THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
jftLVªh laö Mhö ,yö&33004@99
REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx III—[k.M 4
PART III—Section 4
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
ubZ fnYyh] lkseokj] fnlEcj 23] 2019@ikS"k 02] 1941
la- 488]
No. 488]
NEW DELHI, MONDAY, DECEMBER 23, 2019/PAUSHA 02, 1941
के ीय िव तु ािधकरण
अिधसूचना
नई दली,
23
दस बर, 2019
सं. सीईएसीईए-जीओजीओ-1313-15/3/201915/3/2019-डीपीआर भाग.—िवुत (पूव
काशन क
या) िनयम, 2005 के िनयम (3)
के उप िनयम (2) के साथ पठत िवुत अिधिनयम, 2003 (2003 का 36) क धारा 177 क उपधारा (3)
के)*ीय िवुत
का
ािधकरण (मीटर. का अिध/ठापन और
7ताव छह दैिनक समाचार-प<. म=
संभावना है, उस तारीख से िजसको उB
चालन) िविनयम, 2006 का संशोधन करने के िलए
कािशत कया गया था, िजसम= उन सभी AिBय. से िजनक इनसे
काशन. को अंतDवE करने वाले समाचार-प<. क
'ारा यथापेि(त
ा6प िविनयम
भािवत होने क
ितयां जनता को उपलFध करा
दी जाती है, पGतािलस दन. क अविध क समािH से पूव, सुझाव और आ(ेप आमंि<त कये गये थे;
और उKत िविनयम. को अंतDव/ट करने वाले उB समाचार प<. क
ितयां 21 फरवरी, 2019 को जनता को
उपलFध करा दी गई थO;
और उB
ा6प िविनयम. पर जनता से
ाH आ(ेप. और सुझाव. पर क=*ीय िवुत
ािधकरण 'ारा िवचार कर
िलया गया था;
अतः अब के)*ीय िवुत
ािधकरण, िवुत अिधिनयम 2003 क धारा 177 क उपधारा (2) के खQड (ग) के साथ
पठत धारा 55 क उपधारा (1) 'ारा
और
दS शिBय. का
योग करते Tए, के)*ीय िवुत
ािधकरण (मीटर. का अिध/ठापन
चालन) िविनयम, 2006 का संशोधन करने के िलए िनUिलिखत िविनयम बनाता है, अथात् -
6588 GI/2019
(1)
2
1.
THE GAZETTE OF INDIA : EXTRAORDINARY
(1) इन िविनयम. का संि(Xत नाम के)*ीय िवुत
ािधकरण (मीटर. का अिध/ठापन और
[PART III—SEC. 4]
चालन)
(संशोधन)
िविनयम 2019 है।
(2) ये िविनयम राजप< म= उनके
2.
के)*ीय िवुत
काशन क तारीख से
वृS ह.गे।
ािधकरण (मीटर. का अिध/ठापन और
चालन) िविनयम 2006 (िजसे इसम= इसके प[चात् उB
िविनयम कहा गया है), म= िविनयम 2, उप िविनयम (1) म= (i) खंड (छ) का लोप कया जाएगा।
(ii) खंड (झ) के 7थान पर, िनUिलिखत खंड को रखा जाएगा, अथात्: -
"(झ)
‘चेक मीटर’ से वह मीटर अिभ ेत है, जो इं7]मे)ट ^ांसफामर के उसी कोर से जोड़ा है, िजससे मु_य मीटर
जुड़ा Tआ है और इसका उपयोग मु_य मीटर क िवफलता क ि7थित म= िवुत के लेखांकन और िबaलग म= कया
जाएगा;"
(iii) खंड (ञ) के 7थान पर, िनUिलिखत खंड को रखा जाएगा, अथात्: -
"(ञ) ’उपभोKता मीटर' से वह मीटर अिभ
ेत है िजसका उपयोग उपभोBा को या उससे आपूDत क जाने वाली
िवुत के लेखांकन और िबaलग के िलए कया जाता है, bकतु उन उपभोBाc को छोड़कर जो इं टरफ़ेस मीटर के
अधीन आते हG;"
(iv) खंड (ट) के 7थान पर, िनUिलिखत खंड को रखा जाएगा, अथात्: -
"(ट) 'संशुe मीटर' से वह मीटर अिभ
ेत है जो इन िविनयम. क अनुसच
ू ी म= यथा िविनfदE मानक. के अनु6प है;"
(v) खंड (ड) के 7थान पर, िनUिलिखत खंड को रखा जाएगा, अथात्: -
"(ड) 'इं 7]म=ट ^ांसफॉमर' से 'करं ट ^ांसफॉमर' (सीटी) या 'करं ट ^ांसफॉमर' (सीटी) और 'कैपेिसटर वोhटेज ^ांसफॉमर'
(सीवीटी) या 'करं ट ^ांसफॉमर' (सीटी) और 'इं डिKटव वोhटेज ^ांसफॉमर' (आईवीटी) अिभ
ेत है;"
(vi) खंड (ढ) के 7थान पर, िनUिलिखत खंड को रखा जाएगा, अथात्: -
‘’(ढ) ‘’इं टरफ़ेस मीटर’’ से िवुत के लेखांकन और िबaलग हेतु उपयोग कया जाने वाला वह मीटर अिभ ेत है, जो
िवुत उiपादन कंपनी, लाइस=सधारी और उपभोBाc क िवुत
अंतराjयीय पारे षण
णाली या राjयांतरक पारे षण
णािलय. के बीच अंत:संयोजन aबदु से जुड़ा है,
णाली या िवतरण
णाली और िज)ह= उपयुKत आयोग 'ारा
खुली पTंच क अनुमित दी गई है, से सीधे जुड़ा होता है;
(vii) खंड (त) के 7थान पर, िनUिलिखत खंड को रखा जाएगा, अथात्: -
"(त) 'मीटर', से वह उपकरण अिभ
ेत है, जो िवुत या िवुत
णाली से संबिं धत कसी अ)य मा<ा के
वहण के
मापन, उपदशन और अिभलेखन के िलए उपयुB है और इसके अंतगत, जहां लागू हो, अ)य उप7कर, जैसे मापन के
योजन के िलए आव[यक इ)7]मे)ट ^ा)सफामर शािमल हG और इससे ‘संशुe मीटर’ भी अिभ ेत है, यद वह इन
िविनयम. क अनुसच
ू ी म= िविनfद/ट मानक. के अनु6प है;"
(viii) खंड (द) का लोप कया जाएगा।
(ix) खंड (न) के प[चात, िनUिलिखत खंड को अंत:7थािपत कया जाएगा, अथात्: -
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
3
"(नक) '7माट मीटर' से आईएस 16444 और समय समय पर यथासंशोिधत म= िविनfद/ट मीटर अिभ ेत है;"
(x) खंड (फ) के 7थान पर, िनUिलिखत खंड को रखा जाएगा, अथात्: -
“(फ) ‘7टGडबाई मीटर’ से वह मीटर अिभ
ेत है, जो मु_य मीटर और चेक मीटर के िलए
युKत इं 7]मे)ट ^ांसफामर के
अतरKत अ)य इं 7]मे)ट ^ांसफामर से संयोिजत है, और िजसका उपयोग मु_य मीटर और चेक मीटर दोन. क
िवफलता क ि7थित म= िवुत के लेखांकन और िबaलग के िलए कया जाएगा;"
(xi) खंड (भ) और (म) का लोप कया जाएगा।
3.
क=*ीय िवुत
ािधकरण (मीटर. का अिध/ठापन और
चालन) संशोधन िविनयम, 2014 म= लागू होने से संबि
ं धत
िविनयम 2 का लोप कया जाएगा।
4.
उKत िविनयम. के िविनयम 4 म= उप िविनयम (1) के 7थान पर, िनUिलिखत को रखा जाएगा अथात्: "(1) (क) सभी नए 'इ)टरफेस मीटर' और 'एनजl अकाउं mटग एवं ऑिडट मीटर' ि7थर
कार के ह.गे और उनम=
7वचािलत दूर7थ मीटर रीaडग क सुिवधा होगी;
(ख) सभी नए उपभोBा मीटर पूव भुगतान सुिवधा वाले 7माट मीटर ह.गे;
पर)तु 7माट मीटर. के अलावा, अ)य मौजूदा मीटर. को क=* सरकार 'ारा िनfदE समय सीमा के भीतर पूव
भुगतान सुिवधा वाले 7माट मीटर. से
5.
