Requirements
Retests
Unsatisfactory Tests
Impact Properties
Impact Tests
Impact Test Frequency
Initial Test Requirements
Retests
Unsatisfactory Tests
Thin Plates
Marking
Stamped or Stenciled Material
Coils, Lifts and Bundles
Flanging-quality Identification
Special Stamping and Marking
Special Impact Testing
Steel with Improved Through Thickness Properties
Steel with Ultrasonic Examination
Shipping Procedure
Steel at Secondary Sources
Surface Finish
Surface Inspection
Treatment of Surface Defects – Plates
Extent of Weld Repaired Area
Minimum Thickness before Weld Repairs
Inspection Before Weld Repairs
Repair-welding Quality
Treatment of Surface Defects – Shapes
Chipping and Grinding Material under 9.5 mm (0.375 in.) in Thickness
Chipping and Grinding Material 9.5 mm (0.375 in.) and over in Thickness
Welding Repairs
--------Bar-stock Repairs
Rivet Steel and Rivets
2/1.5
Higher-strength Hull Structural Steel
2/1.5.1
2/1.5.2
2/1.5.3
2/1.5.3a
2/1.5.3b
2/1.6
2/1.6.1
2/1.6.2
2/1.6.3
2/1.6.3a
General
Fine Grain Practice
Additional Requirements of TMCP Steel
Carbon Equivalent
Cold Cracking Susceptibility
Lower Temperature Materials
General
Marking
Toughness Tests
Charpy V-notch
12
MODU 2001
2-1-2/5.7.1
2-1-2/5.7.2
2-1-2/7
2-1-2/7.1
2-1-2/7.1.1
2-1-2/7.1.2
2-1-2/7.3
2-1-2/7.3.1
2-1-2/7.3.2
2-1-2/9
2-1-2/9.1
2-1-2/9.3
2-1-2/9.5
2-1-2/9.7
2-1-2/9.9
2-1-2/9.11
2-1-2/9.13
2-1-2/11
2-1-2/11.1
2-1-2/11.3
2-1-2/11.5
2-1-2/11.7
2-1-2/11.9
2-1-2/11.11
2-1-2/13
2-1-2/13.1
2-1-2/13.3
2-1-2/13.5
2-1-2/13.7
2-1-2/13.9
2-1-2/13.11
2-1-2/13.13
2-1-2/13.15
2-1-2/13.17
2-1-2/15
2-1-2/15.1
2-1-2/15.3
2-1-2/15.3.1
2-1-2/15.3.2
2-1-2/15.3.3
2-1-2/15.3.4
2-1-2/15.5
2-1-2/15.5.1
2-1-2/15.5.2
2-1-2/15.5.3
2-1-2/15.5.3(a)
2-1-2/15.5.3(b)
2-1-2/15.5.3(c)
2-1-2/15.5.3(d)
2-1-2/15.7
2-1-2/15.9
2-1-3
2-1-3/1
2-1-3/3
2-1-3/5
2-1-3/7
2-1-3/7.1
2-1-3/7.3
2-1-4
2-1-4/1
2-1-4/3
2-1-4/5
2-1-4/5.1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
2/1.6.3b
2/1.6.4
2/1.6.5
2/1.6.6
2/1.6.7
2/1.7
2/1.7.1
2/1.7.2
2/1.7.2a
2/1.7.2b
2/1.7.3
2/1.7.4
2/1.7.5
2/1.7.5a
2/1.7.5b
2/1.7.6
2/1.7.7
2/1.7.7a
2/1.7.7b
2/1.7.7c
2/1.7.7d
2/1.7.7e
2/1.7.7f
2/1.9
2/1.9.1
2/1.9.1a
2/1.9.1b
2/1.9.1c
2/1.9.1d
2/1.9.2
2/1.9.2a
2/1.9.2b
2/1.9.3
2/1.9.3a
2/1.9.3b
2/1.9.3c
2/1.9.3d
2/1.9.3e
2/1.9.4
2/1.9.4a
2/1.9.5
2/1.9.5a
2/1.9.5b
2/1.9.5c
2/1.9.5d
2/1.9.6
2/1.9.6a
2/1.9.6a1
2/1.9.6a2
2/1.9.6a3
2/1.9.6b
2/1.9.6c
2/1.9.7
2/1.11
2/1.11.1
2/1.11.2
2/1.11.3
2/1.11.3a
2/1.11.3b
2/1.11.4
2/1.11.4a
2/1.11.4b
2/1.11.4c
Title
Drop-weight Test
Service Temperature 0°C (32°F) or Above
Service Temperature at or above -55°C (-67°F) up to 0°C (32°F)
Service Temperature at or Above -196°C (-320°F) up to -55°C (-67°F)
Service Temperatures below -196°C (-320°F)
Hull Steel Castings
Process of Manufacture
Marking and Retests
Marking
Retests
Heat Treatment
Tensile Properties
Test Specimens
Material Coupons
Separately Cast Coupons
Number of Tests
Inspection and Repair
General
Minor Defects
Major Defects
Welded Repair
Post Weld Repair Heat Treatment
Nondestructive Testing
Hull Steel Forgings
Process of Manufacture
General
Degree of Reduction
Discard
Chemical Composition
Marking and Retests
Marking
Retests
Heat Treatment
General
Cooling Prior to Heat Treatment
Annealing
Normalizing
Tempering
Physical Properties
Tensile Properties
Test Specimens
Location and Orientation of Specimens
Hollow-drilled Specimens
Small Forgings
Specimen Identification
Number of Tests
Tension Test
Large Forgings
Intermediate-sized Forgings
Small Forgings
Brinell Hardness Test
Special Situations
Inspection
Anchors
Process of Manufacture
Annealing
Testing and Inspection
Calibrated Testing Machines
Test Coupons
Details of Tests for Anchors
Bend Tests
Drop Tests
Hammering Tests
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-1-4/5.3
2-1-4/7
2-1-4/9
2-1-4/11
2-1-4/13
2-1-5
2-1-5/1
2-1-5/3
2-1-5/3.1
2-1-5/3.3
2-1-5/5
2-1-5/7
2-1-5/9
2-1-5/9.1
2-1-5/9.3
2-1-5/11
2-1-5/13
2-1-5/13.1
2-1-5/13.3
2-1-5/13.5
2-1-5/13.7
2-1-5/13.9
2-1-5/13.11
2-1-6
2-1-6/1
2-1-6/1.1
2-1-6/1.3
2-1-6/1.5
2-1-6/1.7
2-1-6/3
2-1-6/3.1
2-1-6/3.3
2-1-6/5
2-1-6/5.1
2-1-6/5.3
2-1-6/5.5
2-1-6/5.7
2-1-6/5.9
2-1-6
2-1-6/7
2-1-6/9
2-1-6/9.1
2-1-6/9.3
2-1-6/9.5
2-1-6/9.7
2-1-6/11
2-1-6/11.1
2-1-6/11.1.1
2-1-6/11.1.2
2-1-6/11.1.3
2-1-6/11.3
2-1-6/11.5
2-1-6/11.7
2-2-1
2-2-1/1
2-2-1/3
2-2-1/5
2-2-1/5.1
2-2-1/5.3
2-2-1/7
2-2-1/7.1
2-2-1/7.3
2-2-1/7.5
13
Notices and General Information
MODU 1997
2/1.11.4d
2/1.11.4e
2/1.11.5
2/1.11.5a
2/1.11.5b
2/1.13
2/1.13.1
2/1.13.2
2/1.13.3
2/1.13.4
2/1.13.4a
2/1.13.4b
2/1.13.4c
2/1.13.5
2/1.13.5a
2/1.13.5b
2/1.13.5c
2/1.13.5d
2/1.13.6
2/1.13.6a
2/1.13.6b
2/1.13.7
2/1.13.7a
2/1.13.7b
2/1.13.7c
2/1.13.7d
2/1.13.7e
2/1.13.7f
2/1.13.7g
2/1.13.8
2/1.13.8a
2/1.13.8b
2/1.13.8c
2/1.13.9
2/1.13.9a
2/1.13.9b
2/1.13.9c
2/1.13.9d
2/1.13.9e
2/1.13.10
2/1.13.10a
2/1.13.10b
2/1.13.10c
2/1.13.10d
2/1.13.11
2/1.13.12
2/1.13.12a
2/1.13.12b
2/1.13.12c
2/1.13.12d
2/1.13.12e
2/1.13.12f
2/1.13.12g
2/1.13.12h
2/1.13.12i
2/1.15
2/1.15.1
2/1.15.2
2/1.15.3
Table 2/1.1-1
Table 2/1.1-2
14
Title
Fabricated Steel Anchors
Proof Tests
Marking for Anchors
Kind of Markings
Provisions for Marks
Anchor Chain
Scope
General
Specially Approved Chain
Qualification of Manufacturers
General
Locking Pins in Accessories
Stud Attachment
Chain Dimensions and Tolerances
Shape
Dimensions
Tolerances
Length Over Five Links
Material for Chain
Process of Steel Manufacture and Deoxidation
Chemical Composition
Material Testing
Heat Treatment of Test Specimens
Number of Tests
Tension Test Specimens
Bend Test Specimens
Impact Test Specimens
Additional Tests before Rejection
Manufacturer’s Option
Heat Treatment of Chain Lengths
Flash Butt-welded Chain
Drop-forged, Cast-steel and Extra-high-strength Chain
Sequence of Heat Treatment
Testing and Inspection of Chain Lengths
General
Chain Identification
Testing Precautions
Weighing of Tested Chain
Testing of Used Chain
Details of Tests on Chain Lengths
Breaking Test
Proof Test
Mechanical Tests on Completed Chain
Mechanical and Breaking Tests on Chain Produced in Long Continuous Lengths
Marking for Chain
Anchor Chain Accessories
Dimensions and Dimensional Tolerances
Material Testing
Cast Accessories
Forged Accessories
Inspection
Hardness Test
Break Test
Proof Tests
Markings
Unstudded Short-link Chain
General
Testing
Marking
Chemical Properties of Ordinary Strength Hull Structural Steel 100 mm (4.0 in.) and
Under
Tensile Properties of Ordinary Strength Hull Structural Steel 100 mm (4.0 in.) and
Under
MODU 2001
2-2-1/7.7
2-2-1/7.9
2-2-1/9
2-2-1/9.1
2-2-1/9.3
2-2-2
2-2-2/1
2-2-2/3
2-2-2/5
2-2-2/7
2-2-2/7.1
2-2-2/7.3
2-2-2/7.5
2-2-2/9
2-2-2/9.1
2-2-2/9.3
2-2-2/9.5
2-2-2/9.7
2-2-2/11
2-2-2/11.1
2-2-2/11.3
2-2-2/13
2-2-2/13.1
2-2-2/13.3
2-2-2/13.5
2-2-2/13.7
2-2-2/13.9
2-2-2/13.11
2-2-2/13.13
2-2-2/15
2-2-2/15.1
2-2-2/15.3
2-2-2/15.5
2-2-2/17
2-2-2/17.1
2-2-2/17.3
2-2-2/17.5
2-2-2/17.7
2-2-2/17.9
2-2-2/19
2-2-2/19.1
2-2-2/19.3
2-2-2/19.5
2-2-2/19.7
2-2-2/21
2-2-2/23
2-2-2/23.1
2-2-2/23.3
2-2-2/23.5
2-2-2/23.7
2-2-2/23.9
2-2-2/23.11
2-2-2/23.13
2-2-2/23.15
2-2-2/23.17
2-2-2/25
2-2-2/25.1
2-2-2/25.3
2-2-2/25.5
2-1-2/Table 1
2-1-2/Table 2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Table 2/1.1-3
Table 2/1.1-4
Table 2/1.1
Table 2/1.2-1
Table 2/1.2-2
Table 2/1.2-3
Table 2/1.2-4
Table 2/1.2
Table 2/1.3
Table 2/1.7
Table 2/1.8
Table 2/1.9
Table 2/1.10
Figure 2/1.1
Figure 2/1.3
Figure 2/1.4
Figure 2/1.5
Figure 2/1.6
Figure 2/1.7
Part
2
Section
2
2/2.1
2/2.1.1
2/2.1.1a
2/2.1.1b
2/2.1.1b1
2/2.1.1b2
2/2.1.1b3
2/2.1.1c
2/2.1.1d
2/2.1.1e
2/2.1.2
2/2.1.3
2/2.1.4
2/2.1.4a
2/2.1.4b
2/2.1.5
2/2.1.5a
2/2.1.5b
2/2.1.5c
2/2.1.5d
2/2.1.6
2/2.1.6a
2/2.1.6b
2/2.1.6c
2/2.1.6d
2/2.1.6e
2/2.1.6f
2/2.1.6g
2/2.1.7
2/2.1.7a
2/2.1.7b
2/2.1.8
2/2.1.8a
2/2.1.8b
Title
Elongation Requirements for Alternative B Specimen
Impact Properties of Ordinary Strength Hull Structural Steel 100 mm (4.0 in.) and
Under
Condition of Supply and Frequency of Impact Tests Ordinary Strength Hull
Structural Steel
Chemical Properties of Higher-Strength Hull Structural Steel 100 mm (4.0 in.) and
Under
Tensile Properties of Higher-Strength Hull Structural Steel 100 mm (4.0 in.) and
Under
Elongation Requirements for Alternative B Specimen
Impact Properties of Higher-Strength Hull Structural Steel 100 mm (4.0 in.) and
Under
Condition of Supply and Frequency of Impact Tests Higher-Strength Hull Structural
Steel
Carbon Equivalent for Higher-Strength Hull Structural Steel 100 mm (4.0 in.) and
Under Produced by TMCP
Proof Tests for Anchors
Chain Materials – Mechanical Properties
Stud-link Anchor Chain Proof and Break Tests
Unstudded Short-link Chain
Standard Tension Test Specimen
Charpy V-notch Impact Test Specimens
Proof Load Application
Stockless Anchor
Location and Orientation of Test Specimens
Marking for Chain
Rules and Regulations for Materials and Welding
Materials for Machinery, Boilers, Pressure Vessels and Piping
General
Testing and Inspection
General
Test and Test Data
Witnessed Tests
Manufacturer’s Data
Other Tests
Rejection of Previously Accepted Material
Calibrated Testing Machines
ASTM References
Defects
Identification of Materials
Manufacturer’s Certificates
Form of Certificate
Other Certificates
Marking And Retests
Identification of Test Specimens
Defects in Specimens
Retests
Rejected Material
Standard Test Specimens
General
Test Specimens
Tension Test Specimens for Plates and Shapes
Tension Test Specimens for Castings (Other than Iron) and Forgings
Tension Test Specimens (for Cast Iron)
Transverse or Flexure Test Specimens for Cast Iron
Bend Test Specimens for Steel Castings and Forgings
Definition and Determination of Yield Point And Yield Strength
Yield Point
Yield Strength
Permissible Variations in Dimensions
Scope
Plates
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-1-2/Table 3
2-1-2/Table 4
2-1-2/Table 5
2-1-3/Table 1
2-1-3/Table 2
2-1-3/Table 3
2-1-3/Table 4
2-1-3/Table 5
2-1-3/Table 6
2-2-1/Table 1
2-2-2/Table 1
2-2-2/Table 2
2-2-2/Table 3
2-1-1/Figure 1
2-1-1/Figure 2
2-2-1/Figure 1
2-2-1/Figure 2
2-2-2/Figure 1
2-2-2/Figure 2
2-3-1
2-3-1/1
2-3-1/1.1
2-3-1/1.3
2-3-1/1.3.1
2-3-1/1.3.2
2-3-1/1.3.3
2-3-1/1.5
2-3-1/1.7
2-3-1/1.9
2-3-1/3
2-3-1/5
2-3-1/7
2-3-1/7.1
2-3-1/7.3
2-3-1/9
2-3-1/9.1
2-3-1/9.3
2-3-1/9.5
2-3-1/9.7
2-3-1/11
2-3-1/11.1
2-3-1/11.3
2-3-1/11.5
2-3-1/11.7
2-3-1/11.9
2-3-1/11.11
2-3-1/11.13
2-3-1/13
2-3-1/13.1
2-3-1/13.3
2-3-1/15
2-3-1/15.1
2-3-1/15.3
15
Notices and General Information
MODU 1997
2/2.3
2/2.3.1
2/2.3.1a
2/2.3.1b
2/2.3.2
2/2.3.2a
2/2.3.2b
2/2.3.2c
2/2.3.2d
2/2.3.2e
2/2.3.3
2/2.3.3a
2/2.3.4
2/2.3.4a
2/2.3.4b
2/2.3.6
2/2.3.6a
2/2.3.6b
2/2.3.6c
2/2.3.6d
2/2.3.7
2/2.3.7a
2/2.3.7b
2/2.3.7c
2/2.3.8
2/2.3.8a
2/2.3.8b
2/2.3.9
2/2.3.10
2/2.3.11
2/2.5
2/2.5.1
2/2.5.2
2/2.5.3
2/2.5.4
2/2.5.5
2/2.7
2/2.7.1
2/2.7.2
2/2.7.3
2/2.7.3a
2/2.7.3b
2/2.7.3c
2/2.7.4
2/2.7.5
2/2.7.5a
2/2.7.5b
2/2.7.6
2/2.9
2/2.9.1
2/2.9.2
2/2.9.3
2/2.9.3a
2/2.9.3b
2/2.9.3c
2/2.9.4
2/2.9.5
2/2.9.5a
2/2.9.5b
2/2.9.6
2/2.10
2/2.11
16
Title
Steel Plates for Machinery, Boilers and Pressure Vessels – General Requirements for
All Grades of Steel Plates for Machinery, Boilers, and Pressure Vessels
General
Inspection at Mills
Alloy Steels or Special Carbon Steels
Marking
Plates and Test Specimens
Heat-treatment Marking
Bureau Markings
Thin Plates
Special Impact Testing
Process of Manufacture
Plates Produced from Coils
Chemical Composition
Ladle Analysis
Check Analysis
Test Specimens
Selection of Specimens
Specimens from Plates 19 mm (0.75 in.) and Under in Thickness
Specimens from Plates Over 19 mm (0.75 in.) Thickness
Stress Relieving
Tensile Properties
Tensile Requirements
Elongation Deduction for Material Under 7.9 mm (0.313 in.) Thick
Elongation Deduction for Material Over 88.9 mm (3.50 in.) Thick
Retests
For All Thicknesses
For Heat-treated Material
Thickness Variation
Finish
Weldability
Steel Plates for Intermediate-temperature Service
Scope
General
Chemical Composition
Specimen Preparation
Tensile Properties
Steel Plates for Intermediate- and Higher-temperature Service
Scope
General
Heat Treatment
Treatment
Heat-treatment Instructions on Orders
Responsibility for Heat Treatment
Chemical Composition
Test Specimens
Plates Not Requiring Heat Treatment
Plates Requiring Heat Treatment
Tensile Properties
Steel Plates for Intermediate- and Lower-temperature Service
Scope
General
Heat Treatment
Grain Refinement
Heat-treatment Instructions on Orders
Responsibility for Heat Treatment
Chemical Composition
Test Specimens
Plates 38.1 mm (1.5 in.) and Under in Thickness
Plates Requiring Heat Treatment
Tensile Properties
Materials for Low Temperature Service [Below -18°C (0°F)]
Seamless Forged-steel Drums
MODU 2001
2-3-2
2-3-2/1
2-3-2/1.1
2-3-2/1.1.1
2-3-2/1.1.2
2-3-2/1.3
2-3-2/1.3.1
2-3-2/1.3.2
2-3-2/1.3.3
2-3-2/1.3.4
2-3-2/1.3.5
2-3-2/1.5
2-3-2/1.5.1
2-3-2/1.7
2-3-2/1.7.1
2-3-2/1.7.2
2-3-2/1.9
2-3-2/1.9.1
2-3-2/1.9.2
2-3-2/1.9.3
2-3-2/1.9.4
2-3-2/1.11
2-3-2/1.11.1
2-3-2/1.11.2
2-3-2/1.11.3
2-3-2/1.13
2-3-2/1.13.1
2-3-2/1.13.2
2-3-2/1.15
2-3-2/1.17
2-3-2/1.19
2-3-2/3
2-3-2/3.1
2-3-2/3.3
2-3-2/3.5
2-3-2/3.7
2-3-2/3.9
2-3-2/5
2-3-2/5.1
2-3-2/5.3
2-3-2/5.5
2-3-2/5.5.1
2-3-2/5.5.2
2-3-2/5.5.3
2-3-2/5.7
2-3-2/5.9
2-3-2/5.9.1
2-3-2/5.9.2
2-3-2/5.11
2-3-2/7
2-3-2/7.1
2-3-2/7.3
2-3-2/7.5
2-3-2/7.5.1
2-3-2/7.5.2
2-3-2/7.5.3
2-3-2/7.7
2-3-2/7.9
2-3-2/7.9.1
2-3-2/7.9.2
2-3-2/7.11
2-3-2/9
2-3-3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
2/2.11.1
2/2.11.2
2/2.13
2/2.13.1
2/2.13.2
2/2.13.3
2/2.13.4
2/2.13.5
2/2.13.6
2/2.15
2/2.15.1
2/2.15.2
2/2.15.2a
2/2.15.2b
2/2.15.2c
2/2.15.2d
2/2.15.2e
2/2.15.2f
2/2.15.2g
2/2.15.2h
2/2.15.3
2/2.15.3a
2/2.15.3b
2/2.15.3c
2/2.15.3d
2/2.15.4
2/2.15.5
2/2.15.6
2/2.15.6a
2/2.15.6b
2/2.15.6c
2/2.15.6d
2/2.15.6e
2/2.15.6f
2/2.15.7
2/2.15.8
2/2.15.8a
2/2.15.8b
2/2.15.8c
2/2.15.9
2/2.15.10
2/2.15.10a
2/2.15.10b
2/2.15.11
2/2.15.12
2/2.15.13
2/2.15.14
2/2.15.15
2/2.15.15a
2/2.15.15b
2/2.15.15c
2/2.15.15d
2/2.15.15e
2/2.15.16
2/2.15.16a
2/2.15.16b
2/2.15.16c
2/2.15.16d
2/2.15.16d1
2/2.15.16d2
2/2.15.16e
2/2.15.17
2/2.15.17a
Title
Tests and Inspections
Heat Treatment
Seamless-steel Pressure Vessels
General
Tension Test
Flattening Test
Hydrostatic Test
Inspection
Marking
Boiler and Superheater Tubes
Scope
General
Grades D and F
Grade G
Grade H
Grade J
Grades K, L and M
Grades N, O and P
Grades R and S
ASTM Designation
Process of Manufacture
Grades D, F, and G
Grades H, J, K, L, and M
Grades N, O, and P
Grades R and S
Marking
Chemical Composition – Ladle Analysis
Check Analysis
General
Samples
Grades D, F, G, and H
Grades J, K, L, M, N, O, P, R and S
Retests for Seamless Tubes
Retests for Electric-resistance-welded Tubes
Mechanical Tests Required
Test Specimens
Selection of Specimens
Tension Test Specimens
Testing Temperature
Tensile Properties
Flattening Test
Seamless and Electric-resistance-welded Tubes
Electric-resistance-welded Tubes
Reverse Flattening Test
Flange Test
Flaring Test
Crush Test
Hardness Tests
Type of Test
Brinell Hardness Test
Rockwell Hardness Test
Tubes with Formed Ends
Maximum Permissible Hardness
Hydrostatic Test
General
Maximum Hydrostatic Test Pressure
Duration of Test
Alternate Tests
----Rejection
Nondestructive Electric Test (NDET)
General
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-3-3/1
2-3-3/3
2-3-4
2-3-4/1
2-3-4/3
2-3-4/5
2-3-4/7
2-3-4/9
2-3-4/11
2-3-5
2-3-5/1
2-3-5/3
2-3-5/3.1
2-3-5/3.3
2-3-5/3.5
2-3-5/3.7
2-3-5/3.9
2-3-5/3.11
2-3-5/3.13
2-3-5/3.15
2-3-5/5
2-3-5/5.1
2-3-5/5.3
2-3-5/5.5
2-3-5/5.7
2-3-5/7
2-3-5/9
2-3-5/11
2-3-5/11.1
2-3-5/11.3
2-3-5/11.5
2-3-5/11.7
2-3-5/11.9
2-3-5/11.11
2-3-5/13
2-3-5/15
2-3-5/15.1
2-3-5/15.3
2-3-5/15.5
2-3-5/17
2-3-5/19
2-3-5/19.1
2-3-5/19.3
2-3-5/21
2-3-5/23
2-3-5/25
2-3-5/27
2-3-5/29
2-3-5/29.1
2-3-5/29.3
2-3-5/29.5
2-3-5/29.7
2-3-5/29.9
2-3-5/31
2-3-5/31.1
2-3-5/31.3
2-3-5/31.5
2-3-5/31.7
2-3-5/31.7.1
2-3-5/31.7.2
2-3-5/31.9
2-3-5/33
2-3-5/33.1
17
Notices and General Information
MODU 1997
2/2.15.17b
2/2.15.17c
2/2.15.17c1
2/2.15.17c2
2/2.15.17c3
2/2.15.17d
2/2.15.17e
2/2.15.17f
2/2.15.18
2/2.15.19
2/2.15.20
2/2.15.20a
2/2.15.20b
2/2.17
2/2.17.1
2/2.17.2
2/2.17.2a
2/2.17.2b
2/2.17.2c
2/2.17.3
2/2.17.4
2/2.17.5
2/2.17.6
2/2.17.7
2/2.17.7a
2/2.17.7b
2/2.17.7c
2/2.19
2/2.19.1
2/2.19.1a
2/2.19.1b
2/2.19.2
2/2.19.2a
2/2.19.2b
2/2.19.3
2/2.19.3a
2/2.19.3b
2/2.19.3c
2/2.19.3d
2/2.19.3e
2/2.19.4
2/2.19.4a
2/2.19.4b
2/2.19.5
2/2.19.5a
2/2.19.5b
2/2.19.5c
2/2.19.5d
2/2.19.6
2/2.19.6a
2/2.19.6a1
2/2.19.6a2
2/2.19.6a3
2/2.19.6a4
2/2.19.6a5
2/2.19.6a6
2/2.19.6b
2/2.19.6b1
2/2.19.6b2
2/2.19.6b3
2/2.19.7
2/2.19.7a
2/2.19.7b
18
Title
Ultrasonic Calibration Standards
Eddy-Current Calibration Standards
Drilled Hole
Transverse Tangential Notch
Longitudinal Notch
Flux Leakage Calibration Standards
Rejection
Affidavits
Retests
Finish
Permissible Variations in Dimensions
Wall Thickness
Outside Diameter
Boiler Rivet and Staybolt Steel and Rivets
Process of Manufacture
Marking and Retests
Manufacturer’s Markings
Bureau Markings
Retests
Tensile Properties
Bending Properties
Test Specimens
Number of Tests
Tests of Finished Rivets
Bending Properties
Flattening Tests
Number of Tests
Steel Machinery Forgings
Process of Manufacture
General
Chemical Composition
Marking and Retests
Marking
Retests
Heat Treatment
General
Cooling Prior to Heat Treatment
Annealing
Normalizing
Tempering
Tensile Properties
Carbon-steel Forgings
Alloy or Special Carbon Steels
Test Specimens
Location and Orientation of Specimens
Hollow-drilled Specimens
Small Forgings
Identification of Specimens
Number and Location of Tests
Tension Test
Large Forgings
Intermediate-Sized Forgings
Small Forgings
Reduction Gear Ring Forgings
Reduction Gear Pinion and Gear Forgings
Reduction Gear Shaft Forgings
Hardness Tests
Large, Intermediate and Small Sized Forgings
Reduction Gear Ring Forgings
Reduction Gear Pinion and Gear Forgings
Inspection
Surface Inspection of Tail Shaft Forgings
Ultrasonic Examination of Tail Shaft Forgings
MODU 2001
2-3-5/33.3
2-3-5/33.5
2-3-5/33.5.1
2-3-5/33.5.2
2-3-5/33.5.3
2-3-5/33.7
2-3-5/33.9
2-3-5/33.11
2-3-5/35
2-3-5/37
2-3-5/39
2-3-5/39.1
2-3-5/39.3
2-3-6
2-3-6/1
2-3-6/3
2-3-6/3.1
2-3-6/3.3
2-3-6/3.5
2-3-6/5
2-3-6/7
2-3-6/9
2-3-6/11
2-3-6/13
2-3-6/13.1
2-3-6/13.3
2-3-6/13.5
2-3-7
2-3-7/1
2-3-7/1.1
2-3-7/1.3
2-3-7/3
2-3-7/3.1
2-3-7/3.3
2-3-7/5
2-3-7/5.1
2-3-7/5.3
2-3-7/5.5
2-3-7/5.7
2-3-7/5.9
2-3-7/7
2-3-7/7.1
2-3-7/7.3
2-3-7/9
2-3-7/9.1
2-3-7/9.3
2-3-7/9.5
2-3-7/9.7
2-3-7/11
2-3-7/11.1
2-3-7/11.1.1
2-3-7/11.1.2
2-3-7/11.1.3
2-3-7/11.1.4
2-3-7/11.1.5
2-3-7/11.1.6
2-3-7/11.3
2-3-7/11.3.1
2-3-7/11.3.2
2-3-7/11.3.3
2-3-7/13
2-3-7/13.1
2-3-7/13.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
2/2.21
2/2.21.1
2/2.21.2
2/2.23
2/2.23.1
2/2.23.1a
2/2.23.1b
2/2.23.2
2/2.23.2a
2/2.23.2b
2/2.23.3
2/2.23.4
2/2.23.5
2/2.23.5a
2/2.23.5b
2/2.23.5c
2/2.23.6
2/2.23.6a
2/2.23.6b
2/2.23.7
2/2.23.7a
2/2.23.7b
2/2.23.8
2/2.23.8a
2/2.23.8b
2/2.23.8c
2/2.23.8d
2/2.23.8e
2/2.23.8f
2/2.23.9
2/2.25
2/2.25.1
2/2.25.1a
2/2.25.1b
2/2.25.1c
2/2.25.1d
2/2.25.2
2/2.25.2a
2/2.25.2b
2/2.25.3
2/2.27
2/2.27.1
2/2.27.2
2/2.27.3
2/2.29
2/2.29.1
2/2.29.2
2/2.29.2a
2/2.29.2b
2/2.29.2c
2/2.29.2d
2/2.29.2e
2/2.29.2f
2/2.29.3
2/2.29.3a
2/2.29.3b
2/2.29.3c
2/2.29.3d
2/2.29.3e
2/2.29.4
2/2.29.5
2/2.29.6
2/2.29.7
Title
Hot-rolled Steel Bars for Machinery
Hot-rolled Steel Bars
Number of Tests
Steel Castings for Machinery, Boilers, and Pressure Vessels
General
Process of Manufacturer
ASTM Designations
Marking and Retests
Marking
Retests
Heat Treatment
Tensile Properties
Application
General and High-temperature Applications
Propeller and Forging Applications
Alloy Steels or Special Carbon Steels
Test Specimens
Preparation and Identification of Test Coupons
Small Castings
Number of Tests
Machinery Castings
Steel Propeller Castings
Inspection and Repair
General
Minor Defects
Major Defects
Welded Repair
Postweld-repair Heat Treatment
Crankshaft Castings
Castings for Ice-strengthened Propellers
Ductile (Nodular) Iron Castings
Manufacture and Test
General
Tension Test Requirements
Size of Test Coupon
Chemical Composition
Heat Treatment
Grade 60-40-18 Castings
Grade 65-45-12 Castings
Weld Repairs
Gray-iron Castings
Process of Manufacture
Tensile Strength
Higher-strength Castings
Steel Piping
Scope
General
Grades 1, 2, and 3
Grades 4 and 5
Grade 6
Grades 7, 11, 12, 13 and 14
Grades 8 and 9
ASTM Designations
Process of Manufacture
Grades 1, 2, and 3
Grades 4 and 5
Grades 6 and 7
Grades 8 and 9
Grades 11, 12, 13 and 14
Marking
Chemical Composition
Ladle Analysis
Check Analysis
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-3-8
2-3-8/1
2-3-8/3
2-3-9
2-3-9/1
2-3-9/1.1
2-3-9/1.3
2-3-9/3
2-3-9/3.1
2-3-9/3.3
2-3-9/5
2-3-9/7
2-3-9/9
2-3-9/9.1
2-3-9/9.3
2-3-9/9.5
2-3-9/11
2-3-9/11.1
2-3-9/11.3
2-3-9/13
2-3-9/13.1
2-3-9/13.3
2-3-9/15
2-3-9/15.1
2-3-9/15.3
2-3-9/15.5
2-3-9/15.7
2-3-9/15.9
2-3-9/15.11
2-3-9/17
