Uploaded by roughkoc

3 2 COMET Overview Brochure

advertisement
GEML - Mill and Dump Leach
MORE THAN
YEARS OF
EXPERIENCE
100
MINING PROJECTS
200
MORE THAN
WORLDWIDE
ACTIVE USERS
1
0.9
0.8
0.7
0.6
OPTIMISING THE WORLD'S MOST COMPLEX
MINING ASSETS FOR OVER 15 YEARS.
0.5
0.4
0.3
0.2
www.cometstrategy.com
0.1
COMET Strategy Pty Ltd focuses solely on
value creation through the provision of tools,
expertise and training for strategic analysis in
the mining industry.
SOFTWARE
In the 18 years since its initial development,
COMET Optimal Scheduler has been used on
more than 80 of the world’s most valuable
surface and underground mines and it is now
running in excess of 100,000 scenarios each
year for projects located in countries such as;
Australia, Brazil, Canada, Chile, Mongolia,
PNG, Philippines, Peru, South Africa, USA,
among others.
COMET Optimal Scheduler is an advanced
multi-policy schedule optimisation tool
developed to optimise both single mine and
complex combinations of surface and
underground mines using common
infrastructure. The objective of each
optimisation is to maximize NPV, taking into
account productivity, operational constraints
and economic conditions that may change
throughout the life of the project.
Our algorithms are unique in how they
simultaneously optimises multiple policies
such as pushback/strip sequences, variable
processing cut-off grades, haulage to multiple
destinations, stockpile creation and depletion,
process recovery (throughput/recovery
relationships), multiple ore types and any
number of processing facilities and methods.
COMET Optimal Scheduler is used on many
different types of projects including; copper,
gold, silver, platinum, uranium, bauxite, coal,
iron, diamonds, nickel, zinc, and molybdenum.
COMET ONE is the new on-line schedule
optimisation tool designed to simply and
freely help students understand how to find
and exploit the value drivers of a mine. This is
one way for COMET Strategy puts back into
the next generation of mining professionals.
TRAINING
CONSULTING
COMET Strategy provides specific consulting services and tailored solutions to complement the optimisatio
COMET provides tailored consulting services
to mining professionals to complement the
optimisation tools. Together with our clients
and optimisation tools, focus on increasing
shareholder value by discovering the value
potential from each resource.
COMET Strategy provides a range of training
courses including:
• Mine Planning and Strategic Analysis
• Mining Economics Foundations
• COMET Software Foundations
• COMET Software Advanced Applications
• COMET Software Distributed Processing
• COMET Software Medium-term Scheduling
SOFTWARE
SOFTWARE
SOFTWARE
FEATURES
FEATURES
& CAPABILITIES
FEATURES
& CAPABILITIES
& CAPABILITIES
The COMET
COMET
Software
Optimal
The
is anCOMET
advance
Scheduler
Software
is anThis
is antool
advance
therefore
This tool is
therefore
This
mainly
toolis
used
therefore
mainly
by used
is by
mainly used by
Strategic Mine
advance
Planning
strategic
Strategic
tool,
mine
Mine
for
analysis
Planning
tool,
the Project
tool, Evaluation
the
for projectteams
the
evaluation
Project
fromEvaluation
teams
most fromteams from most
advance and
for advanced
experienced
advance
and experienced
Mining
and experienced
of the Tier
Mining
most
1 mining
of the
companies
ofTier
the1 Tier
mining
in
1 the
mining
companies
companies in the
engineers. mining engineers.
engineers.
world, within the
theworld,
common
world,
with the
goal
with
common
the
of common
goal of goal of
Maximisingmaximising
the total value
Maximising
the total
of a Mining
business
the total
value
value
of of a Mining
Asset (NPV).a set of mining
Assetassets
(NPV).
using the NPV.