ित7थािपत कर दया जाएगा।"
उKत िविनयम. के िविनयम 5 म= खंड (क) के 7थान पर िनUिलिखत को रखा जाएगा अथात्: “(क) भारतीय मानक Fयूरो (बीआईएस) के सुसंगत मानक. के अनु6प है। यद कसी िवशेष उप7कर या सामoी के
िलए बीआईएस मानक उपलFध नहO हG, तो सुसंगत अंतराpीय िवुत-तकनीक आयोग (आईईसी) मानक., या कसी
अ)य समक( मानक का अनुपालन कया जाएगा:
पर)तु जब भी कसी आईईसी मानक या कसी अ)य समक( मानक का अनुपालन कया जाता है, तो उKत
मानक. को वा7तिवक 6प से अपनाए जाने से पूव भारत म=
अिभिहत (नॉिमनल)
चिलत अिभिहत (नॉिमनल)
णाली आवृिS और
णाली वोhटेज के िलए आव[यक संशिु eयां या संशोधन करने ह.गे:
पर)तु यह और क परवेशी (एिqबए)ट) तापमान और आ*ता के िलए आव[यक संशिु eय. या संशोधन. को
इन िविनयम. क अनुसच
ू ी म= िविनfदE सीमा के अनुसार कया जाएगा।"
6.
उKत िविनयम. के िविनयम 6, उप-िविनयम (2) म=, खंड (ख) के 7थान पर िनUिलिखत को रखा जाएगा अथात्: "(ख) यद कोई उपभोBा मीटर य करने का िवकhप चुनता है, तो वह इन िविनयम. के अनुपालन म= लाइस=सधारी
'ारा िनधारत तकनीक िविश/टताc के अनु6प उसे खरीद सकता है और उपभोBा 'ारा खरीदे गए मीटर का
परी(ण, अिध/ठापन और सीaलग लाइस=सधारी 'ारा कया जाएगा:
पर)तु उपभोBा अपने 'ारा खरीदे गए मीटर का अपनी परसंपिS के 6प म= दावा केवल तभी करे गा, जब
वह िवतरण लाइस=सधारी क
7.
णाली से 7थायी 6प से हटा दया जाता है।"
उB िविनयम. के िविनयम 7 म=, -
4
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
(i) उप-िविनयम (1) म=, सारणी-1 के 7थान पर िनUिलिखत सारणी को रखा जाएगा, अथात्: -
चरण
.सं.
1.
सारणीसारणी-1
चेक मीटर
मुय मीटर
उiपादन क=*
िविभ)न
शुhक
या
िविभ)न
िविभ)न 7वािमiव वाले या
िविभ)न
दोन.
कार
या
क=*.
के दो चरण. के बीच
वाले
के
उiपादन
शुhक वाले या
7वािमiव
दोन.
उiपादन
टडबाई
डबाई मीटर
कार
क=*.
के
वाले
बस सेKशनलाइजर या टाई
चरण.
लाइन सिहत सभी बDहगामी
सेKशनलाइजर/
फडर. पर।
लाइन
के
के
दो
बीच
सिहत
बस
टाई
सभी
बDहगामी फडर. पर।
(i) जेनरे टर ^ा)सफ़ॉमर.
के उr वोhटता (एचवी)
िसरे पर
(ii) सभी 7टेशन सहायक
(ऑिsजलरी)
^ा)सफ़ॉमर. के उr
वोhटता (एचवी) िसरे
पर।
2.
पारे षण
और
िवतरण
णाली
(i) एक
(i) पृथक
ही लाइस=सधारी
के उप क=*. के बीच क
लाइन
के
एक
6प
से
कोई
भी 7टGडबाई मीटर नहO
िसरे
होगा।
पर:
िभ)न
(ii) दो
लाइस=सधारय.
के
क=*. के बीच क लाइन के
-
लाइस=सधारय.
के
मामले म= लाइन के दूसरे
दोन. िसर. पर:
िसरे
पर)तु संबंिधत
मीटर
लाइस=सधारय.
िभt
(ii) दो
उप
पर
अिध/ठािपत
7टGडबाई
मीटर का काय करे गा।
के िलए
दोन. िसर. के मीटर. को
मु_य
मीटर माना
जाएगा।
3.
अंतःसंयोिजत
^ांसफामर आईसीटी
के
उr
वोhटता
(एचवी) वाले िसरे पर।
(आईसीटी)
-
आईसीटी
वोhटता
िसरे पर।
4.
अंतराjयीय
पारे षण
णाली या राjयांतरक
पारे षण
णाली
िवतरण
उपभोBा,
संयोिजत
िज)ह=
या
णाली से सीधे
समुिचत
आयोग
'ारा ओपन एKसेस क
अनुमित
दान क गई है
या
कोई
अ)य
उपयुKत
नहO है।
म=
णाली, जो
सिqमिलत
समुिचत आयोग 'ारा जैसा िविनिwत कया जाए।
के
िनqन
(एलवी)
वाले
5
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
म,
(I) खंड (क) के थम पर तुक म “ रयल टाइम िडले यूिनट“ शद के थान पर “इन होम िडले यूिनट“ रखा जाएगा।
(II) खंड (ख) के थान पर िनिलिखत को रखा जाएगा, अथा"त्: -
(ii) उप-िविनयम (2)
"(ख) मी
टर का थान और फश" से मीटर िडले क( ऊंचाई, आईएस 15707 म यथािविन*द+ट और समय-समय पर
यथासंशोिधत होगी।"
(III) खंड (ग) के
थान पर, िनिलिखत को रखा जाएगा, अथा"त्: -
अिध+ठापन के मामले म, आईएस 15707 म यथािविन*द+ट
वाले उपयु0 आवरण 1ारा मीटर को सुर.ा दान क( जाएगी।"
"(ग) बाहरी
(IV) खंड (घ)
और समय-समय पर यथासंशोिधत
सुर.ा तर
का लोप 8कया जाएगा।
(iii) उप-िविनयम (3)
म खंड (i) म उपखंड (क) के प9ात् िनिलिखत पर तुक अंतःथािपत 8कया जाएगा अथा"त्: -
पर तु नवीकरणीय ऊजा" उ<पादन क = के मामले म, मीटर को इ वट"र <यावत? धारा (एसी) आउटपुट
टAमनल पर संथािपत 8कया जाएगा,"
उBत िविनयम के िविनयम 9 म, (i) उप-िविनयम (3) के था न पर िनिलिखत को रखा जाएगा, अथा"त्: -
8.
र के मामले म, उपभो0ा यह सुिनि9त करेगा 8क उपभोBता क( ओर क( वायFरग म कॉमन
यूHल या फे ज न हो अथवा दो या अिधक उपभो0ाI के यूHल या फे ज क( लूJपग न हो:
“(3) एकल फेज मीट
पर तु, य8द लाइससधारी को ऐसे कॉमन यूHल या फे ज अथवा यूHल या फे ज क( लूJपग का पता चलता है, तो
इसका पता चलते ही वह अिध+ठापन रपोट" अथवा िनयिमत िवMुत िबल अथवा मीटर परी.ण रपोटP या
एसएमएस के माQयम से, जो भी लागू हो, सूचना उपभो0ा को देगा और इस कार का नो टस देने के 15 8दन के
भीतर उपभो0ा 1ारा उसे सुधारा जाएगा।"
(ii) उप-िविनयम (5) के थान पर िनिलिखत को रखा जाएगा, अथा"त्: य8द मीटर म अथ" लीके ज संकेत दAशत होता है, तो इसका पता चलते ही लाइससधारी अिध+ठापन रपोट"
अथवा िनयिमत िवMुत िबल अथवा मीटर परी.ण रपोटP या एसएमएस के माQयम से, जो भी लागू हो, सूचना
उपभो0ा को देगा और इस कार का नो टस देने के 15 8दन के भीतर उपभो0ा 1ारा उसे सुधारा जाएगा।"
"(5)
(iii) उप-िविनयमन (6)
के थान पर िनिलिखत को रखा जाएगा, अथा"त्: -
य8द इंRमट Hा सफाम"र, मीटर के भाग हS, तो मीटर को यथासंभव इंRमट Hा सफाम"र के पास अिध+ठािपत
8कया जाएगा, ता8क ि1तीयक लीड म िवभव िगरावट (पोटेि शयल Tॉप) को कम 8कया जा सके ।”
“(6)
9.
उBत िविनयम के िविनयम 12 म, -
(i) उप-िविनयम (1)
म, खंड (ख) के थान पर िनिलिखत को रखा जाएगा, अथा"त्: -
(1)
6
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
इससधारी 1ारा सभी सील के िलए एक िनगरानी और रकॉVडग तंW बनाए रखा जाएगा ता8क सील के कु ल
संचालन से ारXभ करके ापण (िनमा"ता के िववरण सिहत), भंडारण, रकॉड" रखना, अिध+ठापन, िनरी.ण क(
Yृख
ं ला और हटाने पर नजर रखी जा सके।"
"(ख) ला
10.