2-3-10
2-3-10/1
2-3-10/1.1
2-3-10/1.3
2-3-10/1.5
2-3-10/1.7
2-3-10/3
2-3-10/3.1
2-3-10/3.3
2-3-10/5
2-3-11
2-3-11/1
2-3-11/3
2-3-11/5
2-3-12
2-3-12/1
2-3-12/3
2-3-12/3.1
2-3-12/3.3
2-3-12/3.5
2-3-12/3.7
2-3-12/3.9
2-3-12/3.11
2-3-12/5
2-3-12/5.1
2-3-12/5.3
2-3-12/5.5
2-3-12/5.7
2-3-12/5.9
2-3-12/7
2-3-12/9
2-3-12/11
2-3-12/13
19
Notices and General Information
MODU 1997
2/2.29.7a
2/2.29.7b
2/2.29.7c
2/2.29.7d
2/2.29.7e
2/2.29.7f
2/2.29.7g
2/2.29.7h
2/2.29.7I
2/2.29.8
2/2.29.9
2/2.29.9a
2/2.29.9b
2/2.29.9b1
2/2.29.9b2
2/2.29.9c
2/2.29.10
2/2.29.11
2/2.29.12
2/2.29.13
2/2.29.13a
2/2.29.13b
2/2.29.14
2/2.29.14a
2/2.29.14b
2/2.29.14b1
2/2.29.14b2
2/2.29.14b3
2/2.29.14c
2/2.29.14c1
2/2.29.14c2
2/2.29.14c3
2/2.29.14d
2/2.29.14d1
2/2.29.14d2
2/2.29.15
2/2.29.15a
2/2.29.15b
2/2.29.15c
2/2.29.15d
2/2.29.15e
2/2.29.16
2/2.29.16a
2/2.29.16b
2/2.29.16c
2/2.29.16c1
2/2.29.16c2
2/2.29.16c3
2/2.29.16d
2/2.29.16e
2/2.29.16f
2/2.29.17
2/2.29.17a
2/2.29.17b
2/2.29.17c
2/2.29.17d
2/2.29.18
2/2.29.18a
2/2.29.18b
2/2.29.19
2/2.29.20
2/2.29.20a
2/2.29.20b
20
Title
General
Samples
Grades 1, 2, and 3
Grades 4 and 5
Grades 6, 7, 11, 12, 13 and 14
Grade 8 and 9
Retests for Grades 1, 2, 3, 4, and 5
Retests for Grades 6, 7, 11, 12, 13 and 14
Retests for Grades 8 and 9
Mechanical Tests Required
Tension Test Specimens
Grades 1, 2, and 3
Grades 4, 5, 6, 7, 11, 12, 13 and 14
Longitudinal Tension Test Specimens
Transverse Tension Test Specimens
Grades 8 and 9
Bend and Flattening Test Specimens
Testing Temperature
Tensile Properties
Bend Test
General
Details of Test
Flattening Test
General
Furnace-welded Pipe
Test Step No. 1
Test Step No. 2
Test Step No. 3
Electric-resistance-welded Pipe
Test Step No. 1
Test Step No. 2
Test Step No. 3
Seamless Pipe
Test Step No. 1
Test Step No. 2
Hydrostatic Test
General
Grades 1, 2, and 3
Grades 4, 5, 6, 7. 11, 12, 13 and 14
Grades 8 and 9
Limiting Test Pressures
Nondestructive Electric Test (NDET) for Seamless Pipe
General
Ultrasonic Calibration Standards
Eddy-Current Calibration Standards
Drilled Hole
Transverse Tangential Notch
Longitudinal Notch
Flux Leakage Calibration Standards
Rejection
Affidavits
Retests
General
Grades 1, 2, 3, 8, and 9
Grades 4 and 5
Grades 6, 7, 11, 12, 13 and 14
Pipe Testing and Inspection
Group I Piping
Group I and II Piping
Permissible Variation in Wall Thickness
Permissible Variations in Outside Diameter
Grades 1, 2, 3
Grades 4, 5, 6, 7, 11, 12, 13 and 14
MODU 2001
2-3-12/13.1
2-3-12/13.3
2-3-12/13.5
2-3-12/13.7
2-3-12/13.9
2-3-12/13.11
2-3-12/13.13
2-3-12/13.15
2-3-12/13.17
2-3-12/15
2-3-12/17
2-3-12/17.1
2-3-12/17.3
2-3-12/17.3.1
2-3-12/17.3.2
2-3-12/17.5
2-3-12/19
2-3-12/21
2-3-12/23
2-3-12/25
2-3-12/25.1
2-3-12/25.3
2-3-12/27
2-3-12/27.1
2-3-12/27.3
2-3-12/27.3.1
2-3-12/27.3.2
2-3-12/27.3.3
2-3-12/27.5
2-3-12/27.5.1
2-3-12/27.5.2
2-3-12/27.5.3
2-3-12/27.7
2-3-12/27.7.1
2-3-12/27.7.2
2-3-12/29
2-3-12/29.1
2-3-12/29.3
2-3-12/29.5
2-3-12/29.7
2-3-12/29.9
2-3-12/31
2-3-12/31.1
2-3-12/31.3
2-3-12/31.5
2-3-12/31.5.1
2-3-12/31.5.2
2-3-12/31.5.3
2-3-12/31.7
2-3-12/31.9
2-3-12/31.11
2-3-12/33
2-3-12/33.1
2-3-12/33.3
2-3-12/33.5
2-3-12/33.7
2-3-12/35
2-3-12/35.1
2-3-12/35.3
2-3-12/37
2-3-12/39
2-3-12/39.1
2-3-12/39.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
2/2.29.20c
2/2.29.20d
2/2.31
2/2.31.1
2/2.31.2
2/2.31.3
2/2.31.4
2/2.31.5
2/2.31.6
2/2.31.7
2/2.31.8
2/2.31.9
2/2.31.10
2/2.31.11
2/2.31.12
2/2.31.13
2/2.31.14
2/2.31.15
2/2.31.16
2/2.33
2/2.33.1
2/2.33.1a
2/2.33.1b
2/2.33.2
2/2.33.2a
2/2.33.2b
2/2.33.2c
2/2.33.2d
2/2.33.2e
2/2.33.2f
2/2.33.2g
2/2.33.2h
2/2.33.2i
2/2.33.2j
2/2.33.2k
2/2.33.2l
2/2.33.3
2/2.34
2/2.34.1
2/2.34.2
2/2.34.3
2/2.34.4
2/2.34.5
2/2.34.5a
2/2.34.5b
2/2.34.5c
2/2.34.5d
2/2.34.5e
2/2.34.5f
2/2.34.6
2/2.35
2/2.35.1
2/2.35.2
2/2.35.2a
2/2.35.2b
2/2.35.3
2/2.35.4
2/2.35.4a
2/2.35.4b
2/2.35.5
2/2.35.6
2/2.35.6a
2/2.35.6b
Title
Grades 8 and 9
Inspection
Piping, Valves and Fittings for Low-temperature Service [Below -18°C (0°F)]
Scope
Designation
Manufacture
Heat Treatment
Marking
Chemical Composition
Mechanical Tests
Impact Properties
Steels for Service Temperatures Between -18°C (0°F) and -196°C (-320°F)
Steels for Service Below -196°C (-320°F)
Materials for Nuts and Bolts
Toughness
Impact Test Temperature
Witnessed Tests
Retests
Welding
Bronze Castings
For General Purpose
Tensile Properties
Number of Tests
Propellers and Propeller Blades
Castings
Chemical Composition
Zinc Equivalent
Alternative Zinc Equivalent
Tensile Properties
Test Specimens
Separately Cast Coupons
Integrally Cast Coupons
Number of Tests
Special Compositions
Inspection and Repair
Marking
Castings for Ice-strengthened Propellers
Austenitic Stainless Steel Propeller Castings
Process of Manufacture
Inspection and Repair
Chemical Composition
Tensile Properties
Tests and Marking
Test Specimens
Separately Cast Coupons
Integral Coupons
Number of Tests
Special Compositions
Marking
Castings for Ice-strengthened Propellers
Seamless Copper Piping
Scope
General
Grades C1, C2, C3, C4, C5, C6 and C7
ASTM Designation
Process of Manufacture
Markings
Manufacturer’s Markings
Bureau Markings
Chemical Composition
Tension Test
Tension Test Specimens
Tensile Properties
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-3-12/39.5
2-3-12/39.7
2-3-13
2-3-13/1
2-3-13/3
2-3-13/5
2-3-13/7
2-3-13/9
2-3-13/11
2-3-13/13
2-3-13/15
2-3-13/17
2-3-13/19
2-3-13/21
2-3-13/23
2-3-13/25
2-3-13/27
2-3-13/29
2-3-13/31
2-3-14
2-3-14/1
2-3-14/1.1
2-3-14/1.3
2-3-14/3
2-3-14/3.1
2-3-14/3.3
2-3-14/3.5
2-3-14/3.7
2-3-14/3.9
2-3-14/3.11
2-3-14/3.13
2-3-14/3.15
2-3-14/3.17
2-3-14/3.19
2-3-14/3.21
2-3-14/3.23
2-3-14/5
2-3-15
2-3-15/1
2-3-15/3
2-3-15/5
2-3-15/7
2-3-15/9
2-3-15/9.1
2-3-15/9.3
2-3-15/9.5
2-3-15/9.7
2-3-15/9.9
2-3-15/9.11
2-3-15/11
2-3-16
2-3-16/1
2-3-16/3
2-3-16/3.1
2-3-16/3.3
2-3-16/5
2-3-16/7
2-3-16/7.1
2-3-16/7.3
2-3-16/9
2-3-16/11
2-3-16/11.1
2-3-16/11.3
21
Notices and General Information
MODU 1997
2/2.35.7
2/2.35.8
2/2.35.9
2/2.35.9a
2/2.35.9b
2/2.35.10
2/2.35.11
2/2.35.12
2/2.37
2/2.37.1
2/2.37.2
2/2.37.2a
2/2.37.2b
2/2.37.3
2/2.37.4
2/2.37.5
2/2.37.6
2/2.37.7
2/2.37.8
2/2.37.9
2/2.37.9a
2/2.37.9b
2/2.37.10
2/2.37.11
2/2.37.12
2/2.39
2/2.39.1
2/2.39.2
2/2.39.2a
2/2.39.2b
2/2.39.3
2/2.39.4
2/2.39.4a
2/2.39.4b
2/2.39.5
2/2.39.6
2/2.39.6a
2/2.39.6b
2/2.39.7
2/2.39.8
2/2.39.9
2/2.39.9a
2/2.39.9b
2/2.39.10
2/2.39.11
2/2.39.12
2/2.41
2/2.41.1
2/2.41.2
2/2.41.2a
2/2.41.2b
2/2.41.3
2/2.41.3a
2/2.41.3b
2/2.41.4
2/2.41.5
2/2.41.5a
2/2.41.5b
2/2.41.6
2/2.41.6a
2/2.41.6b
2/2.41.7
2/2.41.8
22
Title
Expansion Test
Flattening Test
Hydrostatic Test
Limiting Test Pressures
Affidavits of Tests
Number of Tests
Retests
Permissible Variations in Dimensions
Seamless Red-brass Piping
Process of Manufacture
Marking
Manufacturer’s Marking
Bureau Marking
Scope
Chemical Composition
Expansion Test
Flattening Test
Mercurous Nitrate Test
Bend Test
Hydrostatic Test
Limiting Test Pressures
Affidavits of Tests
Number of Tests
Retests
Permissible Variations in Dimensions
Seamless Copper Tube
Scope
General
Grades CA, CB, CC, CD, CE, CF, and CG
ASTM Designation
Process of Manufacture
Marking
Manufacturer’s Marking
Bureau Marking
Chemical Composition
Tension Test
Tension Test Specimens
Tensile Properties
Expansion Test
Flattening Test
Hydrostatic Test
Limiting Test Pressures
Affidavits of Tests
Number of Tests
Retests
Permissible Variations in Dimensions
Condenser and Heat Exchanger Tube
Scope
General
Grades CNA and CNB
ASTM Designation
Process of Manufacture
Grade CNA
Grade CNB
Marking
Chemical Composition
Chemical Requirements
Chemical Analysis Sampling
Tension Test
Tension Test Specimens
Tensile Properties
Expansion Test
Flattening Test
MODU 2001
2-3-16/13
2-3-16/15
2-3-16/17
2-3-16/17.1
2-3-16/17.3
2-3-16/19
2-3-16/21
2-3-16/23
2-3-17
2-3-17/1
2-3-17/3
2-3-17/3.1
2-3-17/3.3
2-3-17/5
2-3-17/7
2-3-17/9
2-3-17/11
2-3-17/13
2-3-17/15
2-3-17/17
2-3-17/17.1
2-3-17/17.3
2-3-17/19
2-3-17/21
2-3-17/23
2-3-18
2-3-18/1
2-3-18/3
2-3-18/3.1
2-3-18/3.3
2-3-18/5
2-3-18/7
2-3-18/7.1
2-3-18/7.3
2-3-18/9
2-3-18/11
2-3-18/11.1
2-3-18/11.3
2-3-18/13
2-3-18/15
2-3-18/17
2-3-18/17.1
2-3-18/17.3
2-3-18/19
2-3-18/21
2-3-18/23
2-3-19
2-3-19/1
2-3-19/3
2-3-19/3.1
2-3-19/3.3
2-3-19/5
2-3-19/5.1
2-3-19/5.3
2-3-19/7
2-3-19/9
2-3-19/9.1
2-3-19/9.3
2-3-19/11
2-3-19/11.1
2-3-19/11.3
2-3-19/13
2-3-19/15
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
2/2.41.9
2/2.41.10
2/2.41.10a
2/2.41.10b
2/2.41.11
2/2.41.12
2/2.41.13
2/2.41.14
2/2.41.14a
2/2.41.14b
2/2.41.14c
2/2.41.14d
2/2.43
2/2.43.1
2/2.43.2
2/2.43.2a
2/2.43.2b
2/2.43.2c
2/2.43.3
2/2.43.3a
2/2.43.3b
2/2.43.4
2/2.43.5
2/2.43.5a
2/2.43.5b
2/2.43.6
2/2.43.6a
2/2.43.6b
2/2.43.6c
2/2.43.6d
2/2.43.7
2/2.43.7a
2/2.43.7b
2/2.43.8
2/2.43.9
2/2.43.9a
2/2.43.9b
2/2.43.10
2/2.43.10a
2/2.43.10b
2/2.43.11
2/2.43.12
2/2.43.13
2/2.43.14
2/2.43.14a
2/2.43.14b
2/2.43.14c
2/2.43.14d
2/2.43.14e
2/2.43.14f
Figure 2/2.1
Figure 2/2.2
Figure 2/2.3
Figure 2/2.4
Figure 2/2.5
Figure 2/2.6
Table 2/2.1
Table 2/2.2
Table 2/2.4
Table 2/2.5
Table 2/2.6
Table 2/2.7
Table 2/2.8
Title
Nondestructive Electric Test (NDET)
Hydrostatic Test
Limiting Test Pressures
Affidavits of Tests
Number of Tests
Retests
Finish
Dimensions and Tolerances
Diameter
Wall Thickness Tolerances
Length
Squareness of Cut
Copper-Nickel Tube and Pipe
Scope
General
Grades CN1 and CN2
Grades CN3 and CN4
ASTM Designation
Process of Manufacture
Grade CN1 and CN2
Grade CN3 and CN4
Marking
Chemical Composition
Chemical Requirements
Chemical Analysis Sampling
Tension Test
Tension Test Specimens
Seamless Tensile Properties
Welded (WO61) Tensile Properties
Welded (WO50) Tensile Properties
Expansion Test
Grade CN1 and CN2
Grade CN3 and CN4
Flattening Test
Nondestructive Examination
Nondestructive Electric Test (NDET)
Radiographic Examination
Hydrostatic Test
Limiting Test Pressures
Affidavits of Tests
Number of Tests
Retests
Finish
Dimensions and Tolerances
Diameter
Roundness
Wall Thickness Tolerances
Length
Squareness of Cut
Straightness Tolerance
Standard Rectangular Tension Test Specimen with 200 mm (8 in.) Gauge Length
Standard Round Tension Test Specimen
Tension Test Specimen Machined from Transverse or Flexure Test Bars
“Y” Blocks for Test Coupons
Keel Blocks for Test Coupons
Test Coupons
Chemical Composition for Plate Grades MD, ME, MF, MG, H, I, J
Tensile Properties for Plate Grades MD, ME, MF, MG, H, I, J
Chemical Composition for Plate Grades K, L, M, N
Tensile Properties for Plate Grades K, L, M, N
Chemical Composition for Tubes
Mechanical Tests
Tensile Properties for Tubes
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-3-19/17
2-3-19/19
2-3-19/19.1
2-3-19/19.3
2-3-19/21
2-3-19/23
2-3-19/25
2-3-19/27
2-3-19/27.1
2-3-19/27.3
2-3-19/27.5
2-3-19/27.7
2-3-20
2-3-20/1
2-3-20/3
2-3-20/3.1
2-3-20/3.3
2-3-20/3.5
2-3-20/5
2-3-20/5.1
2-3-20/5.3
2-3-20/7
2-3-20/9
2-3-20/9.1
2-3-20/9.3
2-3-20/11
2-3-20/11.1
2-3-20/11.3
2-3-20/11.5
2-3-20/11.7
2-3-20/13
2-3-20/13.1
2-3-20/13.3
2-3-20/15
2-3-20/17
2-3-20/17.1
2-3-20/17.3
2-3-20/19
2-3-20/19.1
2-3-20/19.3
2-3-20/21
2-3-20/23
2-3-20/25
2-3-20/27
2-3-20/27.1
2-3-20/27.3
2-3-20/27.5
2-3-20/27.7
2-3-20/27.9
2-3-20/27.11
2-3-1/Figure 1
2-3-1/Figure 2
2-3-1/Figure 3
2-3-10/Figure 1
2-3-10/Figure 2
2-3-14/Figure 1
2-3-2/Table 1
2-3-2/Table 2
2-3-2/Table 3
2-3-2/Table 4
2-3-5/Table 1
2-3-5/Table 2
2-3-5/Table 3
23
Notices and General Information
MODU 1997
Table 2/2.10
New (2000)
Table 2/2.11
New (2000)
New (2000)
New (2000)
New (2000)
New (2000)
New (2000)
Table 2/2.12
Table 2/2.13
Table 2/2.14
Table 2/2.15
Table 2/2.16
Table 2/2.17
Table 2/2.18
Table 2/2.19
Table 2/2.20
Table 2/2.21
Part
2
Section
3
Part
A
2/3A
2/3A.1
2/3A.1.1
2/3A.1.2
2/3A.1.3
2/3A.1.4
2/3A.1.4a
2/3A.1.4b
2/3A.1.4c
2/3A.1.5
2/3A.3
2/3A.3.1
2/3A.3.2
2/3A.3.3
2/3A.3.4
2/3A.3.5
2/3A.3.6
2/3A.3.7
2/3A.5
2/3A.5.1
2/3A.5.2
2/3A.5.3
2/3A.5.4
2/3A.5.4a
2/3A.5.4b
2/3A.5.5
2/3A.5.6
2/3A.5.7
2/3A.5.8
2/3A.5.8a
2/3A.5.8b
2/3A.5.9
2/3A.5.10
2/3A.7
2/3A.7.1
2/3A.7.2
2/3A.7.3
2/3A.7.4
2/3A.7.5
24
Title
Permissible Variations in Outside Diameter for Tubes
Chemical Composition Requirements, in percent
Tensile Property Requirements for Carbon Steel Machinery Forgings
Chemical Composition Requirements, in percent
Tensile Property Requirements
Chemical Composition Requirements, in percent
Tensile Property Requirements
Chemical Composition Requirements, in percent
Tensile Property Requirements
Maxima or Permissible Range of Chemical Composition in Percent for Pipe
Lot Sizes for Grades 6, 7, 11, 12, 13 and 14
Mechanical Tests for Pipe
Tensile Requirements for Pipe
Hydrostatic-test Pressure for Welded and Seamless Plain-end Steel Pipe
Out-of-Roundness Variation
Chemical Composition for Copper Pipe and Tube
Tensile Properties for Copper Pipe and Tube
Chemical Composition for Copper Nickel Pipe and Tube
Tensile Properties for Seamless Copper Nickel Pipe and Tube
Rules and Regulations for Materials and Welding
Welding and Fabrication
Hull Construction
Hull Construction
General
Hull Welding
Plans and Specifications
Workmanship and Supervision
Welding Procedures
General
Weld Metal Toughness – Criteria for ABS Grades of Steel
Weld Metal Toughness – Criteria for Other Steels
TMCP Templates – Note to Users
Preparation for Welding
Edge Preparation and Fitting
Alignment
Cleanliness
Tack Welds
Run-on and Run-off Tabs
Stud Welding
Forming
Production Welding
Environment
Sequence
Preheat
Low-hydrogen Electrodes or Welding Processes
Welding of Ordinary and Higher Strength Steel
Welding of Quenched and Tempered Steels
Back Gouging
Peening
Fairing and Flame Shrinking
Surface Appearance and Weld Soundness
Surface Appearance
Weld Soundness
Inspection of Welds
Repair Welding
Butt Welds
Manual Welding Using Covered Electrodes
Submerged-arc Welding
Gas Metal-arc and Flux Cored-arc Welding
Electroslag and Electrogas Welding
Special Welding Techniques
MODU 2001
2-3-5/Table 4
2-3-7/Table 1
2-3-7/Table 2
2-3-7/Table 3
2-3-7/Table 4
2-3-7/Table 5
2-3-7/Table 6
2-3-7/Table 7
2-3-7/Table 8
2-3-12/Table 1
2-3-12/Table 2
2-3-12/Table 3
2-3-12/Table 4
2-3-12/Table 5
2-3-12/Table 6
2-3-16/Table 1
2-3-16/Table 2
2-3-19/Table 1
2-3-19/Table 2
2-4-1
2-4-1/1
2-4-1/1.1
2-4-1/1.3
2-4-1/1.5
2-4-1/1.7
2-4-1/1.7.1
2-4-1/1.7.2
2-4-1/1.7.3
2-4-1/1.9
2-4-1/3
2-4-1/3.1
2-4-1/3.3
2-4-1/3.5
2-4-1/3.7
2-4-1/3.9
2-4-1/3.11
2-4-1/3.13
2-4-1/5
2-4-1/5.1
2-4-1/5.3
2-4-1/5.5
2-4-1/5.7
2-4-1/5.7.1
2-4-1/5.7.2
2-4-1/5.9
2-4-1/5.11
2-4-1/5.13
2-4-1/5.15
2-4-1/5.15.1
2-4-1/5.15.2
2-4-1/5.17
2-4-1/5.19
2-4-1/7
2-4-1/7.1
2-4-1/7.3
2-4-1/7.5
2-4-1/7.7
2-4-1/7.9
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Part
2
Section
3
Part
B
2/3B
2/3B.1
2/3B.1.1
2/3B.1.2
2/3B.1.3
2/3B.1.3a
2/3B.1.3b
2/3B.1.3c
2/3B.1.4
2/3B.3
2/3B.3.1
2/3B.3.2
2/3B.5
2/3B.5.1
2/3B.5.2
2/3B.5.3
2/3B.5.4
2/3B.7
2/3B.7.1
2/3B.7.2
2/3B.7.3
2/3B.7.4
2/3B.7.5
2/3B.7.6
2/3B.7.6a
2/3B.7.6b
2/3B.7.6c
2/3B.7.7
2/3B.7.8
2/3B.7.9
2/3B.7.9a
2/3B.7.9b
2/3B.7.9c
2/3B.7.9c1
2/3B.7.9c2
2/3B.7.9c3
2/3B.7.9d
2/3B.7.9e
2/3B.7.10
2/3B.9
2/3B.9.1
2/3B.9.1a
2/3B.9.1b
2/3B.9.1c
2/3B.9.2
2/3B.9.2a
2/3B.9.2b
2/3B.9.3
2/3B.9.3a
2/3B.9.3b
2/3B.9.3c
2/3B.9.3d
2/3B.9.3e
2/3B.9.4
2/3B.9.4a
2/3B.9.4b
2/3B.9.4c
2/3B.9.4d
2/3B.9.5
2/3B.9.6
Title
Rules and Regulations for Materials and Welding
Welding and Fabrication
Boilers, Unfired Pressure Vessels, Piping and Engineering Structures
Boilers, Unfired Pressure Vessels, Piping and Engineering Structures
General Considerations
Fabrication
Welding Approval
Grouping of Welded Structures
Boilers and Pressure Vessels
Pipe Connections
Engineering Structures
Weld Repairs to Ductile (Nodular) Iron
Plans and Specifications
Details
Base Materials
Workmanship and Supervision
Construction
Joint Tolerance
Surfaces of Parts
Out of Roundness
Details of Joints
Dimensions and Shape
Double-welded Butt Joints
Single-welded Butt Joints
Joint Finish
Lap Joints
Head to Shell Attachments
Length of Flange
Inserted Heads
Connections
Bending Stresses in Welds
Connections
Nozzles
Figure 2 a and b
Figure 2 c through h
Figure 2 l, m, n, o, and p
------Figure 2 k, q, r, s, and t
Figure 2 u, v, w, and x
Limitations
Forms of Welded Joints Requireds
Boilers and Group I Pressure Vessels
Double-welded
Nozzles and Other Connections
Closing Plates
Group II Pressure Vessels
Single-welded
Full-fillet Lap
Group I Pipe Connections
Pipes Over 89 mm OD (3 in. NPS)
Pipes 89 mm OD (3 in. NPS) and Below
Flanges
Backing
Welding
Group II Pipe Connection
Single-groove
Backing
Square-groove Welds
Sleeves
Low-temperature Piping Systems (Below -18°C (0°F))
Engineering Structures
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-4-2
2-4-2/1
2-4-2/1.1
2-4-2/1.3
2-4-2/1.5
2-4-2/1.5.1
2-4-2/1.5.2
2-4-2/1.5.3
2-4-2/1.7
2-4-2/3
2-4-2/3.1
2-4-2/3.3
2-4-2/5
2-4-2/5.1
2-4-2/5.3
2-4-2/5.5
2-4-2/5.7
2-4-2/7
2-4-2/7.1
2-4-2/7.3
2-4-2/7.5
2-4-2/7.7
2-4-2/7.9
2-4-2/7.11
2-4-2/7.11.1
2-4-2/7.11.2
2-4-2/7.11.3
2-4-2/7.13
2-4-2/7.15
2-4-2/7.17
2-4-2/7.17.1
2-4-2/7.17.2
2-4-2/7.17.3
2-4-2/7.17.3(a)
2-4-2/7.17.3(b)
2-4-2/7.17.3(c)
2-4-2/7.17.4
2-4-2/7.17.5
2-4-2/7.19
2-4-2/9
2-4-2/9.1
2-4-2/9.1.1
2-4-2/9.1.2
2-4-2/9.1.3
2-4-2/9.3
2-4-2/9.3.1
2-4-2/9.3.2
2-4-2/9.5
2-4-2/9.5.1
2-4-2/9.5.2
2-4-2/9.5.3
2-4-2/9.5.4
2-4-2/9.5.5
2-4-2/9.7
2-4-2/9.7.1
2-4-2/9.7.2
2-4-2/9.7.3
2-4-2/9.7.4
2-4-2/9.9
2-4-2/9.11
25
Notices and General Information
MODU 1997
2/3B.11
2/3B.11.1
2/3B.11.1a
2/3B.11.1b
2/3B.11.1b1
2/3B.11.1b2
2/3B.11.1b3
2/3B.11.1b4
2/3B.11.1b5
2/3B.11.2
2/3B.13
2/3B.13.1
2/3B.13.2
2/3B.15
2/3B.15.1
2/3B.15.2
2/3B.15.3
2/3B.15.3a
2/3B.15.3b
2/3B.15.3c
2/3B.15.3d
2/3B.15.3e
2/3B.15.4
2/3B.15.4a
2/3B.15.4b
2/3B.15.4c
2/3B.15.4d
2/3B.15.4e
2/3B.15.5
2/3B.15.5a
2/3B.15.5a1
2/3B.15.5a2
2/3B.15.5a3
2/3B.15.5b
2/3B.15.5c
2/3B.15.5d
2/3B.15.6
2/3B.15.6a
2/3B.15.6a1
2/3B.15.6a2
2/3B.15.6a3
2/3B.15.6b
2/3B.15.6c
2/3B.15.6d
2/3B.15.7
2/3B.15.8
2/3B.15.9
2/3B.17
2/3B.17.1
2/3B.17.1a
2/3B.17.1a1
2/3B.17.1a2
2/3B.17.1a3
2/3B.17.1b
2/3B.17.2
26
Title
Preheat
Boilers, Pressure Vessels, and Group I Piping
General
Preheat Temperature
----------Group I Pipe Connections
General Requirements for Postweld Heat Treatment
General
Heat-treatment Determination
Fusion-welded Boilers
Postweld Heat Treatment
Lower Temperatures – Carbon and Carbon Molybdenum Steels
Heat Treatment Exceptions for Fusion-welded Boilers – ABS Plate Grades MA, MB,
MC, MD, ME, MF, MG, K, L, M, N, Tube Grades D, F, G, H, J and Group I Piping
Grades 1, 2, 3, 4, 5, 8, and 9
Circumferential Welds
Fillet Welds
Heat-absorbing Surfaces
Tubes
Studs
Heat Treatment Exceptions for Fusion-welded Boilers – ABS Plate Grades H, I, J,
Tube Grades K, L, M, and Group I Piping Grades 6 and 7
Circumferential Welds
Fillet Welds
Heat-absorbing Surfaces
Tubes
Studs
Heat Treatment Exceptions for Fusion-welded Boilers – ABS Tube Grades N, O and
Group I Pipe Grades 11 and 12
Circumferential Welds
------Fillet Welds
Heat-absorbing Surfaces and Studs
Tubes
Heat Treatment Exceptions for Fusion-welded Boilers – ABS Tube Grade P and
Group I Pipe Grade 13
Circumferential Welds
------Fillet Welds
Heat-absorbing Surfaces and Studs
Tubes
Other Materials
Other Welded Connections
Welded Joints
Fusion-welded Pressure Vessels
Preheat and Postwelded Treatment
Preheat and Postweld Heat Treatment
Postweld Heat Treatment
General
------Welded Joints
Heat-treatment Exceptions – ABS Plate Grades MA, MB, MC, MD, ME, MF, MG,
K, L, M, N and Tube Grades D, F, G, H, J
MODU 2001
2-4-2/11
2-4-2/11.1
2-4-2/11.1.1
2-4-2/11.1.2
2-4-2/11.1.2(a)
2-4-2/11.1.2(b)
2-4-2/11.1.2(c)
2-4-2/11.1.2(d)
2-4-2/11.1.2(e)
2-4-2/11.3
2-4-2/13
2-4-2/13.1
2-4-2/13.3
2-4-2/15
2-4-2/15.1
2-4-2/15.3
2-4-2/15.5
2-4-2/15.5.1
2-4-2/15.5.2
2-4-2/15.5.3
2-4-2/15.5.4
2-4-2/15.5.5
2-4-2/15.7
2-4-2/15.7.1
2-4-2/15.7.2
2-4-2/15.7.3
2-4-2/15.7.4
2-4-2/15.7.5
2-4-2/15.9
2-4-2/15.9.1
2-4-2/15.9.1(a)
2-4-2/15.9.1(b)
2-4-2/15.9.1(c)
2-4-2/15.9.2
2-4-2/15.9.3
2-4-2/15.9.4
2-4-2/15.11
2-4-2/15.11.1
2-4-2/15.11.1(a)
2-4-2/15.11.1(b)
2-4-2/15.11.1(c)
2-4-2/15.11.2
2-4-2/15.11.3
2-4-2/15.11.4
2-4-2/15.13
2-4-2/15.15
2-4-2/15.17
2-4-2/17
4-4-1/7.9
4-4-1A1/19
2-4-2/17.1
2-4-2/17.1.1
2-4-2/17.1.1(a)
2-4-2/17.1.1(b)
2-4-2/17.1.1(c)
2-4-2/17.1.2
2-4-2/17.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
2/3B.17.2a
2/3B.17.2b
2/3B.17.2b1
2/3B.17.2b2
2/3B.17.3
2/3B.17.3a
2/3B.17.3b
2/3B.17.3b1
2/3B.17.3b2
2/3B.17.4
2/3B.17.5
2/3B.17.6
2/3B.19
2/3B.19.1
2/3B.19.2
2/3B.19.3
2/3B.19.4
2/3B.19.5
2/3B.21
2/3B.21.1
2/3B.21.2
2/3B.21.3
2/3B.21.4
2/3B.21.5
2/3B.21.5a
2/3B.21.5b
2/3B.21.5c
2/3B.21.6
2/3B.23
2/3B.23.1
2/3B.23.1a
2/3B.23.1b
2/3B.23.1c
2/3B.23.2
2/3B.23.4
2/3B.23.4a
2/3B.23.4a1
2/3B.23.4a2
2/3B.23.4b
2/3B.23.5
2/3B.23.6
2/3B.23.7
2/3B.23.8
2/3B.23.9
2/3B.23.10
2/3B.23.11
2/3B.23.11a
2/3B.23.11b
2/3B.25
2/3B.25.1
2/3B.25.2
2/3B.25.3
2/3B.25.4
2/3B.25.5
Figure 2/3B.1
Figure 2/3B.2
Part
2
Section
3
Part
C
2/3C
2/3C.1
2/3C.1.1
2/3C.1.2
Title
38.1 mm (1.5 in.) and Under
Over 38.1 mm (1.5 in.)