LONG TERM
LONG
SCHEDULING
TERM
LONG
SCHEDULING
TERM SCHEDULING
(LOM) FOR
TO NPV
MAXIMISE
(LOM) FULL
FOR NPV
NPV
1
1
1
Optimal Mine
Optimised
plans that
Optimal
mine
Maximise
plans
Mine
that
plans that
Maximise
VARIABLE
CUT-OFF
VARIABLE
VARIABLE
CUT-OFFCUT-OFF
total NPV and
maximise
meet all
the
total
project
full
NPV
NPV
and
from
meet
all allGRADE
project and
OPTIMISATION
GRADE OPTIMISATION
GRADE OPTIMISATION
operational
periods
constraints,
tooperational
meet
including
all project
constraints,
and
including
2
2
2
Determine
Determine
the optimum
Determine
theCut-Off
optimum
thecut-off
optimum Cut-Off
economic operational
conditionseconomic
that
constraints,
change
conditions
including
that change
Grade
grade
periodper
and
Grade
period,
per Ore
per
pertype
period
ore type
andand
per Ore type
with time.economic
For Open
with
conditions
Pit
time.
and
that
Forchange
Open
Pit per
and
/ processing
for each
destination
processing
/ processing
for destination
yourdestination
for for your
Underground
withmining
time. Underground
methods.
mining methods.
Long / Medium
your strategic
TermLong
Mine
and
/Plan.
Medium
long term
Term
mine
Mine Plan.
plans.
OPEN PITINTEGRATED
& UNDERGROUND
OPEN
OPEN
PIT &PIT
UNDERGROUND
&
OPTIMISATION
UNDERGROUND
OPTIMISATION
OPTIMISATION
3
3
3
Optimise projects
Optimisethat
projects
Optimise
have that
Open
projects
have open
thatSTOCKPILING
have Open
STOCKPILING
& STOCKPILING
&
&
Pit and Underground
pit and underground
Pit operations
and Underground
operations operations
REHANDLING
REHANDLING
REHANDLING
on the same
usingdeposit
common
on or
the
infrastructure
mining
same deposit
4 and or 4mining 4
lease. Optimise
constraints.
tolease.
Optimise
decide
Optimise
the
to determine
to Maximise
decide the
Improve
the utilization
the
Maximise
utilization
of your
the
of your
utilization of your
sequence the
of extraction
extraction
sequence
sequence
of both
of of
extraction
each resource
of both
and
resource
maximise
when
resource
the
maximising
value
andofmaximise
the
the value of
methods in
region
seriesand
ormethods
the
in ascale
parallel
inand
series
timing
or of
in a parallel
your
project
value ofby
your
your
using
project
project
using
our our
by using our
manner. capital expenditures.
manner.
Stockpilingautomated
and Stockpiling
stockpiling
Reclaiming
andand
Reclaiming
automatedreclaiming
capabilities.
automated
capabilities.
capabilities.
PROCESSING
PROCESSING
FACILITIES
PROCESSING
FACILITIES
FACILITIES
OPTIMISATION
OPTIMISATION
OPTIMISATION
5
5
5
Select theSelect
optimum
the Select
optimum
processing
theprocessing
optimum processing
MULTIPLEMULTIPLE
PROCESSING
MULTIPLE
PROCESSING
PROCESSING
method and
method
processing
and
method
processing
capacity
and processing
capacity
capacity
DESTINATIONS
DESTINATIONS
OPTIMISATION
DESTINATIONS
OPTIMISATION
OPTIMISATION
for your project
for your
or operation.
project
for your
or project
operation.
or
6 operation.
6
6
For projects
For and
projects
operations
Forand
projects
operations
withand with
operations with
multiple multiple
processing
processing
multiple
methods,
methods,
processing
methods,
COMET COMET
will
will
optimise
COMET
optimise the
the
will
optimise
the
productionproduction
schedule
production
schedule
by sending
byschedule
sending by sending
OPEN PIT
MULTIPLE
MULTIPLE
OPENMULTIPLE
PIT
OPEN PIT
material tomaterial
its optimum
tomaterial
its optimum
economic
to itseconomic
optimum economic
OPTIMISATION processingprocessing
OPTIMISATION
OPTIMISATION
processing
destination,to
to destination,
to
7 and unlock
7 value7destination,
to helpOptimise
the clientone
reach
their
strategic
objectives
of
each
resource.
Maximise
NPV
maximise
of
the
NPV
Maximise
project
of
the
and
NPV
project
to
of
the
and
project
to
and
to
Optimise
one
multiple
Optimise
or multiple
one
oropen
multiple
pit oropen
pit open pit
fulfillmultiple
the processing
fulfill the processing
fulfill
capacities
the processing
capacities
and
capacities
and
and
projects/operations
with
projects/operations
projects/operations
with multiple
with multiple
constraints.
phases
in in
parallel
or constraints.
in series constraints.
to
phases in phases
parallelinor
parallel
in series
or
toseries to
Maximise
the
Maximise the
maximise
overallthe
NPV
overall
of your
NPVoverall
of yourNPV of your
assets.
assets.
assets.
