7 Maintenance 7.3 Maintenance schedule Perform checks and maintenance work in accordance with the specified maintenance intervals in order to ensure the perfect functioning of the product. Maintenance intervals The maintenance intervals are in reference to eight-hour daily production duration. Adjust the maintenance intervals as appropriate for longer operating times. 1 2 4 3 5 Interval No. Device under test Findings Measures Time (17) Daily 1 Connectors, cables, hoses Damaged, leaking Replace Daily 2 Jetting head Extremely dirty Clean Daily 3 Nozzle Irregular, indirect jet of adhesive Clean Daily 3 Nozzle Damaged, leaking Replace Monthly 4 Jetting element Adhesive drip formation Replace Every 6 months 5 Adhesive filter Extremely dirty (18) Replace Tab. 5: Maintenance schedule SX Diamond Jetting Head 17) Enter the required time for the maintenance work here. 18) Dependent 50 on adhesive type and adhesive temperature. Assembly instructions SX Diamond Jetting Head - 1.5