Nozzle Connections
Nonpressure Attachments
Heat-treatment Exceptions – ABS Plate Grades, H, I, J and Tube Grades K, L, M
15.9 mm (0.625 in.) and Under
Over 15.9 mm (0.625 in.)
Nonpressure Attachments
Tube or Pipe Attachments
Heat-treatment Exceptions – Attachments
Other Materials
Welded Connections
Pipe Connections and Engineering Structures
Group I Pipe Connections
Group II Pipe Connections
Group I Engineering Structures
Group II Engineering Structures
Low-temperatures Piping Systems (Below -18°C (0°F))
Postweld Heat Treatment Details
Boilers and Pressure Vessels
Pipe Connections
Other Steels
Clad Pressure Vessels
Opening Connections
Size of Weld
Opening Diameter
Exception
Seal Welding
Radiography
General
Welded-joint Preparation
Radiographic Examination with Backing Strip
Details of Radiographic Search
Boilers
Other Pressure Vessels
Full Radiography
Joint Efficiency
Material Used
Spot (Random) Radiography
Group I Pipe Connections
Group II Pipe Connections
Low-temperature Piping Connections (Below -18°C (0°F))
Group I Engineering Structures
Group II Engineering Structures
Engine Bedplates
Miscellaneous
Alloy and Clad Pressure Vessels
Nozzles, Sumps, etc.
Hydrostatic Test
Boilers and Pressure Vessels
Group I Piping Welded Joints
Group II Piping
Defects
Retest
Head to Shell Attachments
Types of Fusion-welded Construction Details
Rules and Regulations for Materials and Welding
Welding and Fabrication
Weld Tests
Weld Tests
General
Weld Groups
Tests
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-4-2/17.3.1
2-4-2/17.3.2
2-4-2/17.3.2(a)
2-4-2/17.3.2(b)
2-4-2/17.5
2-4-2/17.5.1
2-4-2/17.5.2
2-4-2/17.5.2(a)
2-4-2/17.5.2(b)
2-4-2/17.7
2-4-2/17.9
2-4-2/17.11
2-4-2/19
2-4-2/19.1
2-4-2/19.3
2-4-2/19.5
2-4-2/19.7
2-4-2/19.9
2-4-2/21
2-4-2/21.1
2-4-2/21.3
2-4-2/21.5
2-4-2/21.7
2-4-2/21.9
2-4-2/21.9.1
2-4-2/21.9.2
2-4-2/21.9.3
2-4-2/21.11
2-4-2/23
2-4-2/23.1
2-4-2/23.1.1
2-4-2/23.1.2
2-4-2/23.1.3
2-4-2/23.3
2-4-2/23.5
2-4-2/23.5.1
2-4-2/23.5.1(a)
2-4-2/23.5.1(b)
2-4-2/23.5.2
2-4-2/23.7
2-4-2/23.9
2-4-2/23.11
2-4-2/23.13
2-4-2/23.15
2-4-2/23.17
2-4-2/23.19
2-4-2/23.19.1
2-4-2/23.19.2
2-4-2/25
2-4-2/25.1
2-4-2/25.3
2-4-2/25.5
2-4-2/25.7
2-4-2/25.9
2-4-2/Figure 1
2-4-2/Figure 2
2-4-3
2-4-3/1
2-4-3/1.1
2-4-3/1.3
27
Notices and General Information
MODU 1997
2/3C.3
2/3C.3.1
2/3C.3.2
2/3C.3.2a
2/3C.3.2b
2/3C.3.2c
2/3C.5
2/3C.5.1
2/3C.5.2
2/3C.5.3
2/3C.5.4
2/3C.5.5
2/3C.5.6
2/3C.7
2/3C.7.1
2/3C.7.2
2/3C.7.2a
2/3C.7.2b
2/3C.7.2c
2/3C.7.2d
2/3C.7.2e
2/3C.7.2f
2/3C.7.3
2/3C.7.4
2/3C.7.5
2/3C.7.6
2/3C.7.7
2/3C.9
2/3C.9.1
2/3C.9.2
2/3C.9.2a
2/3C.9.2b
2/3C.9.2b1
2/3C.9.2b2
2/3C.9.2b3
2/3C.9.2b4
2/3C.9.2c
2/3C.9.2d
2/3C.9.2e
2/3C.11
2/3C.11.1
2/3C.11.2
2/3C.11.3
Figure 2/3C.1
Figure 2/3C.2
Figure 2/3C.3
Figure 2/3C.4
Figure 2/3C.5
Figure 2/3C.6
Figure 2/3C.7
Figure 2/3C.8
Figure 2/3C.9
Figure 2/3C.10
Figure 2/3C.11
Figure 2/3C.12
Figure 2/3C.13
Table 2/3C.1
Part
2
Appendix A
2/A
28
Title
MODU 2001
Filler Metals
2-4-3/3
General
2-4-3/3.1
Approval Basis
2-4-3/3.3
Bureau Standards
2-4-3/3.3.1
Standards of Other Agencies
2-4-3/3.3.2
Special Approval
2-4-3/3.3.3
Approval of Welding Procedures
2-4-3/5
Approved Filler Metals
2-4-3/5.1
Surveyor’s Acceptance
2-4-3/5.3
New Procedures and Methods
2-4-3/5.5
Tests
2-4-3/5.7
Special Tests
2-4-3/5.9
Repair and Cladding of Stern Tube and Tail Shafts
2-4-3/5.11
Workmanship Tests
2-4-3/7
Hull Construction
2-4-3/7.1
Boilers and Group I Pressure Vessels
2-4-3/7.3
Required Tests
2-4-3/7.3.1
Test Exceptions
2-4-3/7.3.2
Attached Test Plates
2-4-3/7.3.3
Separate Test Plates
2-4-3/7.3.4
Number of Test Plates
2-4-3/7.3.5
Test-plate Heat Treatment and Retests
2-4-3/7.3.6
Other Pressure Vessels
2-4-3/7.5
Group I Pipe Connections
2-4-3/7.7
Group II Pipe Connections
2-4-3/7.9
Group I Engineering Structures
2-4-3/7.11
Group II Engineering Structures
2-4-3/7.13
Radiographic or Ultrasonic Inspection
2-4-3/9
Hull Construction
2-4-3/9.1
Boilers and Pressure Vessels
2-4-3/9.3
General
2-4-3/9.3.1
Acceptability of Welds-Full Radiography
2-4-3/9.3.2
Incomplete Fusion or Penetration
2-4-3/9.3.2(a)
Elongated Slag Inclusions or Cavities
2-4-3/9.3.2(b)
Slag Inclusion in Line
2-4-3/9.3.2(c)
Porosity Standards
2-4-3/9.3.2(d)
Acceptability of Welds – Spot (Random) Radiography
2-4-3/9.3.3
Survey Report Data
2-4-3/9.3.4
Pipe-joint Exception
2-4-3/9.3.5
Welders
2-4-3/11
General Requirements
2-4-3/11.1
Qualification Tests
2-4-3/11.3
Tests Nos. Q1, Q2, Q3, and Q4
2-4-3/11.5
Preparation of Test Plates and Pipes for Weld Tests Nos. 1 and 2
2-4-3/Figure 1
Typical Arrangement of Test Plates for Workmanship Tests in Group B1
2-4-3/Figure 2
Test No. 1 – Reduced-section Tension Test for Plate
2-4-3/Figure 3
Test No. 1 – Reduced-section Tension Test for Pipe
2-4-3/Figure 4
Test No. 2 – Guided Bend Test for Root Bend and Face Bend (Plate or Pipe)
2-4-3/Figure 5
Test No. 2 – Guided Bend Test for Side Bend (Plate or Pipe)
2-4-3/Figure 6
Guided Bend Test Jig
2-4-3/Figure 7
Test No. 3 – Fillet-weld Test
2-4-3/Figure 8
Welder Qualification Test No. Q1
2-4-3/Figure 9
Welder Qualification Test No. Q2
2-4-3/Figure 10
Welder Qualification Test No. Q3R
2-4-3/Figure 11
Welder Qualification Test No. Q4
2-4-3/Figure 12
Orientation and Location of Charpy V-notch Specimens for Weld and Heat Affected
2-4-3/Figure 13
Zone Properties
Welder Qualification Tests
2-4-3/Table 1
Rules and Regulations for Materials and Welding
List of Destructive and Nondestructive Tests Required in Sections 2/1 and 2/2 and
Responsibility for Verifying
List of Destructive and Nondestructive Tests Required in Sections 2/1 and 2/2 and
2-A1
Responsibility for Verifying
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Part
2
Appendix B
Section
1
2/B.1
2/B.1.1
2/B.1.1.1
2/B.1.1.2
2/B.1.1.2a
2/B.1.1.2b
2/B.1.1.2c
2/B.1.2
2/B.1.2.1
2/B.1.2.2
2/B.1.2.3
2/B.1.3
2/B.1.4
2/B.1.4.1
2/B.1.4.2
2/B.1.5
2/B.1.5.1
2/B.1.5.2
2/B.1.5.2a
2/B.1.5.2b
2/B.1.5.2c
2/B.1.5.2d
2/B.1.6
2/B.1.7
2/B.1.8
2/B.1.8.1
2/B.1.8.2
2/B.1.8.3
2/B.1.9
2/B.1.9.1
2/B.1.9.2
2/B.1.10
2/B.1.10.1
2/B.1.10.2
2/B.1.10.3
2/B.1.10.3a
2/B.1.10.3b
2/B.1.10.3c
2/B.1.11
2/B.1.11.1
2/B.1.11.2
2/B.1.11.3
2/B.1.12
2/B.1.12.1
2/B.1.12.2
2/B.1.12.3
2/B.1.12.4
2/B.1.13
2/B.1.13.1
2/B.1.13.2
2/B.1.14
2/B.1.15
2/B.1.15.1
2/B.1.15.1a
2/B.1.15.1b
2/B.1.16
2/B.1.17
Table 2/B.1.1
Table 2/B.1.2
Figure 2/B.1.1
Title
Rules and Regulations for Materials and Welding
Requirements for the Approval of Filler Metals
General
General
Scope
Condition of Approval
Approval Procedure
------Grading
ABS Grades
Other Standards
Special Properties
Manufacturer’s Guarantee
Plant Inspection
Initial Inspection
Annual Inspection
Test Requirements
General
Test Plate Material
Deposited Metal Test and Diffusible Hydrogen Test
Butt Weld Test and Fillet Weld Test
Ordinary and Higher-strength Filler Metals (Dual Approvals)
Electroslag or Electrogas Welding for Higher-Strength Steel
Welding Conditions
Chemical Analysis
Deposited Metal Tension Test
Specimen Type and Preparation
Hydrogen Removal
Test Requirements
Butt Weld Tension Test
Specimen Type and Preparation
Test Requirements
Impact Test
Specimen Type and Preparation
Test Requirements
Retests
------Butt Weld Bend Test
Specimen Type and Preparation
Test Requirements
Alternative Test for YQ-Grades
Diffusible Hydrogen Test
Optional or Required Test
Test Methods
Alternative Test Method
Test Requirements
Special Tests
Nondestructive Testing
Additional Tests
Licensee Approvals
Annual Check Tests
Upgrading and Uprating
Upgrading
Uprating
Quality Assurance Program
Retests
Tension Test Requirements
Impact Test Requirements
Deposited Metal Tension Test Specimen
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
2-A2-1
2-A2-1/1
2-A2-1/1.1
2-A2-1/1.3
2-A2-1/1.3.1
2-A2-1/1.3.2
2-A2-1/1.3.3
2-A2-1/3
2-A2-1/3.1
2-A2-1/3.3
2-A2-1/3.5
2-A2-1/5
2-A2-1/7
2-A2-1/7.1
2-A2-1/7.3
2-A2-1/9
2-A2-1/9.1
2-A2-1/9.3
2-A2-1/9.3.1
2-A2-1/9.3.2
2-A2-1/9.3.3
2-A2-1/9.3.4
2-A2-1/11
2-A2-1/13
2-A2-1/15
2-A2-1/15.1
2-A2-1/15.3
2-A2-1/15.5
2-A2-1/17
2-A2-1/17.1
2-A2-1/17.3
2-A2-1/19
2-A2-1/19.1
2-A2-1/19.3
2-A2-1/19.5
2-A2-1/19.5.1
2-A2-1/19.5.2
2-A2-1/19.5.3
2-A2-1/21
2-A2-1/21.1
2-A2-1/21.3
2-A2-1/21.5
2-A2-1/23
2-A2-1/23.1
2-A2-1/23.3
2-A2-1/23.5
2-A2-1/23.7
2-A2-1/25
2-A2-1/25.1
2-A2-1/25.3
2-A2-1/27
2-A2-1/29
2-A2-1/29.1
2-A2-1/29.1.1
2-A2-1/29.1.2
2-A2-1/31
2-A2-1/33
2-A2-1/Table 1
2-A2-1/Table 2
2-A2-1/Figure 1
29
Notices and General Information
MODU 1997
Figure 2/B.1.2
Figure 2/B.1.3
Figure 2/B.1.4
Part
2
Appendix B
Section
2
2/B.2
2/B.2.1
2/B.2.2
2/B.2.3
2/B.2.3.1
2/B.2.3.2
2/B.2.4
2/B.2.4.1
2/B.2.4.2
2/B.2.4.3
2/B.2.5
2/B.2.5.1
2/B.2.5.2
2/B.2.5.3
2/B.2.5.4
2/B.2.5.4.1
2/B.2.5.4.2
2/B.2.6
2/B.2.6.1
2/B.2.6.2
2/B.2.6.3
2/B.2.7
2/B.2.7.1
2/B.2.7.2
Figure 2/B.2.1
Figure 2/B.2.2
Figure 2/B.2.3
Figure 2/B.2.4
Part
2
Appendix B
Section
3
2/B.3
2/B.3.1
2/B.3.2
2/B.3.3
2/B.3.3.1
2/B.3.3.2
2/B.3.4
2/B.3.4.1
2/B.3.4.2
2/B.3.5
2/B.3.5.1
2/B.3.5.2
2/B.3.5.3
2/B.3.6
2/B.3.7
2/B.3.7.1
2/B.3.8
2/B.3.8.1
2/B.3.8.2
2/B.3.9
2/B.3.10
2/B.3.10.1
2/B.3.10.2
2/B.3.10.3
Figure 2/B.3.1
30
Title
Butt Weld Tension Test Specimen
Charpy V-Notch Test Specimen
Bending Elongation Test
Rules and Regulations for Materials and Welding
Requirements for the Approval of Filler Metals
Electrodes for Shielded Metal Arc Welding
Electrodes for Shielded Metal Arc Welding
General
Chemical Analysis
Deposited Metal Test Assemblies
Test Assembly
Test Specimens
Butt Weld Test Assemblies
Test Assemblies
Welding Procedure
Test Specimens
Fillet Weld Test Assemblies
General
Test Assemblies
Welding Procedure
Test Specimens
Macrographs and Hardness Tests
Breaking Tests
Low Hydrogen Approval
Ordinary-Strength Filler
Higher-Strength Filler Metals
YQ Grade Filler Metals
Annual Check Tests
General
Upgrading and Uprating
Deposited-Metal Test Assembly for Manual and Gas-Metal Arc Welding
Butt Weld Test Assembly for Manual and Gas-Metal Arc Welding
Fillet-Weld Test Assembly
Fillet Weld Hardness Test Locations
Rules and Regulations for Materials and Welding
Requirements for the Approval of Filler Metals
Wire-Flux Combinations for Submerged Arc Welding
Wire-Flux Combinations for Submerged Arc Welding
General
Chemical Analysis
Deposited Metal Test Assemblies for Multi-Run Technique
Test Assembly
Test Specimens
Butt Weld Test Assemblies for Multi-Run Technique
Test Assembly
Test Specimens
Butt Weld Assemblies for Two-Run Technique
Test Assemblies
Test Specimens
Longitudinal All-Weld-Metal Tension Test
Fillet Weld Tests
Low Hydrogen Approval
YQ Grade Wires – Flux Combination
Annual Check Tests
General
Upgrading and Uprating
Multiple Electrodes
Electroslag Welding
General
Annual Tests
Upgrading and Uprating
Deposited-Metal Test Assembly for Submerged Arc Welding – Multi-Run Technique
and Automatic Gas-Metal Arc Welding
MODU 2001
2-A2-1/Figure 2
2-A2-1/Figure 3
2-A2-1/Figure 4
2-A2-2
2-A2-2/1
2-A2-2/3
2-A2-2/5
2-A2-2/5.1
2-A2-2/5.3
2-A2-2/7
2-A2-2/7.1
2-A2-2/7.3
2-A2-2/7.5
2-A2-2/9
2-A2-2/9.1
2-A2-2/9.3
2-A2-2/9.5
2-A2-2/9.7
2-A2-2/9.7.1
2-A2-2/9.7.2
2-A2-2/11
2-A2-2/11.1
2-A2-2/11.3
2-A2-2/11.5
2-A2-2/13
2-A2-2/13.1
2-A2-2/13.3
2-A2-2/Figure 1
2-A2-2/Figure 2
2-A2-2/Figure 3
2-A2-2/Figure 4
2-A2-3
2-A2-3/1
2-A2-3/3
2-A2-3/5
2-A2-3/5.1
2-A2-3/5.3
2-A2-3/7
2-A2-3/7.1
2-A2-3/7.3
2-A2-3/9
2-A2-3/9.1
2-A2-3/9.3
2-A2-3/9.5
2-A2-3/11
2-A2-3/13
2-A2-3/13.1
2-A2-3/15
2-A2-3/15.1
2-A2-3/15.3
2-A2-3/17
2-A2-3/19
2-A2-3/19.1
2-A2-3/19.3
2-A2-3/19.5
2-A2-3/Figure 1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Figure 2/B.3.2
Figure 2/B.3.3
Figure 2/B.3.4
Part
Appendix
Section
2
B
4
2/B.4
2/B.4.1
2/B.4.2
2/B.4.3
2/B.4.3.1
2/B.4.3.2
2/B.4.3.3
2/B.4.3.4
2/B.4.4
2/B.4.4.1
2/B.4.4.2
2/B.4.4.3
2/B.4.5
2/B.4.5.1
2/B.4.5.2
2/B.4.5.3
2/B.4.6
2/B.4.6.1
2/B.4.6.2
2/B.4.6.3
2/B.4.6.4
2/B.4.7
2/B.4.7.1
2/B.4.7.1a
2/B.4.7.1b
2/B.4.8
2/B.4.8.1
2/B.4.8.2
2/B.4.9
2/B.4.9.1
2/B.4.9.2
2/B.4.9.3
Figure 2/B.4.1
New (2000)
New (2000)
New (2000)
New (2000)
Part
2
Appendix C
2/C
Title
MODU 2001
Butt-Weld Test Assembly for Submerged Arc Welding – Multi-Run Technique
2-A2-3/Figure 2
Butt-Weld Test Assembly for Submerged Arc Welding
2-A2-3/Figure 3
Butt-Weld Impact Test Specimen Location for Submerged and Gas-Metal Arc
2-A2-3/Figure 4
Welding – Two Run Technique
Rules and Regulations for Materials and Welding
Requirements for the Approval of Filler Metals
Wire and Wire Gas Combinations for Gas Metal Arc Welding and Flux Cored Wires for Flux
Cored Arc Welding
Wire and Wire Gas Combinations for Gas Metal Arc Welding and Flux Cored Wires
2-A2-4
for Flux Cored Arc Welding
General
2-A2-4/1
Chemical Analysis and Shielding Gas Compositions
2-A2-4/3
Deposited Metal Test Assemblies for Semi-Automatic and Automatic Testing
2-A2-4/5
Semi-Automatic Test Assemblies
2-A2-4/5.1
Test Specimens for Semi-Automatic
2-A2-4/5.3
Automatic Test Assembly
2-A2-4/5.5
Test Specimens for Automatic
2-A2-4/5.7
Butt Weld Test Assemblies for Semi-Automatic and Automatic Techniques
2-A2-4/7
Test Assemblies
2-A2-4/7.1
Welding Procedure
2-A2-4/7.3
Test Specimens
2-A2-4/7.5
Butt Weld Test Assemblies for Two-Run Technique
2-A2-4/9
Test Assemblies
2-A2-4/9.1
Test Specimens
2-A2-4/9.3
Longitudinal All-Weld-Metal Tension Test
2-A2-4/9.5
Fillet Weld Tests
2-A2-4/11
General
2-A2-4/11.1
Test Assemblies
2-A2-4/11.3
Welding Procedure
2-A2-4/11.5
Test Requirements
2-A2-4/11.7
Low Hydrogen Approval
2-A2-4/13
Flux Cored Wire
2-A2-4/13.1
Ordinary or Higher-Strength Wires
2-A2-4/13.1.1
YQ-Grade Wires
2-A2-4/13.1.2
Annual Check Tests
2-A2-4/15
General
2-A2-4/15.1
Upgrading and Uprating
2-A2-4/15.3
Electrogas Welding
2-A2-4/17
General
2-A2-4/17.1
Annual Tests
2-A2-4/17.3
Upgrading and Uprating
2-A2-4/17.5
Butt-Weld Test Assembly for Gas-Metal Arc Welding – Two Run Technique
2-A2-4/Figure 1
Superceded Plate Specification
2-A2-4/Table 1
Superceded Bar and Shape Specification
2-A2-4/Table 2
Substitute for Plates, Shapes and Bars
2-A2-4/Table 3
Substitute for Bars and Reforging
2-A2-4/Table 4
Rules and Regulations for Materials and Welding
Application of Filler Metals to ABS Steels
Application of Filler Metals to ABS Steels
2-A3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
31
Notices and General Information
MODU 1997
Part
3
Section
1
3/1
3/1.1
3/1.1.1
3/1.1.2
3/1.1.3
3/1.1.4
3/1.3
3/1.3.1
3/1.3.2
3/1.3.2a
3/1.3.2b
3/1.3.3
3/1.3.3a
3/1.3.3b
3/1.3.4
3/1.5
3/1.7
3/1.9
3/1.10
3/1.11
3/1.12
3/1.13
3/1.13a
3/1.13b
3/1.13c
3/1.15
3/1.17
3/1.19
Part
3
Section
2
3/2
3/2.1
3/2.1.1
3/2.1.2
3/2.1.2a
3/2.1.2b
3/2.1.2c
3/2.1.2c1
3/2.1.2c2
3/2.1.2c3
3/2.1.2c4
3/2.1.2c5
3/2.1.3
3/2.1.3a
3/2.1.3b
3/2.1.3c
3/2.1.3d
3/2.1.4
3/2.1.4a
3/2.1.4b
3/2.1.5
3/2.1.6
3/2.1.7
Table 3/2.1
Table 3/2.2
Figure 3/2.1
Part
3
Section
3
3/3
3/3.1
32
Title
Hull Construction and Equipment
Definitions
Definitions
General
Unit
Drilling Unit
Self-propelled Unit
Non-self-propelled Unit
Types of Drilling Unit
Self-elevating Drilling Unit
Column-stabilized Drilling Unit
Semi-submersible Drilling Unit
Submersible Drilling Unit
Surface-type Drilling Unit
Ship-type Drilling Unit
Barg-type Drilling Unit
Other Types of Drilling Unit
Dimensions
Water Depth
Molded Base Line
Bulhead Deck
Freeboard Deck
Lightweight
Mode of Operation
Normal Drilling Condition
Severe Storm Condition
Transit Condition
Weathertight
Watertight
Systems of Measurement
Hull Construction and Equipment
Environmental Loadings
Environmental Loadings
Loading Criteria
General
Wind Loadings
General
Wind Pressure
Wind Force
----------Wave Loadings
General
Determination of Wave Loads
Morison’s Equation
Wave Induced Vibrations
Current Loading
Current Assoicated with Waves
Drag Force
Loadings due to Vortex Shedding
Deck Loadings
Units Resting on the Sea Bed
Values of Cs
Values of Ch
Current Velocity Profile
Hull Construction and Equipment
Stability and Watertight/Weathertight Integrity
Stability and Watertight/Weathertight Integrity
Stability
MODU 2001
3-1-1
3-1-1/1
3-1-1/1.1
3-1-1/1.3
3-1-1/1.5
3-1-1/1.7
3-1-1/3
3-1-1/3.1
3-1-1/3.3
3-1-1/3.3.1
3-1-1/3.3.2
3-1-1/3.5
3-1-1/3.5.1
3-1-1/3.5.2
3-1-1/3.7
3-1-1/5
3-1-1/7
3-1-1/9
3-1-1/11
3-1-1/13
3-1-1/15
3-1-1/17
3-1-1/17.1
3-1-1/17.3
3-1-1/17.5
3-1-1/19
3-1-1/21
3-1-1/23
3-1-2
3-1-2/1
3-1-2/1.1
3-1-2/1.3
3-1-2/1.3.1
3-1-2/1.3.2
3-1-2/1.3.3
3-1-2/1.3.3(a)
3-1-2/1.3.3(b)
3-1-2/1.3.3(c)
3-1-2/1.3.3(d)
3-1-2/1.3.3(e)
3-1-2/1.5
3-1-2/1.5.1
3-1-2/1.5.2
3-1-2/1.5.3
3-1-2/1.5.4
3-1-2/1.7
3-1-2/1.7.1
3-1-2/1.7.2
3-1-2/1.9
3-1-2/1.11
3-1-2/1.13
3-1-2/Table 1
3-1-2/Table 2
3-1-2/Figure 1
3-3-1
3-3-1/1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
3/3.1.1
3/3.1.2
3/3.1.2a
3/3.1.2b
3/3.1.2b1
3/3.1.2b2
3/3.1.2c
3/3.1.2c1
3/3.1.2c2
3/3.1.3
3/3.3
3/3.3.1
3/3.3.2
3/3.3.2a
3/3.3.2b
3/3.3.2c
3/3.3.2c1
3/3.3.2c2
3/3.3.3
3/3.3.4
3/3.3.5
3/3.3.5a
3/3.3.5b
3/3.3.5c
3/3.3.6
3/3.5
3/3.7
3/3.7.1
3/3.7.2
3/3.7.2a
3/3.7.2b
3/3.7.2c
3/3.7.2d
3/3.7.2e
3/3.7.3
3/3.9
3/3.9.1
3/3.9.2
3/3.9.2a
3/3.9.2a1
3/3.9.2a2
3/3.9.2a3
3/3.9.2b
3/3.9.2b1
3/3.9.2b2
3/3.9.2b3
3/3.9.2b4
3/3.9.2c
3/3.9.2c1
3/3.9.2c2
3/3.9.2d
3/3.9.3
Figure 3/3.1
Figure 3/3.2
Figure 3/3.3
Figure 3/3.4
Part
3
Section
4
3/4
3/4.1
3/4.1.1
3/4.1.1a
3/4.1.1b
Title
General
Stability Afloat
Intact Stability
Damage Stability
----Alternatives for treatment fo void spaces
----Lightweight and Center of Gravity
Stability Criteria
General
Righting Moment
Intact Stability Criteria
Damage Stability Criteria
Residual Stability Criteria
----Wind Overturning Moment
Wind Tunnel Tests
Alternative Stability Criteria
General
Guidelines
Alternative Intact Stability Criteria
Units Resting on the Sea Bed
Load Line
Extent of Damage for Damage Stability Studies
Self-elevated Drilling Units
Column-stabilized Drilling Units
----------Surface-type Drilling Units
Watertight/Weathertight Integrity
Weathertight Integrity
Watertight Integrity
Internal Openings Used for Access While Afloat
------Internal Opening Secured Closed While Afloat
--------External Openings Used for Access While Afloat
----External Openings Secured Closed While Afloat
Penetrations
Dynamic Stability Curve
Damage Stability Curve
Residual Damage Stability Requirements for Column Stabilized Units
Minimum Weathertight Integrity Requirements for Column Stabilized Units
Hull Construction and Equipment
Structural Analysis
Structural Analysis
Structural Analysis
Analysis of Primary Structure
-----
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
3-3-1/1.1
3-3-1/1.3
3-3-1/1.3.1
3-3-1/1.3.2
3-3-1/1.3.2(a)
3-3-1/1.3.2(b)
3-3-1/1.3.3
3-3-1/1.3.3(a)
3-3-1/1.3.3(b)
3-3-1/1.5
3-3-1/3
3-3-1/3.1
3-3-1/3.3
3-3-1/3.3.1
3-3-1/3.3.2
3-3-1/3.3.3
3-3-1/3.3.3(a)
3-3-1/3.3.3(b)
3-3-1/3.5
3-3-1/3.7
3-3-1/3.9
3-3-1/3.9.1
3-3-1/3.9.2
3-3-1/3.9.3
3-3-1/3.11
3-3-1/5
3-3-1/7
3-3-1/7.1
3-3-1/7.3
3-3-1/7.3.1
3-3-1/7.3.2
3-3-1/7.3.3
3-3-1/7.3.4
3-3-1/7.3.5
3-3-1/7.5
3-3-1/9
3-3-1/9.1
3-3-1/9.3
3-3-1/9.3.1
3-3-1/9.3.1(a)
3-3-1/9.3.1(b)
3-3-1/9.3.1(c)
3-3-1/9.3.2
3-3-1/9.3.2(a)
3-3-1/9.3.2(b)
3-3-1/9.3.2(c)
3-3-1/9.3.2(d)
3-3-1/9.3.3
3-3-1/9.3.3(a)
3-3-1/9.3.3(b)
3-3-1/9.3.4
3-3-1/9.3
3-3-1/Figure 1
3-3-1/Figure 2
3-3-1/Figure 3
3-3-1/Figure 4
3-2-1
3-2-1/1
3-2-1/1.1
3-2-1/1.1i)
3-2-1/1.1ii)
33
Notices and General Information
MODU 1997
3/4.1.2
3/4.1.3
3/4.1.4
3/4.1.5
3/4.1.5a
3/4.1.5b
3/4.1.6
3/4.1.7
3/4.1.8
3/4.1.8a
3/4.1.8b
3/4.1.8c
3/4.1.8d
3/4.1.9
3/4.1.10
3/4.3
3/4.3.1
3/4.3.2
3/4.3.3
3/4.3.4
3/4.3.4a
3/4.3.4b
3/4.3.5
3/4.3.5a
3/4.3.5b
3/4.3.6
Part
3
Section
5
3/5
3/5.1
3/5.1.1
3/5.1.2
3/5.1.3
3/5.1.4
3/5.3
3/5.3.1
3/5.3.2
3/5.3.2a
3/5.3.2b
3/5.3.2c
3/5.3.2d
3/5.5
3/5.5.1
3/5.5.1a
3/5.5.1b
3/5.5.2
3/5.5.3
3/5.7
3/5.7.1
3/5.7.2
3/5.7.3
3/5.7.4
3/5.7.4a
3/5.7.4b
3/5.7.4c
3/5.7.5
3/5.7.5a
3/5.7.5b
3/5.7.5c
3/5.7.6
3/5.7.6a
3/5.7.6b
34
Title
Consideration of Local Stresses
Combination of Stress Components
Consideration of Buckling
Determination of Bending Stresses
Effective Flange Area
Eccentric Axial Loading
Determination of Shear Stresses
Stress Concentration
Analysis and Details of Structural Connections
--------Fatigue Analysis
Plastic Analysis
Allowable Stresses
General
Individual Stresses
Buckling Considerations
Members Subjected to Combined Axial Load and Bending
----Column Buckling Stresses
Overal Buckling
Local Buckling
Equivalent Stress Criteria for Plated Structures
Hull Construction and Equipment
Common Structures
Common Structures
General
Materials
Scantlings
Surface-type Drilling Units
Scantlings and Corrosion Control
Helicopter Deck
General
Structure
Overall Distributed Loading
Helicopter Landing Impact Loading
Stowed Helicopter Loading
Loading due to Motion of Unit
Structures Supporting the Drilling Derrick
Sudstructures
Individual Loads
Combined Loads
Substructure Supporting Arrangement
Moveable Cantilever and Skid Beam Testing
Watertight Bulkheads and Watertight Flats
General
Plating
Stiffeners and Beams
Corrugated Bulkheads
Plating
Stiffeners
End Connections
Girders and Webs
Strength Requirements
Proportions
Tripping Brackets
Testing
General
Hose Testing
MODU 2001
3-2-1/1.3
3-2-1/1.5
3-2-1/1.7
3-2-1/1.9
3-2-1/1.9.1
3-2-1/1.9.2
3-2-1/1.11
3-2-1/1.13
3-2-1/1.15
3-2-1/1.15i)
3-2-1/1.15ii)
3-2-1/1.15iii)
3-2-1/1.15iv)
3-2-1/1.17
3-2-1/1.19
3-2-1/3
3-2-1/3.1
3-2-1/3.3
3-2-1/3.5
3-2-1/3.7
3-2-1/3.7.1
3-2-1/3.7.2
3-2-1/3.9
3-2-1/3.9.1
3-2-1/3.9.2
3-2-1/3.11
3-2-2
3-2-2/1
3-2-2/1.1
3-2-2/1.3
3-2-2/1.5
3-2-2/1.7
3-2-2/3
3-2-2/3.1
3-2-2/3.3
3-2-2/3.3.1
3-2-2/3.3.2
3-2-2/3.3.3
3-2-2/3.3.4
3-2-2/5
3-2-2/5.1
3-2-2/5.1.1
3-2-2/5.1.2
3-2-2/5.3
3-2-2/5.5
3-2-2/7
3-2-2/7.1
3-2-2/7.3
3-2-2/7.5
3-2-2/7.7
3-2-2/7.7.1
3-2-2/7.7.2
3-2-2/7.7.3
3-2-2/7.9
3-2-2/7.9.1
3-2-2/7.9.2
3-2-2/7.9.3
3-2-2/7.11
3-2-2/7.11.1
3-2-2/7.11.2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
3/5.7.6c
3/5.9
3/5.9.1
3/5.9.2
3/5.9.3
3/5.9.4
3/5.9.5
3/5.9.5a
3/5.9.5b
3/5.9.5c
3/5.9.6
3/5.9.7
3/5.9.7a
3/5.9.7b
3/5.9.7c
3/5.9.7d
3/5.11
3/5.13
3/5.13.1
3/5.13.2
3/5.15
Table 3/5.1
Table 3/5.2
Figure 3/5.1
Figure 3/5.2
Part
3
Section
6
3/6
3/6.1
3/6.3
3/6.5
3/6.5.1
3/6.5.1a
3/6.5.1b
3/6.5.1c
3/6.5.1d
3/6.5.1e
3/6.5.1f
3/6.5.1g
3/6.5.1g1
3/6.5.1g2
3/6.5.2
3/6.5.3
3/6.5.4
3/6.5.5
3/6.5.6
3/6.5.6a
3/6.5.6b
3/6.5.7
3/6.5.8
3/6.5.8a
3/6.5.8b
3/6.5.8c
3/6.5.8d
3/6.5.8e
3/6.5.8f
3/6.7
Figure 3/6.1
Part
3
Section
7
3/7
3/7.1
3/7.1.1
Title
Air Testing
Tank Bulkheads and Tank Flats
General
Plating
Stiffeners and Beams
Corrugated Bulkheads
Girders and Webs
Strength Requirements
Proportions
Tripping Brackets
Drainage and Air Escape
Testing
General
Hydrostatic Testing
Air Testing
Structural Testing
Apputenant Structures
Guards and Rails
Floor Deck Areas and Openings
Helicopter Landing Deck
Means of Access and Egress
Allowable Factors of Safety Based on Fy for Helicopter Decks
Thickness and Flange Width of Brackets and Knees
Corrugated Bulkhead
Corrugated Bhd End Connections
Hull Construction and Equipment
Self-elevating Drilling Units
Self-elevating Drilling Units
Application
General Requirements for Scantlings
Structural Considerations
Legs
Leg Types
Legs without Mats
Legs in the Transit Condition
Legs in Severe Storm Transit Condition
Unit in Elevated Position
Leg Scantlings
Safety Against Overturning
Normal Drilling Condition
Severe Storm Condition
Structure in way of Jacking or Other Elevating Arrangements
Hull Strucutre
Wave Clearance
Bottom Mat
Preload
Capability
Leg Strength
Sea Bed Conditions
Deckhouses
Design Head
Plating
Stiffeners
House Sides
End Attachment
Racking Resistance
Structures Supporting the Drilling Derrick
Typical Hull Construction
Hull Construction and Equipment
Column-stabilized Drilling Units
Column-stabilized Drilling Units
General
Application
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
3-2-2/7.11.3
3-2-2/9
3-2-2/9.1
3-2-2/9.3
3-2-2/9.5
3-2-2/9.7
3-2-2/9.9
3-2-2/9.9.1
3-2-2/9.9.2
3-2-2/9.9.3
3-2-2/9.11
3-2-2/9.13
3-2-2/9.13.1
3-2-2/9.13.2
3-2-2/9.13.3
3-2-2/9.13.4
3-2-2/11
3-2-2/13
3-2-2/13.1
3-2-2/13.3
3-2-2/15
3-2-2/Table 1
3-2-2/Table 2
3-2-2/Figure 1
3-2-2/Figure 2
3-2-3
3-2-3/1
3-2-3/3
3-2-3/5
3-2-3/5.1
3-2-3/5.1.1
3-2-3/5.1.2
3-2-3/5.1.3
3-2-3/5.1.4
3-2-3/5.1.5
3-2-3/5.1.6
3-2-3/5.1.7
3-2-3/5.1.7(a)
3-2-3/5.1.7(b)
3-2-3/5.3
3-2-3/5.5
3-2-3/5.7
3-2-3/5.9
3-2-3/5.11
3-2-3/5.11.1
3-2-3/5.11.2
3-2-3/5.13
3-2-3/5.15
3-2-3/5.15.1
3-2-3/5.15.2
3-2-3/5.15.3
3-2-3/5.15.4
3-2-3/5.15.5
3-2-3/5.15.6
3-2-3/7
3-2-3/Figure 1
3-2-4
3-2-4/1
3-2-4/1.1
35
Notices and General Information
MODU 1997
3/7.1.2
3/7.1.2a
3/7.1.2b
3/7.1.3
3/7.3
3/7.3.1
3/7.3.2
3/7.3.2a
3/7.3.2b
3/7.3.2c
3/7.3.2d
3/7.3.3
3/7.3.4
3/7.3.4a
3/7.3.4b
3/7.3.4c
3/7.3.5
3/7.3.5a
3/7.3.5b
3/7.3.5c
3/7.3.5d
3/7.3.6
3/7.3.7
3/7.3.8
3/7.3.9
3/7.5
3/7.5.1
3/7.5.2
3/7.5.2a
3/7.5.2b
3/7.5.2c
3/7.5.2d
3/7.5.3
3/7.5.4
3/7.5.5
3/7.5.5a
3/7.5.5b
3/7.5.5c
3/7.5.5c1
3/7.5.5c2
3/7.5.5c3
3/7.5.5c4
3/7.5.5d
3/7.5.5d1
3/7.5.5d2
3/7.5.5d3
3/7.5.6
3/7.5.6a
3/7.5.6b
3/7.5.6c
3/7.5.6d
3/7.5.6e
3/7.5.7
3/7.6
3/7.7
3/7.7.1
3/7.7.2
3/7.8
3/7.8.1
3/7.8.2
3/7.8.3
36
Title
Special Considerations Regarding Stress
----Effect of Mooring Forces on Local Structure
Upper Structure
General
Deck Plating
General
Storage Area Decks
Decks in way of Tanks
Provision for Fork-lift Trucks
Beams
Girders
Strength Requirements
Proportions
Tripping Brackets
Stanchions and Pillars
Permissible Load
Length
Calculated Load
Pillars Under the Tops of Tanks
Upper Structure not Subjected to Wave Loading
Buoyant Upper Structure
Storage Tanks on Upper Decks
Deck Houses
Columns, Lower Hulls and Footings
General
Scantlings of Framed Shells
Tank Space
Void Compartment Spaces
Areas Subject to Wave Immersion
Minimum Scantlings
Scantlings of Unframed Shells
Scantlings of Structural Flats
Additional Structural Requirements
Provision for Wave and Current Loadings
Provision for Frame Action
Consideration for High Local Loadings
--------Scouring Consideration
------Bracing Members
General
Loading Conditions
Effect of Wave Impact
Reinforcement of Tubular Bracing Members
Watertight Bracing Members
Openings in Columns
Structures Supporting the Drilling Derrick
Wave Clearance
Afloat Modes of Operation
On-bottom Modes of Operation
Structural Redundancy
Assumed Damage
Analysis
Upper Hull
MODU 2001
3-2-4/1.3
3-2-4/1.3i)
3-2-4/1.3ii)
3-2-4/1.5
3-2-4/3
3-2-4/3.1
3-2-4/3.3
3-2-4/3.3.1
3-2-4/3.3.2
3-2-4/3.3.3
3-2-4/3.3.4
3-2-4/3.5
3-2-4/3.7
3-2-4/3.7.1
3-2-4/3.7.2
3-2-4/3.7.3
3-2-4/3.9
3-2-4/3.9.1
3-2-4/3.9.2
3-2-4/3.9.3
3-2-4/3.9.4
3-2-4/3.11
3-2-4/3.13
3-2-4/3.15
3-2-4/3.17
3-2-4/5
3-2-4/5.1
3-2-4/5.3
3-2-4/5.3.1
3-2-4/5.3.2
3-2-4/5.3.3
3-2-4/5.3.4
3-2-4/5.5
3-2-4/5.7
3-2-4/5.9
3-2-4/5.9.1
3-2-4/5.9.2
3-2-4/5.9.3
3-2-4/5.9.3i)
3-2-4/5.9.3ii)
3-2-4/5.9.3iii)
3-2-4/5.9.3iv)
3-2-4/5.9.4
3-2-4/5.9.4i)
3-2-4/5.9.4ii)
3-2-4/5.9.4iii)
3-2-4/5.11
3-2-4/5.11.1
3-2-4/5.11.2
3-2-4/5.11.3
3-2-4/5.11.4
3-2-4/5.11.5
3-2-4/5.13
3-2-4/7
3-2-4/9
3-2-4/9.1
3-2-4/9.3
3-2-4/11
3-2-4/11.1
3-2-4/11.3
3-2-4/11.5
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Part
3
Section
8
3/8
3/8.1
3/8.3
3/8.3.1
3/8.3.2
3/8.3.3
3/8.3.4
3/8.3.5
3/8.5
Part
3
Section
9
3/9
3/9.1
3/9.1.1
3/9.1.2
3/9.1.3
3/9.1.4
3/9.3
3/9.3.1
3/9.3.2
3/9.3.3
3/9.3.4
3/9.5
3/9.5.1
3/9.5.2
3/9.5.2a
3/9.5.2b
3/9.5.2c
3/9.5.3
3/9.5.3a
3/9.5.3b
3/9.5.3c
3/9.5.4
3/9.5.5
3/9.5.5a
3/9.5.5b
3/9.5.5c
3/9.5.5d
3/9.5.5e
3/9.5.5e1
3/9.5.5e2
3/9.5.5e3
3/9.5.5e4
Table 3/9.1
Part
3
Section
10
Part
A
3/10A
3/10A.1
3/10A.3
3/10A.5
3/10A.5a
3/10A.5b
3/10A.5b1
3/10A.5b2
3/10A.5b3
3/10A.7
3/10A.9
3/10A.9a
3/10A.9b
Title
Hull Construction and Equipment
Surface-type Drilling Units
Surface-type Drilling Units
General
Hull Scantlings
General
Drilling Well
Hatches
Concentrated Loads
Efect of Mooring Forces on Local Structure
Structures Supporting the Drilling Derrick
Hull Construction and Equipment
Material Selection
Material Selection
Materials
General
Characteristics
Toughness
Materials Other than Steel
Hull Steel Grades
Ordinary and Higher Strength Steel
Quenched and Tempered Steel
Additional Requirements
Other Grades
Selection of Grades
Hold Stringers
Self-elevating Units
Secondary Application Structure (Least Critical)
Primary Application Structure (Intermediate)
Special Application Structure (Most Critical)
Column-stabilized Units
Secondary Application Structure (Least Critical)
Primary Application Structure (Intermediate)
Special Application Structure (Most Critical)
Selection Criteria for ABS Grades of Steel
Criteria for Other Steels
General
CVN Requirements
CVN Temperatures
Extra High Strength Steels
Alternative Requirements
--------Material Selection Requirements for ABS Ordinary and Higher Strength Steels
Hull Construction and Equipment
Welding, Forming and Weld Design
Production Welding
Welding, Forming and Weld Design – Production Welding
General
Thickness in Excess of 50 mm (2 in.)