उBत िविनयम के िविनयम 13 म, उप िविनयम (3) म,उपभो0ा मीटर” शद के थान पर “उपभो0ा मीटर” और “ रयल टाईम िडले यूिनट” शद के थान पर “इन
होम िडले यूिनट” रखा जाएगा।
िविनयम 14 के थान पर िनिलिखत को रखा जाएगा, अथा"त:् (i) “
11.
के आंकड़ को डाउनलोड करने, मीटरीकृ त आंकड़ का रकॉड" रखने और समुिचत
आयोग 1ारा िनधा" रत 8^या के अनुसार उ0 आंकड़ को िविभ_ एजिसय को तुत करने का उ<तरदािय<व उस
उ<पादन कं पनी या लाइससधारी का होगा, िजसके प रसर म मीटर अिध+ठािपत 8कया गया है:
"(1) इं टरफ़ेस मीटर: (क) मीटर
पर तु, इंटरफ़े स मीटर से जुड़ी सभी जानकारी का डेटाबेस रखने और मीटरीकृ त आंकड़ क( संशुbता
स<यािपत करने का उ<तरदािय<व समुिचत आयोग 1ारा िनधा" रत 8^या के अनुसार होगा।
(ख) एक सुरि.त और समAपत संचार णाली का उपयोग करते cए संबि
ं धत भार ेषण क = (लोड िडपैच सटर) को
मीटर के आंकड़ क( जानकारी दान क( जाएगी।
उपभो0ा मीटर: (क) थानीय या दूरथ eप से मीटर के आंकड़ को डाउनलोड करने, मीटरीकृ त आंकड़ का
रकॉड" रखने, मीटर से जुड़ी सभी जानकारी का डेटाबेस रखने और मीटरीकृ त आंकड़ क( संशुbता स<यािपत करने
का उ<तरदािय<व लाइससधारी का होगा:
(2)
पर तु, समुिचत िविनयामक आयोग लाइससधा रय 1ारा सभी उपभो0ा मीटर क( इलेBHॉिनक मीटर
रीJडग सुिनि9त करने के िलए उपयु0 समय सीमा को िविन*दf करेगा।
अपने उपभो0ाI 1ारा उपयोग क( गई िवMुत ऊजा" और अ य िवMुत माWाI
लाइससधारी रखग:े
(ख)
का
लेखा-जोखा
पर तु, लाइससधारी उपभो0ा को मोबाइल ऐप या वेब एिलके शन या इन होम िडले या 8कसी अ य
उपयु0 माQयम से उसक( ऊजा" खपत से संबंिधत जानकारी उपलध कराएगा I
संि.h इितहास, अिध+ठापन क( ितिथ और परी.ण के यौरे,
लाइससधारी 1ारा रखे जाएंगे।
(ग)
अंशशोधन
और मीटर को बदलने संबंधी आंकड़े
एनज? अकाउं Fटग एवं ऑिडट मीटर: (क) थानीय या दूरथ eप से मीटर के आंकड़ को डाउनलोड करने,
मीटरीकृ त आंकड़ का रकॉड" रखने, एनज? अकाउं Fटग एवं ऑिडट मीटर से जुड़ी सभी जानकारी का डेटाबेस रखने
और मीटरीकृ त आंकड़ क( संशb
ु ता स<यािपत करने का उ<तरदािय<व उ<पादन कंपनी या लाइससधारी का होगा।
(3)
<येक उ<पादन कं पनी या लाइससधारी अपनी णाली के कुशल चालन और णाली िवकास
कार"वाई करने के िलए Wैमािसक, अध"-वाAषक और वाAषक ऊजा" खाता बनाएगा।"
(ख)
हेतु उिचत
¹Hkkx IIIµ[k.M 4º
12.
Hkkjr dk jkti=k % vlk/kj.k
उBत िविनयम के
(i) उप-िविनयम (1)
"(क) जब भी
िविनयम 15
7
म, -
म, खंड (क) और (ख) के थान पर िनिलिखत को रखा जाएगा, अथा"त:् -
8कसी मास, मुkय मीटर और चेक मीटर रीJडग के बीच अंतर 0.5% से अिधक है, तो िनिलिखत उपाय
8कए जाएंगे:
(i)
इंRमट Hांसफॉम"र कनेBशन क( जाँच करना।
परी.णाधीन मीटर क( प रशुbता Yेणी से उmचतर प रशुbता Yेणी वाले मानक संदभ" मीटर से इंटरफ़ेस मीटर क(
प रशुbता का काय" थल पर परी.ण करना।
(ii)
(iii) मद (i) और (ii)
क( जाएगी।
म िन*दf परी.ण प रणाम के आधार पर, दोषपूण" मीटर को बदलने के िलए सुधारा<मक कार"वाई
मापे गए ाचल के अिनयिमत दश"न जैसी प+ट िवफलताI के मामले म और जब मीटर के
परी.ण म पाई गई Wु ट सुसंगत मानक म दान क( गई Wु ट क( अनुमेय सीमा से परे है, तो मीटर को त<काल बदल
8दया जाएगा।
(ख) मीटर के जलने और
पर तु, जब कभी इंटरफ़ेस मीटर को बदला जाए, तब यह सुिनि9त 8कया जाएगा 8क पारेषण/िवतरण णाली
के दूसरे छोर पर लगा इं टरफ़ेस मीटर, य8द कोई हो, एक ही प रशुbता Yेणी के ह।"
(iii) उप-िविनयम (3)
“(घ) जब
13.
म, खंड (ग) के पoचात्, िनिलिखत को अंत:थािपत 8कया जाएगा : -
रीJडग इंटरफ़े स मीटर के रीJडग के अनुeप नहp हS।"
उBत िविनयम के िविनयम 17 के
उप-िविनयम (2)
व (3) के थान पर िनिलिखत को रखा जाएगा, अथा"त्: -
लाइससधारी मा यता ाh परी.ण योगशालाएं थािपत करेगा या अ य मा यता ाh
योगशालाI क( सेवाI का उपयोग करेगा।
“(2) (क)
ससधारी अपनी िवMमान मीटर परी.ण योगशालाI
ऐसा पहले नहp 8कया गया है, त<काल कार" वाई करे गा।
(ख) लाइ
को एनएबीएल से
मा यता 8दलाने
उ<पादन कंपनी अथवा लाइससधारी यह सुिनि9त करेगा 8क िविनमा"ता 1ारा सभी कार के
परी.ण, सुसंगत आईएस क( अपे.ा का अनुपालन करते cए 8कए जाते हS।"
(3)
14.
उBत िविनयम के िविनयम 18 म, (i) उप-िविनयम (1)
परी.ण
म, खंड (ख) और (ग) के थान पर िनिलिखत को रखा जाएगा, अथा"त:् -
नेमी
के िलए
, य8द
और वीकृ ित
8
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
) सभी इंटरफ़े स मीटर का पांच वष" म कम से कम एक बार मा यता ाh परी.ण योगशाला का उपयोग करते
cए काय" थल पर नेमी संशb
ु ता परी.ण 8कया जाएगा और य8द आवoयक हो तो उनका पुन: अंशशोधन 8कया
“(ख
जाएगा।
पर तु, इन मीटर का परी.ण तब भी 8कया जाएगा, जब मीटर 1ारा रकाड" क( गई ऊजा" और अ य माWाएं
असामा य या वैMुत िनकटथ मीटर के असंगत हो।
ग) परी.ण क( ितिथ के बारे म अ य प.कार को अिrम नो टस देकर आपूAतकता" और ^े ता के ितिनिधय
क( उपिथित म इंटरफ़े स मीटर का परी.ण और अंशशोधन 8कया जाएगा।";
(
(iii) उप-िविनयम (2)
और (3) के थान पर िनिलिखत को रखा जाएगा, अथा"त्: -
उपभो0ा मीटर: उपभो0ा मीटर का पांच वष" म कम से कम एक बार मा यता ाh परी.ण योगशाला
माQयम से काय" थल पर परी.ण 8कया जाएगा और य8द आवoयक हो तो उनका पुन: अंशशोधन 8कया जाएगा;
"(2)
के
पर तु, लाइससधारी काय" थल पर मीटर का परी.ण करने के बजाय मीटर को हटा सकता है और उसको 8कसी
मा यता ाh परी.ण योगशाला म िविधवत परी.ण 8कए गए मीटर को लगा सकता है;
पर तु यह और 8क य8द पूव"वत? वषP के इ हp महीन या मौसम म खपत पैटन" म तीs प रवत"न आता है अथवा
8कसी मीटर के बारे म उपभोBता क( िशकायत हो, तो मीटर का परी.ण 8कया जाएगा:
पर तु यह भी 8क परी.ण के िलए उपयोग 8कया जाने वाला
प रशुbता Yेणी वाला होगा।
मीटर
परी.णाधीन मीटर क( तुलना म उmचतर
एनज? अकाउं Fटग और ऑिडट मीटर: एनज? अकाउं Fटग और ऑिडट मीटर का परी.ण मा यता
ाh परी.ण योगशाला के माQयम से पांच साल म कम से कम एक बार या जब भी उनक( प रशुbता पर संदहे हो
अथवा जब भी रीJडग अ य मीटर, अथा"त् चेक मीटर, टSडबाई मीटर क( रीJडग के असंगत हो, काय" थल पर
परी.ण 8कया जाएगा, और य8द आवoयक हो, तो दोषपूण" मीटर का पुन: अंशशोधन 8कया जाएगा:
पर तु, यह परी.ण इ Rमे ट Hा सफामर के कनेBशन हटाए िबना 8कया जाए।"
15. उBत िविनयम के िविनयम 20 का लोप 8कया जाएगा।
16. उBत िविनयम के यथा िवलोिपत िविनयम 20 के पoचात् िनिलिखत िविनयम, अंत:थािपत 8कया जाएगा,
अथा"त्: (3)
साइबर सुर.ा- (1) उ<पादन कं पनी और लाइससधारी क = सरकार 1ारा समय-समय पर जारी साइबर सुर.ा
8दशािनदtश, और ािधकरण 1ारा िवMुत .ेW म संचार णाली के िलए िनधा" रत तकनीक( मानक का पालन करगे।
“21.
