GEML - Mill and Dump Leach MORE THAN YEARS OF EXPERIENCE 100 MINING PROJECTS 200 MORE THAN WORLDWIDE ACTIVE USERS 1 0.9 0.8 0.7 0.6 OPTIMISING THE WORLD'S MOST COMPLEX MINING ASSETS FOR OVER 15 YEARS. 0.5 0.4 0.3 0.2 www.cometstrategy.com 0.1 COMET Strategy Pty Ltd focuses solely on value creation through the provision of tools, expertise and training for strategic analysis in the mining industry. SOFTWARE In the 18 years since its initial development, COMET Optimal Scheduler has been used on more than 80 of the world’s most valuable surface and underground mines and it is now running in excess of 100,000 scenarios each year for projects located in countries such as; Australia, Brazil, Canada, Chile, Mongolia, PNG, Philippines, Peru, South Africa, USA, among others. COMET Optimal Scheduler is an advanced multi-policy schedule optimisation tool developed to optimise both single mine and complex combinations of surface and underground mines using common infrastructure. The objective of each optimisation is to maximize NPV, taking into account productivity, operational constraints and economic conditions that may change throughout the life of the project. Our algorithms are unique in how they simultaneously optimises multiple policies such as pushback/strip sequences, variable processing cut-off grades, haulage to multiple destinations, stockpile creation and depletion, process recovery (throughput/recovery relationships), multiple ore types and any number of processing facilities and methods. COMET Optimal Scheduler is used on many different types of projects including; copper, gold, silver, platinum, uranium, bauxite, coal, iron, diamonds, nickel, zinc, and molybdenum. COMET ONE is the new on-line schedule optimisation tool designed to simply and freely help students understand how to find and exploit the value drivers of a mine. This is one way for COMET Strategy puts back into the next generation of mining professionals. TRAINING CONSULTING COMET Strategy provides specific consulting services and tailored solutions to complement the optimisatio COMET provides tailored consulting services to mining professionals to complement the optimisation tools. Together with our clients and optimisation tools, focus on increasing shareholder value by discovering the value potential from each resource. COMET Strategy provides a range of training courses including: • Mine Planning and Strategic Analysis • Mining Economics Foundations • COMET Software Foundations • COMET Software Advanced Applications • COMET Software Distributed Processing • COMET Software Medium-term Scheduling SOFTWARE SOFTWARE SOFTWARE FEATURES FEATURES & CAPABILITIES FEATURES & CAPABILITIES & CAPABILITIES The COMET COMET Software Optimal The is anCOMET advance Scheduler Software is anThis is antool advance therefore This tool is therefore This mainly toolis used therefore mainly by used is by mainly used by Strategic Mine advance Planning strategic Strategic tool, mine Mine for analysis Planning tool, the Project tool, Evaluation the for projectteams the evaluation Project fromEvaluation teams most fromteams from most advance and for advanced experienced advance and experienced Mining and experienced of the Tier Mining most 1 mining of the companies ofTier the1 Tier mining in 1 the mining companies companies in the engineers. mining engineers. engineers. world, within the theworld, common world, with the goal with common the of common goal of goal of Maximisingmaximising the total value Maximising the total of a Mining business the total value value of of a Mining Asset (NPV).a set of mining Assetassets (NPV). using the NPV. LONG TERM LONG SCHEDULING TERM LONG SCHEDULING TERM SCHEDULING (LOM) FOR TO NPV MAXIMISE (LOM) FULL FOR NPV NPV 1 1 1 Optimal Mine Optimised plans that Optimal mine Maximise plans Mine that plans that Maximise VARIABLE CUT-OFF VARIABLE VARIABLE CUT-OFFCUT-OFF total NPV and maximise meet all the total project full NPV NPV and from meet all allGRADE project and OPTIMISATION GRADE OPTIMISATION GRADE OPTIMISATION operational periods constraints, tooperational meet including all project constraints, and including 2 2 2 Determine Determine the optimum Determine theCut-Off optimum thecut-off optimum Cut-Off economic operational conditionseconomic that constraints, change conditions including that change Grade grade periodper and Grade period, per Ore per pertype period ore type andand per Ore type with time.economic For Open with conditions Pit time. and that Forchange Open Pit per and / processing for each destination processing / processing for destination yourdestination for for your Underground withmining time. Underground methods. mining methods. Long / Medium your strategic TermLong Mine and /Plan. Medium long term Term mine Mine Plan. plans. OPEN PITINTEGRATED & UNDERGROUND OPEN OPEN PIT &PIT UNDERGROUND & OPTIMISATION UNDERGROUND OPTIMISATION OPTIMISATION 3 3 3 Optimise projects Optimisethat projects Optimise have that Open projects have open thatSTOCKPILING have Open STOCKPILING & STOCKPILING & & Pit and Underground pit and underground Pit operations and Underground operations operations REHANDLING REHANDLING REHANDLING on the same usingdeposit common on or the infrastructure mining same deposit 4 and or 4mining 4 lease. Optimise constraints. tolease. Optimise decide Optimise the to determine to Maximise decide the Improve the utilization the Maximise utilization of your the of your utilization of your sequence the of extraction extraction sequence sequence of both of of extraction each resource of both and resource maximise when resource the maximising value andofmaximise the the value of methods in region seriesand ormethods the in ascale parallel inand series timing or of in a parallel your project value ofby your your using project project using our our by using our manner. capital expenditures. manner. Stockpilingautomated and Stockpiling stockpiling Reclaiming andand Reclaiming automatedreclaiming capabilities. automated capabilities. capabilities. PROCESSING PROCESSING FACILITIES PROCESSING FACILITIES FACILITIES OPTIMISATION OPTIMISATION OPTIMISATION 5 5 5 Select theSelect optimum the Select optimum processing theprocessing optimum processing MULTIPLEMULTIPLE PROCESSING MULTIPLE PROCESSING PROCESSING method and method processing and method processing capacity and processing capacity capacity DESTINATIONS DESTINATIONS OPTIMISATION DESTINATIONS OPTIMISATION OPTIMISATION for your project for your or operation. project for your or project operation. or 6 operation. 