Extent of Inspection of Welds
General
Extent and Method
Self-elevating Units
Column-stabilized Units
Nondestructive Inspection Plan
Acceptance Criteria
Fillet Welds
Workmanship
Special Precautions
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
3-2-5
3-2-5/1
3-2-5/3
3-2-5/3.1
3-2-5/3.3
3-2-5/3.5
3-2-5/3.7
3-2-5/3.9
3-2-5/3
3-1-3
3-1-3/1
3-1-3/1.1
3-1-3/1.3
3-1-3/1.5
3-1-3/1.7
3-1-3/3
3-1-3/3.1
3-1-3/3.3
3-1-3/3.5
3-1-3/3.7
3-1-3/5
3-1-3/5.1
3-1-3/5.3
3-1-3/5.3.1
3-1-3/5.3.2
3-1-3/5.3.3
3-1-3/5.5
3-1-3/5.5.1
3-1-3/5.5.2
3-1-3/5.5.3
3-1-3/5.7
3-1-3/5.9
3-1-3/5.9.1
3-1-3/5.9.2
3-1-3/5.9.3
3-1-3/5.9.4
3-1-3/5.9.5
3-1-3/5.9.5i)
3-1-3/5.9.5ii)
3-1-3/5.9.5iii)
3-1-3/5.9.5iv)
3-1-3/Table 1
3-2-7
3-2-7/1
3-2-7/3
3-2-7/5
3-2-7/5.1
3-2-7/5.3
3-2-7/5.3.1
3-2-7/5.3.2
3-2-7/5.3.3
3-2-7/7
3-2-7/9
3-2-7/9.1
3-2-7/9.3
37
Notices and General Information
MODU 1997
Part
3
Section
10
Part
B
3/10B
3/10B.1
3/10B.1.1
3/10B.1.2
3/10B.1.2a
3/10B.1.2b
3/10B.1.2c
3/10B.1.2d
3/10B.1.2e
3/10B.1.3
3/10B.1.4
3/10B.1.5
3/10B.1.5a
3/10B.1.5b
3/10B.1.6
3/10B.1.6a
3/10B.1.6b
3/10B.1.7
3/10B.3
3/10B.5
3/10B.7
Table 3/10B.1
Part
3
Section
11
3/11
3/11.1
3/11.1a
3/11.1b
3/11.3
3/11.3.1
3/11.3.2
3/11.3.3
3/11.3.4
3/11.3.4a
3/11.3.4b
3/11.3.4b1
3/11.3.4b2
3/11.3.4b3
3/11.3.4b4
3/11.3.4b5
3/11.3.4b6
3/11.3.4b7
3/11.3.4b8
3/11.3.4b9
3/11.3.4b10
3/11.3.4b11
3/11.3.5
3/11.3.6
3/11.3.7
3/11.3.8
3/11.3.9
3/11.3.10
3/11.5
3/11.5.1
3/11.5.2
3/11.5.3
3/11.5.4
3/11.5.5
3/11.5.6
3/11.5.7
38
Title
Hull Construction and Equipment
Welding, Forming and Weld Design
Weld Design
Welding, Forming and Weld Design – Weld Design
Fillet Welds
Plans and Specifications
Tee Connections
Size of Fillet Welds
Length and Arrangement of Fillet
Intermittent Welding at Intersection
Welding of Longitudinals to Plating
Stiffeners and Webs to Hatch Covers
Tee-type End Connections
Ends of Unbracketed Stiffeners
Reduced Weld Size
Controlled Gaps
Deep Penetration Welds
Lapped Joints
Overlapped End Connections
Overlapped Seams
Plug Welds or Slot Welds
Full or Partial Penetration Corner or Tee Joints
Alternatives
Welding for Machinery Components
Weld Factors
Hull Construction and Equipment
Structural Fire Protection and Means of Escape
Structural Fire Protection and Means of Escape
General
Administrative Review
Bureau Review
Structural Fire Protection
Construction Materials
Alternate Materials
Fire Integrity of Bulkheads and Decks
Application of Tables
--------------------------------------Protection of Accommodation Spaces, Service Spaces and Control Stations
---------------
MODU 2001
3-2-6
3-2-6/1
3-2-6/1.1
3-2-6/1.3
3-2-6/1.3.1
3-2-6/1.3.2
3-2-6/1.3.3
3-2-6/1.3.4
3-2-6/1.3.5
3-2-6/1.5
3-2-6/1.7
3-2-6/1.9
3-2-6/1.9.1
3-2-6/1.9.2
3-2-6/1.11
3-2-6/1.11.1
3-2-6/1.11.2
3-2-6/1.13
3-2-6/3
3-2-6/5
3-2-6/7
3-2-6/Table 1
3-4-1
3-4-1/1
3-4-1/1.1
3-4-1/1.3
3-4-1/3
3-4-1/3.1
3-4-1/3.3
3-4-1/3.5
3-4-1/3.7
3-4-1/3.7.1
3-4-1/3.7.2
3-4-1/3.7.2(a)
3-4-1/3.7.2(b)
3-4-1/3.7.2(c)
3-4-1/3.7.2(d)
3-4-1/3.7.2(e)
3-4-1/3.7.2(f)
3-4-1/3.7.2(g)
3-4-1/3.7.2(h)
3-4-1/3.7.2(i)
3-4-1/3.7.2(j)
3-4-1/3.7.2(k)
3-4-1/3.9
3-4-1/3.11
3-4-1/3.13
3-4-1/3.15
3-4-1/3.17
3-4-1/3.19
3-4-1/5
3-4-1/5.1
3-4-1/5.3
3-4-1/5.5
3-4-1/5.7
3-4-1/5.9
3-4-1/5.11
3-4-1/5.13
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
3/11.5.7.1
3/11.5.7.2
3/11.5.7.3
3/11.5.8
3/11.5.9
3/11.5.10
3/11.5.11
3/11.5.11.1
3/11.5.11.2
3/11.5.11.3
3/11.5.12
3/11.5.12.1
3/11.5.12.2
3/11.5.13
3/11.5.13.1
3/11.5.13.2
3/11.5.13.3
3/11.5.13.4
3/11.5.13.5
3/11.5.14
3/11.5.14.1
3/11.5.14.2
3/11.5.14.3
3/11.5.14.4
3/11.5.14.5
3/11.5.15
3/11.5.16
3/11.5.16.1
3/11.5.16.2
3/11.5.16.3
3/11.5.16.4
3/11.5.17
3/11.5.18
3/11.5.19
3/11.5.19.1
3/11.5.19.2
3/11.5.19.3
3/11.5.20
3/11.7
3/11.7.1
3/11.7.1.1
3/11.7.1.2
3/11.7.1.3
3/11.7.2
3/11.7.2.1
3/11.7.2.2
3/11.7.3
3/11.7.4
3/11.7.5
Table 3/11.1
Table 3/11.2
Part
3
Section
12
3/12
3/12.1
3/12.3
3/12.5
3/12.7
Part
3
Appendix A
3/A
-----
Title
----------------------------------------------------------------------------Means of Escape
--------------------Fire Integrity of Bulkheads Separating Adjacent Spaces
Fire Integrity of Decks Separating Adjacent Spaces
Hull Construction and Equipment
Position Mooring Systems and Equipment
Position Mooring Systems and Equipment
General
Temporary Mooring Equipment
Position Mooring Equipment
Position Mooring System
Hull Construction and Equipment
Shallow Water Wave Theory
Shallow Water Wave Theory
Equations
Nomenclature
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
3-4-1/5.13i)
3-4-1/5.13ii)
3-4-1/5.13iii)
3-4-1/5.15
3-4-1/5.17
3-4-1/5.19
3-4-1/5.21
3-4-1/5.21i)
3-4-1/5.21ii)
3-4-1/5.21iii)
3-4-1/5.23
3-4-1/5.23i)
3-4-1/5.23ii)
3-4-1/5.25
3-4-1/5.25i)
3-4-1/5.25ii)
3-4-1/5.25iii)
3-4-1/5.25iv)
3-4-1/5.25v)
3-4-1/5.27
3-4-1/5.27i)
3-4-1/5.27ii)
3-4-1/5.27iii)
3-4-1/5.27iv)
3-4-1/5.27v)
3-4-1/5.29
3-4-1/5.31
3-4-1/5.31i)
3-4-1/5.31ii)
3-4-1/5.31iii)
3-4-1/5.31iv)
3-4-1/5.33v)
3-4-1/5.35
3-4-1/5.37
3-4-1/5.37i)
3-4-1/5.37ii)
3-4-1/5.37iii)
3-4-1/5.39
3-4-1/7
3-4-1/7.1
3-4-1/7.1.1
3-4-1/7.1.2
3-4-1/7.1.3
3-4-1/7.3
3-4-1/7.3.1
3-4-1/7.3.2
3-4-1/7.5
3-4-1/7.7
3-4-1/7.9
3-4-1/Table 1
3-4-1/Table 2
3-5-1
3-5-1/1
3-5-1/3
3-5-1/5
3-5-1/7
3-1-A1
3-1-A1/1
3-1-A1/3
39
Notices and General Information
MODU 1997
----Figure 3/A.1
Figure 3/A.1
Figure 3/A.2
Figure 3/A.2
Figure 3/A.3
Figure 3/A.3
Figure 3/A.4
Figure 3/A.4
Figure 3/A.5
Figure 3/A.5
Figure 3/A.6
Figure 3/A.6
Figure 3/A.7
Figure 3/A.7
Figure 3/A.8
Figure 3/A.8
Figure 3/A.9
Figure 3/A.9
Part
3
Appendix B
3/B
----------------3B.I
3B.II
3B.III
3B.IV
Part
3
Appendix C
3/C
3/C.1
3/C.3
3/C.5
3/C.7
Table 3/C.1
Table 3/C.2
Table 3/C.2a
Table 3/C.3
Part
3
Appendix D
3/D
3/D.1
3/D.1.1
3/D.1.2
3/D.1.2a
3/D.1.2b
3/D.1.3
3/D.3
3/D.5
3/D.7
40
Title
MODU 2001
Example
3-1-A1/5
Compute
3-1-A1/7
Ratio of Crest Elevation to Wave Height – SI and Metric Units
3-1-A1/Figure 1
Ratio of Crest Elevation to Wave Height – U.S. Units
3-1-A1/Figure 1
Relative Wave Height – SI and Metric Units
3-1-A1/Figure 2
Relative Wave Height – U.S. Units
3-1-A1/Figure 2
Wave Length Correction Factor – SI and Metric Units
3-1-A1/Figure 3
Wave Length Correction Factor – U.S. Units
3-1-A1/Figure 3
Drag Force Factor – SI and Metric Units
3-1-A1/Figure 4
Drag Force Factor – U.S. Units
3-1-A1/Figure 4
Ratio of Drag Force Lever to Still Water Depth – SI and Metric Units
3-1-A1/Figure 5
Ratio of Drag Force Lever to Still Water Depth – U.S. Units
3-1-A1/Figure 5
Inertial Force Factor – SI and Metric Units
3-1-A1/Figure 6
Inertial Force Factor – U.S. Units
3-1-A1/Figure 6
Ratio of Inertial Force Lever to Still Water Depth – SI and Metric Units
3-1-A1/Figure 7
Ratio of Inertial Force Lever to Still Water Depth – U.S. Units
3-1-A1/Figure 7
Ratio Total Force to Drag Force– SI and Metric Units
3-1-A1/Figure 8
Ratio Total Force to Drag Force – U.S. Units
3-1-A1/Figure 8
Angular Position of Maximum Moment – SI and Metric Units
3-1-A1/Figure 9
Angular Position of Maximum Moment – U.S. Units
3-1-A1/Figure 9
Hull Construction and Equipment
Wave Theory for Deep Water
Wave Theory for Deep Water
3-1-A2
Surface Wave Equation
3-1-A2/1
Equations for Water Velocity
3-1-A2/3
Equations for Water Acceleration
3-1-A2/5
Equation for Dynamic Pressure
3-1-A2/7
Example of Determining Inertia Force in Deep Water
3-1-A2/9
Caisson
3-1-A2/11
Drag Force in Deep Water
3-1-A2/13
Recommended Mass Factors
3-1-A2/15
Two Dimensional Values of Cm
3-1-A2/15I
Three Dimensional Correction to Cm
3-1-A2/15II
Application
3-1-A2/15III
Nomenclature
3-1-A2/15IV
Hull Construction and Equipment
Guide for Material Selection for ABS Grades of High Strength Quenched and Tempered
Steel
Guide for Material Selection for ABS Grades of High Strength Quenched and
3-1-A3
Tempered Steel
General
3-1-A3/1
Chemical Composition
3-1-A3/3
Mechanical Properties
3-1-A3/5
Heat Treatment
3-1-A3/7
Chemical Composition for ABS Grades of High Strength Quenched and Tempered
3-1-A3/Table 1
Steels
Mechanical Properties Requirements for ABS Grades of High Strength Quenched
3-1-A3/Table 2
and Tempered Steels
Elongation Requirements for Alternative B Specimen
3-1-A3/Table 2a
Material Selection Guidelines for ABS Quenched and Tempered Steel Grades
3-1-A3/Table 3
Hull Construction and Equipment
Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice
Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice
3-2-A1
Application
3-2-A1/1
Column Stabilized Unit
3-2-A1/1.1
Units of Other Type
3-2-A1/1.3
Surface Units
3-2-A1/1.3.1
Self-elevating Units
3-2-A1/1.3.2
Novel Features
3-2-A1/1.5
Ice Clas Selection
3-2-A1/3
Ice Waterline
3-2-A1/5
Clearance
3-2-A1/7
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
3/D.9
3/D.11
3/D.11.1
3/D.11.2
3/D.13
3/D.13.1
3/D.13.2
3/D.15
Table 3/D.1
Table 3/D.2
Table 3/D.3
Figure 3/D.1
Part
Appendix
3/E
3/E.1
3/E.2
3/E.2.1
3/E.2.2
3/E.2.2.1
3/E.2.2.2
3/E.2.2.3
3/E.2.2.4
3/E.2.2.4a
3/E.2.2.4b
3/E.2.2.4c
3/E.2.2.5
3/E.2.2.6
3/E.2.2.7
3/E.2.2.8
3/E.2.2.9
3/E.3
3/E.3.1
3/E.3.1.1
3/E.3.1.2
3/E.3.1.3
3/E.3.2
3/E.3.2.1
3/E.4
3/E.4.1
3/E.4.2
3/E.4.3
3/E.5
3/E.5.1
3/E.5.2
3/E.6
3/E.6.1
3/E.7
3/E.7.1
3/E.7.2
3/E.7.3
Part
Appendix
3/F
3/F.1
3/F.1.1
3/F.1.2
3/F.1.3
3
E
3
F
Title
MODU 2001
Ice Belt
3-2-A1/9
Design Ice Loads
3-2-A1/11
Design Ice Pressure
3-2-A1/11.1
Global Design Ice Load
3-2-A1/11.3
Structural Evaluation
3-2-A1/13
Global Evaluation
3-2-A1/13.1
Local Scantlings
3-2-A1/13.3
Other Requirements
3-2-A1/15
Guidance for Ice Class Selection of Column Stabilized Drilling Units
3-2-A1/Table 1
Definition of Ice Conditions of Broken First-year Ice Versus Concentration and
3-2-A1/Table 2
Thickness
Ice Pressure Factors
3-2-A1/Table 3
Ice Belt Areas
3-2-A1/Figure 1
Hull Construction and Equipment
Guide for Position Mooring Systems
Guide for Position Mooring Systems
3-5-A1
General
3-5-A1/1
Anchoring Systems
3-5-A1/3
General
3-5-A1/3.1
Design
3-5-A1/3.3
--3-5-A1/3.3.1
--3-5-A1/3.3.2
--3-5-A1/3.3.3
--3-5-A1/3.3.4
--3-5-A1/3.3.4(a)
--3-5-A1/3.3.4(b)
--3-5-A1/3.3.4(c)
--3-5-A1/3.3.5
--3-5-A1/3.3.6
--3-5-A1/3.3.7
--3-5-A1/3.3.8
--3-5-A1/3.3.9
Equipment
3-5-A1/5
Winches and Windlasses
3-5-A1/5.1
--3-5-A1/5.1.1
--3-5-A1/5.1.2
--3-5-A1/5.1.3
Fairleads and Sheaves
3-5-A1/5.3
--3-5-A1/5.3.1
Anchor Lines
3-5-A1/7
--3-5-A1/7.1
--3-5-A1/7.3
--3-5-A1/7.5
Anchors
3-5-A1/9
--3-5-A1/9.1
--3-5-A1/9.3
Quality Control
3-5-A1/11
--3-5-A1/11.1
Control Stations
3-5-A1/13
--3-5-A1/13.1
--3-5-A1/13.3
--3-5-A1/13.5
Hull Construction and Equipment
Guide for the Application of Dynamic Stability Response Based Intact Stability Criteria for
Column-stabilized Mobile Offshore Drilling Units
Guide for the Application of Dynamic Response Based Intact Stability Criteria for
3-3-A1
Column-stabilized Mobile Offshore Drilling Units
Introduction
3-3-A1/1
Definitions and Symbols
3-3-A1/3
General
3-3-A1/5
Scope
3-3-A1/5.1
Conditions for Compliance
3-3-A1/5.3
Dynamic-response-based Criteria
3-3-A1/5.5
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
41
Notices and General Information
MODU 1997
3/F.2
3/F.2.1
3/F.2.1.1
3/F.2.1.2
3/F.2.2
3/F.2.2a
3/F.2.2b
3/F.2.2c
3/F.2.2d
3/F.3
3/F.3.1
3/F.3.1.1
3/F.3.1.2
3/F.3.2
3/F.3.2.1
3/F.3.2.2
3/F.3.3
Figure 3/F.1
Figure 3/F.2
Part
3
Appendix F.A
3/F.A
3/F.A.1
3/F.A.2
Part
3
Appendix F.B
3/F.B
3/F.B.1
3/F.B.2
3/F.B.3
3/F.B.3.1
3/F.B.3.2
3/F.B.3.3
3/F.B.3.4
3/F.B.3.5
3/F.B.4
3/F.B.4.1
3/F.B.4.2
3/F.B.4.3
3/F.B.5
3/F.B.6
Part
3
Appendix F.C
3/F.C
3/F.C.1
3/F.C.2
3/F.C.3
3/F.C.3.1
3/F.C.3.2
Figure 3/F.C.1
42
Title
Dynamic-response-based Criteria
Criteria
Capsizing
Downflooding
Conditions of Assessment
--------Determination of Dynamic Response
Empirical Approximations
Maximum Dynamic Response Angle, θmax
Reduction in Downflooding Distance, RDFD
Application Limits of Empirical Approximations
Geometric Parameters
Operating Parameters
Direct Calculation
Capsize Criteria Format
Downflooding Criteria Concepts
Hull Construction and Equipment
Sample Calculations
Sample Calculations
Capsize Criteria Assessment (Metric Units)
Downflooding Criteria Assessment (Metric Units)
Hull Construction and Equipment
Direct Analysis of Dynamic Motion Responses
Direct Analysis of Dynamic Motion Responses
General
Analysis Methods and Theoretical Background
Analysis Conditions
Environmental Conditions
Heading
Hydrodynamic Coefficients
Radii of Gyration
Mooring Arrangement
Representation of Environment
Wind Loads
Wave Loads
Current Effects
Results of Analyses and Format
Model Tests
Hull Construction and Equipment
Environmental Conditions and Representations
Environmental Conditions and Representations
General
ABS Average Measured Wind Spectrum
Wave Spectra
Fetch-limited Regions
Open Seas
Joint Probabilities of Occurrence of Wind Speed and Wave Height
MODU 2001
3-3-A1/7
3-3-A1/7.1
3-3-A1/7.1.1
3-3-A1/7.1.2
3-3-A17/7.3
3-3-A17/7.3.1
3-3-A17/7.3.2
3-3-A17/7.3.3
3-3-A17/7.3.4
3-3-A1/9
3-3-A1/9.1
3-3-A1/9.1.1
3-3-A1/9.1.2
3-3-A1/9.3
3-3-A1/9.3.1
3-3-A1/9.3.2
3-3-A1/9.5
3-3-A1/Figure 1
3-3-A1/Figure 2
3-3-A1a
3-3-A1a/1
3-3-A1a/3
3-3-A1b
3-3-A1b/1
3-3-A1b/3
3-3-A1b/5
3-3-A1b/5.1
3-3-A1b/5.3
3-3-A1b/5.5
3-3-A1b/5.7
3-3-A1b/5.9
3-3-A1b/7
3-3-A1b/7.1
3-3-A1b/7.3
3-3-A1b/7.5
3-3-A1b/9
3-3-A1b/11
3-3-A1c
3-3-A1c/1
3-3-A1c/3
3-3-A1c/5
3-3-A1c/5.1
3-3-A1c/5.3
3-3-A1c/Figure 1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Part
4
Section
1
4/1.1
4/1.1.1
4/1.1.2
4/1.1.3
4/1.1.4
Table 4/1.1
4/1.5
4/1.15
4/1.17
4/1.19
4/1.19.1
4/1.19.2
4/1.19.3
4/1.21
Title
Machinery and Systems
Machinery Equipment and their Installation
General
Machinery and Equipment
Drilling Equipment
Certification Under Approved Quality Assurance
Inclination
Angle of Inclination
Plans and Data to be Submitted
Dead Ship start
Unattended Machinery Spaces
Trails for Self-Propelled Drilling Units
Full Power
Reduced Power
Machinery Operation
Trails for Non Self-Propelled Drilling Units
4-1-1
4-1-1/1
4-1-1/3
4-1-1/5
4-1-1/7
4-1-1/Table 1
4-1-1/9
4-1-1/11
4-1-1/13
4-1-1/15
4-1-1/15.1
4-1-1/15.3
4-1-1/15.5
4-1-1/17
4/1.3
4/1.3.1
4/1.3.2
4/1.3.2a
4/1.3.2a1
4/1.3.2a2
4/1.3.2b
4/1.3.2b1
4/1.3.2b2
4/1.3.2b3
4/1.3.2c
4/1.3.2d
4/1.3.2e
4/1.3.3
Rotating Machinery
Drilling Units Without Propulsion Machinery
Internal Combustion Engines Designed for Drilling Operations
Crankcase Ventilation
General
Piping Arrangement
Explosion Relief Valves
General
Location of Valves
Additional Valves Required
Fire Extinguishing Systems for Scavenge Manifolds
Warning Notices
Governor Control
Thrusters
4-1-2
4-1-2/1
4-1-2/3
4-1-2/3.1
4-1-2/3.1.1
4-1-2/3.1.2
4-1-2/3.3
4-1-2/3.3.1
4-1-2/3.3.2
4-1-2/3.3.3
4-1-2/3.5
4-1-2/3.7
4-1-2/3.9
4-1-2/5
4/1.7
4/1.7.1
4/1.7.1a
4/1.7.1b
4/1.7.1c
4/1.7.2
4/1.7.2a
4/1.7.2a1
4/1.7.2a2
4/1.7.2a3
4/1.7.2b
4/1.7.2b1
4/1.7.2b2
4/1.7.2b3
4/1.7.2b4
4/1.7.2b5
4/1.7.2c
4/1.7.2c1
4/1.7.2c2
4/1.7.2c3
4/1.7.2c4
4/1.7.2c5
4/1.7.2c6
4/1.7.2c7
4/1.7.2c8
4/1.7.2c9
Hazardous Areas
Definitions
Hazardous Areas
Enclosed Spaces
Semi-Enclosed Spaces
Classification of Areas
Hazardous spaces Zone 0
------Hazardous Areas Zone 1
----------Hazardous Areas Zone 2
------------------Openings, Access, and Ventilation Conditioning Affecting the Extent of Hazardous
Zones
-------
4-1-3
4-1-3/1
4-1-3/1.1
4-1-3/1.3
4-1-3/1.5
4-1-3/3
4-1-3/3.1
4-1-3/3.1i)
4-1-3/3.1ii)
4-1-3/3.1iii)
4-1-3/3.3
4-1-3/3.3i)
4-1-3/3.3ii)
4-1-3/3.3iii)
4-1-3/3.3iv)
4-1-3/3.3v)
4-1-3/3.5
4-1-3/3.5i)
4-1-3/3.5ii)
4-1-3/3.5iii)
4-1-3/3.5iv)
4-1-3/3.5v)
4-1-3/3.5vi)
4-1-3/3.5vii)
4-1-3/3.5viii)
4-1-3/3.5ix)
4/1.7.3
4/1.7.3a
4/1.7.3a1
4/1.7.3a2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-1-3/5
4-1-3/5.1
4-1-3/5.1i)
4-1-3/5.1ii)
43
Notices and General Information
MODU 1997
4/1.7.3a3
Figure 4/1.1a
4/1.7.3b
4/1.7.3b1
4/1.7.3b2
4/1.7.3b3
Figure 4/1.1b
4/1.7.3c
4/1.7.3c1
4/1.7.3c2
4/1.7.3c3
Figure 4/1.1c
4/1.9
4/1.9.1
4/1.9.2
4/1.9.3
4/1.11
4/1.11.1
4/1.11.2
--Hazardous Zones
--------Hazardous Zones
--------Hazardous Zones
Ventilation
General
Ventilation of Hazardous Areas
Ventilation of Non-Hazardous Areas
Machinery Installation
General
Hazardous Areas
4/1.13
4/1.13.1
4/1.13.2
4/1.13.3
4/1.13.3a
4/1.13.3b
4/1.13.3c
4/1.13.4
4/1.13.4a
4/1.13.4b
4/1.13.4c
4/1.13.5
4/1.13.6