िविनयम क( िशिथलता - ािधकरण, िलिखत आदेश से और कारण को दज" करते cए अपने सम. तुत 8कसी
मामले म अलग-अलग मामले के आधार पर इन िविनयम के 8कसी भी उपबंध म िशिथलता दान कर सकता है।"
22.
उ0 िविनयम क( अनुसच
ू ी म(i) भाग । म,(क) पैरा (1) के थान पर िनिलिखत पैरा को रखा जाएगा, अथा"त्:-
17.
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
9
मानक म मीटर क( िविश+टताएं, बाu कारक से ितर.ा, सीJलग JबदुI तथा काया"<मक आवoयकताI
का ावधान है, जो िविनयामक दृिfकोण से अपेि.त हS:
"(1) इन
पर तु, िवतृत तकनीक( िविश+टताएं, उ<पादन कंपनी अथवा लाइससधारी, जैसा भी मामला हो, 1ारा तैयार
क( जाएंगी।"
(ख) पैरा (2) के थान पर िनिलिखत पैरा को रखा जाएगा, अथा"त्:
2.
मीटर क( िविशfताएं
मानक संदभ" वोvटेज, वोvटेज रज, मानक
आवृिw, ारंJभक िवMुत धारा और अिधकतम
िवMुत धारा, पावर फै Bटर रज, पावर x(y सी
िवदटSड वोvटेज, 1.2/50 माइ^ो सेकंड के िलए
इंपvस वोvटेज िवदटSड परी.ण, ऊजा" खपत
मानक मूल िवMुत धारा
3.
प रशुbता Yेणी (एBयूरेसी Bलास)
“(2)
1.
सुसंगत
भारतीय मानक (आईएस) के अनुसार।
उपभोBता मीटर क( िवMुत धारा
क( प रसीमा (करंट रज) इस तरह से चुनी जाएगी 8क वीकृत
भार के तदुनुeप िवMुत भार धारा (लोड करंट) को रकॉड"
8कया जा सके ।
मीटर, प रशुbता Yेणी क( िनिलिखत
अपे.ाI को पूरा
करग:े
सुसंगत आईएस के अनुसार।
(क) इं टरफ़ेस मीटर
0.2 एस
उपभो0ा मीटर
(i) 650 वोvट तक तक सीधे
1.0
(ख)
जुड़े
(ii)
650
कनेBटेड
वोvट
तक
सीटी
जहां पृथक सीटी का उपयोग
8कया
गया
आईएस
के
है,
सुसंगत
अनुसार
Yेणी
0.5 एस
या
टAमनल वाले सीधे
लांग करंट रज मीटर के
िबना
जुड़े
िलए
सुसंगत
अनुसार
आईएस
के
Yेणी 1.0
वोvट से ऊपर और 0.5 एस
33 8कलो वोvट तक
(iv) 33 8कलो वोvट से ऊपर
0.2 एस
(ग) एनज? अकाउं Fटग एवं ऑिडट मीटर
(iii) 650
िवMुत उ<पादन क = म, जनरेटर टेटर टAमनल के बाद
8कसी Jबदु पर, इकाई ऑिzजलरी Hांसफाम"र (र) के िलए
टैप ऑफ से पहले और नवीकरणीय ऊजा" उ<पादन क = के
(i)
10
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
मामले म इ वट"र एसी आउटपुट टAमनल पर मीटर(र) क(
प रशुbता Yेणी, 0.2 एस प रशुbता Yेणी से कम नहp
होगी:
पर तु, अ य मीटर क( प रशुbता Yेणी 1.0 एस प रशुbता
Yेणी से कम न हो।
(ii) पारे षण णाली म मीटर क( प रशुbता Yेणी 0.2 एस
प रशुbता Yेणी से कम नहp होगी।
(iii) िवतरण णाली म जहां मीटर के साथ पृथक कर ट
Hा सफाम"र (सीटीज) का उपयोग 8कया गया है, वहां
प रशुbता Yेणी 0.5 एस प रशुbता Yेणी से कम नहp
होगी:
4.
पर तु िबना टAमनल वाले सीधे जुड़े लXबी करंट रज मीटर
के मामले म प रशुbता Yेणी Yेणी 1.0 से कम नहp होगी।
(iv) उपभो0ा प रसर म िथत नवीकरणीय ऊजा" उ<पादन
क = के एनज? अकाउं Fटग एवं ऑिडट मीटर क( प रशुbता
Yेणी उपभो0ा मीटर के समान होगी।
प रवेशी तापमान और आ="ता (य8द अंतरा"{ीय तापमान प रसीमा:
मानक या आईईसी मानक का अनुपालन 8कया
जाता है)
चालन क( प रसीमा: -10 िडrी सेिvसयस से +70 िडrी
सेिvसयस तक
भंडारण और प रवहन के िलए प रसीमा: -10 िडrी सेिvसयस
से +70 िडrी सेिvसयस तक
सापे. आ="ता: 100% तक
िवशेष अनुयोग के िलए िनमा"ता और ^े ता के
बीच समझौते के अनुसार अ य तापमान मान का
उपयोग 8कया जा सकता है।
नोट: (1)
क( चरम सीमाI पर मीटर का चालन,
भंडारण और प रवहन अिधकतम छह घंटे क( अविध के
(2) तापमान
िलए होना चािहए।
5.
डvयूएच
और वीएआरएच को मापने के दौरान केवल मूल
आवृिw माWाI को ही
मापा और
प रकिलत 8कया
जाएगा।”;
के थान पर िनिलिखत पैरा को रखा जाएगा, अथा"त्:"(3) मीटर म कॉमन मीटर रीJडग इं Rमट (सीएमआरआई) के माQयम से मीटरीकृत आंक ड़े डाउनलोड करने के िलए
एक पोट" और दूरथ संचार के िलए एक अ य पोट"/णाली उपलध होगी।’’
(घ) पैरा (5) के थान पर िनिलिखत पैरा को रखा जाएगा, अथा"त्:
(ग) पैरा (3)
"(5)
सीJलग Jबदु: सीJलग िनिलिखत JबदुI (यथा लागू) पर क( जाएगी:
(क) कवर वाली मीटर बॉडी (य8द एक(कृ त बॉडी का उपयोग 8कया जाता है, तो लागू नहp)
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
11
मीटर टAमनल कवर
(ग) मीटर परी.ण टAमनल लॉक
(ख)
(घ) मीटर कैिबनेट/पैनल
मीटFरग के उ~ेoय के िलए, इंRमट Hांसफाम"र के टAमनल बॉBस और जंBशन बॉBस, य8द कोई हो।"
(ड.) पैरा (6) के थान पर िनिलिखत पैरा को रखा जाएगा, अथा"त्:
(ड.)