CLOUD BASED MULTI SCENARIO
OPTIMISATION CAPABILITIES
Use our cloud based capabilities
to evaluate as many scenarios as
the project and engineer needs in
a swiftly, efficient, and simple
manner.
SUITABLE FOR MOST
MINING PROJECTS
Copper, gold, silver, platinum,
uranium, bauxite, coal, iron ore,
diamonds, nickel, zinc, and
molybdenum.
11
12
13
14
15
Optimise multiple infrastructure
and capital expansion scenarios
simultaneously.
ENGINEER DEFINED REPORTING
& EXPORT FUNCTIONALITIES
Create Financial, Production and
Technical reports as detailed or as
simple as required.
MEDIUM TERM
GUIDANCE
Optimal and operational medium
term mine plans to guide in a
strategic manner the medium
term mine planning engineer.
NPV
CONSULTING
Experience
All of these together can make the
difference of the success of any
mining project:
NPV
NPV
5% to 15%
COMET Strategy offers a
combination of software,
operational and experience
together with inherent value
understanding.
$
50% to 200%
Define the size of your truck and
shovel fleets per period, and for
the entire life of asset (LOA) in
your optimum mine plan.
10
INFRASTRUCTURE &
OPERATIONAL EXPANSIONS
(CAPEX) OPTIMISATION
Understanding Value
TRUCK & SHOVEL
FLEET OPTIMISATION
9
Achieve blending targets for
product control and maximisation
of recovery.
10% to 30%
Exploit mill throughput and
recovery relationships with the
cut-off grades to further improve
the project value without
significant capital expenditure.
BLENDING
Schedule
Optimisation
%
GRINDING & RECOVERY
OPTIMISATION
8
Develop the optimal production schedule of an
open pit, underground or combination of both,
using our state of the art and worldwide
recognised strategic mine planning COMET
Optimal Scheduler .
Realise a large number of sensitivity and risk
analysis using the flexibility and capability of
COMET Optimal Scheduler .
R&D
Create Audit reports for thirds parties
(non-mining engineers) to confirm confidence
and operability of a mining project.
Realise Peer Reviews and Due Diligence studies.
Participating in independent reviews of
investment proposals.
If you are already a COMET Optimal Scheduler
user, we can help and assist you to get the most
out of your software and asset.
Research and Development
SOFTWARE DEVELOPMENT
When very particular complexities are to be
modeled and optimised, COMET Strategy has
all the capabilities and experience to create
new ‘Custom Functions’ and software to
tailor the model as close to real to the
operation or project to be studied. The most
famous Custom Functions or algorithms
include:
• Fleet Replacement
• Grinding Adjustment
(Grinding Versus Recoveries).
• Incremental Distance to Waste Dump
(Waste Dump Optimiser).
GRADE ENGINEERING
COMET Strategy is currently working in
collaboration and as a member with CRCORE
on the Grade Engineering Program, with focus
in Mine Planning Optimisation with Grade
Engineering Techniques.
Grade Engineering Techniques include: Sensor
Based Sorting (Bulk Sorting and Particle
Sorting), Differential Blasting (Induced
Deportment), Grade by Size (Natural
Deportment), and Dense Media Separation
(DMS). COMET Strategy is the first company
with CRCORE to create a full optimisation to the
Long Term Mine Plan of an operating mine with
Grade Engineering Techniques. Please visit our
website to download the technical paper.
KEN LANE’S BOOK
COMET Strategy bases a large part of its work,
research and development, on Kenneth F.
Lane’s Cut-Off Grade theories. Lane’s theories
and work have been the base and foundation
for strategic mine planning worldwide for the
last century. COMET Strategy has recently
released the latest edition in two languages;
English and Spanish.
AROUND THE WORLD
2
1
1
1
4
6
4 3 5
3
4
3
7
3
3
8
8
3
3
4
1
6
3
4
3
3
4
7
1
8
5
1
3
1
3
Coal
Diamond
Copper
4
2
6
Gold
Silver
Iron Ore
7
5
LONG TERM CLIENTS
www.cometstrategy.com
Bauxite
Uranium
8
COMET Support
Download