4/1.13.7
4/1.13.8
4/1.13.9
4/1.13.9a
4/1.13.9b
4/1.13.9c
4/1.13.9d
Part
Section
--4/2.1
4/2.1.1
4/2.1.2
4/2.1.3
4/2.1.4
4/2.1.5
4/2.1.6
4/2.3
4/2.3.1
4/2.3.2
4/2.3.3
4/2.5
4/2.5.1
4/2.5.2
4/2.7
4/2.7.1
4/2.7.2
4/2.7.3
4/2.7.4
4/2.7.5
Jacking or Other Elevating Systems
General
Allowable Stresses
Material
Jacking and Elevated Systems
Other Components
Hydraulic Cylinders
Prototype Test
------Inspection and material Testing
Initial Jacking Test
Instrumentation
Low Temperature Operation
Jacking Gear Motors and Motors Controllers
Group Installation
Overcurrent protection
Running Protection
Metering
Machinery and Systems
Pumps and Piping Systems
General
General Requirements
Damage Stability
Segregation of Piping System
Boilers and Associated Piping
Steering Gear Piping
Gas Turbine Piping
Piping Group
Plans and data to be Submitted
Plans
All Piping Systems
Booklet of Standard Details
Material Tests and Inspection
Specification and Purchase Orders
Special Materials
Pressure Test
Fuel-oil Service System
Fuel-oil Suction and Transfer Lines
Starting Air Piping
Hydraulic Power Piping
All Piping
44
4
2
Title
MODU 2001
4-1-3/5.1iii)
4-1-3/Figure 1
4-1-3/5.3
4-1-3/5.3i)
4-1-3/5.3ii)
4-1-3/5.3iii)
4-1-3/Figure 2
4-1-3/5.5
4-1-3/5.5i)
4-1-3/5.5ii)
4-1-3/5.5iii)
4-1-3/Figure 3
4-1-3/7
4-1-3/7.1
4-1-3/7.3
4-1-3/7.5
4-1-3/9
4-1-3/9.1
4-1-3/9.3
4-1-4
4-1-4/1
4-1-4/3
4-1-4/5
4-1-4/5.1
4-1-4/5.3
4-1-4/5.5
4-1-4/7
4-1-4/7.1
4-1-4/7.3
4-1-4/7.5
4-1-4/9
4-1-4/11
4-1-4/13
4-1-4/15
4-1-4/17
4-1-4/17.1
4-1-4/17.3
4-1-4/17.5
4-1-4/17.7
4-2-1
4-2-1/1
4-2-1/1.1
4-2-1/1.3
4-2-1/1.5
4-2-1/1.7
4-2-1/1.9
4-2-1/1.11
4-2-1/3
4-2-1/3.1
4-2-1/3.3
4-2-1/3.5
4-2-1/5
4-2-5/5.1
4-2-1/5.3
4-2-1/7
4-2-1/7.1
4-2-1/7.3
4-2-1/7.5
4-2-1/7.7
4-2-1/7.9
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/2.9
4/2.9.1
4/2.9.2
4/2.9.4
4/2.9.5
4/2.9.6
4/2.9.7
4/2.9.8
4/2.9.9
4/2.9.9a
4/2.9.10
4/2.9.11
4/2.9.12
4/2.9.13
4/2.9.13a
4/2.9.13b
4/2.9.14
4/2.9.15
4/2.9.16
4/2.9.16a
4/2.9.16b
Title
General Installation Details
Protection
Pipes Near Switchboards
Expansion and Contraction Stresses
Non-metallic Expansion Joints
Bulkhead, Deck or Tank-Top Penetrations
Collision-bulkhead Penetration
Sluice Valves and Cocks
Relief Valves
Exceptions
Common Overboard Discharges
Remote Operation
Standard or Extra Heavy Pipe
Instruments
Temperature
Pressure
Hose
Control of Static Electricity
Leakage Containment
Oil Leaks
Boiler Flat
MODU 2001
4-2-1/9
4-2-1/9.1
4-2-1/9.3
4-2-1/9.5
4-2-1/9.7
4-2-1/9.9
4-2-1/9.11
4-2-1/9.13
4-2-1/9.15
4-2-1/9.15.1
4-2-1/9.17
4-2-1/9.19
4-2-1/9.21
4-2-1/9.23
4-2-1/9.23.1
4-2-1/9.23.2
4-2-1/9.25
4-2-1/9.27
4-2-1/9.29
4-2-1/9.29.1
4-2-1/9.29.2
--4/2.11
4/2.11.1
4/2.11.2
4/2.13
4/2.13.1
4/2.13.2
4/2.13.3
4/2.15
4/2.15.1
4/2.15.2
4/2.15.2a
4/2.15.2b
4/2.15.2c
4/2.15.3
4/2.15.4
4/2.15.6
Table 4/2.1
4/2.15.7
4/2.17
4/2.17.1
4/2.17.2
4/2.17.3
4/2.17.3a
4/2.17.3b
4/2.17.3c
4/2.17.3c1
4/2.17.3c2
4/2.17.3d
4/2.17.3e
4/2.17.3f
4/2.17.3g
4/2.17.3h
4/2.17.3h1
4/2.17.3h2
4/2.17.3h3
4/2.17.3h4
4/2.17.3i
4/2.17.4
4/2.17.4a
4/2.17.4a1
Pumps, Pipes, Valves and Fittings
General
Service Conditions
Standards for Valves, Fittings and Flanges
Pumps
General Requirements
Hydrostatic Test
Capacity Test
Metallic Piping
Test and Inspection Group I Piping
Steel Pipe
Seamless Pipe
Welded Pipe
Fuel-oil Pipe
Copper Pipe
Brass Pipe
Maximum Allowable Working Pressure and Minimum Thickness
Allowable Stress Values S for Piping N/mm2
Working Pressure and Thickness- Alternative Consideration
Plastic Pipes
General
Specification
Design
Internal Pressure
External Pressure
Axial Strength
----Temperature
Impact Resistance
Fire Endurance
Flame Spread
Electrical Conductivity
--------Marking
Installation of Plastic Piping
-----
4-2-2
4-2-2/1
4-2-2/1.1
4-2-2/1.3
4-2-2/3
4-2-2/3.1
4-2-2/3.3
4-2-2/3.5
4-2-2/5
4-2-2/5.1
4-2-2/5.3
4-2-2/5.3.1
4-2-2/5.3.2
4-2-2/5.3.3
4-2-2/5.5
4-2-2/5.7
4-2-2/5.9
4-2-2/Table 1
4-2-2/5.11
4-2-2/7
4-2-2/7.1
4-2-2/7.3
4-2-2/7.5
4-2-2/7.5.1
4-2-2/7.5.2
4-2-2/7.5.3
4-2-2/7.5.3(a)
4-2-2/7.5.3(b)
4-2-2/7.5.4
4-2-2/7.5.5
4-2-2/7.5.6
4-2-2/7.5.7
4-2-2/7.5.8
4-2-2/7.5.8(a)
4-2-2/7.5.8(b)
4-2-2/7.5.8(c)
4-2-2/7.5.8(d)
4-2-2/7.5.9
4-2-2/7.7
4-2-2/7.7.1
4-2-2/7.7.1(a)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
45
Notices and General Information
MODU 1997
4/2.17.4a2
4/2.17.4a3
4/2.17.4a4
4/2.17.4a5
4/2.17.4b
4/2.17.4c
4/2.17.4c1
4/2.17.4c2
4/2.17.4c3
4/2.17.4c4
4/2.17.4d
4/2.17.4d1
4/2.17.4d2
4/2.17.4e
4/2.17.4f
4/2.17.4f1
4/2.17.4f2
4/2.17.4f3
4/2.17.4g
4/2.17.5
4/2.17.6
4/2.17.6a
4/2.17.6a1
4/2.17.6a2
4/2.17.6b
4/2.17.6b1
4/2.17.6b2
4/2.17.6b3
4/2.17.7
4/2.17.7a
4/2.17.7a1
4/2.17.7a2
4/2.17.7a3
4/2.17.7b
4/2.17.7b1
4/2.17.7b2
4/2.17.7b3
4/2.17.7b4
4/2.17.7b5
4/2.17.7b6
4/2.17.7c
4/2.17.7d
4/2.17.7d1
4/2.17.7d2
4/2.17.7d3
4/2.17.8
4/2.17.8a
4/2.17.8a1
4/2.17.8a2
4/2.17.8a3
4/2.17.8a4
4/2.17.8a5
4/2.17.8b
4/2.17.8b1
4/2.17.8b2
4/2.17.8b3
4/2.17.8b4
4/2.17.8b5
4/2.17.8b6
4/2.17.8b7
Figure 4/2.1
46
Title
--------External Loads
----------Electrical Conductivity
----Shell Connections
Bulkhead and Deck Penetrations
------Application of Fire Protecting Coatings
Manufacturing of Plastic Pipes
Plastic Pipe Bonding Procedure Qualification
Procedure Qualification Requirements
----Procedure Qualification Testing
------Test by the Manufacturer - Fire Endurance Testing of Plastic Piping in dry
Conditions (For Level 1and Level 2)
Test method
------Test Specimen
------------Test Condition
Acceptance Criteria
------Test by the Manufacturer - Fire Endurance Testing of Water-Filled Plastic Piping
(For Level 3)
Test Method
----------Test Specimen
--------------Fire Endurance Burner Assembly
MODU 2001
4-2-2/7.7.1(b)
4-2-2/7.7.1(c)
4-2-2/7.7.1(d)
4-2-2/7.7.1(e)
4-2-2/7.7.2
4-2-2/7.7.3
4-2-2/7.7.3(a)
4-2-2/7.7.3(b)
4-2-2/7.7.3(c)
4-2-2/7.7.3(d)
4-2-2/7.7.4
4-2-2/7.7.4(a)
4-2-2/7.7.4(b)
4-2-2/7.7.5
4-2-2/7.7.6
4-2-2/7.7.6(a)
4-2-2/7.7.6(b)
4-2-2/7.7.6(c)
4-2-2/7.7.9
4-2-2/7.9
4-2-2/7.11
4-2-2/7.11.1
4-2-2/7.11.1(a)
4-2-2/7.11.1(b)
4-2-2/7.11.2
4-2-2/7.11.2(a)
4-2-2/7.11.2(b)
4-2-2/7.11.2(c)
4-2-2/7.13
4-2-2/7.13.1
4-2-2/7.13.1(a)
4-2-2/7.13.1(b)
4-2-2/7.13.1(c)
4-2-2/7.13.2
4-2-2/7.13.2(a)
4-2-2/7.13.2(b)
4-2-2/7.13.2(c)
4-2-2/7.13.2(d)
4-2-2/7.13.2(e)
4-2-2/7.13.2(f)
4-2-2/7.13.3
4-2-2/7.13.4
4-2-2/7.13.4(a)
4-2-2/7.13.4(b)
4-2-2/7.13.4(c)
4-2-2/7.15
4-2-2/7.15.1
4-2-2/7.15.1(a)
4-2-2/7.15.1(b)
4-2-2/7.15.1(c)
4-2-2/7.15.1(d)
4-2-2/7.15.1(e)
4-2-2/7.15.2
4-2-2/7.15.2(a)
4-2-2/7.15.2(b)
4-2-2/7.15.2(c)
4-2-2/7.15.2(d)
4-2-2/7.15.2(e)
4-2-2/7.15.2(f)
4-2-2/7.15.2(g)
4-2-2/Figure 1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
Figure 4/2.2
4/2.17.8c
4/2.17.8c1
4/2.17.8c2
4/2.17.8c3
4/2.17.8d
4/2.17.8d1
4/2.17.8d2
4/2.17.9
4/2.17.9a
4/2.17.9a1
4/2.17.9a2
4/2.17.9a3
4/2.17.9a4
4/2.17.9a5
4/2.17.9a6
4/2.17.9a7
4/2.17.9a8
4/2.17.9a9
4/2.17.10
4/2.19
4/2.19.1
4/2.19.1a
4/2.19.1b
4/2.19.2
4/2.19.3
4/2.21
4/2.21.1
4/2.21.2
4/2.21.3
4/2.22
4/2.23
4/2.23.1
4/2.23.2
4/2.23.2a
4/2.23.2b
4/2.23.3
4/2.25
4/2.25.1
4/2.25.2
4/2.25.3
4/2.25.4
4/2.25.5
4/2.27
4/2.27.1
4/2.27.2
4/2.27.2a
4/2.27.2b
4/2.27.2c
4/2.27.2d
4/2.27.2d1
4/2.27.2d2
4/2.27.3
4/2.29
4/2.29.1
4/2.29.2
4/2.29.3
4/2.29.4
4/2.29.5
4/2.29.5a
4/2.29.5b
4/2.29.5c
4/2.29.6
Title
Fire Endurance Test Stand With Mounted Sample
Test Conditions
------Acceptance Criteria
----Test by Manufacturer - Flame Spread
Test Method
------------------Testing on Board After Installation
Valves
General
Standard Valves
Non-Standard Valves
Construction
Hydrostatic Test and Identification
Pipe Fittings
General
Hydrostatic Test and Identification
Non-Standard Fittings
Welded Non-Standard Valves Fittings
Flanges
General
Group I Piping Flanges
Steel Pipe
Nonferrous Pipe
Group II Piping Flanges
Material of Valves and Fittings
General
Forged or Cast Steel
Cast Iron
Nonferrous
Ductile (Nodular) Iron
Fluid Power Cylinders
Application
Cylinders for Group I Piping Systems
Design
Plans and Data to be Submitted
Material
Hydrostatic Test
General
Test Pressure
Cylinders for Group II Piping Systems
Sea Inlets and Overboard Discharges
Installation
Valve Connection to Shell
Materials
Shell Reinforcement
Sea-Water Inlet and Discharge Valves
Column Stabilized Units
Self Elevating and Surface Type Units
Self Elevating Units
Sea Chests
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-2-2/Figure 2
4-2-2/7.15.3
4-2-2/7.15.3(a)
4-2-2/7.15.3(b)
4-2-2/7.15.3(c)
4-2-2/7.15.4
4-2-2/7.15.4(a)
4-2-2/7.15.4(b)
4-2-2/7.17
4-2-2/7.17.1
4-2-2/7.17.1(a)
4-2-2/7.17.1(b)
4-2-2/7.17.1(c)
4-2-2/7.17.1(d)
4-2-2/7.17.1(e)
4-2-2/7.17.1(f)
4-2-2/7.17.1(g)
4-2-2/7.17.1(h)
4-2-2/7.17.1(i)
4-2-2/7.19
4-2-2/9
4-2-2/9.1
4-2-2/9.1.1
4-2-2/9.1.2
4-2-2/9.3
4-2-2/9.5
4-2-2/11
4-2-2/11.1
4-2-2/11.3
4-2-2/11.5
4-2-2/13
4-2-2/15
4-2-2/15.1
4-2-2/15.3
4-2-2/15.3.1
4-2-2/15.3.2
4-2-2/15.5
4-2-2/17
4-2-2/17.1
4-2-2/17.3
4-2-2/17.5
4-2-2/17.7
4-2-2/17.9
4-2-2/19
4-2-2/19.1
4-2-2/19.3
4-2-2/19.3.1
4-2-2/19.3.2
4-2-2/19.3.3
4-2-2/19.3.4
4-2-2/19.3.4(a)
4-2-2/19.3.4(b)
4-2-2/19.5
4-2-2/21
4-2-2/21.1
4-2-2/21.3
4-2-2/21.5
4-2-2/21.7
4-2-2/21.9
4-2-2/21.9.1
4-2-2/21.9.2
4-2-2/21.9.3
4-2-2/21.11
47
Notices and General Information
MODU 1997
4/2.31
4/2.31.1
4/2.31.2
4/2.31.3
4/2.33
4/2.35
4/2.35.1
4/2.35.2
4/2.35.3
4/2.37
4/2.37.1
4/2.37.1a
4/2.37.1b
4/2.37.2
4/2.37.2a
4/2.37.2a
Table 4/2.2
Title
Scuppers and Drains on Surface-type and Self-Elevating Units
Discharges through the Shell
Scuppers and Discharges below the Freeboard Deck - Shell Penetration
Scuppers from Superstructures or Deckhouses
Helicopter Deck Drainage Arrangement
Cooler Installation External to the Hull
General
Keel Cooler Installation
Grid Cooler Installation
Penetration Throughout Watertight Boundaries
Ventilating Systems
----Internal Drain System
----Fire Endurance Requirements Matrix
MODU 2001
4-2-2/23
4-2-2/23.1
4-2-2/23.3
4-2-2/23.5
4-2-2/25
4-2-2/27
4-2-2/27.1
4-2-2/27.3
4-2-2/27.5
4-2-2/29
4-2-2/29.1
4-2-2/29.1i)
4-2-2/29.1ii)
4-2-2/29.3
4-2-2/29.3.1
4-2-2/29.3.2
4-2-2/Table 2
--4/2.39
4/2.39.1
4/2.39.2
4/2.39.3
4/2.39.4
4/2.39.4a
4/2.39.4b
4/2.39.4c
Bilge and Ballast Systems, Vents & Sounding
General Arrangement of Bilge and Ballast Systems for Surface Type Units
General
Number of Bilge Pumps
Independent Bilge Suction
Direct Bilge Suction
Steam-engine Installations
Internal-combustion Engine Installation
Valve Arrangement
General Arrangement for Bilge Systems for Column-Stabilized Units and Self
Elevating Units
Permanent Systems
Void Compartments
Chainlockers
Bilge Alarm
Bilge Piping (All Units)
General
Installation
Manifolds, Cocks, and Valves
Common-main-type Bilge System
Strainers
Gravity Drains
Bilge Suctions from Hazardous Areas
Exceptions
Bilge Pumps (All Units)
General
Arrangement and Capacity
Size of Bilge Suctions
Surface Type Units
Main Line
Branch Line
Main Line Reduction
Size Limits
Column-Stabilized Units and Self-Elevating Units
Main Line
Branch Line
Size Limits
Ballast Piping ( All Units)
General
Installation
Controls for Ballast Tank Valves
Exceptions
Ballast Systems for Column-Stabilized Units
General
---
4-2-3
4-2-3/1
4-2-3/1.1
4-2-3/1.3
4-2-3/1.5
4-2-3/1.7
4-2-3/1.7.1
4-2-3/1.7.2
4-2-3/1.7.3
4/2.41
4/2.41.1
4/2.41.2
4/2.41.3
4/2.41.4
4/2.43
4/2.43.1
4/2.43.2
4/2.43.3
4/2.43.4
4/2.43.5
4/2.43.6
4/2.43.7
4/2.43.8
4/2.45
4/2.45.1
4/2.45.2
4/2.47
4/2.47.1
4/2.47.1a
4/2.47.1b
4/2.47.1c
4/2.47.1d
4/2.47.2
4/2.47.2a
4/2.47.2b
4/2.47.2c
4/2.49
4/2.49.1
4/2.49.2
4/2.49.3
4/2.49.4
4/2.51
4/2.51.1
4/2.51.1a
48
4-2-3/3
4-2-3/3.1
4-2-3/3.3
4-2-3/3.5
4-2-3/3.7
4-2-3/5
4-2-3/5.1
4-2-3/5.3
4-2-3/5.5
4-2-3/5.7
4-2-3/5.9
4-2-3/5.11
4-2-3/5.13
4-2-3/5.15
4-2-3/7
4-2-3/7.1
4-2-3/7.3
4-2-3/9
4-2-3/9.1
4-2-3/9.1.1
4-2-3/9.1.2
4-2-3/9.1.3
4-2-3/9.1.4
4-2-3/9.3
4-2-3/9.3.1
4-2-3/9.3.2
4-2-3/9.3.3
4-2-3/11
4-2-3/11.1
4-2-3/11.3
4-2-3/11.5
4-2-3/11.7
4-2-3/13
4-2-3/13.1
4-2-3/13.1i)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/2.51.1b
4/2.51.2
4/2.51.3
4/2.51.3a
4/2.51.3b
4/2.51.4
4/2.51.4a
4/2.51.4a1
4/2.51.4a2
4/2.51.4a2a
4/2.51.4a2b
4/2.51.4a2c
4/2.51.4a2d
4/2.51.4a2e
4/2.51.4a2f
4/2.51.4a2g
4/2.51.4a2h
4/2.51.4a2j
4/2.51.4a3
4/2.51.4a4
4/2.51.4b
4/2.51.4c
4/2.51.4c1
4/2.51.4c1a
4/2.51.4c1b
4/2.51.4c2
4/2.51.4c3
4/2.51.4c4
4/2.51.4c5
4/2.51.4d
4/2.51.4e
4/2.51.4f
4/2.53
4/2.53.1
4/2.53.2
4/2.53.3
4/2.53.4
4/2.53.5
4/2.53.6
4/2.57
4/2.57.1
4/2.57.2
4/2.57.2a
4/2.57.2b
4/2.57.2c
4/2.57.2c1
4/2.57.2c2
4/2.57.2c3
4/2.57.3
--Manifolds
Pumps
Number
Pump Performance
Ballast Control Features
Centralized Control Station
Location
Controls and Indications
------------------Communication
Back-up Station
Independent Local Control
Safety Futures
Independence
All Systems
Pump/Valve Control System
--------Valve Positioning Indicating System
Draft Indicating System
Tank Level indicating System
Tank Vents and Overflows
General
Progressive Flooding Consideration
Height of Vent Pipes
Size
Termination of Vent Pipes
Overflow Pipes
Sounding Arrangement
General
Sounding Pipes
Oil Tanks
Other Tanks
Ignition of Spillage
------Gauge Glasses
Title
MODU 2001
4-2-3/13.1ii)
4-2-3/13.3
4-2-3/13.5
4-2-3/13.5.1
4-2-3/13.5.2
4-2-3/13.7
4-2-3/13.7.1
4-2-3/13.7.1(a)
4-2-3/13.7.1(b)
4-2-3/13.7.1(b)i)
4-2-3/13.7.1(b)ii)
4-2-3/13.7.1(b)iii)
4-2-3/13.7.1(b)iv)
4-2-3/13.7.1(b)v)
4-2-3/13.7.1(b)vi)
4-2-3/13.7.1(b)vii)
4-2-3/13.7.1(b)viii)
4-2-3/13.7.1(b)ix)
4-2-3/13.7.1(c)
4-2-3/13.7.1(d)
4-2-3/13.7.2
4-2-3/13.7.3
4-2-3/13.7.3(a)
4-2-3/13.7.3(a)i)
4-2-3/13.7.3(a)ii)
4-2-3/13.7.3(b)
4-2-3/13.7.3(c)
4-2-3/13.7.3(d)
4-2-3/13.7.3(e)
4-2-3/13.7.4
4-2-3/13.7.5
4-2-3/13.7.6
4-2-3/15
4-2-3/15.1
4-2-3/15.3
4-2-3/15.5
4-2-3/15.7
4-2-3/15.9
4-2-3/15.11
4-2-3/17
4-2-3/17.1
4-2-3/17.3
4-2-3/17.3.1
4-2-3/17.3.2
4-2-3/17.3.3
4-2-3/17.3.3i)
4-2-3/17.3.3ii)
4-2-3/17.3.3iii)
4-2-3/17.5
--4/2.59
4/2.59.1
4/2.59.1a
4/2.59.1b
4/2.59.1c
4/2.59.2
4/2.59.3
4/2.59.3a
4/2.59.3b
4/2.59.4
4/2.61
4/2.61.1
Fuel Oil and other Piping Systems
Fuel Oil Piping System - General
Arrangement
Tanks
Spillage
Service and Settlings Tanks
Piping, Valves and Fittings
Oil Heating Arrangements
Oil Heaters
Tanks
Fuel Oil Purifiers
Fuel Oil Transfer and Filling
General
4-2-4
4-2-4/1
4-2-4/1.1
4-2-4/1.1.1
4-2-4/1.1.2
4-2-4/1.1.3
4-2-4/1.3
4-2-4/1.5
4-2-4/1.5.1
4-2-4/1.5.2
4-2-4/1.7
4-2-4/3
4-2-4/3.1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
49
Notices and General Information
MODU 1997
4/2.61.2
4/2.61.3
4/2.61.4
4/2.61.5
4/2.61.5a
4/2.61.5b
4/2.61.5c
4/2.63
4/2.64
4/2.64.1
4/2.64.1a
4/2.64.1b
4/2.64.1c
4/2.64.2
4/2.64.3
4/2.64.4
4/2.64.4a
4/2.64.4b
4/2.65
4/2.65.1
4/2.65.1a
4/2.65.1b
4/2.65.1c
4/2.65.2
4/2.65.3
4/2.67
4/2.67.1
4/2.67.2
4/2.67.3
4/2.67.4
4/2.67.4a
4/2.67.4b
4/2.67.4c
4/2.67.4d
4/2.67.5
4/2.69
4/2.69.1
4/2.69.2
4/2.69.2a
4/2.69.2b
4/2.69.3
4/2.69.4
4/2.69.4a
4/2.69.4b
4/2.69.4c
4/2.69.4d
4/2.69.5
4/2.69.6
4/2.69.7
4/2.69.8
4/2.69.9
4/2.71
4/2.71.1
4/2.71.2
4/2.71.3
4/2.71.3.1
4/2.71.3.2
4/2.71.4
4/2.73
4/2.73.1
4/2.73.1a
4/2.73.1b
4/2.73.1c
50
Title
Heating Coil
Pipes in Oil Tanks
Control Valves or Cocks
Valves on Oil Tanks
------Fuel Oil Service System for Boilers
Fuel Oil Service System for Internal Combustion Engines
Fuel Oil Pumps and Oil Heaters
Transfer Pumps
Booster Pumps
Heaters
Oil Tanks and Drains for Fuel Oil System
Fuel Oil Pressure Piping
Fuel Oil Injecting System
General
Shielding of High Pressure Fuel Oil Piping
Low Flash Point Fuels
General
------Fuel Heating
Fuel Tank Vents
Lubricating Oil Systems
General
Sight Flow Glasses
Turbines and Reduction Gears
Internal Combustion Engines and Reduction Gear
Lubricating Oil Pumps
Filters
Low Oil Pressure Alarm
Drain Pipes
Electrical machinery
Hydraulic Systems
General
Valves
General
Relief Valves
Piping
Pipe Fittings
Non-standard Fittings
Split Flanges
Straight Thread O Rings Connections
Tapered Threaded Connections
Hose
Accumulators
Fluid Power Cylinders
Design Pressure
Segregation of High Pressure Hydraulic Units
Fixed Oxygen - Acetylene Installations
Cylinder Storage
Piping and Fittings
Pressure Relief and System Protective Devices
----Testing
-----------
MODU 2001
4-2-4/3.3
4-2-4/3.5
4-2-4/3.7
4-2-4/3.9
4-2-4/3.9i)
4-2-4/3.9ii)
4-2-4/3.9iii)