) इंRमट Hांसफॉम"र क( प रशुbता Yेणी संबb मीटर से कम नहp होगी।
“(6) (क
) इंRमट Hांसफॉम"र सुसंगत भारतीय मानक के अनुeप हगे।
(ख
य8द िवMमान इंRमट Hांसफाम"र इन िविनयम का अनुपालन नहp करते हS, दोषपूण" हS या िनि+^य पाए जाते हS,
तो उ ह नए इंRमट Hांसफॉम"र से बदल 8दया जाएगा।";
(च) पैरा (7) का लोप 8कया जाएगा।
(ii) भाग ।। के पैरा (1) म (ग)
(क) उप-पैरा (क)
और (ख) के थान पर िनिलिखत उप पैरा को रखा जाएगा, अथा"त्:-
फे स चार वायर वाले थैितक कार के समr (कXपोिजट) मीटर हगे जो स8^य (ऐिBटव) व
ितघाती ( रऐिBटव) ऊजा" तथा िनिलिखत अनुmछेद म वAणत कु छ अ य पैरामीटर को मापने वाले वत:पूण"
उपकरण हगे:
"(क) इं टरफ़ेस मीटर तीन
पर तु, ये मीटर 110 वोvट सेके डरी लाइन टू लाइन वोvटेज रेFटग वाले वोvटेज Hांसफॉम"र (वीटी) और 1
एXपी यर या 5 एXपी यर सेके डरी कर ट रे Fटग वाले करं ट Hांसफाम"र (सीटी) म सीधे जोड़े जाने के िलए उपयु0 ह:
पर तु यह भी 8क, संदभ" आवृिw (x(Bवे सी) 50 ह‚ज" होगी।
(ख) इन मीटर म एक नॉन वोलेटाइल मेमोरी होगी जो कम से कम िपछले दस 8दन क( अविध के आंकड़े संrहीत
करने म स.म होगी और सुसंगत भारतीय मानक म िन*दf पैरामीटर के अित रBत, िनXनिलिखत पैरामीटर को
मापने म स.म होगी:
<येक ^िमक समय लॉक के िलए औसत आवृिw 2 दशमलव H के शन तक;
(ii) टेशन
बसबार से बाहर भेजी गई ऐिBटव पॉवर के िलए + िचƒन और बसबार म ाh ऐिBटव पॉवर
के िलए - िचƒन सिहत <येक ^िमक समय लॉक के दौरान नेट डvयूए च Hा सिमटल दो दशमलव तक;
(iii) <येक अध"रािW म संचयी डvयूएच Hा स िमटल एक दशमलव सिहत आठ अंक म;
(iv) उ„ वोvटेज िथित के िलए <येक अध"रािW म संचयी वीएआरएच Hा सिमटल एक दशमलव सिहत आठ अंक
म;
(v) िनXन वोvटेज िथित के िलए <येक अध"रािW म संचयी वीएआरएच Hा सिमटल एक दशमलव सिहत आठ
अंक म;
(vi) 8कसी फे स पर वीटी आपूAत क( िवफलता क( िथित म ितिथ और समय लॉक तारां8कत (*) िचƒन और पूण"
वोvटेज िवफलता क( िथित म जेड (Z) िचƒन के eप म;
(vii) टेशन बसबार से बाहर भेजी गई रऐिBटव पॉवर के िलए + िचƒन और बसबार म ाh रऐिBटव पॉवर
के िलए - िचƒन सिहत <येक ^िमक समय लॉक के दौरान नेट वीएआरएच Hा सिमटल दो दशमलव तक;
(i)
12
THE GAZETTE OF INDIA : EXTRAORDINARY
(viii)
[PART III—SEC. 4]
औसत वोvटेज 2 दशमलव H के शन तक:
पर तु मीटर 1ारा मीटर डेटा क( रकॉVडग के िलए समय लॉक 15 िमनट या क =ीय आयोग 1ारा िन*दf अनुसार
होगा।";
का लोप 8कया जाएगा।
(ग) उप-पैरा (घ) का लोप 8कया जाएगा।
(घ) उप-पैरा (ड.), (च), (छ) और (ज) के थान पर िनिलिखत उप पैरा को रखा जाएगा, अथा"त्:
(ख) उप-पैरा (ग)
ितघाती ऊजा" ( रऐिBटव एनज?) रिजटर हगे, एक उस अविध के िलए जब औसत आरएमएस वोvटेज
103% से अिधक है और दूसरा उस अविध के िलए जब वोvटेज 97% से कम।
"(ड.) दो
उप क = बसबार से नेट डvयूएच िनया"त है तो डvयू
डvयूएच आयात है तो - िचƒन होगा:
(च) जब
एच
रकॉVडग म
+
िचƒन
होगा और जब नेट
पर तु, जब उप क = बसबार से डvयूएच या वीएआरएच का िनया"त होता है, तो डvयूएच और वीएआरएच के िलए
एक(कृ त (संचयी) रिजटर आगे बढ़ेगा और जब आयात है तो पीछे चलेगा।
(छ) मीटर,
(i)
िनिलिखत पैरामीटर को भी (मांग पर) बारी-बारी दAशत करेगा:
मीटर क( िविशf पहचान संkया,
(ii) ितिथ,
(iii) समय,
वॉट ऑवर (डvयूएच) रिजटर रीJडग,
(v) िपछले समय लॉक क( औसत आवृिw,
(vi) िपछले समय लॉक म नेट डvयूएच संचारण, +/- िचƒन सिहत,
(vii) औसत ितशत वोvटेज,
(viii) रऐिBटव पॉवर +/- िचƒन सिहत,
(ix) वोvटेज-उ„ वीएआरएच रिजटर रीJडग,
(x) वोvट-िनXन वीएआरएच रिजटर रीJडग,
(xi) िपछले समय लॉक म नेट वीएआरएच संचारण, +/- िचƒन सिहत।
(iv) संचयी
यूHल वोvटेज क( लगातार िनगरानी क( जाएगी, और य8द इनम से कोई भी
जाता है, तो इसे उपयु0 eप से दशा"या जाएगा और मीटर मेमोरी म रकॉड" 8कया जाएगा।
(ज) (i) तीन लाइन-टू -
(ii) ये मीटर आमतौर पर
80% से कम हो
वीटी सेके डरी प रपथ से ली गई िवMुत से प रचालन करगे:
पर तु इन मीटर को एसी और डीसी ऑिzजलरी िवMुत आपूAत से चािलत करने का ावधान होगा।
<येक मीटर म एक िबvट-इन कै लडर तथा घड़ी होगी, और उसम वत: समय तादा<Xय (टाइम िस ^ोनाइजेशन)
क( सुिवधा होगी ।
(iv) मीटर ठीक से सील 8कया जाएगा और काय" थल पर समायोजन (एडजटमे ट) क( 8कसी भी संभावना से परे ,
8कसी भी छेड़छाड़ को पf दशा"ने वाले (टैXपर एिवडे ट) हगे।"
(iii)
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
13
का लोप 8कया जाएगा;
(च) उप-पैरा (ण) के थान पर िनिलिखत उप-पैरा को रखा जाएगा, अथा"त्:
(ड़) खंड (i)
मुkय मीटर और चेक मीटर इ Rमे ट Hांसफाम"र के एक ही कोर से जोड़े जाएंगे।"
(ज) उप-पैरा (ञ) के प9ात्, िनिलिखत उप-पैरा को अंत:थािपत 8कया जाएगा:
"(ञ)
“(ट) स
भी नए मीटर म आवृिw को 0.01 ह‚ज" के चरण म रकॉट" करने क( .मता होगी।
सभी नए मीटर क =ीय आयोग 1ारा िन*दf समय लॉक के प रवत"न के अनुeप काय" थल पर 8फर से कॉि फ़गर
8कए जाने योzय हगे।"
(ठ)
(iii) भाग ।।।
म,
2) के थान पर िनिलिखत पैरा को रखा जाएगा, अथा"त्:
(क) पैरा (1) और (
िविभ_ Yेिणय के उपभो0ाI के िलए टै रफ आवoयकताI पर आधा रत उपभो0ा मीटर म सुसंगत भारतीय
मानक के अनुeप पैरामीटर को मापने, रकॉड" करने तथा दशा"ने क( सुिवधा होगी:
पर तु, उपभो0ा मीटर म लाइससधारी क( आवoयकता के अनुसार छेड़-छाड़ (टैXपर) से संबिं धत घटनाI को
दज" करने और दशा"ने क( भी सुिवधा हो।
(2) सभी मीटर म नॉन वोलेटाइल मेमोरी म कम से कम 35 8दन के िलए डेटा संrहण .मता होगी।";
(ख) पैरा (3) म,(क) मद (i) और उसके अंतग"त टपण के थान पर िनिलिखत को रखा जाएगा, अथा"त्:"(1)
उपयु0 आयोग के िविनयम या 8दशा-िनदtश के अनुसार अित र0 एंटी-टैXपFरग िवशेषताएं, िजनम धारा
प रपथ को पलटना, धारा प रपथ शाट" अथवा ओपेन अथवा असामा य चुंबक(य .ेW क( उपिथित जैसी छेड़-छाड़ क(
घटनाI को लॉग करना सिXमिलत हो, उपलध कराई जा सकती हS।"
"(i)
"
टपण - माट" मीटर ि1-8दशा<मक है और इसिलए उपयु"Bत (3) (ड.) म उिvलिखत एंटी टैXपर िवशेषता लागू नहp
होगी।";
म, पैरा (1) का लोप 8कया जाएगा।
(v) भाग IV म, पैरा (2) के थान पर िनिलिखत पैरा को रखा जाएगा, अथा"त्:
(iv) भाग IV
संबंिधत उ<पादन कं पनी या लाइससधारी क( एनज? अकाउं Fटग एवं ऑिडट आवoयकताI के आधार पर एनज?
