Uploaded by Mantvydas Bernotas

SX Diamond struktura. Robotech (1)

advertisement
7 Maintenance
7.3
Maintenance schedule
Perform checks and maintenance work in accordance with the specified maintenance intervals in order to ensure the perfect functioning of the product.
Maintenance intervals
The maintenance intervals are in reference to eight-hour daily production duration. Adjust the maintenance intervals as appropriate for longer operating
times.
1
2
4
3
5
Interval
No.
Device under test
Findings
Measures
Time
(17)
Daily
1
Connectors, cables,
hoses
Damaged, leaking
Replace
Daily
2
Jetting head
Extremely dirty
Clean
Daily
3
Nozzle
Irregular, indirect jet
of adhesive
Clean
Daily
3
Nozzle
Damaged, leaking
Replace
Monthly
4
Jetting element
Adhesive drip formation
Replace
Every 6 months
5
Adhesive filter
Extremely dirty (18)
Replace
Tab. 5: Maintenance schedule SX Diamond Jetting Head
17) Enter
the required time for the maintenance work here.
18) Dependent
50
on adhesive type and adhesive temperature.
Assembly instructions SX Diamond Jetting Head - 1.5
Download