4-2-4/5
4-2-4/7
4-2-4/7.1
4-2-4/7.1.1
4-2-4/7.1.2
4-2-4/7.1.3
4-2-4/7.3
4-2-4/7.5
4-2-4/7.7
4-2-4/7.7.1
4-2-4/7.7.2
4-2-4/9
4-2-4/9.1
4-2-4/9.1.1
4-2-4/9.1.2
4-2-4/9.1.3
4-2-4/9.3
4-2-4/9.5
4-2-4/11
4-2-4/11.1
4-2-4/11.3
4-2-4/11.5
4-2-4/11.7
4-2-4/11.7.1
4-2-4/11.7.2
4-2-4/11.7.3
4-2-4/11.7.4
4-2-4/11.9
4-2-4/13
4-2-4/13.1
4-2-4/13.3
4-2-4/13.3.1
4-2-4/13.3.2
4-2-4/13.5
4-2-4/13.7
4-2-4/13.7.1
4-2-4/13.7.2
4-2-4/13.7.3
4-2-4/13.7.4
4-2-4/13.9
4-2-4/13.11
4-2-4/13.13
4-2-4/13.15
4-2-4/13.17
4-2-4/15
4-2-4/15.1
4-2-4/15.3
4-2-4/15.5
4-2-4/15.5i)
4-2-4/15.5ii)
4-2-4/15.7
4-2-4/17
4-2-4/17.1
4-2-4/17.1i)
4-2-4/17.1ii)
4-2-4/17.1iii)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/2.73.1d
4/2.73.2
4/2.73.2a
4/2.73.2b
4/2.73.2c
4/2.75
4/2.75.1
4/2.75.2
4/2.75.2a
4/2.75.2b
4/2.75.3
4/2.77
4/2.77.1
4/2.77.2
4/2.77.3
4/2.77.4
4/2.79
4/2.79.1
4/2.79.2
4/2.81
Part
4
Section
3
--4/3.1
4/3.3
4/3.3.1
4/3.3.2
4/3.3.3
4/3.3.3a
4/3.3.3b
4/3.3.4
4/3.3.5
4/3.3.6
4/3.3.a
4/3.3.7
4/3.3.8
4/3.3.9
4/3.3.10
4/3.3.11
4/3.3.12
4/3.3.13
4/3.3.14
4/3.3.15
4/3.3.16
4/3.5
4/3.7
4/3.9
4/3.11
4/3.13
4/3.13.1
4/3.13.2
4/3.13.3
4/3.13.4
4/3.13.5
4/3.13.6
4/3.15
4/3.17
4/3.19
4/3.21
4/3.21.1
4/3.21.2
Table 4/3.1
Table 4/3.2
Title
--Spill Continent
------Starting Air System
Design and Construction
Starting Air Capacity
Diesel Propulsion
Diesel - Electric Propulsion
Protective Devices for Starting Air Mains
Cooling Water Systems for Internal Combustion Engines
General
Sea Suctions
Strainers
Circulating Water Pumps
Exhaust System
Exhaust Lines
Exhaust Gas Temperature
Valves in Atomizing Lines
Machinery and Systems
Electrical Installations
General
Applications
Definitions
Earthed Distribution System
Essential Services
Explosion-proof (Flame-proof) Equipment
----Hazardous Areas (Hazardous Location)
Hull-return System
Intrinsically-safe
Category "ia"
Increased Safety
Non-Periodic Duty Rating
Non-sparking Fan
Periodic Duty Rating
Portable Apparatus
Pressurized Equipment
Semi-enclosed Space
Separate Circuit
Short Circuit
Short-time Rating
Plans and Data to be Submitted
Standard Distribution System
Voltage and Frequency Variations
Materials
Insulation Materials
Class A Insulation
Class B Insulation
Class E Insulation
Class F Insulation
Class H Insulation
Insulation for Temperature Above 180°
Degree of Protection for Enclosure
Temperature Rating
Clearances and Creepage Distance
Service Trail
Electrical Installation for Drilling Unit Main Service
Communication Facilities
Voltage and Frequency Variations
Degree of Protection – indicated by the first characteristic numeral
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-2-4/17.1iv)
4-2-4/17.3
4-2-4/17.3i)
4-2-4/17.3ii)
4-2-4/17.3iii)
4-2-4/19
4-2-4/19.1
4-2-4/19.3
4-2-4/19.3.1
4-2-4/19.3.2
4-2-4/19.5
4-2-4/21
4-2-4/21.1
4-2-4/21.3
4-2-4/21.5
4-2-4/21.7
4-2-4/23
4-2-4/23.1
4-2-4/23.3
4-2-4/25
4-3-1
4-3-1/1
4-3-1/3
4-3-1/3.1
4-3-1/3.3
4-3-1/3.5
4-3-1/3.5i)
4-3-1/3.5ii)
4-3-1/3.7
4-3-1/3.9
4-3-1/3.11
4-3-1/3.11.1
4-3-1/3.13
4-3-1/3.15
4-3-1/3.17
4-3-1/3.19
4-3-1/3.21
4-3-1/3.23
4-3-1/3.25
4-3-1/3.27
4-3-1/3.29
4-3-1/3.31
4-3-1/5
4-3-1/7
4-3-1/9
4-3-1/11
4-3-1/13
4-3-1/13.1
4-3-1/13.3
4-3-1/13.5
4-3-1/13.7
4-3-1/13.9
4-3-1/13.11
4-3-1/15
4-3-1/17
4-3-1/19
4-3-1/21
4-3-1/21.1
4-3-1/21.3
4-3-1/Table 1
4-3-1/Table 2
51
Notices and General Information
MODU 1997
Table 4/3.3
Part
4
Section
3
Part
A
4/3A
4/3A1
4/3A1.1
4/3A1.1.1
4/3A1.1.2
4/3A1.3
4/3A1.5
4/3A1.7
4/3A2
4/3A2.1
4/3A2.1.1
4/3A2.1.2
4/3A2.1.3
4/3A2.1.4
4/3A2.1.5
4/3A2.1.6
4/3A2.3
4/3A2.3.1
4/3A2.3.2
4/3A2.5
4/3A3
4/3A3.1
4/3A3.1.1
4/3A3.1.2
4/3A3.1.3
4/3A3.1.3a
4/3A3.1.3b
4/3A3.1.3c
4/3A3.1.3d
4/3A3.1.3e
4/3A3.3
4/3A3.3.1
4/3A3.3.2
4/3A3.3.2a
4/3A3.3.2b
4/3A3.3.2c
4/3A3.3.2d
4/3A3.3.2e
4/3A3.3.2f
4/3A3.3.2g
4/3A3.3.2h
4/3A3.3.3
4/3A3.3.4
4/3A3.3.5
4/3A3.3.6
4/3A3.3.7
4/3A3.3.8
4/3A3.3.9
4/3A3.3.10
4/3A3.3.11
4/3A3.3.12
4/3A3.3.13
4/3A3.3.14
4/3A3.5
4/3A3.5.1
4/3A3.5.1a
4/3A3.5.1b
4/3A3.5.1c
4/3A3.5.2
52
Title
Degree of Protection - indicated by the second characteristic numeral
Machinery and Systems
Electrical Installations
Drilling Unit Systems
Drilling Unit Systems
Plans and Data to be Submitted
Wiring
Systems
Data for Wiring Systems
Short-circuit Data
Protective Device Coordination
Load Analysis
Main Source of Power
Power Supply by Generator
Number of Generators
Capacity of Generators
Multiple Generators
Starting from "Dead Ship" Condition
Fuel Capacity for Generator Prime Mover
Propulsion and Steering Related Equipment
Generator Driven by Propulsion Unit
Shaft Generator as a Main Source of Power
Non-constant Speed Shaft Generator
Sizing of A.C. Generator
Emergency Source of Power
General
Basic Requirement
Boundary
Alternative Arrangement
----------Emergency Power Supply
--------------------------------------------Emergency Sources
General
------Generator
MODU 2001
4-3-1/Table 3
4-3-2
4-3-2/1
4-3-2/1.1
4-3-2/1.1.1
4-3-2/1.1.2
4-3-2/1.3
4-3-2/1.5
4-3-2/1.7
4-3-2/3
4-3-2/3.1
4-3-2/3.1.1
4-3-2/3.1.2
4-3-2/3.1.3
4-3-2/3.1.4
4-3-2/3.1.5
4-3-2/3.1.6
4-3-2/3.3
4-3-2/3.3.1
4-3-2/3.3.2
4-3-2/3.5
4-3-2/5
4-3-2/5.1
4-3-2/5.1.1
4-3-2/5.1.2
4-3-2/5.1.3
4-3-2/5.1.3i)
4-3-2/5.1.3ii)
4-3-2/5.1.3iii)
4-3-2/5.1.3iv)
4-3-2/5.1.3v)
4-3-2/5.3
4-3-2/5.3i)
4-3-2/5.3ii)
4-3-2/5.3iii)
4-3-2/5.3iv)
4-3-2/5.3v)
4-3-2/5.3vi)
4-3-2/5.3vii)
4-3-2/5.3viii)
4-3-2/5.3ix)
4-3-2/5.3x)
4-3-2/5.3xi)
4-3-2/5.3xii)
4-3-2/5.3xiii)
4-3-2/5.3xiv)
4-3-2/5.5
4-3-2/5.5.1
4-3-2/5.5.1i)
4-3-2/5.5.1ii)
4-3-2/5.5.1iii)
4-3-2/5.5.2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/3A3.5.2a
4/3A3.5.2b
4/3A3.5.2c
4/3A3.5.3
4/3A3.5.3a
4/3A3.5.3b
4/3A3.5.3c
4/3A3.5.4
4/3A3.7
4/3A3.7.1
4/3A3.7.2
4/3A3.7.3
4/3A3.9
4/3A3.9.1
4/3A3.9.2
4/3A3.9.3
4/3A3.9.4
4/3A3.9.5
4/3A3.11
4/3A3.13
4/3A3.15
4/3A3.15.1
4/3A3.15.2
4/3A3.15.3
4/3A3.15.3a
4/3A3.15.3b
4/3A3.15.3c
4/3A3.15.4
4/3A3.17
4/3A4
4/3A4.1
4/3A4.1.1
4/3A4.1.2
4/3A4.1.3
4/3A4.1.4
4/3A4.1.5
4/3A4.1.6
4/3A4.1.6a
4/3A4.1.6b
4/3A4.1.6
4/3A4.3
4/3A4.3.1
4/3A4.3.1a
4/3A4.3.1b
4/3A4.3.1c
4/3A4.3.2
4/3A4.5
4/3A4.7
4/3A4.7.1
4/3A4.7.2
4/3A4.7.3
4/3A4.7.4
4/3A4.7.5
4/3A4.7.6
4/3A5
4/3A5.1
4/3A5.1.1
4/3A5.1.1a
4/3A5.1.1b
4/3A5.1.1c
4/3A5.1.1i
4/3A5.1.1ii
4/3A5.1.2
Title
------Accumulator Battery
------Emergency Generator for Non-emergency Services
Transitional Source of Power
------Emergency Switchboard
General
Emergency Switchboard for Generator
Accumulator Battery
Interconnect Feeder Between Emergency and Main Switchboard
Disconnection of Non-emergency Circuits
Ballast Pumps
Arrangement for Periodic Testing
Starting Arrangement for Emergency Generator Set
Cold Conditions
Number of Starts
Charging of Stored Energy
------Manual Starting
Requirements by the Governmental Authority
Distribution System
Drilling Unit Main Service Distribution System
General
Method of Distribution
Through-feed Arrangement
Motor Control Center
Motor Branch Circuit
Power Supply Through Transformer and Converters
Continuity of Supply
Arrangement
Heating Appliances
Hull Return System
General
------Final Subcircuits and Earth Wires
Earthed Distribution Systems
External or Shore Power Supply Connection
General
Earthing Terminal
Indicators
Polarity or Phase Sequence
Information Plate
Securing of Trailing Cable
Circuit Protection System
System Design
General
----------Protection Against Short-circuit
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-3-2/5.5.2i)
4-3-2/5.5.2ii)
4-3-2/5.5.2iii)
4-3-2/5.5.3
4-3-2/5.5.3i)
4-3-2/5.5.3ii)
4-3-2/5.5.3iii)
4-3-2/5.5.4
4-3-2/5.7
4-3-2/5.7i)
4-3-2/5.7ii)
4-3-2/5.7iii)
4-3-2/5.9
4-3-2/5.9.1
4-3-2/5.9.2
4-3-2/5.9.3
4-3-2/5.9.4
4-3-2/5.9.5
4-3-2/5.11
4-3-2/5.13
4-3-2/5.15
4-3-2/5.15.1
4-3-2/5.15.2
4-3-2/5.15.3
4-3-2/5.15.3i)
4-3-2/5.15.3ii)
4-3-2/5.15.3iii)
4-3-2/5.15.4
4-3-2/5.17
4-3-2/7
4-3-2/7.1
4-3-2/7.1.1
4-3-2/7.1.2
4-3-2/7.1.3
4-3-2/7.1.4
4-3-2/7.1.5
4-3-2/7.1.6
4-3-2/7.1.6(a)
4-3-2/7.1.6(b)
4-3-2/7.1.7
4-3-2/7.3
4-3-2/7.3.1
4-3-2/7.3.1i)
4-3-2/7.3.1ii)
4-3-2/7.3.1iii)
4-3-2/7.3.2
4-3-2/7.5
4-3-2/7.7
4-3-2/7.7.1
4-3-2/7.7.2
4-3-2/7.7.3
4-3-2/7.7.4
4-3-2/7.7.5
4-3-2/7.7.6
4-3-2/9
4-3-2/9.1
4-3-2/9.1.1
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.1iii)
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.2
53
Notices and General Information
MODU 1997
4/3A5.1.2a
4/3A5.1.2b
4/3A5.1.2c
4/3A5.1.3
4/3A5.1.3a
4/3A5.1.3b
4/3A5.1.3c
4/3A5.1.3d
4/3A5.1.4
4/3A5.1.4a
4/3A5.1.4b
4/3A5.1.5
4/3A5.1.5a
4/3A5.1.5b
4/3A5.1.5c
4/3A5.3
4/3A5.3.1
4/3A5.3.2
4/3A5.3.3
4/3A5.3.3a
4/3A5.3.3b
4/3A5.3.4
4/3A5.5
4/3A5.5.1
4/3A5.5.2
4/3A5.5.2a
4/3A5.5.2b
4/3A5.5.2c
4/3A5.7
4/3A5.7.1
4/3A5.7.2
4/3A5.7.2a
4/3A5.7.2b
4/3A5.7.2c
4/3A5.9
4/3A5.11
4/3A5.11.1
4/3A5.11.2
4/3A5.13
4/3A5.13.1
4/3A5.13.2
4/3A5.13.3
4/3A5.13.4
4/3A5.13.5
4/3A5.13.6
4/3A5.15
4/3A5.15.1
4/3A5.15.2
4/3A5.17
4/3A6
4/3A6.1
4/3A6.3
4/3A6.3.1
4/3A6.3.1a
4/3A6.3.1b
4/3A6.3.1c
4/3A6.3.2
4/3A6.5
4/3A6.7
4/3A7
4/3A7.1
4/3A7.1.1
4/3A7.1.2
54
Title
Protective Devices
Rated Short-circuit Breaking Capacity
Rated Short-circuit Making capacity
Protection Against Overload
Circuit Breaks
Fuses
Rating
Indication
Cascade System (Back-up Protection)
General
Application
Coordinated Tripping
------Protection for Generator
General
Trip Setting for Coordination
Load-shedding Arrangement
----Emergency Generator
Protection for Alternating Current (A.C.) Generators
Short-time Delay-trip
Parallel Operation
Instantaneous Trip
Reverse Power Protection
Undervoltage Protection
Protection for Direct Current (D.C.) Generators
Instantaneous Trip
Parallel Operation
Reverse Current Protection
Generator Ammeter Shunts
Undervoltage Protection
Protection for Accumulator Batteries
Protection for External or Shore Power Supply
General
Interlocking Arrangement
Protection for Motor Branch Circuits
General
Direct-current Motor Branch Circuits
Alternating-current Motor Branch Circuits
Motor Running Protection
Protection for Undervoltage
Jacking Gear Motors
Protection for Transformer Circuit
Setting for Overcurrent Device
Parallel Operation
Protection for Meters, Pilot Lamps, and Control Circuits
Systems for Steering Gear Installed in Self-propelled Units
Power Supply Feeder
Protection for Steering Gear Motor Circuit
Short Circuit Protection
Direct Current (D.C.) Motors
Alternating Current (A.C.) Motors
Fuses as Motor-feeder Protection
Undervoltage Release
Emergency Power Supply
Controls, Instrumentation, and Alarms
Lighting and Navigation Light
Lighting System
Main Lighting System
System Arrangement
MODU 2001
4-3-2/9.1.2(a)
4-3-2/9.1.2(b)
4-3-2/9.1.2(c)
4-3-2/9.1.3
4-3-2/9.1.3(a)
4-3-2/9.1.3(b)
4-3-2/9.1.3(c)
4-3-2/9.1.3(d)
4-3-2/9.1.4
4-3-2/9.1.4(a)
4-3-2/9.1.4(b)
4-3-2/9.1.5
4-3-2/9.1.5(a)
4-3-2/9.1.5(b)
4-3-2/9.1.5(c)
4-3-2/9.3
4-3-2/9.3.1
4-3-2/9.3.2
4-3-2/9.3.3
4-3-2/9.3.3(a)
4-3-2/9.3.3(b)
4-3-2/9.3.4
4-3-2/9.5
4-3-2/9.5.1
4-3-2/9.5.2
4-3-2/9.5.2(a)
4-3-2/9.5.2(b)
4-3-2/9.5.2(c)
4-3-2/9.7
4-3-2/9.7.1
4-3-2/9.7.2
4-3-2/9.7.2(a)
4-3-2/9.7.2(b)
4-3-2/9.7.2(c)
4-3-2/9.9
4-3-2/9.11
4-3-2/9.11.1
4-3-2/9.11.2
4-3-2/9.13
4-3-2/9.13.1
4-3-2/9.13.2
4-3-2/9.13.3
4-3-2/9.13.4
4-3-2/9.13.5
4-3-2/9.13.6
4-3-2/9.15
4-3-2/9.15.1
4-3-2/9.15.2
4-3-2/9.17
4-3-2/11
4-3-2/11.1
4-3-2/11.3
4-3-2/11.3.1
4-3-2/11.3.1(a)
4-3-2/11.3.1(b)
4-3-2/11.3.1(c)
4-3-2/11.3.2
4-3-2/11.5
4-3-2/11.7
4-3-2/13
4-3-2/13.1
4-3-2/13.1.1
4-3-2/13.1.2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/3A7.1.2a
4/3A7.1.2b
4/3A7.1.3
4/3A7.1.3a
4/3A7.1.4
4/3A7.3
4/3A7.3.1
4/3A7.3.2
4/3A7.3.3
4/3A8
4/3A8.1
4/3A8.1.1
4/3A8.1.2
4/3A8.3
4/3A8.5
4/3A8.5.1
4/3A8.5.2
4/3A8.5.3
4/3A8.7
4/3A8.9
4/3A8.9a
4/3A8.9b
4/3A8.9b1
4/3A8.9b2
4/3A8.9c
4/3A9
4/3A9.1
4/3A9.1.1
4/3A9.1.2
4/3A9.1.2a
4/3A9.1.2b
4/3A9.3
4/3A9.5
4/3A9.7
4/3A10
4/3A10.1
4/3A10.1.1
4/3A10.1.1a
4/3A10.1.1b
4/3A10.1.1c
4/3A10.1.2
4/3A10.1.3
Part
4
Section
3
Part
B
4/3B
4/3B1
4/3B1.1
4/3B1.3
4/3B1.5
4/3B1.7
4/3B2
4/3B2.1
4/3B2.1.1
4/3B2.1.2
4/3B2.1.3
4/3B2.3
4/3B2.5
4/3B2.5.1
4/3B2.5.2
4/3B2.5.3
4/3B2.5.4
4/3B2.7
Title
Main Lighting System
Emergency Lighting System
Lighting Circuits
Machinery Space and Accommodation Space
Protection for Lighting Circuits
Navigation Light System
Feeders
Navigation Light Indicator
Protection
Interior Communication System for Self-propelled Units
Navigating Bridge
General
Engine Order Telegraph
Main Propulsion Control Stations
Voice Communications
Propulsion and Steering Control Stations
Elevator
Independence of Power Supply Circuit
Emergency and Interior-communication Switchboard
Public Address System
----------Manually Operated Alarms
General emergency Alarm Systems
General
System Requirements
----Engineer's Alarm
Refrigerated Space Alarm
Elevator
Fire Protection and Fire Detecting System
Emergency Stop
Ventilation System
General
Machinery Space Ventilation
Ventilation Other Machinery Spaces
Fuel Oil Units
Fire Detection and Alarm System
Machinery and Systems
Electrical Installations
Drilling Unit Installation
Drilling Units
Plans and Data to be Submitted
Booklet of Standard Details
Arrangement of Electrical Equipment
Electrical Equipment in Hazardous Areas
Emergency Shutdown Procedure
Equipment Installation and Arrangement
General Consideration
Equipment Location
Protection from Bilge Water
Accessibility
Generators
Drilling Unit Main Service Motors
General
Pump Motors
Motors on Weather Deck
Motors Below Deck
Accumulator Batteries
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-3-2/13.1.2(a)
4-3-2/13.1.2(b)
4-3-2/13.1.3
4-3-2/13.1.3(a)
4-3-2/13.1.4
4-3-2/13.3
4-3-2/13.3.1
4-3-2/13.3.2
4-3-2/13.3.3
4-3-2/15
4-3-2/15.1
4-3-2/15.1.1
4-3-2/15.1.2
4-3-2/15.3
4-3-2/15.5
4-3-2/15.5.1
4-3-2/15.5.2
4-3-2/15.5.3
4-3-2/15.7
4-3-2/15.9
4-3-2/15.9.1
4-3-2/15.9.2
4-3-2/15.9.2i)
4-3-2/15.9.2ii)
4-3-2/15.9.3
4-3-2/17
4-3-2/17.1
4-3-2/17.1.1
4-3-2/17.1.2
4-3-2/17.1.2(a)
4-3-2/17.1.2(b)
4-3-2/17.3
4-3-2/17.5
4-3-2/17.7
4-3-2/19
4-3-2/19.1
4-3-2/19.1.1
4-3-2/19.1.1(a)
4-3-2/19.1.1(b)
4-3-2/19.1.1(c)
4-3-2/19.1.2
4-3-2/19.3
4-3-3
4-3-3/1
4-3-3/1.1
4-3-3/1.3
4-3-3/1.5
4-3-3/1.7
4-3-3/3
4-3-3/3.1
4-3-3/3.1.1
4-3-3/3.1.2
4-3-3/3.1.3
4-3-3/3.3
4-3-3/3.5
4-3-3/3.5.1
4-3-3/3.5.2
4-3-3/3.5.3
4-3-3/3.5.4
4-3-3/3.7
55
Notices and General Information
MODU 1997
4/3B2.7.1
4/3B2.7.2
4/3B2.7.2a
4/3B2.7.2b
4/3B2.7.2c
4/3B2.7.2d
4/3B2.7.2d1
4/3B2.7.2d2
4/3B2.7.2e
4/3B2.7.2f
4/3B2.7.3
4/3B2.7.3a
4/3B2.7.3b
4/3B2.7.3c
4/3B2.7.3d
4/3B2.7.4
4/3B2.9
4/3B2.11
4/3B2.11.1
4/3B2.11.2
4/3B2.11.3
4/3B2.13
4/3B2.13.1
4/3B2.13.2
4/3B2.13.2a
4/3B2.13.2b
4/3B2.13.2c
4/3B2.13.2d
4/3B2.13.2e
4/3B2.13.3
4/3B2.15
4/3B2.17
4/3B2.19
4/3B2.21
4/3B2.23
4/3B2.25
4/3B3
4/3B3.1
4/3B3.1.1
4/3B3.1.2
4/3B3.1.3
4/3B3.1.4
4/3B3.1.5
4/3B3.1.6
4/3B3.3
4/3B3.5
4/3B3.5.1
4/3B3.5.2
4/3B3.5.2a
4/3B3.5.2b
4/3B3.5.2c
4/3B3.5.3
4/3B3.7
4/3B3.9
4/3B3.9.1
4/3B3.9.1a
4/3B3.9.1b
4/3B3.9.1c
4/3B3.9.1d
4/3B3.9.1e
4/3B3.9.2
4/3B3.11
4/3B3.11.1
56
Title
General
Battery Installation and Arrangement
Large Batteries
Moderate-size Batteries
Small Batteries
Low-hydrogen-emission Battery Installation
----Battery Trays
Identification of Battery
Ventilation
Battery Rooms
Battery Lockers
Deck Boxes
Small Batteries Boxes
Protection from Corrosion
Switchboard
Distribution Boards
Location and Protection
Switchboard-type Distribution Boards
Safety-type Panels
Motor Controllers and Control Centers
Location and Installation
Disconnecting Arrangement
Device
Location
Locking means
Identification Plate
Open and Close Indications
Indicating-light Circuit
Resistors for Control Apparatus
Lighting Fixtures
Heating Equipment
Magnetic Compasses
Portable Equipment Outlets
Receptacles and Plugs of Different Rating
Cable Installation
General Consideration
Continuity of Cabling
Choice of Cables
Cable Voltage Drop for New Installation
Restricting Locating of Cabling
Means of Drainage from Cable Enclosures
High Voltage Cables
Insulation Resistance for New Installation
Protection for Electro-magnetic Induction
Multiple Conductor Cables
Single Conductor Cables
------Non-shielded Signal Cables
Joints and Sealing
--------------Bending Radius
Cable Run and Bunches
Reduction of Current Rating
MODU 2001
4-3-3/3.7.1
4-3-3/3.7.2
4-3-3/3.7.2(a)
4-3-3/3.7.2(b)
4-3-3/3.7.2(c)
4-3-3/3.7.2(d)
4-3-3/3.7.2(d)i)