अकाउं Fटग एवं ऑिडट मीटर म सुसंगत भारतीय मानक के अनुeप पैरामीटर को मापने, रकॉड" करने तथा दशा"ने
क( सुिवधा उपलध होगी।"
"(2)
पी.सी. कुरील, सिचव
िव‡ापन III/4/असा./375/19]
[
टपणी: मूल िविनयम,
क(
1ारा भारत के राजपW,
सं 23/47/2014-आर एˆड आर (खंड.III)
अिधसूचना सं 502/70/सीइए/डीपी एंड डी तारीख 22
म कािशत 8कए गए थे और अिधसूचना
तारीख 03 8दसंबर 2014 1ारा अंितम बार संशोिधत 8कये गये थे।
असाधारण, भाग 3, खंड 4
माच",
2006
14
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
CENTRAL ELECTRICITY AUTHORITY
NOTIFICATION
New Delhi, the 23rd December, 2019
No. CEA-GO-13-15/3/2019-DPR Division.—Whereas the draft regulations proposing to amend the Central
Electricity Authority (Installation and Operation of Meters) Regulations, 2006 was published in six newspaper dailies, as
required by sub-section (3) of section 177 of the Electricity Act, 2003 (36 of 2003) read with sub-rule (2) of rule (3) of the
Electricity (Procedure for previous Publication) Rules, 2005, inviting objections and suggestions from all persons likely to
be affected thereby, before the expiry of the period of forty-five days, from the date on which the copies of the newspaper
containing the said publications were made available to the public;
And whereas copies of the said newspapers containing the said regulations were made available to the public on
21st February, 2019;
And whereas the objections and suggestions received from the public on the said draft regulations were
considered by the Central Electricity Authority;
Now, therefore, in exercise of the powers conferred by sub-section (1) of section 55 read with clause
(c) of sub-section (2) of section 177 of the Electricity Act, 2003, the Central Electricity Authority hereby makes the
following regulations further to amend the Central Electricity Authority (Installation and Operation of Meters)
Regulations, 2006, namely: 1.
(1) These regulations may be called the Central Electricity Authority (Installation and Operation of Meters)
(Amendment) Regulations, 2019.
(2) They shall come into force on the date of their publication in the Official Gazette.
2.
In the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 (hereinafter referred to
as the said regulations), in sub-regulation (1) of regulation (2),(i) clause (g), shall be omitted;
(ii) for clause (i), the following clause shall be substituted, namely:“(i) ‘Check Meter’ means a meter, which shall be connected to the same core of the Instrument Transformer
to which main meter is connected and shall be used for accounting and billing of electricity in case of failure
of main meter;”;
(iii)
for clause (j), the following clause shall be substituted, namely:“(j) ‘Consumer Meter’ means a meter used for accounting and billing of electricity supplied to or from the
consumer but excluding those consumers covered under Interface Meters;”;
(iv)
for clause (k), the following clause shall be substituted, namely:“(k) ‘Correct Meter’ means a meter, complying the standards as specified in the Schedule to these
regulations;”;
(v) for clause (m), the following clause shall be substituted, namely:“(m) ‘Instrument Transformer’ means the ‘Current Transformer’ (CT) or ‘Current Transformer’ (CT) and
‘Capacitor Voltage Transformer’ (CVT) or ‘Current Transformer’ (CT) and ‘Inductive Voltage Transformer’
(IVT);”;
(vi)
for clause (n), the following clause shall be substituted, namely:“(n) ‘Interface Meter’ means a meter used for accounting and billing of electricity, connected at the point of
interconnection between electrical systems of generating company, licensee and consumers, directly
connected to the Inter-State Transmission System or Intra-State Transmission System or Distribution System
and who have been permitted open access by the Appropriate Commission;”;
(vii) for clause (p), the following clause shall be substituted, namely:“(p) ‘Meter’ means a device suitable for measuring, indicating and recording the conveyance of electricity or
any other quantity related with electrical system and shall include, wherever applicable, other equipment such
as Instrument Transformer necessary for the purpose of measurement and also mean ‘Correct Meter’, if it
complies with the standards as specified in the Schedule to these regulations;”;
(viii) clause (r), shall be omitted.
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
15
(ix) after clause (t), the following clause shall be inserted, namely:“(ta) ‘Smart Meter’ means a meter as specified in IS 16444 and as amended from time to time;”;
(x) for clause (v), the following clause shall be substituted, namely:“(v) ‘Standby Meter’ means a meter connected to Instrument Transformer, other than those used for main
meter and check meter and shall be used for accounting and billing of electricity in case of failure of both
main meter and check meter;”;
(xi) clauses (x) and (y), shall be omitted.
3.
In the Central Electricity Authority (Installation and Operation of Meters) Amendment Regulations, 2014,
regulation 2 relating to Application shall be omitted.
4.
In regulation 4 of the said regulations, for sub-regulation (1), the following shall be substituted, namely:“(1) (a) all new Interface Meters and Energy Accounting and Audit Meters shall be of static type and shall
have automatic remote meter reading facility;
(b) all new Consumer Meters shall be Smart Meters with prepayment feature:
Provided that the existing meters, other than Smart Meters, shall be replaced with Smart Meters with
prepayment feature within a time frame as specified by the Central Government.”.
5.
In regulation 5 of the said regulations, for clause (a), the following shall be substituted, namely:“(a) comply with the relevant standards of Bureau of Indian Standards (BIS). If BIS Standards are not
available for a particular equipment or material, the relevant International Electro-technical Commission
(IEC) Standards, or any other equivalent Standard shall be followed:
Provided that whenever an IEC Standard or any other equivalent Standard is followed, necessary
corrections or modifications shall be made for nominal system frequency and nominal system voltage
prevailing in India before actual adoption of the said Standard:
Provided further that necessary corrections or modifications for ambient temperature and humidity shall
be made as per the range specified in the Schedule to these regulations.”.
6.
In regulation 6 of the said regulations, in sub-regulation (2), for clause (b), the following shall be substituted,
namely:“(b) If any consumer opts to purchase a meter, the same may be purchased by him as per the technical
specifications laid down by the licensee in compliance with these regulations and meter purchased by the
consumer shall be tested, installed and sealed by the licensee:
Provided that the consumer shall claim the meter purchased by him as his asset only after it is
permanently removed from the system of the licensee.”
7.
In regulation 7 of the said regulations,(i) in sub-regulation (1), for Table-1, the following Table shall be substituted, namely:“Table -1
Sl.
No
(1)
Stages
Main Meter
(2)
1.
Generating Station
2.
Transmission
Check Meter
Standby Meter
(3)
(4)
(5)
On
all
outgoing
feeders
including bus sectionalizer or tie
line between two stages of
generating
stations
having
different tariffs or different
ownership or both
On all outgoing feeders
including
bus
sectionalizer or tie line
between two stages of
generating
stations
having different tariffs or
different ownership or
both
(i)High Voltage
(HV) side of
Generator
Transformers
(ii) High Voltage
side of all Station
Auxiliary
Transformers
and (i)
At one end of the
line between the substations
(i) There shall be
no
separate
16
THE GAZETTE OF INDIA : EXTRAORDINARY
Distribution System
[PART III—SEC. 4]
of the same licensee;
(ii)
At both ends of the
line between substations of
two different licensees:
Provided that meters at both
ends shall be considered as main
meters for respective licensees.
-
3.
Inter-Connecting
Transformer (ICT)
High Voltage (HV) side of ICT.
4.
Consumer
directly
connected to the InterState
Transmission
System or Intra-State
Transmission System or
Distribution System who
has been permitted open
access by the Appropriate
Commission
-
standby meter.
(ii)Meter
installed at other
end of the line in
case of two
different licensees
shall work as
standby meter.
Low
Voltage
(LV) side of ICT.