6 6 For projects For and projects operations Forand projects operations withand with operations with multiple multiple processing processing multiple methods, methods, processing methods, COMET COMET will will optimise COMET optimise the the will optimise the productionproduction schedule production schedule by sending byschedule sending by sending OPEN PIT MULTIPLE MULTIPLE OPENMULTIPLE PIT OPEN PIT material tomaterial its optimum tomaterial its optimum economic to itseconomic optimum economic OPTIMISATION processingprocessing OPTIMISATION OPTIMISATION processing destination,to to destination, to 7 and unlock 7 value7destination, to helpOptimise the clientone reach their strategic objectives of each resource. Maximise NPV maximise of the NPV Maximise project of the and NPV project to of the and project to and to Optimise one multiple Optimise or multiple one oropen multiple pit oropen pit open pit fulfillmultiple the processing fulfill the processing fulfill capacities the processing capacities and capacities and and projects/operations with projects/operations projects/operations with multiple with multiple constraints. phases in in parallel or constraints. in series constraints. to phases in phases parallelinor parallel in series or toseries to Maximise the Maximise the maximise overallthe NPV overall of your NPVoverall of yourNPV of your assets. assets. assets. CLOUD BASED MULTI SCENARIO OPTIMISATION CAPABILITIES Use our cloud based capabilities to evaluate as many scenarios as the project and engineer needs in a swiftly, efficient, and simple manner. SUITABLE FOR MOST MINING PROJECTS Copper, gold, silver, platinum, uranium, bauxite, coal, iron ore, diamonds, nickel, zinc, and molybdenum. 11 12 13 14 15 Optimise multiple infrastructure and capital expansion scenarios simultaneously. ENGINEER DEFINED REPORTING & EXPORT FUNCTIONALITIES Create Financial, Production and Technical reports as detailed or as simple as required. MEDIUM TERM GUIDANCE Optimal and operational medium term mine plans to guide in a strategic manner the medium term mine planning engineer. NPV CONSULTING Experience All of these together can make the difference of the success of any mining project: NPV NPV 5% to 15% COMET Strategy offers a combination of software, operational and experience together with inherent value understanding. $ 50% to 200% Define the size of your truck and shovel fleets per period, and for the entire life of asset (LOA) in your optimum mine plan. 10 INFRASTRUCTURE & OPERATIONAL EXPANSIONS (CAPEX) OPTIMISATION Understanding Value TRUCK & SHOVEL FLEET OPTIMISATION 9 Achieve blending targets for product control and maximisation of recovery. 10% to 30% Exploit mill throughput and recovery relationships with the cut-off grades to further improve the project value without significant capital expenditure. BLENDING Schedule Optimisation % GRINDING & RECOVERY OPTIMISATION 8 Develop the optimal production schedule of an open pit, underground or combination of both, using our state of the art and worldwide recognised strategic mine planning COMET Optimal Scheduler . Realise a large number of sensitivity and risk analysis using the flexibility and capability of COMET Optimal Scheduler . R&D Create Audit reports for thirds parties (non-mining engineers) to confirm confidence and operability of a mining project. Realise Peer Reviews and Due Diligence studies. Participating in independent reviews of investment proposals. If you are already a COMET Optimal Scheduler user, we can help and assist you to get the most out of your software and asset. Research and Development SOFTWARE DEVELOPMENT When very particular complexities are to be modeled and optimised, COMET Strategy has all the capabilities and experience to create new ‘Custom Functions’ and software to tailor the model as close to real to the operation or project to be studied. The most famous Custom Functions or algorithms include: • Fleet Replacement • Grinding Adjustment (Grinding Versus Recoveries). • Incremental Distance to Waste Dump (Waste Dump Optimiser). GRADE ENGINEERING COMET Strategy is currently working in collaboration and as a member with CRCORE on the Grade Engineering Program, with focus in Mine Planning Optimisation with Grade Engineering Techniques. Grade Engineering Techniques include: Sensor Based Sorting (Bulk Sorting and Particle Sorting), Differential Blasting (Induced Deportment), Grade by Size (Natural Deportment), and Dense Media Separation (DMS). COMET Strategy is the first company with CRCORE to create a full optimisation to the Long Term Mine Plan of an operating mine with Grade Engineering Techniques. Please visit our website to download the technical paper. KEN LANE’S BOOK COMET Strategy bases a large part of its work, research and development, on Kenneth F. Lane’s Cut-Off Grade theories. Lane’s theories and work have been the base and foundation for strategic mine planning worldwide for the last century. COMET Strategy has recently released the latest edition in two languages; English and Spanish. AROUND THE WORLD 2 1 1 1 4 6 4 3 5 3 4 3 7 3 3 8 8 3 3 4 1 6 3 4 3 3 4 7 1 8 5 1 3 1 3 Coal Diamond Copper 4 2 6 Gold Silver Iron Ore 7 5 LONG TERM CLIENTS www.cometstrategy.com Bauxite Uranium 8 COMET Support