4-3-3/3.7.2(d)ii)
4-3-3/3.7.2(e)
4-3-3/3.7.2(f)
4-3-3/3.7.3
4-3-3/3.7.3(a)
4-3-3/3.7.3(b)
4-3-3/3.7.3(c)
4-3-3/3.7.3(d)
4-3-3/3.7.4
4-3-3/3.9
4-3-3/3.11
4-3-3/3.11.1
4-3-3/3.11.2
4-3-3/3.11.3
4-3-3/3.13
4-3-3/3.13.1
4-3-3/3.13.2
4-3-3/3.13.2(a)
4-3-3/3.13.2(b)
4-3-3/3.13.2(c)
4-3-3/3.13.2(d)
4-3-3/3.13.2(e)
4-3-3/3.13.3
4-3-3/3.15
4-3-3/3.17
4-3-3/3.19
4-3-3/3.21
4-3-3/3.23
4-3-3/3.25
4-3-3/5
4-3-3/5.1
4-3-3/5.1.1
4-3-3/5.1.2
4-3-3/5.1.3
4-3-3/5.1.4
4-3-3/5.1.5
4-3-3/5.1.6
4-3-3/5.3
4-3-3/5.5
4-3-3/5.5.1
4-3-3/5.5.2
4-3-3/5.5.2(a)
4-3-3/5.5.2(b)
4-3-3/5.5.2(c)
4-3-3/5.5.3
4-3-3/5.7
4-3-3/5.9
4-3-3/5.9.1
4-3-3/5.9.1(a)
4-3-3/5.9.1(b)
4-3-3/5.9.1(c)
4-3-3/5.9.1(d)
4-3-3/5.9.1(e)
4-3-3/5.9.2
4-3-3/5.11
4-3-3/5.11.1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/3B3.11.2
4/3B3.11.3
4/3B3.13
4/3B3.15
4/3B3.15.1
4/3B3.15.2
4/3B3.17
4/3B3.17.1
4/3B3.17.2
4/3B3.19
4/3B3.21
4/3B3.23
4/3B3.25
4/3B3.27
4/3B3.29
4/3B3.29.1
4/3B3.29.2
4/3B3.29.3
4/3B3.31
4/3B3.33
4/3B3.33.1
4/3B3.33.2
4/3B3.33.3
4/3B3.33.3a
4/3B3.33.3b
4/3B3.33.3c
4/3B3.33.4
4/3B3.33.5
4/3B4
4/3B4.1
4/3B4.1.1
4/3B4.1.2
4/3B4.1.3
4/3B4.3
4/3B4.5
4/3B4.5.1
4/3B4.5.2
4/3B4.5.3
4/3B4.7
4/3B4.9
4/3B5
4/3B5.1
4/3B5.1.1
4/3B5.1.2
4/3B5.1.2a
4/3B5.1.2b
4/3B5.1.2c
4/3B5.1.3
4/3B5.1.4
4/3B5.1.5
4/3B5.3
4/3B5.3.1
4/3B5.3.2
4/3B5.3.2a
4/3B5.3.2b
4/3B5.3.2c
4/3B5.3.2d
4/3B5.3.3
4/3B5.5
4/3B5.5.1
4/3B5.5.1a
4/3B5.5.1b
4/3B5.5.1c
Title
Clearance and Segregation
Cable of Lower Conductor Temperature
Deck and Bulkhead Penetrations
Mechanical Penetrations
Metallic Armor
Conduit Pipe or Structural Shapes
Emergency and Essential Feeders
Location
Requirements by the Governmental Authority
Mineral Insulated Cables
Fiber Optic Cables
Battery Room
Paneling and Dome Fixtures
Sheathing and Structural Insulation
Splicing of Electrical Cables
Basis of Approval
Installation
Protection
Splicing of Fiber Optic Cables
Cable Junction Box
----------------Earthing
General
------Permanent Equipment
Connections
General
Earthed Distribution System
Connection to Hull Structure
Portable Cords
Cable Metallic Covering
Equipment and Installation in Hazardous Areas
General Consideration
General
Electrical Equipment
Zone O Areas
Zone 1 Areas
Zone 2 Areas
Cables Installation
Lighting Circuits
Permanent Warning Plates
Certified-safe Type and Pressurized Equipment and Systems
Installation Approval
Intrinsically-safe System
Separation
Physical Barrier
Nameplate
Replacement
Pressurized Equipment
Paint Stores
General
-------
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-3-3/5.11.2
4-3-3/5.11.3
4-3-3/5.13
4-3-3/5.15
4-3-3/5.15.1
4-3-3/5.15.2
4-3-3/5.17
4-3-3/5.17.1
4-3-3/5.17.2
4-3-3/5.19
4-3-3/5.21
4-3-3/5.23
4-3-3/5.25
4-3-3/5.27
4-3-3/5.29
4-3-3/5.29.1
4-3-3/5.29.2
4-3-3/5.29.3
4-3-3/5.31
4-3-3/5.33
4-3-3/5.33.1
4-3-3/5.33.2
4-3-3/5.33.3
4-3-3/5.33.3(a)
4-3-3/5.33.3(b)
4-3-3/5.33.3(c)
4-3-3/5.33.4
4-3-3/5.33.5
4-3-3/7
4-3-3/7.1
4-3-3/7.1i)
4-3-3/7.1ii)
4-3-3/7.1iii)
4-3-3/7.3
4-3-3/7.5
4-3-3/7.5.1
4-3-3/7.5.2
4-3-3/7.5.3
4-3-3/7.7
4-3-3/7.9
4-3-3/9
4-3-3/9.1
4-3-3/9.1.1
4-3-3/9.1.2
4-3-3/9.1.2(a)
4-3-3/9.1.2(b)
4-3-3/9.1.2(c)
4-3-3/9.1.3
4-3-3/9.1.4
4-3-3/9.1.5
4-3-3/9.3
4-3-3/9.3.1
4-3-3/9.3.2
4-3-3/9.3.2(a)
4-3-3/9.3.2(b)
4-3-3/9.3.2(c)
4-3-3/9.3.2(d)
4-3-3/9.3.3
4-3-3/9.5
4-3-3/9.5.1
4-3-3/9.5.1i)
4-3-3/9.5.1ii)
4-3-3/9.5.1iii)
57
Notices and General Information
MODU 1997
4/3B5.5.1d
4/3B5.5.1e
4/3B5.5.2
4/3B5.5.3
4/3B5.5.3a
4/3B5.5.3b
4/3B5.5.3c
4/3B5.7
4/3B5.7.1
4/3B5.7.1a
4/3B5.7.1b
4/3B5.7.2
4/3B5.7.2a
4/3B5.7.2b
4/3B5.7.2c
4/3B5.7.2c1
4/3B5.7.2c2
4/3B5.7.2c3
4/3B5.7.2c4
4/3B5.7.2d
4/3B5.7.2d1
4/3B5.7.2d2
4/3B5.7.2d3
4/3B5.7.3
Table 4/3B.1
Table 4/3B.2
Table 4/3B.3
Part
4
Section
3
Part
C
4/3C
4/3C1
4/3C1.1
4/3C1.3
4/3C1.5
4/3C2
4/3C2.1
4/3C2.1.1
4/3C2.1.2
4/3C2.1.3
4/3C2.1.3a
4/3C2.1.3b
4/3C2.1.3c
4/3C2.1.3d
4/3C2.1.3e
4/3C2.1.3f
4/3C2.1.3g
4/3C2.1.3h
4/3C2.3
4/3C2.3.1
4/3C2.3.1a
4/3C2.3.1b
4/3C2.3.2
4/3C2.5
4/3C2.6
4/3C2.6.1
4/3C2.6.2
4/3C2.6.2a
4/3C2.6.2b
4/3C2.6.2c
4/3C2.7
4/3C2.7.1
4/3C2.7.2
58
Title
----Open Area Near Ventilation Openings
Enclosed Access Spaces
------Non-sparking Fans
Design Criteria
Air Gap
Protection Screen
Materials
Impeller and its Housing
Electrostatic Charges
Acceptance Combination of Materials
--------Unacceptable Combination of Materials
------Type Test
Minimum Degree of protection
Minimum Bending Radii of Cables
Size of Earth-continuity Conductors and Earthing Connections
Machinery and Systems
Electrical Installations
Machinery and Equipment
Machinery and Equipment
Plans and Data to Be Submitted
Generators and Motors of 100 kW and Over
Generators and Motors Below 100 kW and Over
Switchboards, Distribution Boards, etc. for Essential or Emergency Services
Rotating Machines
General
Applications
Certification on Basis of an Approved Quality Assurance Program
References
Inclination
Insulation Material
Capacity of Generators
Power Supply by Generator
Protection for Generator Circuits
Protection for Motor Circuits
Installation
Protection Enclosures and its Selection
Testing and Inspection
Application
Machines of 100 kW and Over
Machines Below 100 kW
Special Testing Arrangement
Insulation Resistance Measurement
Overload and Overcurrent Capacity
A.C. Generators
A.C. Motors
Overcurrent Capacity
Overload Capacity
Overload Capacity for Synchronous Motors
Dielectric Strength of Insulation
Application
Standard Voltage Test
MODU 2001
4-3-3/9.5.1iv)
4-3-3/9.5.1v)
4-3-3/9.5.2
4-3-3/9.5.3
4-3-3/9.5.3i)
4-3-3/9.5.3ii)
4-3-3/9.5.3iii)
4-3-3/9.7
4-3-3/9.7.1
4-3-3/9.7.1(a)
4-3-3/9.7.1(b)
4-3-3/9.7.2
4-3-3/9.7.2(a)
4-3-3/9.7.2(b)
4-3-3/9.7.2(c)
4-3-3/9.7.2(c)i)
4-3-3/9.7.2(c)ii)
4-3-3/9.7.2(c)iii)
4-3-3/9.7.2(c)iv)
4-3-3/9.7.2(d)
4-3-3/9.7.2(d)i)
4-3-3/9.7.2(d)ii)
4-3-3/9.7.2(d)iii)
4-3-3/9.7.3
4-3-3/Table 1
4-3-3/Table 2
4-3-3/Table 3
4-3-4
4-3-4/1
4-3-4/1.1
4-3-4/1.3
4-3-4/1.5
4-3-4/3
4-3-4/3.1
4-3-4/3.1.1
4-3-4/3.1.2
4-3-4/3.1.3
4-3-4/3.1.3(a)
4-3-4/3.1.3(b)
4-3-4/3.1.3(c)
4-3-4/3.1.3(d)
4-3-4/3.1.3(e)
4-3-4/3.1.3(f)
4-3-4/3.1.3(g)
4-3-4/3.1.3(h)
4-3-4/3.3
4-3-4/3.3.1
4-3-4/3.3.1(a)
4-3-4/3.3.1(b)
4-3-4/3.3.2
4-3-4/3.5
4-3-4/3.7
4-3-4/3.7.1
4-3-4/3.7.2
4-3-4/3.7.2(a)
4-3-4/3.7.2(b)
4-3-4/3.7.2(c)
4-3-4/3.9
4-3-4/3.9.1
4-3-4/3.9.2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/3C2.7.3
4/3C2.9
4/3C2.9.1
4/3C2.9.1a
4/3C2.9.1b
4/3C2.9.1c
4/3C2.9.1d
4/3C2.9.1e
4/3C2.9.2
4/3C2.11
4/3C2.11.1
4/3C2.11.2
4/3C2.11.3
4/3C2.11.4
4/3C2.11.5
4/3C2.11.6
4/3C2.11.7
4/3C2.11.8
4/3C2.11.9
4/3C2.13
4/3C2.15
4/3C2.15.1
4/3C2.15.1a
4/3C2.15.1a1
4/3C2.15.1a2
4/3C2.15.1a3
4/3C2.15.1b
4/3C2.15.1c
4/3C2.15.2
4/3C2.15.3
4/3C2.17
4/3C2.17.1
4/3C2.17.1a
4/3C2.17.1a1
4/3C2.17.1a2
4/3C2.17.1a3
4/3C2.17.1a4
4/3C2.17.1b
4/3C2.17.1c
4/3C2.17.2
4/3C2.19
4/3C2.19.1
4/3C2.19.2
4/3C2.19.2a
4/3C2.19.2b
4/3C2.19.2c
4/3C2.19.3
4/3C2.19.3a
4/3C2.19.3b
4/3C2.19.3c
4/3C2.19.4
4/3C2.21
4/3C2.21.1
4/3C2.21.1a
4/3C2.21.1b
4/3C2.21.1c
4/3C2.21.2
4/3C2.21.2a
4/3C2.21.2b
4/3C2.21.2c
4/3C2.21.3
4/3C2.21.3a
4/3C2.21.3b
Title
Direct Current Test
Temperature Rating
Temperature Rises
Continuous Rating Machines
Short-time Rating Machines
Periodic Duty Rating Machines
Non-Periodic Duty Rating Machines
Insulation Material Above 180oC
Ambient Temperature
Construction and Assembly
Enclosure, Frame and Pedestals
Shafts and Couplings
Circulating Current
Rotating Exciters
Insulation of Winding
Protection Against Cooling Water
Moisture-condensation Prevention
Terminal Arrangements
Nameplates
Lubrication
Turbines and generators
Operating Governor
Momentary Speed Variations
------Speed Variation in Steady State
Emergency Generator Prime Mover
Overspeed Governor
Power Output of Gas Turbines
Diesel Engines for Generators
Operating Governor
Momentary Speed Variations
--------Speed Variation in Steady State
Emergency Generator Prime Mover
Overspeed Governor
Alternating-current (A.C.) Generators
Control and Excitation of Governor
Voltage Regulation
Voltage Regulators
Steady Conditions
Short Circuit Conditions
Parallel Operation
Reactive Load Sharing
Load Sharing
Facilities for Load Adjusting
Temperature Detectors
Direct-current (D.C) Generators
Control and Excitation of Generators
Field Regulation
Polarity of Series Windings
Equalizer Connections
Voltage Regulation
Shunt or Stabilized Shunt-wound Generator
Compound-wound Generator
Automatic Voltage Regulators
Parallel Operation
Stability
Load Sharing
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-3-4/3.9.3
4-3-4/3.11
4-3-4/3.11.1
4-3-4/3.11.1(a)
4-3-4/3.11.1(b)
4-3-4/3.11.1(c)
4-3-4/3.11.1(d)
4-3-4/3.11.1(e)
4-3-4/3.11.2
4-3-4/3.13
4-3-4/3.13.1
4-3-4/3.13.2
4-3-4/3.13.3
4-3-4/3.13.4
4-3-4/3.13.5
4-3-4/3.13.6
4-3-4/3.13.7
4-3-4/3.13.8
4-3-4/3.13.9
4-3-4/3.15
4-3-4/3.17
4-3-4/3.17.1
4-3-4/3.17.1(a)
4-3-4/3.17.1(a)i)
4-3-4/3.17.1(a)ii)
4-3-4/3.17.1(a)iii)
4-3-4/3.17.1(b)
4-3-4/3.17.1(c)
4-3-4/3.17.2
4-3-4/3.17.3
4-3-4/3.19
4-3-4/3.19.1
4-3-4/3.19.1(a)
4-3-4/3.19.1(a)i)
4-3-4/3.19.1(a)ii)
4-3-4/3.19.1(a)iii)
4-3-4/3.19.1(a)iv)
4-3-4/3.19.1(b)
4-3-4/3.19.1(c)
4-3-4/3.19.2
4-3-4/3.21
4-3-4/3.21.1
4-3-4/3.21.2
4-3-4/3.21.2(a)
4-3-4/3.21.2(b)
4-3-4/3.21.2(c)
4-3-4/3.21.3
4-3-4/3.21.3(a)
4-3-4/3.21.3(b)
4-3-4/3.21.3(c)
4-3-4/3.21.4
4-3-4/3.23
4-3-4/3.23.1
4-3-4/3.23.1(a)
4-3-4/3.23.1(b)
4-3-4/3.23.1(c)
4-3-4/3.23.2
4-3-4/3.23.2(a)
4-3-4/3.23.2(b)
4-3-4/3.23.2(c)
4-3-4/3.23.3
4-3-4/3.23.3(a)
4-3-4/3.23.3(b)
59
Notices and General Information
MODU 1997
4/3C2.21.3c
4/3C3
4/3C3.1
4/3C3.1.1
4/3C3.1.2
4/3C3.1.3
4/3C3.1.3a
4/3C3.1.3b
4/3C3.1.3c
4/3C3.1.3d
4/3C3.3
4/3C3.3.1
4/3C3.3.2
4/3C3.3.3
4/3C3.5
4/3C4
4/3C4.1
4/3C4.1.1
4/3C4.1.2
4/3C4.1.2a
4/3C4.1.2b
4/3C4.1.2c
4/3C4.1.2d
4/3C4.1.2e
4/3C4.1.2f
4/3C4.1.2g
4/3C4.1.2h
4/3C4.3
4/3C4.3.1
4/3C4.3.1a
4/3C4.3.1b
4/3C4.3.1c
4/3C4.3.1d
4/3C4.3.1e
4/3C4.3.2
4/3C4.5
4/3C4.7
4/3C4.7a
4/3C4.7b
4/3C4.7.1
4/3C4.7.2
4/3C4.9
4/3C4.9.1
4/3C4.9.2
4/3C4.9.3
4/3C4.9.4
4/3C4.11
4/3C4.11.1
4/3C4.11.2
4/3C4.11.3
4/3C4.11.4
4/3C4.11.5
4/3C4.11.5a
4/3C4.11.5b
4/3C4.11.5c
4/3C4.11.6
4/3C4.11.7
4/3C4.13
4/3C4.13.1
4/3C4.13.1a
4/3C4.13.1b
4/3C4.13.1c
4/3C4.13.2
60
Title
Tripping of Circuit Breaker
Accumulator Batteries
General
Application
Sealed Type Batteries
References
Emergency Service
Protection of Batteries
Battery Installation
Cable Installation
Construction and Assembly
Cells and Fillings Plugs
Crates and Trays
Nameplates
Engine-starting Battery
Switchboards, Distribution Boards, Chargers, and Controllers
General
Applications
References
Inclination
Emergency Switchboard
Circuit Breaker
Feeder Protection
Hull Return and Earthed Distribution
Earthing
Installation
Protection Enclosures and its Selection
Testing and Inspection
Applications
For Essential or Emergency Services
For Non-essential or Non-emergency Services
Motor Control Centers
Battery Charges and Discharging Board
Test Items
Special Testing Arrangements
Insulation Resistance Measurement
Dielectric Strength of Insulation
----Production-line Apparatus
Devices with Low Insulation Strength
Construction and Assembly
Enclosure and Assemblies
Dead Front
Mechanical Strength
Mechanical Protection
Bus Bars, Wiring and Contacts
Design
Operating Temperature of Bus Bars
Short Circuit Rating
Internal Wiring
Arrangement
Accessibility
Locking of Connections
Soldered Connections
Clearances and Creepage Distances
Terminals
Control and Protection Devices
Circuit-disconnecting Devices
Systems Exceeding 55 Volts
Systems of 55 Volts and Less
Disconnected Devices
Arrangement of Equipment
MODU 2001
4-3-4/3.23.3(c)
4-3-4/5
4-3-4/5.1
4-3-4/5.1.1
4-3-4/5.1.2
4-3-4/5.1.3
4-3-4/5.1.3(a)
4-3-4/5.1.3(b)
4-3-4/5.1.3(c)
4-3-4/5.1.3(d)
4-3-4/5.3
4-3-4/5.3.1
4-3-4/5.3.2
4-3-4/5.3.3
4-3-4/5.5
4-3-4/7
4-3-4/7.1
4-3-4/7.1.1
4-3-4/7.1.2
4-3-4/7.1.2(a)
4-3-4/7.1.2(b)
4-3-4/7.1.2(c)
4-3-4/7.1.2(d)
4-3-4/7.1.2(e)
4-3-4/7.1.2(f)
4-3-4/7.1.2(g)
4-3-4/7.1.2(h)
4-3-4/7.3
4-3-4/7.3.1
4-3-4/7.3.1(a)
4-3-4/7.3.1(b)
4-3-4/7.3.1(c)
4-3-4/7.3.1(d)
4-3-4/7.3.1(e)
4-3-4/7.3.2
4-3-4/7.5
4-3-4/7.7
4-3-4/7.7i)
4-3-4/7.7ii)
4-3-4/7.7.1
4-3-4/7.7.2
4-3-4/7.9
4-3-4/7.9.1
4-3-4/7.9.2
4-3-4/7.9.3
4-3-4/7.9.4
4-3-4/7.11
4-3-4/7.11.1
4-3-4/7.11.2
4-3-4/7.11.3
4-3-4/7.11.4
4-3-4/7.11.5
4-3-4/7.11.5(a)
4-3-4/7.11.5(b)
4-3-4/7.11.5(c)
4-3-4/7.11.6
4-3-4/7.11.7
4-3-4/7.13
4-3-4/7.13.1
4-3-4/7.13.1(a)
4-3-4/7.13.1(b)
4-3-4/7.13.1(c)
4-3-4/7.13.2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/3C4.13.2a
4/3C4.13.2b
4/3C4.13.2c
4/3C4.13.2d
4/3C4.13.2e
4/3C4.13.2f
4/3C4.13.3
4/3C4.15
4/3C4.15.1
4/3C4.15.2
4/3C4.15.3
4/3C4.15.3a
4/3C4.15.3b
4/3C4.15.4
4/3C4.17
4/3C4.17.1
4/3C4.17.2
4/3C4.17.3
4/3C4.19
4/3C4.19.1
4/3C4.19.2
4/3C4.19.2a
4/3C4.19.2b
4/3C4.19.2c
4/3C4.19.2d
4/3C4.19.2e
4/3C4.19.2f
4/3C4.19.2g
4/3C5
4/3C5.1
4/3C5.1.1
4/3C5.1.2
4/3C5.1.2a
4/3C5.1.2b
4/3C5.1.2c
4/3C5.1.3
4/3C5.3
4/3C5.5
4/3C5.5.1
4/3C5.5.2
4/3C5.5.3
4/3C5.7
4/3C5.7a
4/3C5.7b
4/3C5.7c
4/3C6
4/3C6.1
4/3C6.1.1
4/3C6.1.2
4/3C6.1.3
4/3C6.3
4/3C6.5
4/3C6.5.1
4/3C6.5.2
4/3C6.5.3
4/3C6.5.4
4/3C6.7
4/3C6.7.1
4/3C6.7.2
4/3C7
4/3C7.1
4/3C7.1.1
4/3C7.1.2
Title
Air Circuit Breakers
Voltage Regulators
Equipment Operated in High Temperature
Accessibility to Fuses
Protective Devices for Instruments
Wearing Parts
Marking
Switchboards
Handrails
Main Bus Bar Sub-division
Equalizer Circuit for Direct-current (D.C.) Generators
Equalizer Main Circuit
Equalizer Bus Bar
Equipment and Instrumentation
Motor Controllers and Control Centers
Enclosures and Assemblies
Disconnect Switches and Circuits Breakers
Auto-starters
Battery Chargers
Charging Capacity
Equipment and Instrumentation
Power Supply Disconnecting Switch
Pilot Light
Charging Voltage Adjuster
Voltmeter
Ammeter
Discharge Protection
Current Limiting Constant Voltage
Transformers
General
Applications
References
Power Supply Arrangements
Protections
Protection Enclosures and its Selection
Forced Cooling Arrangement (Air or Liquid)
Temperature Rise
Construction and Assembly
Windings
Terminals
Nameplate
Testing
------Other Electric and Electronic Devices
Circuit Breakers
General
Mechanical property
Isolation
Fuses
Semiconductor Converters
General
Cooling Arrangement
Accessibility
Nameplate
Cable Junction Boxes
General
Design and Construction
Cables and Wires
Cable Construction
General
Flame Retarded Property
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-3-4/7.13.2(a)
4-3-4/7.13.2(b)
4-3-4/7.13.2(c)
4-3-4/7.13.2(d)
4-3-4/7.13.2(e)
4-3-4/7.13.2(f)
4-3-4/7.13.3
4-3-4/7.15
4-3-4/7.15.1
4-3-4/7.15.2
4-3-4/7.15.3
4-3-4/7.15.3(a)
4-3-4/7.15.3(b)
4-3-4/7.15.4
4-3-4/7.17
4-3-4/7.17.1
4-3-4/7.17.2
4-3-4/7.17.3
4-3-4/7.19
4-3-4/7.19.1
4-3-4/7.19.2
4-3-4/7.19.2(a)
4-3-4/7.19.2(b)
4-3-4/7.19.2(c)
4-3-4/7.19.2(d)
4-3-4/7.19.2(e)
4-3-4/7.19.2(f)
4-3-4/7.19.2(g)
4-3-4/9
4-3-4/9.1
4-3-4/9.1.1
4-3-4/9.1.2
4-3-4/9.1.2(a)
4-3-4/9.1.2(b)
4-3-4/9.1.2(c)
4-3-4/9.1.3
4-3-4/9.3
4-3-4/9.5
4-3-4/9.5.1
4-3-4/9.5.2
4-3-4/9.5.3
4-3-4/9.7
4-3-4/9.7i)
4-3-4/9.7ii)
4-3-4/9.7iii)
4-3-4/11
4-3-4/11.1
4-3-4/11.1.1
4-3-4/11.1.2
4-3-4/11.1.3
4-3-4/11.3
4-3-4/11.5
4-3-4/11.5.1
4-3-4/11.5.2
4-3-4/11.5.3
4-3-4/11.5.4
4-3-4/11.7
4-3-4/11.7.1
4-3-4/11.7.2
4-3-4/13
4-3-4/13.1
4-3-4/13.1.1
4-3-4/13.1.2
61
Notices and General Information
MODU 1997
4/3C7.1.2a
4/3C7.1.2b
4/3C7.1.3
4/3C7.1.4
4/3C7.1.5
4/3C7.1.6
4/3C7.3
4/3C7.5
4/3C7.7
Figure 4/3C.1
Table 4/3C.1
Table 4/3C.2
Table 4/3c.3
Table 4/3c.4
Table 4/3c.5
Table 4/3c.6
Table 4/3c.7
Table 4/3c.8
Table 4/3c.9
Table 4/3c.10
Part
4
Section
3
Part
D
4/3D
4/3D1
4/3D1.1
4/3D1.1.1
4/3D1.1.2
4/3D1.1.3
4/3D1.1.4
4/3D1.1.4a
4/3D1.1.4b
4/3D1.3
4/3D1.3.1
4/3D1.3.2
4/3D1.3.2a
4/3D1.3.2b
4/3D1.3.2c
4/3D1.3.3
4/3D1.3.4
4/3D1.3.5
4/3D1.3.6
4/3D1.5
4/3D1.5.1
4/3D1.5.2
4/3D1.7
4/3D1.7.1
4/3D1.7.2
4/3D1.7.3
4/3D1.7.4
4/3D1.7.5
4/3D1.9
4/3D1.9.1
4/3D1.9.2
4/3D1.9.2a
4/3D1.9.2b
4/3D1.9.3
4/3D1.9.3a
4/3D1.9.3b
4/3D1.9.3c
4/3D1.9.3d
4/3D1.9.3e
4/3D1.9.3f
62
Title
Standards
Alternative Arrangement
Fire Resistant Property
Insulating Material
Armor for Single-conductor Cables
Fabric Optic Cables
No text
Portable and Flexing Electric Cables
Mineral-isolated Metal-sheathed Cable
Limiting curves for loading 4-stroke diesel engine step by step to rated power as ..