As decided by the Appropriate Commission.”.
or
any other system
covered above
not
(ii) in sub-regulation (2),(I) in clause (a), in the first proviso, for the words “real time display unit”, the words “in home display unit”
shall be substituted;
(II) for clause (b), the following shall be substituted, namely:“(b) The location of meter and height of meter display from the floor shall be as specified in IS 15707 and as
amended from time to time.”;
(III) for clause (c), the following shall be substituted, namely:“(c) For outdoor installations, the meters shall be protected by appropriate enclosure of level of protection as
specified in the IS 15707 and as amended from time to time.”;
(IV) clause (d) shall be omitted.
(iii) in sub-regulation (3), in clause (i), after sub-clause (a), the following proviso shall be inserted , namely:-
8.
“Provided that in case of Renewable energy generating station, the meter shall be installed at the inverter
Alternating Current (AC) output terminals.”.
In regulation 9 of the said regulations,(i) for sub-regulation (3), the following shall be substituted, namely:“(3) In case of single phase meters, the consumer shall ensure that there is no common neutral or phase or
looping of neutral or phase of two or more consumers on consumers’ side wiring:
Provided that, if such common neutral or phase or looping of neutral or phase comes to the notice of
licensee, it shall suitably inform the consumer through installation report or regular electricity bills or meter
test report or SMS as applicable, as soon as it comes to it’s notice and the same shall be rectified by the
consumer within 15 days from such notice by the licensee.”;
(ii) for sub-regulation (5), the following shall be substituted, namely:“(5) If the earth leakage indication is displayed in the meter, the licensee shall suitably inform the consumer
through installation report or regular electricity bills or meter test report or SMS as applicable, as soon as it
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
17
comes to it’s notice and the same shall be rectified by the consumer within 15 days from such notice by the
licensee.”;
(iii) for sub-regulation (6), the following shall be substituted, namely:-
9.
“(6) In case Instrument Transformer form part of the meters, the meter shall be installed as near as possible to
the Instrument Transformer to reduce the potential drop in the secondary leads.”.
In regulation 12 of the said regulations,(i) in sub-regulation (1), for clause (b), the following shall be substituted, namely:-
“(b) A tracking and recording mechanism for all seals shall be maintained by the licensee so as to track total
movement of seals starting from procurement (with manufacturer’s details), storage, record keeping,
installation, series of inspections and removal.”.
10. In regulation 13 of the said regulations, in sub-regulation (3),(i) For the words “consumer meter”, the words “Consumer Meter” and for the words “real time display”, the words
“in home display” shall be substituted.
11. For regulation 14, the following shall be substituted, namely:“(1) Interface Meters: (a) It shall be the responsibility of the Generating Company or the licensee, in whose
premises the meter has been installed, to download the meter data, record the metered data and furnish such
data to various agencies as per the procedure laid down by the Appropriate Commission:
Provided that the responsibility of maintaining database of all the information associated with the
Interface Meters and verifying the correctness of the metered data shall be in accordance with the procedure
laid down by the Appropriate Commission.
(b) The metered data shall be communicated to the respective Load Despatch Centre by using a secured and
dedicated communication system.
(2) Consumer Meters: (a) It shall be the responsibility of the licensee to download the Meter data either locally
or remotely, record the metered data, maintain database of all the information associated with the Consumer
Meters and verify the correctness of the metered data:
Provided that the Appropriate Regulatory Commission shall specify suitable time frame for ensuring
electronic meter reading of all consumer meters by the licensees.
(b) The licensee shall maintain accounts for the electricity consumption and other electrical quantities of its
consumers:
Provided that the licensee shall provide information to the consumer related to his energy consumption
through Mobile App or Web application or in home display or any other suitable means.
(c) Brief history, date of installation and details of testing, calibration and replacement of meters shall be
maintained by the licensee.
(3) Energy Accounting and Audit Meters.- (a) It shall be the responsibility of the generating company or
licensee to download the meter data locally or remotely, record the metered data, maintain database of all the
information associated with the energy accounting and audit meters and verify the correctness of the metered
data.
(b) Each generating company or licensee shall prepare quarterly, half-yearly and yearly energy account for its
system for taking appropriate action for efficient operation and system development.”.
12. In regulation 15 of the said regulations,(i) in sub-regulation (1) for clauses (a) & (b), the following shall be substituted, namely:“ (a) Whenever difference between the readings of the Main Meter and the Check Meter for any month is more
than 0.5%, the following steps shall be taken:
(i) checking of Instrument Transformers connections;
(ii) testing of accuracy of Interface Meter at site with a reference standard meter of accuracy class higher than
the meter under test;
(iii) based on the test results as specified in items (i) and (ii), corrective action shall be taken to replace the
defective meter.
18
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
(b)
In case of conspicuous failures like burning of meter and erratic display of metered parameters and when
the error found in testing of meter is beyond the permissible limit of error provided in the relevant standard, the
meter shall be replaced immediately:
Provided that whenever an Interface Meter is replaced, it shall be ensured that Interface Meter at the
other end, if any, of the transmission or distribution system, shall have same accuracy class.”;
(ii) in sub-regulation (3), after clause (c), the following shall be inserted, namely:“(d) readings not in conformity with the readings of Interface Meters.”
13. In regulation 17 of the said regulations for sub-regulations (2) and (3), the following shall be substituted, namely:“(2) (a) The licensee shall set up accredited testing laboratories or utilise the services of other accredited testing
laboratories.
(b) The licensee shall take immediate action to get the accreditations for their existing meter testing
laboratories from NABL, if not already done.
(3) The generating company or licensee shall ensure that all type, routine and acceptance tests are carried out
by the manufacturer complying with the requirement of the relevant Indian Standards.”.
14. In regulation 18 of the said regulations,(i) in sub-regulation (1), for clauses (b) and (c), the following shall be substituted, namely: “(b) All Interface Meters shall be tested on-site using accredited test laboratory for routine accuracy testing at
least once in five years and recalibrated if required.
Provided that these meters shall also be tested whenever the energy and other quantities recorded by the
meter are abnormal or inconsistent with electrically adjacent meters.
(c) Testing and calibration of Interface Meters shall be carried out in the presence of the representatives of the
supplier and buyer by giving the advance notice to the other party regarding the date of testing.”;
(ii) for sub-regulations (2) and (3), the following shall be substituted, namely: “(2) Consumer Meters: The testing of Consumer Meters shall be done at site through accredited test laboratory
at least once in five years and recalibrated, if required:
Provided that the licensee instead of testing the meter at site can remove the meter and replace the same
by a meter duly tested in an accredited test laboratory:
Provided further that meter shall be tested if the consumption pattern changes drastically from the
similar months or seasons of the previous years or if there is consumer’s complaint pertaining to a meter:
Provided also that the meter used for testing shall be of better accuracy class than the meter under test.
(3) Energy Accounting and Audit Meters: Energy Accounting and Audit Meters shall be tested at site through
accredited test laboratory at least once in five years or whenever the accuracy is suspected or whenever the
readings are inconsistent with the readings of other meters, e.g., Check Meters, Standby Meters and defective
meters shall be recalibrated, if required:
Provided that the testing shall be carried out without removing the Instrument Transformers
connection.”.
15. Regulation 20 of the said regulations shall be omitted.
16. In the said regulations, after regulation 20 as so omitted, the following regulations shall be inserted, namely: “21. Cyber Security. - Generating Company and licensee shall comply with cyber security guidelines issued by
the Central Government, from time to time, and the technical standards for communication system in Power
Sector laid down by the Authority.
22. Relaxation of Regulations. - The Authority, by order in writing and the reasons to be recorded, may relax
any provision of these regulations in respect of any matters referred to the Authority on case to case basis.”
17. In the Schedule to the said regulations, (a) in part I, (a) for paragraph (1), the following paragraph shall be substituted, namely: “(1) These standards provide for specification of meters, immunity to external factors, sealing points and
functional requirements that are required from regulatory perspective:
Provided that, detailed technical specifications shall be prepared by the Generating Company or licensee, as the
case may be.”;
(b) for paragraph (2), the following paragraph shall be substituted, namely: -
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
2.
“(2) Specification of meters:
Standard Reference Voltage, Voltage Range,
Standard Frequency, Starting Current and
Maximum Current, Power Factor Range, Power
Frequency withstand voltage, Impulse voltage
withstand test for 1.2/50 micro sec, Power
Consumption
Standard Basic Current
3.
Accuracy class
1.
19
As per relevant Indian Standards (IS).
As per relevant IS. Current range of consumer meters shall
be so chosen as to record the load current corresponding to
the sanctioned load.
Meters shall meet the following requirements of Accuracy
Class:
(a) Interface Meters
0.2S
(b) Consumer Meters
(i) Upto 650 Volts Direct 1.0
Connected
(ii) Upto 650 volts CT Class 0.5S as per relevant
IS where separate CTs are
Connected
used
Or
Class 1.0 as per relevant
IS for terminal less direct
connected long current
range meters.
(iii) Above 650 volts and 0.5S
up to 33 kilo volts
0.2S
(iv) Above 33 kilo volts
(c) Energy Accounting and Audit Meters
(i) In generating stations, the accuracy class of meter(s)
at a point after the generator stator terminals, before the
tap off to the unit auxiliary transformer(s) and at the
inverter AC output terminals in case of Renewable
Energy generating station, shall not be inferior to that of
0.2S accuracy class:
Provided that, the accuracy class of other meters shall
not be inferior to that of 1.0S accuracy class.
(ii)The accuracy class of meters in transmission system
shall not be inferior to that of 0.2S accuracy class.
(iii) The accuracy class of meters in distribution system
shall not be inferior to that of 0.5S accuracy class where
separate CTs are used with meter:
Provided that in case of terminal less direct connected
long current range meters accuracy class shall not be
inferior to class 1.0.
4.
Ambient Temperature and Humidity (in case an
International Standard or an IEC Standard is
followed)
(iv) The accuracy class of Energy accounting and Audit
Meters for renewable energy generating station located
at consumer premises shall be same as that of consumer
meter.
Temperature range:
Limit range of operation: -10 °C to +70 °C
Limit range for storage and transport: -10 °C to +70 °C
Relative Humidity: up to 100%
20
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
Note: (1) For Special applications other temperature values
can be used according to agreement between
manufacturer and purchaser.
(2) Operation, storage and transport of the meter at
the extremes of the temperature range should be
for a maximum period of six hours.
5.
Only fundamental frequency quantities shall be measured and computed while measuring Wh and VArh.”;
(c) for paragraph (3), the following paragraph shall be substituted, namely:“(3) Meter shall have one port for downloading facilities of metered data through Common Meter Reading
Instrument (CMRI) and another port/system for remote communication.”;
(d) for paragraph (5), the following paragraph shall be substituted, namely:“(5) Sealing Points: Sealing shall be done at the following points (as applicable):
(a) Meter body with cover (Not applicable if integrated body is used),
(b) Meter terminal cover ,
(c) Meter test terminal block ,
(d) Meter cabinet/ panel,
(e) Instrument Transformer(s) terminal box for metering purpose, and junction box, if any.”;
(e) for paragraph (6), the following paragraph shall be substituted, namely:“(6) (a) The accuracy class of Instrument Transformer shall not be inferior to that of associated meters.
(b) The Instrument Transformer shall comply with relevant Indian Standards.
(c) The existing Instrument Transformer not complying with these regulations shall be replaced by new
Instrument Transformer, if found defective or non-functional.”;
(f) paragraph (7), shall be omitted.
(b) in part II, in paragraph (1),(a) for sub-paragraphs (a) and (b), the following sub-paragraph shall be substituted, namely:“(a) The Interface Meters shall be three phase four wire static type, composite meters, self–contained devices
for measurement of active and reactive energy, and certain other parameters as described in the following
paragraphs:
Provided that, the meters shall be suitable for being connected directly to voltage transformers (VTs)
having a rated secondary line-to-line voltage of 110 V, and to current transformers (CTs) having a rated
secondary current of 1A or 5A:
Provided further that, the reference frequency shall be 50Hz.
(b) The meters shall have a non-volatile memory capable of storing data for a period of at least last ten days
and shall be able to measure following parameters in the manner specified, in addition to those specified in the
relevant Indian Standards:
(i) average frequency for each successive time block upto 2 decimal truncation;
(ii) net Wh transmittal during each successive time block upto two decimal, with plus sign for active power
sent out from station busbars and minus sign for active power received into the busbars;
(iii) cumulative Wh transmittal at each midnight, in eight digits including one decimal;
(iv) cumulative VArh transmittal for voltage high condition, at each midnight, in eight digits including one
decimal;
(v) cumulative VArh transmittal for voltage low condition, at each midnight, in eight digits including one
decimal;
(vi) date and time blocks of failure of VT supply on any phase, as a star(*) mark and (Z) mark in case of
complete voltage failure;
(vii) net VArh transmittal during each successive time block upto two decimal with plus sign for reactive
power sent out from station busbars and minus sign for reactive power received into the busbars;
(viii) average voltage upto 2 decimal truncation:
¹Hkkx IIIµ[k.M 4º
Hkkjr dk jkti=k % vlk/kj.k
21
Provided that the time block for recording of meter data by the meter shall be 15 minutes or as specified
by the Central Commission.”;
(b) sub-paragraph (c) shall be omitted.
(c) sub-paragraph (d), shall be omitted.
(d) for sub-paragraphs (e), (f), (g) and (h), the following sub-paragraphs shall be substituted, namely:“(e) There shall be two reactive energy registers, one for the period when average RMS voltage is above 103%
and the other for the period when the voltage is below 97%.
(f) The Wh recording shall have a +ve sign when there is a net Wh export from substation busbars, and a –ve
sign when there is a net Wh import:
Provided that the integrating (cumulative) registers for Wh and VArh shall move forward when there is
Wh or VArh export from substation busbars, and backward when there is an import.
(g) The meters shall also display (on demand), by turn, the following parameters :
(i) Unique identification number of the meter,
(ii) Date,
(iii) Time,
(iv) Cumulative Wh register reading,
(v) Average frequency of the previous time block,
(vi) Net Wh transmittal in the previous time block, with +/-sign,
(vii) Average percentage voltage,
(viii) Reactive power with +/- sign,
(ix) Voltage-high VArh register reading,
(x) Voltage-low VArh register reading,
(xi) Net VArh transmittal in the previous time block, with +/-sign.
(h) (i) the three line-to-neutral voltages shall be continuously monitored, and in case any of these falls below
80%, the same shall be suitably indicated and recorded in the meter memory.
(ii) the meters shall normally operate with the power drawn from the VT secondary circuits:
Provided that there shall be provision to operate the meters from AC and DC auxiliary power supply.
(iii) each meter shall have a built-in calendar and clock and shall have facility of automatic time
synchronisation.
(iv) the meters shall be properly sealed and tamper evident with no possibility of any adjustment at site.”;
(e) clause (i), shall be omitted;
(f) for sub-paragraph (j), the following sub-paragraph shall be substituted, namely:“(j) The Main Meter and the Check Meter shall be connected to same core of Instrument Transformer.”;
(g) after sub-paragraph (j), the following sub-paragraphs shall be inserted, namely:“(k) All new meters shall have capability of recording frequency in steps of 0.01 Hz.
(l) All new meters shall be re-configurable at site for change of time block as specified by the Central
Commission.”.
(iii) In part III,(a) for paragraphs (1) and (2), the following paragraphs shall be substituted, namely:“(1) The Consumer Meter shall have the facilities to measure, record and display parameters depending upon
the tariff requirement for various categories of consumers in line with the relevant Indian Standards:
Provided that the consumer meter shall also have facility to log and display tamper related events as per
the requirement of licensee.
(2) All meters shall have data storage capacity for at least 35 days in a non-volatile memory.”;
(b)
in paragraph (3), for item (i) and the NOTE thereunder, the following shall be substituted, namely:-
22
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—SEC. 4]
“(i) Additional anti-tampering features including logging of tampers such as current circuit reversal, current
circuit short or open and presence of abnormal magnetic field may be provided as per the regulations or
directions of the Appropriate Commission.
NOTE.- Smart Meter is bi-directional and therefore anti tamper feature stipulated at (3) (e) above shall not be
applicable.”;
(v) Part IV, paragraph (1), shall be omitted;
(v) In Part IV, for paragraph (2), the following paragraph shall be substituted, namely:“(2) The Energy Accounting and Audit Meters shall have the facility to measure, record and display parameters
depending upon the energy accounting and audit requirement of the respective Generating Company or
licensee in line with relevant Indian Standards.”
P. C. KUREEL, Secy.
[ADVT.-III/4/Exty./375/19]
Note: The principal regulations were published in the Gazette of India, Extraordinary, Part III, Section 4, vide
notification No. 502/70/CEA/DP&D, dated the 22nd March, 2006 and last amended vide notification No.
23/47/2014-R&R (Vol.III), dated the 03rd December, 2014.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
MANOJ
KUMAR
and Published by the Controller of Publications, Delhi-110054.
VERMA
Digitally signed by
MANOJ KUMAR
VERMA
Date: 2019.12.27
19:17:28 +05'30'