Factory Testing Schedule for Rotating Machines of 100 kW and over
Dielectric Strength Test for Rotating Machines
Limits of Temperature Rise for Air-Cooled Rotating Machines
Nameplates
Factory Testing Schedule for Switchboards, Chargers, Motor Control Centers, and …
Clearance and Creepage Distance for Switchboards, Distribution Boards, and …
Equipment and Instrumentation for Switchboards
Temperature Rise for Transformers
Types of cables Insulation
Maximum Current Carrying Capacity for Insulated Copper Wires and Cables
Machinery and Systems
Electrical Installations
Specialized Installations
Specialized Installations
High Voltage System
General
Application
Standard Voltages and Frequencies
Distribution System
Air Clearances and Creepage Distance
Air Clearance
Creepage Distance
System Design
Selective Coordination
Earthed Neutral Systems
Current Due to Earth Fault
Equipment
Other Standard of Code
Neutral Disconation
Hull Connection of Earthing Resistors
Interconnection of Neutrals
Earth Fault Detection
Auxiliary Systems
Source of Supply
Number of Supply Sources
Protection
Generator
Power Transformers
Voltage Transformers for Control and Instrumentation
Fuses
Low Voltage Systems
Equipment Installation and Arrangement
Degree of Protection
Protective Arrangements
Interlocking Arrangements
Warning Plates
Cables
Runs of Cables
Segregation
Installation Arrangement
Termination and Splices
Marking
Test after Installation
MODU 2001
4-3-4/13.1.2(a)
4-3-4/13.1.2(b)
4-3-4/13.1.3
4-3-4/13.1.4
4-3-4/13.1.5
4-3-4/13.1.6
4-3-4/13.3
4-3-4/13.5
4-3-4/Figure 1
4-3-4/Table 1
4-3-4/Table 2
4-3-4/Table 3
4-3-4/Table 4
4-3-4/Table 5
4-3-4/Table 6
4-3-4/Table 7
4-3-4/Table 8
4-3-4/Table 9
4-3-4/Table 10
4-3-5
4-3-5/1
4-3-5/1.1
4-3-5/1.1.1
4-3-5/1.1.2
4-3-5/1.1.3
4-3-5/1.1.4
4-3-5/1.1.4(a)
4-3-5/1.1.4(b)
4-3-5/1.3
4-3-5/1.3.1
4-3-5/1.3.2
4-3-5/1.3.2(a)
4-3-5/1.3.2(b)
4-3-5/1.3.2(c)
4-3-5/1.3.3
4-3-5/1.3.4
4-3-5/1.3.5
4-3-5/1.3.6
4-3-5/1.5
4-3-5/1.5.1
4-3-5/1.5.2
4-3-5/1.7
4-3-5/1.7.1
4-3-5/1.7.2
4-3-5/1.7.3
4-3-5/1.7.4
4-3-5/1.7.5
4-3-5/1.9
4-3-5/1.9.1
4-3-5/1.9.2
4-3-5/1.9.2(a)
4-3-5/1.9.2(b)
4-3-5/1.9.3
4-3-5/1.9.3(a)
4-3-5/1.9.3(b)
4-3-5/1.9.3(c)
4-3-5/1.9.3(d)
4-3-5/1.9.3(e)
4-3-5/1.9.3(f)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/3D1.11
4/3D1.11.1
4/3D1.11.1a
4/3D1.11.1b
4/3D1.11.1c
4/3D1.11.1d
4/3D1.11.1e
4/3D1.11.1f
4/3D1.11.2
4/3D1.11.2a
4/3D1.11.2b
4/3D1.11.2c
4/3D1.11.2d
4/3D1.11.2e
4/3D1.11.2f
4/3D1.11.2g
4/3D1.11.2h
4/3D1.11.2i
4/3D1.11.3
4/3D1.11.3a
4/3D1.11.3b
4/3D1.11.4
4/3D1.11.5
4/3D1.11.5a
4/3D1.11.5b
4/3D2
4/3D2.1
4/3D2.3
4/3D2.5
4/3D2.5.1
4/3D2.5.1a
4/3D2.5.1b
4/3D2.5.1c
4/3D2.5.1d
4/3D2.5.1e
4/3D2.5.2
4/3D2.5.2
4/3D2.5.2
4/3D2.5.2
4/3D2.5.3
4/3D2.5.3a
4/3D2.5.3b
4/3D2.5.3c
4/3D2.7
4/3D2.7.1
4/3D2.7.2
4/3D2.7.2a
4/3D2.7.2b
4/3D2.7.3
4/3D2.7.4
4/3D2.7.5
4/3D2.7.5a
4/3D2.7.5b
4/3D2.7.5c
4/3D2.7.5d
4/3D2.9
4/3D2.9.1
4/3D2.9.2
4/3D2.9.3
4/3D2.9.4
4/3D2.11
4/3D2.11.1
4/3D2.11.2
Title
Machinery and Equipment
Rotating machines
Protection
Windings
Temperature Detectors
Cooler
Space Heater
Tests
Switchgear and Controlgear
Protection
Mechanical Construction
Configuration
Clearance and Creepage Distances
Circuit Breakers
Locking Facilities
Shutters
Earthing and Short-circuiting
Tests
Transformers
Protection
Condensation
Miscellaneous Equipment
Cables
Standards
Rated Voltage
Electric Propulsion System
Application
Plans to be Submitted
Propulsion Power Systems
Propulsion Generators
Power Supply
Single System
Multiple System
Excitation System
Features of Other Systems
Propulsion Excitation
Excitation Circuits
Field Circuits
Drilling Unit's Service Generator Connections
Semiconductor Converters
------Circuit Protection
Settings
Direct-current (D.C) Propulsion Circuits
Circuit Protection
Protection for Reversal of the Rotation
Excitation Circuits
Reduction of Magnetic Fluxes
Semiconductor Converters
Overvoltage Protection
Overcurrent Protection
Short-circuit Protection
Filter Circuits
Protection of earth Leakage
Main Propulsion Circuits
Excitation Circuits
Alternating-current (A.C.) Systems
Direct-current (D.C.) Systems
Electric Propulsion Control
General
Automatic and Remote Control System
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-3-5/1.11
4-3-5/1.11.1
4-3-5/1.11.1(a)
4-3-5/1.11.1(b)
4-3-5/1.11.1(c)
4-3-5/1.11.1(d)
4-3-5/1.11.1(e)
4-3-5/1.11.1(f)
4-3-5/1.11.2
4-3-5/1.11.2(a)
4-3-5/1.11.2(b)
4-3-5/1.11.2(c)
4-3-5/1.11.2(d)
4-3-5/1.11.2(e)
4-3-5/1.11.2(f)
4-3-5/1.11.2(g)
4-3-5/1.11.2(h)
4-3-5/1.11.2(i)
4-3-5/1.11.3
4-3-5/1.11.3(a)
4-3-5/1.11.3(b)
4-3-5/1.11.4
4-3-5/1.11.5
4-3-5/1.11.5(a)
4-3-5/1.11.5(b)
4-3-5/3
4-3-5/3.1
4-3-5/3.3
4-3-5/3.5
4-3-5/3.5.1
4-3-5/3.5.1(a)
4-3-5/3.5.1(b)
4-3-5/3.5.1(c)
4-3-5/3.5.1(d)
4-3-5/3.5.1(e)
4-3-5/3.5.2
4-3-5/3.5.2(a)
4-3-5/3.5.2(b)
4-3-5/3.5.2(c)
4-3-5/3.5.3
4-3-5/3.5.3(a)
4-3-5/3.5.3(b)
4-3-5/3.5.3(c)
4-3-5/3.7
4-3-5/3.7.1
4-3-5/3.7.2
4-3-5/3.7.2(a)
4-3-5/3.7.2(b)
4-3-5/3.7.3
4-3-5/3.7.4
4-3-5/3.7.5
4-3-5/3.7.5(a)
4-3-5/3.7.5(b)
4-3-5/3.7.5(c)
4-3-5/3.7.5(d)
4-3-5/3.9
4-3-5/3.9.1
4-3-5/3.9.2
4-3-5/3.9.3
4-3-5/3.9.4
4-3-5/3.11
4-3-5/3.11.1
4-3-5/3.11.2
63
Notices and General Information
MODU 1997
4/3D2.11.3
4/3D2.11.4
4/3D2.11.5
4/3D2.11.6
4/3D2.11.7
4/3D2.11.8
4/3D2.11.9
4/3D2.13
4/3D2.13.1
4/3D2.13.1a
4/3D2.13.1b
4/3D2.13.1c
4/3D2.13.2
4/3D2.13.2a
4/3D2.13.2b
4/3D2.13.2c
4/3D2.15
4/3D2.15.1
4/3D2.15.2
4/3D2.15.2a
4/3D2.15.2b
4/3D2.15.2c
4/3D2.15.3
4/3D2.15.4
4/3D2.17
4/3D2.17.1
4/3D2.17.2
4/3D2.17.3
4/3D2.17.4
4/3D2.17.4a
4/3D2.17.4b
4/3D2.17.4c
4/3D2.17.4d
4/3D2.17.4e
4/3D2.17.5
4/3D2.17.5a
4/3D2.17.5b
4/3D2.17.5c
4/3D2.17.5d
4/3D2.17.6
4/3D2.17.7
4/3D2.17.7a
4/3D2.17.7b
4/3D2.17.8
4/3D2.17.8a
4/3D2.17.8b
4/3D2.17.8c
4/3D2.17.8d
4/3D2.17.8e
4/3D2.17.8f
4/3D2.17.9
4/3D2.17.9a
4/3D2.17.9b
4/3D2.17.9c
4/3D2.17.9d
4/3D2.17.9e
4/3D2.17.9f
4/3D2.17.9g
4/3D2.17.10
4/3D2.17.10a
4/3D2.17.10b
4/3D2.17.10c
4/3D2.17.11
64
Title
Testing and Inspection
Initiation of Control
Emergency Stop
Prime Mover Control
Control Power Failure
Protection
Interlocks
Instrumentation at the Control Station
Indication, Display and Alarms
For A-C Systems
For D-C Systems
For Electric Slip Couplings
Indication of Power System Status
Ready for Operation
Faulty
Power Limitation
Equipment Installation and Location
General
Accessibility and facilities for Repairs
Accessibility
Facility for Supporting
Slip coupling
Semiconductor Converters
Propulsion Cables
Machinery and equipment
Material Test
Temperature Rating
Protection Against Moisture Condensation
Prime Movers
Capability
Speed Control
Manual Controls
Parallel Operation
Protection for Regenerated Power
Rotating machines for Propulsion
Ventilation and protection
Fire-extinguishing Systems
Air Coolers
Temperature Sensors
Propulsion Generators
Direct-current (D.C) Propulsion Motors
Rotors
Overspeed Protection
Electric Couplings
General
Accessibility for Repairs
Temperature rating
Excitation
Control Equipment
Nameplate
Semiconductor Converters for Propulsion
General
Testing and Inspection
Insulation Test
Design data
Watertight Enclosures
Terminals
Nameplates
Reactors and Transformers for Semiconductors Converters
General
Voltage Regulation
High Temperature Alarm
Switches
MODU 2001
4-3-5/3.11.3
4-3-5/3.11.4
4-3-5/3.11.5
4-3-5/3.11.6
4-3-5/3.11.7
4-3-5/3.11.8
4-3-5/3.11.9
4-3-5/3.13
4-3-5/3.13.1
4-3-5/3.13.1(a)
4-3-5/3.13.1(b)
4-3-5/3.13.1(c)
4-3-5/3.13.2
4-3-5/3.13.2(a)
4-3-5/3.13.2(b)
4-3-5/3.13.2(c)
4-3-5/3.15
4-3-5/3.15.1
4-3-5/3.15.2
4-3-5/3.15.2(a)
4-3-5/3.15.2(b)
4-3-5/3.15.2(c)
4-3-5/3.15.3
4-3-5/3.15.4
4-3-5/3.17
4-3-5/3.17.1
4-3-5/3.17.2
4-3-5/3.17.3
4-3-5/3.17.4
4-3-5/3.17.4(a)
4-3-5/3.17.4(b)
4-3-5/3.17.4(c)
4-3-5/3.17.4(d)
4-3-5/3.17.4(e)
4-3-5/3.17.5
4-3-5/3.17.5(a)
4-3-5/3.17.5(b)
4-3-5/3.17.5(c)
4-3-5/3.17.5(d)
4-3-5/3.17.6
4-3-5/3.17.7
4-3-5/3.17.7(a)
4-3-5/3.17.7(b)
4-3-5/3.17.8
4-3-5/3.17.8(a)
4-3-5/3.17.8(b)
4-3-5/3.17.8(c)
4-3-5/3.17.8(d)
4-3-5/3.17.8(e)
4-3-5/3.17.8(f)
4-3-5/3.17.9
4-3-5/3.17.9(a)
4-3-5/3.17.9(b)
4-3-5/3.17.9(c)
4-3-5/3.17.9(d)
4-3-5/3.17.9(e)
4-3-5/3.17.9(f)
4-3-5/3.17.9(g)
4-3-5/3.17.10
4-3-5/3.17.10(a)
4-3-5/3.17.10(b)
4-3-5/3.17.10(c)
4-3-5/3.17.11
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/3D2.17.11a
4/3D2.17.11b
4/3D2.17.11c
4/3D2.17.12
4/3D2.17.12a
4/3D2.17.12b
4/3D2.17.12c
4/3D2.17.12d
4/3D2.17.12e
4/3D2.19
4/3D3
4/3D3.1
4/3D3.3
4/3D3.3.1
4/3D3.3.2
4/3D3.5
4/3D4
4/3D4.1
4/3D4.1.1
4/3D4.1.2
4/3D4.1.2a
4/3D4.1.2b
4/3D4.1.2c
4/3D4.1.2d
4/3D4.1.2e
Table 4/3D.1
Part
4
Section
4
--4/4.1
4/4.3
4/4.3.1
4/4.3.2
4/4.5
4/4.5a
4/4.5b
4/4.7
4/4.7.1
4/4.7.2
4/4.7.2a
4/4.7.2a1
4/4.7.2a2
4/4.7.2a3
4/4.7.2b
4/4.7.3
4/4.7.4
4/4.7.5
4/4.7.5a
4/4.7.5b
4/4.7.5b1
4/4.7.5b2
4/4.7.6
4/4.7.7
4/4.7.7a
4/4.7.7b
4/4.7.7b1
4/4.7.7b2
4/4.7.7b3
4/4.7.8
4/4.9
4/4.9.1
4/4.9.2
4/4.9.3
Title
General Design
Generator and Motor Switches
Field Switches
Propulsion Cable
Conductors
Insulation Materials
Braided Metallic Armor and Impervious Metallic Sheaths
Inner Wiring
Testing
Dock and Sea Trials
Three-wire Dual-voltage D.C. System
Three-wire D.C. Drilling Unit's Generator
Neutral Earthing
Main Switchboard
Emergency Switchboard
Size of Neutral Conductors
Systems Associated with Drilling Operations
Emergency Shutdown Facilities
Shutdown Arrangements
Operation After Shutdown
------------Machinery and Systems
Fire Safety Futures
Equipment and Systems
Governmental Authority
Plans and Specifications
General
Fire Control Plan
Structural Fire Protection
Administration Review
Bureau Review
Fire Pumps
Number of Pumps
Location of Pumps
Location
------Remote Operation
Type of Pumps
Pressure
Pump Capacity
General
Ship-type Units
Total Pump Capacity
Individual Pump Capacity
Relief Valves
Intermediate Tank Water Supply
Tank Capacity
Features
------Pressurized Main Water supply
Fire Main
Size
Cocks or Valves
Isolation
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-3-5/3.17.11(a)
4-3-5/3.17.11(b)
4-3-5/3.17.11(c)
4-3-5/3.17.12
4-3-5/3.17.12(a)
4-3-5/3.17.12(b)
4-3-5/3.17.12(c)
4-3-5/3.17.12(d)
4-3-5/3.17.12(e)
4-3-5/3.19
4-3-5/5
4-3-5/5.1
4-3-5/5.3
4-3-5/5.3.1
4-3-5/5.3.2
4-3-5/5.5
4-3-5/7
4-3-5/7.1
4-3-5/7.1.1
4-3-5/7.1.2
4-3-5/7.1.2i)
4-3-5/7.1.2ii)
4-3-5/7.1.2iii)
4-3-5/7.1.2iv)
4-3-5/7.1.2v)
4-3-5/Table 1
4-4-1
4-4-1/1
4-4-1/3
4-4-1/3.1
4-4-1/3.3
4-4-1/5
4-4-1/5.1
4-4-1/5.3
4-4-1/7
4-4-1/7.1
4-4-1/7.3
4-4-1/7.3.1
4-4-1/7.3.1i)
4-4-1/7.3.1ii)
4-4-1/7.3.1iii)
4-4-1/7.3.2
4-4-1/7.5
4-4-1/7.7
4-4-1/7.9
4-4-1/7.9.1
4-4-1/7.9.2
4-4-1/7.9.2(a)
4-4-1/7.9.2(b)
4-4-1/7.11
4-4-1/7.13
4-4-1/7.13.1
4-4-1/7.13.2
4-4-1/7.13.2i)
4-4-1/7.13.2ii)
4-4-1/7.13.2iii)
4-4-1/7.15
4-4-1/9
4-4-1/9.1
4-4-1/9.3
4-4-1/9.5
65
Notices and General Information
MODU 1997
4/4.9.4
4/4.9.5
4/4.11
4/4.11.1
4/4.11.2
4/4.11.3
4/4.11.5
4/4.13
4/4.13a
4/4.13b
4/4.13c
4/4.13d
4/4.13e
4/4.15
4/4.15.1
4/4.15.1a
4/4.15.1b
4/4.15.1c
4/4.15.1c.i
4/4.15.1c.ii
4/4.15.1d
4/4.15.2
4/4.17
4/4.17.1
4/4.17.2
4/4.17.2a
4/4.17.2b
4/4.19
4/4.21
4/4.21.1
4/4.21.2
4/4.23
4/4.23.1
4/4.23.2
4/4.23.3
4/4.23.4
4/4.25
4/4.25a
4/4.25b
4/4.25c
4/4.25d
4/4.25e
4/4.27
4/4.29
4/4.29a
4/4.29b
4/4.29b1
4/4.29b2
4/4.29c
4/4.29d
4/4.29e
4/4.29f
4/4.29g
4/4.31
4/4.31.1
4/4.31.2
4/4.31.3
4/4.31.4
4/4.32
4/4.32a
4/4.32b
4/4.32c
4/4.32d
66
Title
Cold Weather Protection
Materials
Hydrants, Hoses, and Nozzles
Hydrants
Hoses
Nozzles
International Shore Connection
------------Gas Smothering
General
Storage
Design
Alarm
Electric
Pneumatic
Controls
Carbon Dioxide Systems
Foam
Fixed High Pressure Expansion Foam System
Low expansion Foam System
Application
Design
Fixed Pressure Water Spraying System
Portable Fire Extinguishers and sand
Extinguishers
Sand
Other Fire protection Requirements
Fire Detection and Alarm Systems
General Alarm
Mud tanks Level Alarm
Ventilation System Alarms
Gas Detection and Alarm System
----------Emergency Control Station
Fireman's Outfit
Number
Breathing Apparatus
----Lifeline
Safety lamp and Axe
Boots and Gloves
Helmet
Protective Clothing
Arrangements in Machinery Space
Ventilation Fans and Openings
Other Auxiliaries
Oil Tank Suction Pipes
Oil Fuel Units
Segregation of Fuel Oil Purifiers
---------
MODU 2001
4-4-1/9.7
4-4-1/9.9
4-4-1/11
4-4-1/11.1
4-4-1/11.3
4-4-1/11.5
4-4-1/11.7
4-4-1/13
4-4-1/13i)
4-4-1/13ii)
4-4-1/13iii)
4-4-1/13iv)
4-4-1/13v)
4-4-1/15
4-4-1/15.1
4-4-1/15.1.1
4-4-1/15.1.2
4-4-1/15.1.3
4-4-1/15.1.3(a)
4-4-1/15.1.3(b)
4-4-1/15.1.4
4-4-1/15.3
4-4-1/17
4-4-1/17.1
4-4-1/17.2
4-4-1/17.3.1
4-4-1/17.3.2
4-4-1/19
4-4-1/21
4-4-1/21.1
4-4-1/21.3
4-4-1/23
4-4-1/23.1
4-4-1/23.3
4-4-1/23.5
4-4-1/23.7
4-4-1/25
4-4-1/25i)
4-4-1/25ii)
4-4-1/25iii)
4-4-1/25iv)
4-4-1/25v)
4-4-1/27
4-4-1/29
4-4-1/29.1
4-4-1/29.3
4-4-1/29.3i)
4-4-1/29.3ii)
4-4-1/29.5
4-4-1/29.7
4-4-1/29.9
4-4-1/29.11
4-4-1/29.13
4-4-1/31
4-4-1/31.1
4-4-1/31.3
4-4-1/31.5
4-4-1/31.7
4-4-1/33
4-4-1/33i)
4-4-1/33ii)
4-4-1/33iii)
4-4-1/33iv)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
Notices and General Information
MODU 1997
4/4.33
4/4.35
4/4.35.1
4/4.35.2
4/4.35.2a
4/4.35.2b
4/4.35.2c
4/4.35.3
4/4.35.3a
4/4.35.3b
4/4.37
4/4.37a
4/4.37b
4/4.37c
4/4.37d
4/4.39
4/4.39a
4/4.39ai
4/4.39aii
4/4.39aiii
4/4.39aiv
4/4.39b
Figure 4/4.1
Table 4/4.1
Table 4/4.1
Title
Rotary Table Area
Protection of Helicopter Deck
General
Helicopter Decks with No Refueling Capabilities
Hoses and Nozzles
Portable Extinguisher
Back-up System
Helicopter Decks with Refueling Capabilities
Fire-Fighting System
Fixed-Foam System
Fire Precautions for Machinery Spaces
--------Paint and Flammable Liquid Lockers
Lockers of 4m2 or more floor area and lockers with access to accommodation
--------Lockers of less 4m2 or more floor area having no access to accommodation
International Shore Connection
Classification of Portable and Semiportable Extinguishers
Hand Portable Fire Extinguishers and Semiportable Fire-Extinguishing Systems
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001
MODU 2001
4-4-1/35
4-4-1/37
4-4-1/37.1
4-4-1/37.3
4-4-1/37.3.1
4-4-1/37.3.2
4-4-1/37.3.3
4-4-1/37.5
4-4-1/37.5.1
4-4-1/37.5.2
4-4-1/39
4-4-1/39i)
4-4-1/39ii)
4-4-1/39iii)
4-4-1/39iv)
4-4-1/41
4-4-1/41.1
4-4-1/41.1i)
4-4-1/41.1ii)
4-4-1/41.1iii)
4-4-1/41.1iv)
4-4-1/41.3
4-4-1/Figure 1
4-4-1/Table 1
4-4-1/Table 2
67
Download